This is a set of construction design documents for residential buildings at Yellowstone National Park, consisting of architectural and structural plans prepared by Stantec for the National Park Service.
The documents include electrical plans, foundation plans, and foundation details for two-bedroom, three-bedroom, and three-bedroom ADA-compliant residential structures. The electrical plan (E101D) shows circuits, outlets, switches, lighting, and data connectivity for a 3-bedroom ABA unit, with specifications for GFCI protection, receptacles at 5 feet above floor, strobe lights, and garage door openers. The structural drawings (S001, S101, S111, S201, S211, S500, S501) provide general notes citing the 2021 International Building Code and ASCE/SEI 7-22 standards; foundation plans showing concrete footings, stem walls, and pedestals at specified spacing; and detailed foundation elements including reinforcement schedules, hook geometry, splice lengths, typical footing intersections, wall penetrations, excavation requirements, and crawlspace access provisions. All plans note that this is preliminary documentation not for construction and reference geotechnical reports by McGettigan Consulting establishing bearing pressures of 1,500 PSF, soil classifications by location (Mammoth, Canyon, NE Entrance), and wind speeds of 107 MPH ultimate. The contractor is responsible for temporary shoring, dewatering, coordinating with other trades, and confirming adequacy of as-built structures. Special inspections are required for reinforcement, concrete placement, and fill materials per ACI 318-19 and IBC standards.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R a n g e
R e fr ig e ra to r
D W
M ic ro w a v e
WH
FD
SD
SD
SD
SD/CO
SD
SD/CO
A
B
C
2 3
UC
UC
RECEPTACLE & DATA
JACK @ 5' ABOVE FLOOR
SWITCH, RECEPTACLE,
& LIGHT IN FLOOR
JOISTS ADJACENT TO
CRAWL SPACE ACCESS
STROBE LIGHT
GARAGE OPENER;
PUSH BUTTON
GARAGE OPENER;
KEYPAD
ALL WALL JACK
CABLES ROUTED TO
JUNCTION BOX
GFCI
DRYER
WSHR
GFCI
GFCI
REFRIGERATOR GFCI
GFCI
MICRO GFCI
GFCI
RANGE GFCI
GFCI
GFCI
GFCI
P R
E P
IS
LA
N D
F O
R O
U T
LE
T
S
W P
G F
C I
GFCI
GFCI
GFCI
GFCI
A
B
C
PRELIMINARY
NOT FOR
CONSTRUCTION
Not for permits, pricing or other official purposes. This document has not been completed or checked and is for general information or comment only.
YELLOWSTONE NATIONAL PARK
TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.SUB SHEET NO.DESIGNED:
JC
CADD:
BB/PS/AS
TECH. REVIEW:
LF
DATE:
A/E: FIRM
PRIME:
STANTEC
CHEYENNE, WY
SHEET
OF
P
LO
T D
A
TE
R
E V
IT
V
E R
SI
O
N
198433
:3
:4
P M
A u to d e sk
D o c s:
/1
Y
E L L N
P S a rc h b d r_ a d a .r v t
3BR ABA ELECTRICAL
PLAN
326141E101D
06/12/2026
1/4" = 1'-0"E101D
A1 ELECTRICAL PLAN
06/18/2026
X-X SLAB STEP/ DEPRESSION
SLOPE UP
SLOPE DOWN
RIDGE
VALLEY
REVISION NUMBER
ELEVATION
SECTION MARK
ELEVATION MARK
GRID BUBBLE
S301
S201
SLAB THICKNESS CHANGE
DETAIL MARK0
S501
1.
A.
B.
C.
D.
E.
2.
3.
4.
A.
B.
V. CONCRETE JOINTS:
CONSTRUCTION JOINTS SHALL BE INSTALLED SUCH THAT STRENGTH AND APPEARANCE OF CONCRETE ARE NOT IMPAIRED, AT LOCATIONS INDICATED OR AS APPROVED BY THE ARCHITECT. SEE PROJECT
SPECIFICATIONS FOR LIMITS ON LOCATION AND SPACING.
LOCATE JOINTS FOR BEAMS, SUSPENDED SLABS, JOISTS AND GIRDERS IN THE MIDDLE THIRD OF SPANS.
OFFSET JOINTS IN GIRDERS A MINIMUM DISTANCE OF TWICE THE BEAM WIDTH FROM A BEAM-GIRDER
INTERSECTION.
LOCATE HORIZONTAL JOINTS IN WALLS AND COLUMNS AT THE UNDERSIDE OF FLOORS, SLABS, BEAMS, AND GIRDERS AND AT THE TOP OF FOOTINGS OR FLOOR SLABS, OR AT 40-FEET MAXIMUM HEIGHT, UNLESS PERMITTED BY ENGINEER.
LOCATE VERTICAL JOINTS IN WALLS AT DISCONTINUITIES, BESIDES PILES INTEGRAL WITH WALLS, NEAR
REENTRANT CORNERS, AND IN CONCEALED LOCATIONS WHERE POSSIBLE. PREFERRED JOINT
INTERVALS SHALL BE 15-25 FEET AS APPROPRIATE, WITH A MAXIMUM SPACING OF 30-FEET. AVOID
LOCATING VERTICAL JOINTS WITHIN 15-FEET OF A BUILDING CORNER.
LAYOUT OF CONSTRUCTION JOINTS IN SLABS ON GRADE MAY CORRESPOND WITH CONTRACTION JOINTS.
LEAVE 7 DAYS, MINIMUM, BETWEEN ADJACENT POURS IN WALLS, UNLESS APPROVED BY ENGINEER.
SLAB ON GRADE CONTRACTION JOINTS SHALL BE PROVIDED TO CONTROL THE CRACKING
PATTERNS AT LOCATIONS INDICATED, OR AS APPROVED BY THE ARCHITECT.
LOCATE JOINTS AT COLUMN LINES WHERE APPLICABLE, WITH SPACING NOT TO EXCEED 15-FEET AND RATIO OF LONG TO SHORT SIDE OR POUR NOT TO EXCEED 1.5. MAXIMUM RECTANGULAR SLAB AREA CONTROLLED BY JOINTING NOT TO EXCEED 225 SQUARE-FEET. CONTRACTOR OPTION TO FORM EITHER SAWCUT OR
TOOLED JOINTS.
