About this file

This document is a technical specification section for flowmeters, specifically detailing requirements for floating-ball flowmeters and associated transmitters for a water system project. The specification covers flowmeter performance requirements, including an accuracy of plus or minus 1.5%, flow range of 0.75 to 120 gallons/minute, and operational temperatures from -22 to 150 degrees F. The flowmeters are intended for three raw water wells (Wells 4, 6, and 7), each with a 1.5-inch size and 0-0.17 MGD range, utilizing integral high standard transmitters.

Key technical specifications include stainless steel body, titanium shaft, 150 psig pressure rating, and digital encoder output with capabilities for dual range switching, bi-directional flow indication, and simultaneous digital flow rate and totalization displays. Installation requirements mandate vertical pipe mounting with upward flow, full pipe conditions, and separate conduits for signal and power wiring. The specification also mandates factory calibration with a submitted calibration report and requires field verification using pitot testing to ensure specified flow accuracy.

View the file

Other files for this federal contract opportunity

Other files attached to ORPI 240841 Replace Primary Water System for Maint, newest first.
File Type Posted
Sol_140P2025R0080_Amd_0010.pdf PDF
432255_-_Water_Meters_with_Automatic_Read_System_0010.docx DOCX document
Amendment_10_Answers_0010.pdf PDF
100kTankPower_0010.pdf PDF
40_91_19_Instrumentation_0010.docx DOCX document
Sol_140P2025R0080_Amd_0009.pdf PDF
Sol_140P2025R0080_Amd_0008.pdf PDF
Amendment_08_Q_A_0008.pdf PDF
Sol_140P2025R0080_Amd_0007.pdf PDF
Sol_140P2025R0080_Amd_0006.pdf PDF
Small_Business_Partcipation_0005.pdf PDF
General_References_0005.pdf PDF
Sol_140P2025R0080_Amd_0005.pdf PDF
Design_Report_0005.pdf PDF
Project_Experience_Questionnaire_0005.docx DOCX document
Q_A_Amd_05_0005.pdf PDF
Sign_in_0005.pdf PDF
Sol_140P2025R0080_Amd_0004.pdf PDF
B08_Amendment_04_Q_A_Set_01_0004.pdf PDF
Sol_140P2025R0080_Amd_0003.pdf PDF
Sol_140P2025R0080_Amd_0002.pdf PDF
Sol_140P2025R0080_Amd_0001.pdf PDF
Sol_140P2025R0080.pdf PDF
B08_Attachment_2b_ORPI_CD_SHEETSET-100_Final_CDs_STAMPED.pdf PDF
B08_Attachment_1a_ORPI_Final_CDs_DIV_1_Specifications.pdf PDF
B08_1442_Clause_Package_P2025R0080_7_31_25.pdf PDF
B08_Attachment_4B_Project_Experience_Questionnaire_.docx DOCX document
B08_Attachment_5E_LmtOnSubconRpt_REQD.xlsx XLSX spreadsheet
B08_Attachment_2a_ORPI_CD_SHEETSET-100_Final_CDs_STAMPED.pdf PDF
B08_Attachment_4A_Solit_VOLUME_I_PSP_Cover.pdf PDF
B08_Attachment_4D_Solit_PSP_Vol_I_PastPerf_REQD(1).pdf PDF
B08_Attachment_7_Geotech_Replace_Primary_Park_Water_Systems_FINAL.pdf PDF
B08_Attachment_8_Hydrogeologic_Assessment.pdf PDF
B08_Attachment_4C__Key_Personnel_Resume_Form.pdf PDF
B08_Attachment_5A_Solit_VOLUME_II_PSP_Cover.pdf PDF
B08_Attachment_5B_SF24-23a.pdf PDF
B08_Attachment_5C_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Attachment_5D_ORPI_240821_ContractPriceSchedule.xlsx XLSX spreadsheet
B08_Attachment_9__Water_System_Basis_Design_Report_SD_Submittal.pdf PDF
B08_Attachment_10_140P2025R0080_Q_A_sheet.xlsx XLSX spreadsheet
B08_Attachment_3_ORPI_Wage_Determination.pdf PDF
B08_Attachment_1b_ORPI_Final_CDs_Division_2_Specifications_7_31_25.pdf PDF
B08_Attachment_6_Construction_Contract_Administration.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Copyright 2013 by The American Institute of Architects (AIA)

Exclusively published and distributed by AVITRU, LLC for the AIA

SECTION 43 22 50 – FLOWMETERS

Revise this Section by deleting and inserting text to meet Project-specific requirements.

