B08_Attachment_4B_Project_Experience_Questionnaire_.docx

DOCX document 41 KB Posted

Attached to
ORPI 240841 Replace Primary Water System for Maint Federal contract opportunity
Solicitation number
140P2025R0080
Issued by
Department of the Interior National Park Service National Office

About this file

This is a Project Experience Questionnaire template for federal solicitation 140P2025R0080, a Department of the Interior National Park Service contract opportunity for replacing a primary water system for maintenance purposes.

The questionnaire requires offerors to provide detailed information about relevant past projects, including project title, location, description, owner contact information, and agency details. Contractors must list their role (prime or subcontractor), trade specialization, original and final pricing, and performance periods. The form includes seven specific questions that contractors must address: describing work performed, identifying which solicitation elements their experience addresses, explaining any price or schedule changes with reasons, detailing problems encountered and resolutions, describing successful methods and their applicability to the proposed project, and providing additional relevant project information. The referenced contract opportunity involves water distribution system improvements, specifically replacing existing asbestos-cement pipe infrastructure.

View the file

Other files for this federal contract opportunity

Other files attached to ORPI 240841 Replace Primary Water System for Maint, newest first.
File Type Posted
100kTankPower_0010.pdf PDF
40_91_19_Instrumentation_0010.docx DOCX document
432250_-_Flowmeters_0010.doc DOC document
Sol_140P2025R0080_Amd_0010.pdf PDF
432255_-_Water_Meters_with_Automatic_Read_System_0010.docx DOCX document
Amendment_10_Answers_0010.pdf PDF
Sol_140P2025R0080_Amd_0009.pdf PDF
Amendment_08_Q_A_0008.pdf PDF
Sol_140P2025R0080_Amd_0008.pdf PDF
Sol_140P2025R0080_Amd_0007.pdf PDF
Sol_140P2025R0080_Amd_0006.pdf PDF
Sol_140P2025R0080_Amd_0005.pdf PDF
Design_Report_0005.pdf PDF
Q_A_Amd_05_0005.pdf PDF
Sign_in_0005.pdf PDF
Project_Experience_Questionnaire_0005.docx DOCX document
Small_Business_Partcipation_0005.pdf PDF
General_References_0005.pdf PDF
B08_Amendment_04_Q_A_Set_01_0004.pdf PDF
Sol_140P2025R0080_Amd_0004.pdf PDF
Sol_140P2025R0080_Amd_0003.pdf PDF
Sol_140P2025R0080_Amd_0002.pdf PDF
Sol_140P2025R0080_Amd_0001.pdf PDF
B08_Attachment_2a_ORPI_CD_SHEETSET-100_Final_CDs_STAMPED.pdf PDF
B08_Attachment_4A_Solit_VOLUME_I_PSP_Cover.pdf PDF
B08_Attachment_4D_Solit_PSP_Vol_I_PastPerf_REQD(1).pdf PDF
B08_Attachment_7_Geotech_Replace_Primary_Park_Water_Systems_FINAL.pdf PDF
B08_Attachment_8_Hydrogeologic_Assessment.pdf PDF
B08_Attachment_3_ORPI_Wage_Determination.pdf PDF
B08_Attachment_1b_ORPI_Final_CDs_Division_2_Specifications_7_31_25.pdf PDF
B08_Attachment_6_Construction_Contract_Administration.pdf PDF
B08_Attachment_4C__Key_Personnel_Resume_Form.pdf PDF
B08_Attachment_5A_Solit_VOLUME_II_PSP_Cover.pdf PDF
B08_Attachment_5B_SF24-23a.pdf PDF
B08_Attachment_5C_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Attachment_5D_ORPI_240821_ContractPriceSchedule.xlsx XLSX spreadsheet
B08_Attachment_9__Water_System_Basis_Design_Report_SD_Submittal.pdf PDF
B08_Attachment_10_140P2025R0080_Q_A_sheet.xlsx XLSX spreadsheet
Sol_140P2025R0080.pdf PDF
B08_Attachment_2b_ORPI_CD_SHEETSET-100_Final_CDs_STAMPED.pdf PDF
B08_Attachment_1a_ORPI_Final_CDs_DIV_1_Specifications.pdf PDF
B08_1442_Clause_Package_P2025R0080_7_31_25.pdf PDF
B08_Attachment_5E_LmtOnSubconRpt_REQD.xlsx XLSX spreadsheet
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Experience Questionnaire Solicitation: 140P2025R0080

Submit responses to the questions below that address experience relative to the elements noted under the Project Experience evaluation subfactor in Solicitation Section L. Limit submittals to the quantity of projects and timeframes required in the solicitation. Expand the response sections shown below as needed to adequately address each question (this questionnaire may be expanded to multiple pages if needed).

Offeror
Company Name

REFERENCED PROJECT INFORMATION

Project Title
Title
Project Location
City, State
Brief Project Description
Description
Project Owner
Company Name
POC:
First & Last Name
Phone:
(XXX) XXX-XXXX
Agency
Agency Name
POC:
First & Last Name
Phone:
(XXX) XXX-XXXX

CONTRACTOR LIST

List contractor(s) whose experience on the referenced project is being submitted for evaluation on this proposed project. If more than one contractor is listed (e.g., prime and subcontractors), provide information specific to that contractor.

Contractor Name
Role on Referenced Project

(Prime or Sub)

Trade
Price

(list for each contractor’s specific work) Performance Period (calendar days) (list for each contractor’s specific work)

Original
Final
Original
Final
XXX
Prime
Prime
$XXX,XXX
$X,XXX,XXX
XXX
XXX
XXX
Subcontractor
Plumbing & Mechanical
$X,XXX,XXX
$X,XXX,XXX
XXX
XXX

Subcontractor

PROJECT EXPERIENCE QUESTIONS

1. Describe the project work performed by all contractors listed above.

Response

2. Identify which Project Experience elements listed in section L of the solicitation each contractor’s work addresses.

Response

3. Describe & provide reasons for any changes to the original price for the work described in question 2 above.

Response

4. Describe and provide reasons for any changes to the original schedule for the work described in question 2 above.

Response

5. Describe problems, associated with the work described in question 2 above, which were encountered and how they were resolved. Describe how the offeror’s proposal accounts for similar issues.

Response

6. Describe the means and methods, associated with the work described in question 2 above, which were successful. Would you implement the same means and methods on the proposed project? Why or why not?

Response

7. Provide any other additional project information you believe should be presented.

Response

File details come from the government source that posted it. Updated .