WALL CONTRACTION JOINTS SHALL BE PROVIDED TO CONTROL THE CRACKING PATTERNS AT LOCATIONS
INDICATED, OR AS APPROVED BY THE ARCHITECT.
LOCATE JOINTS AT COLUMN LINES WHERE APPLICABLE, WITH SPACING NOT TO EXCEED TWICE THE WALL
HEIGHT OR 20-FEET AND PREFERABLY MATCHES LAYOUT OF SLAB JOINTING.
FORM CONTRACTION JOINTS FOR A DEPTH EQUAL TO AT LEAST ONE-FOURTH OF CONCRETE WALL THICKNESS BY ATTACHING 1/2"- WIDE BEVELED WOOD STRIPS TO INSIDE OF BOTH SIDES OF CONCRETE
FORM.
1.
2.
A.
a.
b.
B.
C.
A.
B.
C.
A.
B.
C.
D.
E.
F.
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
A.
B.
C.
D.
a.
b.
E.
a.
b.
F.
G.
H.
I.
J.
II. DESIGN LOADS:
DEAD LOAD: THE SELF WEIGHT OF THE STRUCTURE.
SUPERIMPOSED DEAD LOAD:
ROOF LEVEL:
ROOFING 7 PSF
CEILING 5 PSF
FLOOR: 10 PSF
WALL: 8 PSF
3. LIVE LOAD:
ROOF: 20 PSF
FLOOR: 100 PSF
PARTITIONS: 10 PSF
4. SNOW LOAD:
GROUND SNOW LOAD (Pg) = 72 PSF (MAMMOTH), 262 PSF (CANYON) 238 PSF
(NE ENTRANCE)
SNOW IMPORTANCE FACTOR (I): 1.0
ROOF EXPOSURE CONDITION: FULLY EXPOSED
THERMAL FACTOR (Ct) = 1.2 FLAT-ROOF SNOW LOAD (Pf) = 54 PSF (MAMMOTH), 198 PSF (CANYON), 180 PSF
(NE ENTRANCE)
WINTER WIND PARAMETER: 0.35 (MAMMOTH & CANYON), 0.45 (NE ENTRANCE)
5. WIND LOAD
ULTIMATE DESIGN BASIC WIND SPEED V(ult) = 107 MPH NOMINAL DESIGN WIND SPEED V(asd) = 65 MPH
RISK CATEGORY = II
WIND IMPORTANCE FACTOR = 1.0
WIND EXPOSURE CATEGORY = B
ENCLOSURE CATEGORY: ENCLOSED
INTERNAL PRESSURE COEFFICIENT (GCPi): +/- 0.18
GUST EFFECT FACTOR (G): 0.85
SITE TOPOGRAPHIC FACTOR Kzt = 1.0 GROUND ELEVATION FACTOR Ke = 1.0
6. SEISMIC LOAD
SITE CLASS = C
RISK CATEGORY = II
SEISMIC IMPORTANCE FACTOR = 1.0
MAPPED SPECTRAL RESPONSE
SHORT PERIOD SS = 1.0 g (MAMMOTH), 1.1 g (CANYON), 065 g (NE ENTRANCE) 1-SECOND PERIOD S1 = 0.28 g (MAMMOTH), 0.3 g (CANYON), 0.18 g (NE ENTRANCE)
DESIGN SPECTRAL RESPONSE (5% DAMPED)
SHORT PERIOD SDS = 0.83 g (MAMMOTH), 0.89 g (CANYON), 0.56 g (NE ENTRANCE) 1-SECOND PERIOD SD1 = 0.48 g (MAMMOTH), 0.51 g (CANYON), 0.31 g (NE ENTRANCE)
SEISMIC DESIGN CATEGORY: D
RESPONSE MODIFICATION FACTOR R = 6.5
OVERSTRENGTH FACTOR Ωo = 3.0 DEFLECTION AMPLIFICATION FACTOR Cd = 4.0 REDUNDANCY FACTOR ρ = 1.0
1.
2.
3.
4.
5.
6.
7.
8.
9.
III. FOUNDATIONS:
FOUNDATION DESIGN CRITERIA ARE BASED ON THE GEOTECHNICAL REPORT BY McGETTIGAN CONSULTING LLC, DATED AUGUST 4, 2017 PROJECT NO. 15000701. COPIES ARE AVAILABLE FOR REVIEW AT THE
ARCHITECT'S OFFICE.
FOOTINGS ARE DESIGNED BASED ON AN ALLOWABLE SOIL BEARING PRESSURE OF 1500 PSF. THE
ALLOWABLE BEARING MAY BE INCREASED BY ONE THIRD FOR WIND OR SEISMIC.
PER GEOTECHNICAL REPORT FOR NE ENTRANCE AREA, ULTIMATE COEFFICIENT OF SLIDING FRICTION IS
0.40. ULTIMATE NATIVE SOIL PASSIVE RESISTANCE IS 400 PCF. ULTIMATE STRUCTURAL FILL PASSIVE
RESISTANCE IS 500 PCF.
PER GEOTECHNICAL REPORT FOR CANYON AREA, ULTIMATE COEFFICIENT OF SLIDING FRICTION IS 0.50.
ULTIMATE NATIVE SOIL PASSIVE RESISTANCE IS 400 PCF. ULTIMATE STRUCTURAL FILL PASSIVE
RESISTANCE IS 500 PCF.
SOIL PREPARATION OF THE SITE SHALL FOLLOW THE RECOMMENDATIONS DESCRIBED IN THE
GEOTECHNICAL REPORT. THIS INCLUDES REMOVAL OF EXISTING STRUCTURES/UTILITIES, REMOVAL OF
EXISTING FILL WHERE DEEMED NECESSARY, PREPARATION OF THE SUBGRADE & COMPACTION,
EXCAVATIONS FOR NEW FOUNDATIONS & SLABS, AND BACKFILLING TO RETAINING WALLS.
WHERE SOIL CONDITIONS ARE FOUND DURING CONSTRUCTION THAT DO NOT MEET CRITERIA DESCRIBED IN
THE REPORT, SPECIAL INSPECTOR/CONTRACTOR SHALL NOTIFY ARCHITECT IMMEDIATELY.