This Section uses the term "Architect." Change this term to match that used to identify the design professional as defined in the General and Supplementary Conditions.

PART 1 - GENERAL

1.1 SUMMARY

A. This section describes the requirements for floating-ball flowmeters and associated transmitters.

1.2 PERFORMANCE REQUIREMENTS

A. Provide instruments capable of meeting the following performance requirements when installed in accordance with the manufacturer’s recommendations:

1. Measured accuracy within plus or minus 1.5% of rate (standard).

2. Warm up time not to exceed 10 minutes.

3. Flow range: 0.75 to 120 gallons/minute. Normal operating velocities 0.5 to 5 feet/second.

4. Electronics ambient temperature -22 to 150 degrees F.

PART 2 - PRODUCTS

2.1 PRIMARY ELEMENT

A. Meet the following requirements unless noted otherwise on the instrument schedule.

1. Shall meet AWWA Standard C701.

2. Flowmeter body and flanges: 304 Stainless Steel

3. Floating ball impeller with coated titanium shaft and hybrid axial bearings.

4. Process connection: flanges, rated 150 psig.

5. Maximum fluid pressure 150 psig.

6. Maximum fluid temperature with integral electronics, 80 degrees F.

B. Nominal size shall be as identified in the meter schedule in Part 3 of this Section.

2.2 AMPLIFIER/TRANSMITTER

A. Meet the following requirements unless noted otherwise on the instrument schedule.

1. Design: Digital Encoder Output

2. The amplifier/transmitter shall be integrally mounted.

3. The amplifier/transmitter shall be capable of automatic dual range switching and bi-directional flow indication.

4. Display:

a. Provide simultaneous digital indication of flow rate in percent of span or engineering units and totalization in engineering units.

b. Totalizers shall be provided for forward, reverse, and differential flow.

c. Integrally mounted on the primary element.

d. Characters 6 mm or larger.

5. Outputs:

a. Isolated 4-20 mA for use by the supervisory control system.

b. Open collector scaleable pulse output rated 30 Vdc for each direction.

6. Alarms: High and low; adjustable set-points; isolated output SPDT contacts, 2 A 120 Vac.

7. Enclosure: NEMA 4 rated enclosure.

8. Incoming Power: 120 Vac 60Hz, 50 watts, or less

9. Signal: Manufacturer’s sensor cable connection direct from sensor to instrument housing via flexible weather-proof conduit.

10. Provide separate conduits for signal and power wiring to the meter and between the transmitter and control panel. Meter shall be grounded in accordance with manufacturer's instructions.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Verify exact mounting location and orientation with factory trained field representative.

B. Never install a meter where gas can collect or a line can self-drain when flow stops.

C. Install meters where the pipe remains full at all times.

D. Install meters in vertical pipes where flow is upward.

E. Install separate conduits for signal and power wiring to the meter and between the transmitter and control panel. All flow meter cable lengths shall be confirmed prior to installation.

F. Ground the meter in accordance with manufacturer’s instructions.

3.2 FLOW METER CALIBRATION

A. Factory Calibration: Flow calibration of the flow meter shall be performed in the Factory and the calibration report submitted as part of the Shop Drawings.

B. Field Verification: Field verification of the factory calibration shall take place once the flow meter and piping installations are complete. Corporation stops shall be provided for calibration verification using pitot testing. Recalibrate the flow meter as necessary until specified flow accuracy is attained.

3.3 SCHEDULE

Tag
Description
Size (in)
Range (MGD)
Transmitter
Accuracy
Setting
FE-RW-4
Well 4 Raw Water
1.5
0 – 0.17
Integral
High
Standard
FE-RW-6
Well 6 Raw Water
1.5
0 – 0.17
Integral
High
Standard
FE-RW-7
Well 7 Raw Water
1.5
0 – 0.17
Integral
High
Standard

Retain this article if erosion- and sedimentation-control measures are not included in Section 015000 “Temporary Facilities and Controls.”

Insert specific procedures or installation requirements for temporary soil protection and stabilization, erosion controls, stormwater runoff controls, and sedimentation controls.

END OF SECTION 432250