B08_Attachment_5A_Solit_VOLUME_II_PSP_Cover.pdf

PDF 151 KB Posted

Attached to
ORPI 240841 Replace Primary Water System for Maint Federal contract opportunity
Solicitation number
140P2025R0080
Issued by
Department of the Interior National Park Service National Office

About this file

This is Volume II (Business & Price) of a Request for Proposal (RFP) proposal submission package template for Organ Pipe Cactus National Monument. The solicitation number is 140P2024R0150 for replacing the primary waterline for the maintenance and housing area, with project code ORPI 240821, issued by the National Park Service Denver Service Center.

The document provides a template checklist for proposal submission requirements, directing offerors to revise the list based on the specific solicitation's sections L and M. For Technical Volume I, it lists potential requirements including Experience Questionnaire, Key Personnel Qualifications, and Past Performance Questionnaire if specifically required. For Business & Price Volume II, it outlines requirements such as SF 24 Bid Bond for competitive solicitations, Contract Price Schedule matching section B of the solicitation, General References for contractor responsibility checks if needed, and Report on Limitation on Subcontracting for socioeconomic sole source and set-aside solicitations. This appears to be a standard template document rather than the actual solicitation with specific requirements, deadlines, or pricing information.

View the file

Other files for this federal contract opportunity

Other files attached to ORPI 240841 Replace Primary Water System for Maint, newest first.
File Type Posted
432250_-_Flowmeters_0010.doc DOC document
100kTankPower_0010.pdf PDF
40_91_19_Instrumentation_0010.docx DOCX document
Sol_140P2025R0080_Amd_0010.pdf PDF
432255_-_Water_Meters_with_Automatic_Read_System_0010.docx DOCX document
Amendment_10_Answers_0010.pdf PDF
Sol_140P2025R0080_Amd_0009.pdf PDF
Sol_140P2025R0080_Amd_0008.pdf PDF
Amendment_08_Q_A_0008.pdf PDF
Sol_140P2025R0080_Amd_0007.pdf PDF
Sol_140P2025R0080_Amd_0006.pdf PDF
Sol_140P2025R0080_Amd_0005.pdf PDF
Design_Report_0005.pdf PDF
Project_Experience_Questionnaire_0005.docx DOCX document
Q_A_Amd_05_0005.pdf PDF
Sign_in_0005.pdf PDF
Small_Business_Partcipation_0005.pdf PDF
General_References_0005.pdf PDF
Sol_140P2025R0080_Amd_0004.pdf PDF
B08_Amendment_04_Q_A_Set_01_0004.pdf PDF
Sol_140P2025R0080_Amd_0003.pdf PDF
Sol_140P2025R0080_Amd_0002.pdf PDF
Sol_140P2025R0080_Amd_0001.pdf PDF
B08_Attachment_2a_ORPI_CD_SHEETSET-100_Final_CDs_STAMPED.pdf PDF
B08_Attachment_4A_Solit_VOLUME_I_PSP_Cover.pdf PDF
B08_Attachment_4D_Solit_PSP_Vol_I_PastPerf_REQD(1).pdf PDF
B08_Attachment_7_Geotech_Replace_Primary_Park_Water_Systems_FINAL.pdf PDF
B08_Attachment_8_Hydrogeologic_Assessment.pdf PDF
B08_Attachment_4C__Key_Personnel_Resume_Form.pdf PDF
B08_Attachment_5B_SF24-23a.pdf PDF
B08_Attachment_5C_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Attachment_5D_ORPI_240821_ContractPriceSchedule.xlsx XLSX spreadsheet
B08_Attachment_9__Water_System_Basis_Design_Report_SD_Submittal.pdf PDF
B08_Attachment_10_140P2025R0080_Q_A_sheet.xlsx XLSX spreadsheet
B08_Attachment_3_ORPI_Wage_Determination.pdf PDF
B08_Attachment_1b_ORPI_Final_CDs_Division_2_Specifications_7_31_25.pdf PDF
B08_Attachment_6_Construction_Contract_Administration.pdf PDF
Sol_140P2025R0080.pdf PDF
B08_Attachment_2b_ORPI_CD_SHEETSET-100_Final_CDs_STAMPED.pdf PDF
B08_Attachment_1a_ORPI_Final_CDs_DIV_1_Specifications.pdf PDF
B08_1442_Clause_Package_P2025R0080_7_31_25.pdf PDF
B08_Attachment_4B_Project_Experience_Questionnaire_.docx DOCX document
B08_Attachment_5E_LmtOnSubconRpt_REQD.xlsx XLSX spreadsheet
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ORGAN PIPE CACTUS

NATIONAL MONUMENT

Solicitation #140P2024R0150

REPLACE PRIMARY WATERLINE FOR

MAITENANCE AND HOUSING AREA

VOLUME II – BUSINESS & PRICE

ORPI 240821

REQUEST FOR PROPOSAL

(RFP)

Proposal Submission Package

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

Revise the list below per the specific solicitation’s sections L and M.

For Technical Volume I:

(Include the following questionnaires if they are specifically required by section L or M of the solicitation)

1. Experience Questionnaire

2. Key Personnel Qualifications

3. Past Performance Questionnaire

For Business & Price Volume II:

1. SF 24 Bid Bond (include for competitive solicitations)

2. Contract Price Schedule (should match the price schedule shown in section “B” of the solicitation)

3. General References (include if needed for check of contractor responsibility)

4. Report on Limitation on Subcontracting (Include for socio-economic sole source and set-aside solicitations)

File details come from the government source that posted it. Updated .