LOCATION OF ALL UNDERGROUND UTILITIES SHALL BE VERIFIED PRIOR TO CONSTRUCTION OF
FOUNDATION TO AVOID ANY INTERFERENCE. CONTRACTOR SHALL EXPOSE EXISTING UTILITY LINES IN THE IMMEDIATE AREA TO DETERMINE THEIR EXACT INVERT ELEVATION, SIZE AND LOCATION RELATIVE TO THE FOUNDATION. NOTIFY THE ENGINEER IMMEDIATELY OF ANY INTERFERENCE WITH PILES, FOOTINGS OR
FOUNDATION WALLS.
CONTRACTOR SHALL PROVIDE FOR PROPER DEWATERING OF EXCAVATIONS FROM SURFACE WATER, GROUND WATER, AND SEEPAGE. WATER SHALL NOT BE ALLOWED TO STAND IN TRENCHES OR FORMS BEFORE OR AFTER CONCRETE IS PLACED, AND SHALL BE PUMPED OUT. IF BOTTOMS OF TRENCHES BECOME SOFTENED DUE TO RAIN OR OTHER WATER BEFORE FOUNDATIONS ARE CAST, THE CONTRACTOR SHALL, AT THEIR OWN EXPENSE, EXCAVATE THE SOFTENED MATERIAL AND REPLACE WITH CONCRETE.
CONTRACTOR SHALL PROVIDE FOR THE DESIGN AND INSTALLATION OF ALL CRIBBING, SHEATHING AND SHORING REQUIRED TO SAFELY AND ADEQUATELY RETAIN THE EARTH BANKS AND ANY EXISTING
STRUCTURE.
11. EXCAVATIONS FOR FOOTINGS SHALL BE APPROVED BY THE GEOTECHNICAL ENGINEER PRIOR TO PLACING OF CONCRETE AND REINFORCING. CONTRACTOR SHALL NOTIFY THE GEOTECHNICAL ENGINEER WHEN THE EXCAVATIONS ARE READY FOR INSPECTION. THE GEOTECHNICAL ENGINEER SHALL SUBMIT A LETTER OF
COMPLIANCE TO THE OWNER.
12. ALL EXCAVATIONS SHALL BE PROPERLY BACKFILLED. DO NOT PLACE BACKFILL BEHIND RETAINING WALLS BEFORE CONCRETE OR MASONRY HAS ATTAINED FULL DESIGN STRENGTH. CONTRACTOR SHALL BRACE OR PROTECT ALL BUILDING WALLS BELOW GRADE FROM LATERAL LOADS UNTIL ATTACHING FLOORS ARE COMPLETELY IN PLACE AND HAVE ATTAINED FULL DESIGN STRENGTH. CONTRACTOR SHALL PROVIDE FOR
DESIGNS, PERMITS AND INSTALLATION OF BRACING AND PROTECTION.
13. ENGINEERED FILL MATERIAL SPECIFICATIONS MAY BE BASED ON WYOMING AND MONTANA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, AS APPLICABLE TO THE PROJECT SITE, BUT SHALL BE
MODIFIED TO EXCLUDE MATERIALS THAT MAY INCREASE THE RISK OF FROST HEAVE.
14. PROPERLY SPECIFIED BACKFILL SHALL BE PLACED WITHIN 5 FEET HORIZONTALLY OF THE EDGE OF THE
FOUNDATION. GROUNDWATER SHALL BE MAINTAINED AT LEAST 2 FEET BELOW THE FOUNDATION
SUBGRADE.
15. FOOTINGS FOR SLABS-ON-GRADE SHALL BE EMBEDDED BELOW THE FROST DEPTH. FOR ADDED FROST PROTECTION, FOOTINGS MAY BE EXTENDED DEEPER THAN THE FROST DEPTH. ONE FOOT OF ADDITIONAL
EMBEDMENT IS COMMON.
1.
2.
3.
4.
5.
6.
7.
VII. ANCHOR ROD
ANCHOR RODS SHALL BE ASTM F1554 GRADE 36 WITH CLASS 1A THREADS, UNLESS NOTED OTHERWISE.
FURNISH ANCHOR RODS PREFABRICATED WITH MATCHING DOUBLE HEAVY HEX NUTS JAMMED AT THE END EMBEDDED IN CONCRETE. FURNISH HARDENED PLATE WASHERS, LOCK WASHERS, AND MATCHING HEAVY HEX NUTS FOR SECURING THE BASE PLATE TO THE ANCHOR RODS. A RIGID STEEL TEMPLATE SHALL BE
USED TO LOCATE ANCHOR RODS WHILE PLACING CONCRETE.
HOOKED ANCHOR RODS SHALL NOT BE USED EXCEPT WHERE NOTED.
ANCHOR RODS SHALL HAVE SUFFICIENT LENGTH TO PROVIDE THE MINIMUM EMBEDMENT SHOWN ON THE DRAWINGS, MEASURED FROM THE FACE OF THE CONCRETE TO THE NEAR FACE OF THE DOUBLE NUT, WITH ADEQUATE EXTENSION AS REQUIRED TO RECEIVE THE BASE PLATE WITH FULL THREAD PROJECTION FOR
NUT INSTALLATION.
ANCHOR ROD INSTALLATION SHALL BE COORDINATED WITH REINFORCING AND FRAMEWORK.
LEVELING NUTS SHALL NOT BE USED EXCEPT AFTER EVALUATION BY THE CONTRACTOR'S ERECTION
ENGINEER.
AFTER BASE INSTALLATION, ANCHOR ROD NUTS SHALL BE INSTALLED TO A SNUG-TIGHT CONDITION.
NO HEATING OR BENDING OF THE ANCHOR RODS IS PERMITTED. HOLES IN THE BASE MATERIAL SHALL NOT
BE ENLARGED BY BURNING.
GENERAL NOTES
1.
2.
3.
4.
A.
B.
C.
D.
A.
B.
IV. REINFORCED CONCRETE:
CONCRETE CONSTRUCTION SHALL CONFORM TO ACI 318 AND ACI 301 WITH MODIFICATIONS AS NOTED ON
THE CONTRACT DOCUMENTS.
CONCRETE MIXES SHALL BE DESIGNED BY A QUALIFIED TESTING LABORATORY AND BEAR THE WET SEAL OF A CIVIL ENGINEER LICENSED IN THE STATE OF THE PROJECT AND BE PROVIDED TO THE SEOR FOR REVIEW.
EACH MIX DESIGN SHALL BEAR THE NAME OF THE PROJECT AND THE SPECIFIC USE.
