About this file

This Basis of Design Report (BDR) details the rehabilitation of primary water systems for Organ Pipe Cactus National Monument in Ajo, Arizona, with Project Management Information System (PMIS) number 240821. The document outlines specific design considerations for water infrastructure, including service lines, pipe replacement, and water tank design. Key technical specifications include using HDPE (PEX) pipe for domestic service lines, Type K copper for above-grade portions, and glass-fused steel tanks. The design prioritizes minimizing environmental impact, with careful consideration of existing asbestos concrete pipes, which will remain in place to comply with State Historic Preservation Office recommendations. Water tank sizing will account for average daily demand, equalization volume, fire storage volume, potential backwash filter volume, and a 10% dead storage volume, based on two years of National Park Service meter readings.

View the file

Other files for this federal contract opportunity

Other files attached to ORPI 240841 Replace Primary Water System for Maint, newest first.
File Type Posted
100kTankPower_0010.pdf PDF
40_91_19_Instrumentation_0010.docx DOCX document
432250_-_Flowmeters_0010.doc DOC document
Sol_140P2025R0080_Amd_0010.pdf PDF
432255_-_Water_Meters_with_Automatic_Read_System_0010.docx DOCX document
Amendment_10_Answers_0010.pdf PDF
Sol_140P2025R0080_Amd_0009.pdf PDF
Amendment_08_Q_A_0008.pdf PDF
Sol_140P2025R0080_Amd_0008.pdf PDF
Sol_140P2025R0080_Amd_0007.pdf PDF
Sol_140P2025R0080_Amd_0006.pdf PDF
Sol_140P2025R0080_Amd_0005.pdf PDF
Q_A_Amd_05_0005.pdf PDF
Sign_in_0005.pdf PDF
Project_Experience_Questionnaire_0005.docx DOCX document
Small_Business_Partcipation_0005.pdf PDF
General_References_0005.pdf PDF
B08_Amendment_04_Q_A_Set_01_0004.pdf PDF
Sol_140P2025R0080_Amd_0004.pdf PDF
Sol_140P2025R0080_Amd_0003.pdf PDF
Sol_140P2025R0080_Amd_0002.pdf PDF
Sol_140P2025R0080_Amd_0001.pdf PDF
B08_Attachment_2a_ORPI_CD_SHEETSET-100_Final_CDs_STAMPED.pdf PDF
B08_Attachment_4A_Solit_VOLUME_I_PSP_Cover.pdf PDF
B08_Attachment_4D_Solit_PSP_Vol_I_PastPerf_REQD(1).pdf PDF
B08_Attachment_7_Geotech_Replace_Primary_Park_Water_Systems_FINAL.pdf PDF
B08_Attachment_8_Hydrogeologic_Assessment.pdf PDF
B08_Attachment_3_ORPI_Wage_Determination.pdf PDF
B08_Attachment_1b_ORPI_Final_CDs_Division_2_Specifications_7_31_25.pdf PDF
B08_Attachment_6_Construction_Contract_Administration.pdf PDF
B08_Attachment_4C__Key_Personnel_Resume_Form.pdf PDF
B08_Attachment_5A_Solit_VOLUME_II_PSP_Cover.pdf PDF
B08_Attachment_5B_SF24-23a.pdf PDF
B08_Attachment_5C_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Attachment_5D_ORPI_240821_ContractPriceSchedule.xlsx XLSX spreadsheet
B08_Attachment_9__Water_System_Basis_Design_Report_SD_Submittal.pdf PDF
B08_Attachment_10_140P2025R0080_Q_A_sheet.xlsx XLSX spreadsheet
Sol_140P2025R0080.pdf PDF
B08_Attachment_2b_ORPI_CD_SHEETSET-100_Final_CDs_STAMPED.pdf PDF
B08_Attachment_1a_ORPI_Final_CDs_DIV_1_Specifications.pdf PDF
B08_1442_Clause_Package_P2025R0080_7_31_25.pdf PDF
B08_Attachment_4B_Project_Experience_Questionnaire_.docx DOCX document
B08_Attachment_5E_LmtOnSubconRpt_REQD.xlsx XLSX spreadsheet
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ORGAN PIPE CACTUS NATIONAL MONUMENT

AJO, AZ

REHABILITATE PRIMARY PARK WATER SYSTEMS

ORPI

PMIS: 240821

BASIS OF DESIGN REPORT (BDR)

NATIONAL PARK SERVICE (NPS)

DENVER SERVICE CENTER (DSC)

CAD

Highlight existing trench as much as possible to reduce impacts, but maintain an adequate setback from existing asbestos concrete pipe to prevent disturbing pipe.

e. Service lines: Domestic service lines will be HDPE (PEX) pipe except for any above grade portions which will be Type K copper.

Directional drilling was considered for the campground area, but open trenching is preferred to the following factors;

i. Directional Drilling (DD) requires water main to be 6-ft deep minimum. Location of water main would be below an area rich in vegetation as well as concrete campsite pads and shade structures. Exposing pipe for emergency repairs would create a large impact that should be avoided.

ii. DD is preferred in locations where tees and services are minimal. Campground requires multiple tees for comfort station and spigots, therefore each location would need to be exposed reducing any efficiency or impact gains created by the DD method.

f. Asbestos Concrete Pipe Removal and Disposal:

i. Per Arizona Department of Environmental Quality (ADEQ) as long as AC pipe is not made friable, it’s handling, and disposal is not regulated.

ii. Project specifications will state that contractor is not to crush, saw, pulverize, or otherwise make AC pipe friable.

iii. Per State Historic Preservation Office (SHPO), existing water system dates from the Mission 66 era (1960s) and is therefore considered historic. SHPO recommends pipe remain in the ground to prevent the need for SHPO compliance.

iv. Design is locating new water mains in locations where direct impacts to AC pipe will be minimized and AC pipe can remain in current location with minimal disturbance.

2. Water Tank Sizing: Proposed water tanks will be sized as follows;

a. Provide the average daily demand during the peak month, plus

i. Average daily demand is based on meter readings provided by NPS for a 2 year period.

b. An equalization volume equal to the average daily demand, plus

c. Fire Storage Volume based on NFPA 1142, plus

d. Backwash Filter volume (if applicable), and

e. Dead storage volume of approximately 10% at the top of the tank

3. Water Tank Design

a. Proposed water tanks will be designed to minimize maintenance and improve monitoring capability. No specific performance of the tanks needs to be improved.

Specific requirements include;

i. Tanks will be glass-fused steel tanks

CAD

Highlight

CAD

Highlight

File details come from the government source that posted it. Updated .