CONCRETE MODULUS OF ELASTICITY SHALL MEET THE MINIMUM PROVIDED IN ACI 318 SECTION 19.2.2 FOR
THE 28-DAY STRENGTH SPECIFIED BELOW. TEST SHALL BE IN ACCORDANCE WITH ASTM C469.
CONCRETE SHALL HAVE THE FOLLOWING ULTIMATE COMPRESSIVE STRENGTH AT 28 DAYS.
LOCATION STRENGTH, f'c CONCRETE TYPE
SLAB ON GRADE 4,500 PSI NORMAL WEIGHT
FOUNDATIONS 4,000 PSI NORMAL WEIGHT
ALL LOCATIONS UON 3,000 PSI NORMAL WEIGHT
5. PORTLAND CEMENT SHALL CONFORM TO ASTM C150, TYPE I OR II. CONCRETE EXPOSED TO SOILS
CONTAINING CORROSIVE ELEMENTS (SULFATES) SHALL COMPLY WITH IBC 1904.1.
6. FLY ASH MAY BE USED AS A SUBSTITUTE FOR PORTLAND CEMENT. WEIGHT OF FLY ASH SHALL NOT EXCEED 15% OF CEMENT WEIGHT. FLY ASH SHALL CONFORM TO ASTM C618 CLASS F AND LOSS OF
IGNITION SHALL BE LIMITED TO 2%.
7. MIXING OPERATIONS SHALL CONFORM TO ASTM C94.
8. ALL CONCRETE NOT IN CONTACT WITH EARTH TO HAVE FINISH AS SPECIFIED BY ARCHITECT OR AS COVERED IN PROJECT SPECIFICATIONS. UNLESS OTHERWISE NOTED, NON-ARCHITECTURAL CONCRETE
COLUMNS AND WALLS SHALL HAVE 3/4 ” CHAMFERED CORNERS.
9. AGGREGATE FOR NORMALWEIGHT CONCRETE SHALL CONFORM TO ALL REQUIREMENTS AND TESTS OF
ASTM C33 AND PROJECT SPECIFICATIONS
10. LIGHTWEIGHT CONCRETE SHALL HAVE AN AIR-DRY UNIT WEIGHT OF NOT MORE THAN
115 PCF AND NOT LESS THAN 110 PCF (UNLESS HIGH VOLUME FLY ASH CONCRETE USED). LIGHTWEIGHT AGGREGATE SHALL CONFORM TO ASTM C330. TEST SHRINKAGE IN ACCORDANCE WITH ASTM C157.
SHRINKAGE SHALL NOT EXCEED 0.0005 INCHES/INCH.
11. ALL CONCRETE SHALL BE REINFORCED. PROVIDE MINIMUM TEMPERATURE REINFORCEMENT AS REQUIRED
BY ACI-318 IN ELEMENTS WHERE NO REINFORCEMENT IS INDICATED ON THE DRAWINGS.
12. DRY PACK OR GROUT UNDER BASE PLATES AND SILL PLATES SHALL BE 7000 PSI MIN AT 28 DAYS.
13. CONCRETE PLACEMENT SHALL CONFORM TO ACI 304 AND PROJECT SPECIFICATIONS. SANDBLAST ALL
CONCRETE SURFACES WHICH NEW CONCRETE WILL BE PLACED AGAINST.
14. TWO HOURS MUST ELAPSE BETWEEN END OF COLUMN OR WALL POURS AND THE BEGINNING OF FLOOR
POURS.
15. MACROSYNTHETIC FIBERS SHALL CONFORM TO ASTM D7508.
16. ALL REINFORCEMENT, ANCHOR BOLTS AND OTHER EMBEDDED ITEMS SHALL BE SECURELY HELD IN PLACE WHILE CONCRETE IS POURED. ADDITIONAL BARS TO BE PROVIDED BY THE CONTRACTOR FOR SUPPORT AS
NEEDED.
17. MECHANICAL, ELECTRICAL AND PLUMBING OPENINGS AND SLEEVES ARE SHOWN INDICATIVELY AND SMALL OPENINGS AND SLEEVES ARE NOT SHOWN. SEE SLAB EDGE, MECHANICAL, ELECTRICAL, PLUMBING AND OTHER TRADES FOR SIZE AND LOCATION OF ALL SLAB AND WALL OPENINGS AND SLEEVES. CONTRACTOR TO DEVELOP AND SUBMIT A SINGLE COORDINATION DRAWING COMBINING ALL TRADES INDICATING ALL SLAB OPENINGS AND SLEEVES PRIOR TO POURING CONCRETE FOR REVIEW BY STRUCTURAL ENGINEER.
18. ALL PIPE AND CONDUIT OPENINGS SHALL BE SLEEVED AND CAST IN PLACE UNLESS OTHERWISE NOTED. DO NOT SAWCUT, CORE OR CORE DRILL STRUCTURAL CONCRETE WITHOUT EXPLICIT DIRECTION FROM THE STRUCTURAL ENGINEER. DRILL BITS THAT CAN CUT OR DAMAGE REINFORCING ARE NOT PERMITTED TO BE
USED ON STRUCTURAL CONCRETE.
19. CONDUITS AND PIPES SHALL NOT BE PERMITTED IN STRUCTURAL CONCRETE ELEMENTS UNLESS SPECIFICALLY REVIEWED BY THE STRUCTURAL ENGINEER. ALL CONDUITS TO BE EMBEDDED IN THE STRUCTURAL CONCRETE SHALL BE SUBMITTED FOR STRUCTURAL REVIEW ON A SINGLE COORDINATED CONDUIT DRAWING COMBINING ALL TRADES DEVELOPED AND COORDINATED BY THE CONTRACTOR.
COORDINATED CONDUITS/PIPES MUST BE PLACED IN ONE LAYER AVOIDING CROSSOVER AND SPACED AT THE GREATER OF 3" OR 3 DIAMETERS. DRAWINGS SHALL SHOW STUB-UP LOCATIONS, BEND RADIUS AND DETAILS OF CONDUIT/PIPE INSTALLATION. ALL CONDUITS AND PIPES SHALL BE INSTALLED PER THE
REQUIREMENTS OF ACI 318 SECTIONS 20.7 AND 26.8.2.
ELECTRICAL CONDUIT SHALL BE RIGID STEEL CONDUIT OR FLEXIBLE PLASTIC CONDUIT. ALUMINUM CONDUIT IS PROHIBITED. CONDUIT OUTSIDE DIAMETER SHALL NOT EXCEED 2" OR 1/6 SLAB THICKNESS, WHICHEVER IS LESSER. CONDUIT SHALL BE FIRMLY CHAIRED AND TIED TO PREVENT DISPLACEMENT
DURING POURING.
FOR CONDUIT PLACED IN SLABS ON STEEL DECKING, CONDUIT SHALL RUN IN THE STEEL DECK FLUTES
PER THE TYPICAL CONDUIT IN SLAB ON STEEL DECK DETAIL.
20. FOR CONCRETE SLABS-ON-GRADE, A BASE OF STRUCTURAL FILL OR NON-FROST-SUSCEPTIBLE SOILS SHALL EXTEND DEEPER THAN THE FROST DEPTH. A VAPOR BARRIER IS TO BE PLACED BENEATH THE SLAB.
1.
2.
A.
a.
b.
c.
B.
a.
b.
c.
A.
B.
C.
D.
E.
F.
VI. REINFORCING STEEL
REINFORCING STEEL SHALL BE DEFORMED BARS CONFORMING TO ASTM A615, GRADE 60.
REINFORCING STEEL FOR CAST-IN-PLACE NONPRESTRESSED CONCRETE MEMBERS SHALL HAVE THE
FOLLOWING CONCRETE COVER, SEE ACI 117 FOR TOLERANCES.
CONCRETE EXPOSED TO EARTH OR IN CONTACT WITH GROUND:
CAST AGAINST AND PERMANENTLY IN CONTACT WITH EARTH 3"
EXPOSED TO WEATHER OR IN CONTACT WITH EARTH (#5 AND SMALLER) 1-1/2"
EXPOSED TO WEATHER OR IN CONTACT WITH EARTH (#6 AND LARGER) 2"
CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND:
SLABS, JOISTS AND WALLS (#11 AND SMALLER) 3/4"
SLABS, JOISTS AND WALLS (#14 AND LARGER) 1-1/2"
BEAMS, COLUMNS AND PEDESTALS 1-1/2"
3. BAR SPLICES MAY BE DELETED AND CONTINUOUS REINFORCING USED AT CONTRACTORS OPTION. BAR SPLICES SHALL BE MADE AT POINTS OF MINIMUM STRESS. IN FRAMED BEAMS AND SLABS SPLICE TOP BARS
AT MID-SPAN, BOTTOM BARS OVER SUPPORTS.
4. STEEL REINFORCEMENT SHOP DRAWINGS SHALL BE PREPARED BY THE CONTRACTOR IN ACCORDANCE WITH ACI 315: "DETAILS AND DETAILING OF CONCRETE REINFORCEMENT", AND SHALL INDICATE:
MATERIAL AND GRADE
BAR SCHEDULES WITH BAR LENGTHS AND BENT BAR DIAGRAMS
ARRANGEMENT, SPACING, COVER, LAP LOCATIONS AND LENGTHS
SPLICE DETAILS FOR MECHANICAL SPLICES
SUPPORTS FOR CONCRETE REINFORCEMENT
SPECIAL REINFORCEMENT AT OPENINGS
5. ALL REINFORCING STEEL SHALL BE DETAILED AND PLACED IN CONFORMANCE WITH ACI 318 AND THE
'MANUAL OF STANDARD PRACTICE' BY CRSI AS MODIFIED BY THE CONTRACT DOCUMENTS.
6. FIELD BENDING OF REINFORCEMENT SHALL NOT BE PERMITTED WITHOUT SEOR APPROVAL. ALL
REINFORCING BENDS SHALL BE MADE COLD.
7. WHEN MULTIPLE GRADES OF REINFORCEMENT ARE USED, MARK ALL BARS SO IDENTIFICATION CAN BE
MADE DURING IN-PLACE INSPECTION.
8. WELDED REINFORCING STEEL SHALL COMPLY WITH ASTM A706, GRADE 60. REINFORCEMENT SHALL ONLY BE WELDED WHERE SPECIFICALLY NOTED ON THE DRAWINGS. WELDING SHALL CONFORM TO AWS D1.4
USING E90XX ELECTRODES.
9. WELDED WIRE REINFORCEMENT (WWR) SHALL CONFORM TO ASTM A1064 (PLAIN & DEFORMED WIRE). F y = 70 000PSI. LAP WELDED WIRE REINFORCEMENT BY 6" OR ONE AND A HALF FULL MESHES, WHICHEVER IS
GREATER.
10. EPOXY COATED REINFORCEMENT (ASTM A775 (STRAIGHT BARS), ASTM A934 (BENT BARS)) SHALL BE USED WHERE PERMANENTLY EXPOSED TO WATER, DEICING SALTS AND WHERE NOTED IN THE CONTRACT
DOCUMENTS.
11. SPECIAL CONCRETE MOMENT FRAMES AND BOUNDARY ZONES IN SPECIAL CONCRETE SHEAR WALLS:
ACTUAL YIELD STRENGTH BASED ON MILL TESTS SHALL NOT EXCEED SPECIFIED STRENGTH BY MORE THAN 18 ksi (RETESTS SHALL NOT EXCEED THIS VALUE BY MORE THAN 3 ksi). THE RATIO OF ACTUAL ULTIMATE
TENSILE STRESS TO ACTUAL YIELD STRENGTH SHALL NOT BE LESS THAN 1.25.
ABBREVIATIONS
1.
2.
A.
B.
C.
D.
I. GENERAL NOTES:
ALL STRUCTURAL WORK SHALL CONFORM TO THE DRAWINGS, THE PROJECT SPECIFICATIONS, ALL
DRAWING NOTES, AND THE 2021 INTERNATIONAL BUILDING CODE (IBC).
ALL APPLICABLE REFERENCE STANDARDS, AS MODIFIED BY THE BUILDING CODE, INCLUDE:
ASCE/SEI 7-22: MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES
ACI 318-19: BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE
AWS D1.4: STRUCTURAL WELDING CODE - STEEL
ACI 117-10: STANDARD SPECIFICATIONS FOR TOLERANCES FOR CONCRETE CONSTRUCTION AND
MATERIAL
3. THE SCOPE OF WORK IS NOT SOLELY DEFINED BY THESE DOCUMENTS.
4. TYPICAL DETAILS APPLY THROUGHOUT THE PROJECT, EVEN IF NOT SPECIFICALLY REFERENCED IN PLANS OR DETAILS. DETAILS OF CONSTRUCTION NOT FULLY SHOWN OR NOTED ON THE DRAWINGS NOR CALLED OUT IN THE SPECIFICATIONS SHALL BE OF THE SAME SIZE AND CHARACTER AS FOR SIMILAR CONDITIONS
WHICH ARE SHOWN AND NOTED.
5. ALL FORCES INDICATED IN THE STRUCTURAL DRAWINGS ARE SERVICE LOADS AS DEFINED BY ASCE-7, UNLESS NOTED OTHERWISE.
6. DO NOT USE SCALED DIMENSIONS; USE ONLY WRITTEN DIMENSIONS. WHERE NO DIMENSION IS PROVIDED, CONSULT THE ARCHITECT FOR CLARIFICATIONS BEFORE PROCEEDING WITH WORK.
7. SEE ARCHITECTURAL DRAWINGS FOR SITE POSITIONING AND PROJECT DATUM, REFERENCE IS ( 0'-0") AS
SHOWN ON ARCHITECTURAL DRAWINGS.
8. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE CONDITIONS OF THE JOB SITE INCLUDING
SAFETY OF PERSONS AND PROPERTY AND THE MEANS AND METHODS OF CONSTRUCTION.
9. STRUCTURAL ELEMENTS SHALL BE CENTERED ABOUT GRIDLINES OR DIMENSION LINES, UNLESS
OTHERWISE NOTED.
10. THE CONTRACTOR SHALL PROVIDE ENGINEERED DESIGNS OF TEMPORARY SHORING AND BRACING AND
MAKE SAFE ALL FLOORS, ROOFS, WALLS, EXCAVATIONS AND ADJACENT PROPERTY AS PROJECT
CONDITIONS AND LOCAL BUILDING CODE REQUIRE.
11. ALL STRUCTURAL WORK SHALL BE COORDINATED WITH ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING, ETC. REQUIREMENTS. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS NOT SHOWN ON PLAN. DISCREPANCIES AND/OR INTERFERENCES SHALL BE REPORTED TO THE ARCHITECT IMMEDIATELY.
12. OPENINGS SHALL NOT BE MADE IN ANY STRUCTURAL MEMBER UNLESS SPECIFICALLY SHOWN ON THE
STRUCTURAL DRAWINGS OR APPROVED BY THE STRUCTURAL ENGINEER.
13. DEFICIENT WORK AND WORK NOT IN CONFORMANCE WITH THE CONTRACT DOCUMENTS AS IDENTIFIED BY THE ARCHITECT OR INSPECTOR SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. CONTRACTOR
SHALL COMPENSATE OWNER FOR SERVICES ARISING FROM DEFICIENT WORK.
14. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ANY REQUIRED DEWATERING OF THE SITE DURING
CONSTRUCTION.
15. THE CONTRACTOR SHALL PREPARE ENGINEERED DESIGN AND SHALL BE RESPONSIBLE FOR CONFIRMING ADEQUACY OF AS BUILT STRUCTURE FOR ALL SURCHARGE LOADS RESULTING FROM COMPACTION AS WELL AS CRANES TRUCKS, BULLDOZERS OR ANY OTHER CONSTRUCTION EQUIPMENT. ENGINEERED DESIGNS SHALL BE PREPARED, SIGNED AND SEALED BY A PROFESSIONAL ENGINEER LICENSED IN THE
JURISDICTION AND SUBMITTED TO ENGINEER OF RECORD FOR REVIEW.
16. THE STRUCTURAL COMPONENTS BY THEMSELVES ARE A NON-SELF-SUPPORTING STRUCTURE. LATERAL FORCES DUE TO WIND, EARTHQUAKE, OR SOIL ARE CARRIED BY THE ROOF AND FLOOR DIAPHRAGMS TO THE LATERAL SYSTEM. CERTAIN ELEMENTS SHOWN ON THE STRUCTURAL DRAWINGS (SUCH AS BRACING, ROOF AND FLOOR SLABS, AND CONCRETE IN COMPOSITE COLUMNS) ARE REQUIRED FOR OVERALL OR LOCAL STABILITY OF OTHER ELEMENTS (SUCH AS BEAMS, COLUMNS, AND WALLS). IF DUE TO SEQUENCING OF CONSTRUCTION, THESE STABILITY ELEMENTS ARE NOT IN PLACE, THE CONTRACTOR SHALL RETAIN A STRUCTURAL ENGINEER LICENSED TO PERFORM THE WORK IN THE JURISDICTION WHERE THE PROJECT IS LOCATED, WHO SHALL INVESTIGATE WHERE TEMPORARY SHORING/BRACING IS REQUIRED AND SHALL DESIGN THIS TEMPORARY SHORING/BRACING. THE CONTRACTOR SHALL PROVIDE THIS SHORING/BRACING UNTIL THE REQUIRED STRUCTURAL ELEMENTS AND THEIR CONNECTIONS HAVE BEEN INSTALLED AND
REACH THEIR FINAL DESIGN STRENGTHS.
17. CONSTRUCTION MATERIALS SHALL BE SPREAD OUT WHEN PLACED ON FRAMED FLOORS OR ROOFS. THE CONSTRUCTION MATERIAL LOAD SHALL NOT EXCEED THE DESIGN LIVE LOAD PER SQUARE FOOT.
CONTRACTOR SHALL BE RESPONSIBLE FOR SHORING WHERE STRUCTURE IS NOT COMPLETE OR HAS NOT
ATTAINED DESIGN STRENGTH.
18. BUILDING TOLERANCES: STANDARD TOLERANCES SHALL BE BASED ON THE REQUIREMENTS OF THE AISC CODE OF STANDARD PRACTICE AND ACI 117, STANDARD SPECIFICATIONS FOR TOLERANCES FOR
CONCRETE CONSTRUCTION AND MATERIALS.
SYMBOLS
SHEET INDEX
STRUCTURAL SHEET LIST
SHEET NUMBER SHEET NAME
GENERAL STRUCTURAL NOTESS001
S002 S101 S111 S201 S211 S500 S501
GRAND TOTAL 8
STRUCTURAL SPECIAL INSPECTIONS AND TESTS AND GENERAL NOTES
FOUNDATION PLAN - 2BR
FOUNDATION PLAN - 2BR - ADA
FOUNDATION PLAN - 3BR
FOUNDATION PLAN - 3BR - ADA
FOUNDATION DETAILS
FOUNDATION DETAILS
YELLOWSTONE NATIONAL PARK
TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
A/E: FIRM
PRIME:
STANTEC
CHEYENNE, WY
SHEET
OF
PL
O
T D
AT
E:
R
EV
IT
V
ER
SI
O N
198433
326141
T. VHAY
M. LITZINGER
M. PUCKETT
06/12/2026
6/
/2
4:
:1
PM
Au to de sk
D oc s:
//1
_Y
EL
L_ N
PS
/0
3_ st ru c_
8_ 3b dr .rv t
GENERAL STRUCTURAL
NOTESS001
87 94
# POUND
& AND
@ AT
AB ANCHOR BOLT
ACS ALL COMMON SIDES
ADDL ADDITIONAL
AESS ARCHITECTURALLY EXPOSED
STRUCTURAL STEEL
ALT ALTERNATE
ARCH,
ARCH'L
ARCHITECT, ARCHITECTURAL
BL BRICKLEDGE
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BN BOUNDARY NAILING
BO BOTTOM OF
BOB BOTTOM OF BEAM
BOD BOTTOM OF DECK
BOS BOTTOM OF STEEL
BOT,
BOTT
BOTTOM
BP BASE PLATE
BRBF BUCKLING RESTRAINED
BRACED FRAME
BRG BEARING
BTWN BETWEEN
C CHANNEL
CB CONCRETE BEAM
CC CARRIED COLUMN
CEN CENTER
CFMF COLD-FORMED METAL
FRAMING
CIP CAST IN PLACE
CJ CONTROL JOINT
CJP COMPLETE JOINT
PENETRATION
CL CENTERLINE
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONN CONNECT, CONNECTION
CONT CONTINUOUS
CTR CENTERED
CWI CERTIFIED WELDING
INSPECTOR
D, DIA DIAMETER
DBA DEFORMED BAR ANCHOR
DBL DOUBLE
DEF DEFORMED, DEFINITION
DEFL DEFLECTION
DET,
DTL
DETAIL
DIAG DIAGONAL
DN DOWN
DWG DRAWING
EA EACH
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATOR
EN EDGE NAILING
EOR ENGINEER OF RECORD
EOS EDGE OF SLAB
EQ EQUAL
EQ SPA EQUAL SPACE
ES EACH SIDE
EW EACH WAY
EXIST,
(E)
EXISTING
EXT EXTERIOR
FD FLOOR DRAIN
FDN,
FNDN
FOUNDATION
FF EL FINISH FLOOR ELEVATION
FN FIELD NAILING
FOA FACE OF ANGLE
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FT FEET
FTG FOOTING
Fy YIELD STRESS
GA GAGE, GUAGE
GALV GALVANIZED
GB GRADE BEAM
GLB GLUED-LAMINATED BEAM
GT GIRDER TRUSS
H, HORIZ HORIZONTAL
HC HOLLOW CORE
HI HIGH
HK HOOK
HSS HOLLOW STRUCTURAL STEEL
IN INCHES
INFO INFORMATION
INT INTERIOR
JST JOIST
JT JOINT
K KIPS
KB KNEE BRACE
L ANGLE
LB POUND
LF LINEAR FOOT
LG LENGTH
LLBB LONG LEG BACK TO BACK
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LO LOW
LT WT LIGHTWEIGHT
LVL LEVEL
MAX MAXIMUM
MC MOMENT CONNECTION
MCJ MASONRY CONTROL JOINT
MECH MECHANICAL
MEZZ MEZZANINE
MFR,
MANUF
MANUFACTURER
MID MIDDLE
MIL MILLIMETER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTL METAL
N NORTH
NA NOT APPLICABLE
NDT NON-DESTRUCTIVE TESTING
NEW, (N) NEW
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NWC NORMAL WEIGHT CONCRETE
OC ON CENTER
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
PEMB PRE-ENGINEERED METAL
BUILDING
PERP PERPENDICULAR
PJP PARTIAL JOINT PENETRATION
PL PLATE
PLF POUNDS PER LINEAR FOOT
PLYWD PLYWOOD
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
R RADIUS
REF REFER, REFERENCE
REINF REINFORCED,
REINFORCEMENT
REM REMAINDER
REQ'D REQUIRED
REQ'MT
S, REQMTS
REQUIREMENTS
REV REVISION
SAD SEE ARCHITECTURAL
DRAWINGS
SC SLIP CRITICAL
SCHED SCHEDULE
SCJ SAWN CONTROL JOINT
SECT SECTION
SF SQUARE FEET
SHT SHEET
SHTG SHEATHING
SIM SIMILAR
SOG SLAB ON GRADE
SPA SPACES, SPACING
SQ SQUARE
SSH SHORT SLOTTED HOLE
STD STANDARD
STL STEEL
STRUCT STRUCTURE, STRUCTURAL
SUPP SUPPORT
T&B TOP AND BOTTOM
TEMP TEMPORARY
THK THICK
TO TOP OF
TOC TOP OF CONCRETE
TOF TOP OF FOUNDATION
TOM TOP OF MASONRY
TOS TOP OF STEEL
TOSC TOP OF STRUCTURAL
CONCRETE
TOSL TOP OF SLAB
TOT TOTAL
TOW TOP OF WALL
TYP TYPICAL
UON UNLESS OTHERWISE NOTED
V, VERT VERTICAL
VIF VERIFY IN FIELD
W WIDE FLANGE
W/ WITH
W/O WITHOUT
WB WIND BRACE
WBBP WIND BRACE BASEPLATE
WHSS WELDED HEADED STEEL STUD
WP WORKING POINT, WORK POINT
WRT WITH RESPECT TO
WT WEIGHT
WWR WELDED-WIRE
REINFORCEMENT
YD YARD
06/19/2026 948706/18/2026
6/18/26
SOILS
VERIFY EXCAVATIONS ARE EXTENDED TO THE PROPER DEPTH AND HAVE
REACHED PROPER MATERIAL.
GEOTECHNICAL
REPORT
CONSTRUCTION
DOCUMENTS
VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE ADEQUATE TO
ACHIEVE THE DESIGN BEARING CAPACITY.
IBC 1705.6
PERIODIC1. BEARING MATERIAL
PERIODIC2. EXCAVATIONS
PERFORM CLASSIFICATION AND TESTING OF COMPACTED FILL MATERIALSPERIODIC3. FILL MATERIALS
PRIOR TO PLACEMENT OF COMPACTED FILL, INSPECT SUBGRADE AND VERIFY
THAT THE SITE HAS BEEN PREPARED PROPERLY.
PERIODIC4. PRIOR TO PLACEMENT OF FILL
VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT THICKNESSES
DURING PLACEMENT AND COMPACTION OF COMPACTED FILL.
CONTINUOUS5. DURING PLACEMENT OF FILL
THE INSPECTOR SHALL OBSERVE THESE FUNCTIONS ON A
RANDOM BASIS. OPERATIONS NEED NOT BE DELAYED
PENDING OBSERVATIONS.
OBSERVE
THESE INSPECTIONS SHALL BE PERFORMED FOR EACH
CONNECTION OR MEMBER, AND COMPLETED PRIOR TO THE
FINAL ACCEPTANCE OF THE ITEM.
PERFORM
SPECIAL INSPECTION BY THE SPECIAL INSPECTOR WHO IS
PRESENT CONTINUOUSLY WHEN AND WHERE THE WORK TO
BE INSPECTED IS BEING PERFORMED
CONTINUOUS
SPECIAL INSPECTION BY THE SPECIAL INSPECTOR WHO IS
INTERMITTENTLY PRESENT WHERE THE WORK HAS BEEN OR
IS BEING PERFORMED AND AT THE COMPLETION OF WORK.
PERIODIC
A QUALIFIED PERSON EMPLOYED OR RETAINED BY AN
APPROVED AGENCY AND APPROVED BY THE BUILDING
OFFICIAL AS HAVING THE COMPETENCE NECESSARY TO
INSPECT A PARTICULAR TYPE OF CONSTRUCTION
REQUIRING SPECIAL INSPECTION.
SPECIAL
INSPECTOR
INSPECTION OF CONSTRUCTION REQUIRING THE EXPERTISE
OF AN APPROVED SPECIAL INSPECTOR IN ORDER TO
ENSURE COMPLIANCE WITH THE BUILDING CODE AND THE
APPROVED CONSTRUCTION DOCUMENTS.
SPECIAL
INSPECTION
DEFINITIONS
REFERENCES
CODES/STANDARDS
SPECIAL INSPECTION AND TEST REQUIREMENTS
TYPE REQUIRED INSPECTIONS AND/OR TESTSFREQUENCY
INDICATES SPECIAL INSPECTION OF ITEM IS REQUIRED FOR
THE WORK DEFINED IN THE CONSTRUCTION DOCUMENTS
FOR THIS PROJECT.
INSPECTION AND TESTING REQUIREMENTS ON THIS SHEET ARE IN
ACCORDANCE WITH SECTION 1705 OF THE INTERNATIONAL BUILDING CODE (IBC)
AND HAVE BEEN IDENTIFIED AS A STATEMENT OF SPECIAL INSPECTIONS AS
REQUIRED BY IBC SECTION 1704.3. THE OWNER OR THE OWNER'S AUTHORIZED
AGENT, OTHER THAN THE CONTRACTOR, SHALL EMPLOY ONE OR MORE
APPROVED AGENCIES TO PROVIDE THE SPECIAL INSPECTIONS AND TESTS
DURING CONSTRUCTION AS REQUIRED BY IBC SECTION 1705 AND IDENTIFY THE
APPROVED AGENCIES TO THE BUILDING OFFICIAL. THESE SPECIAL
INSPECTIONS AND TESTS ARE IN ADDITION TO THE INSPECTIONS BY THE
BUILDING OFFICIAL THAT ARE IDENTIFIED IN IBC SECTION 110. SPECIAL
INSPECTORS SHALL BE QUALIFIED IN ACCORDANCE WITH IBC SECTION 1704.2.1,
AND ALL OTHER APPLICABLE SECTIONS AND STANDARDS.
SPECIAL INSPECTIONS AND TESTS INDICATED ON THIS SHEET ARE FOR THE
STRUCTURAL WORK, SEE OTHER DISCIPLINES DRAWINGS AND SPECIFICATIONS
FOR REQUIRED NONSTRUCTURAL SPECIAL INSPECTIONS AND TESTS.
STATEMENT OF SPECIAL INSPECTIONS
CONCRETE
INSPECT REINFORCEMENT, INCLUDING PRESTRESSING TENDONS, AND VERIFY
PLACEMENT
1. REINFORCEMENT ACI 318: 20, 25.2, 25.3,
26.6.1-26.6.3
IBC 1908.4
PERIODIC
IBC 1705.3
INSPECT ANCHORS CAST IN CONCRETE2. ANCHORS PERIODIC ACI 318: 17.8.2
INSPECT ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY OR UPWARDLY
INCLINED ORIENTATIONS TO RESIST SUSTAINED TENSION LOADS.3. ANCHORS POST-INSTALLED IN
HARDENED CONCRETE MEMBERS
CONTINUOUS
INSPECT ALL OTHER MECHANICAL OR ADHESIVE ANCHORS - SPECIFIC
REQUIREMENTS FOR SPECIAL INSPECTION SHALL BE INCLUDED IN THE
RESEARCH REPORT FOR THE ANCHOR ISSUED BY AN APPROVED SOURCE IN
ACCORDANCE WITH ACI318: 17.8.2 OR OTHER QUALIFICATION PROCEDURES.
PERIODIC
ACI 318: 17.8.2.4
ACI 318: 17.8.2
VERIFY USE OF REQUIRED DESIGN MIX
4. DESIGN MIX PERIODIC ACI 318:19, 26.4.3, 26.4.4
IBC 1904.1, 1904.2,
1908.2, 1908.3
FABRICATE SPECIMENS FOR STRENGTH TESTS, PERFORM SLUMP AND AIR
CONTENT TESTS, AND DETERMINE THE TEMPERATURE OF THE CONCRETE.
5. PRIOR TO CONCRETE PLACEMENT CONTINUOUS ASTM C172, C31
IBC 1908.10
INSPECT CONCRETE AND SHOTCRETE PLACEMENT FOR PROPER APPLICATION
TECHNIQUES6. DURING PLACEMENT CONTINUOUS
ACI318: 26.5
IBC: 1908.6,1908.7,1908.8
VERIFY MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND TECHNIQUESPERIODIC ACI318: 26.5.3-26.5.5
IBC: 1908.9
APPLICATION OF PRESTRESSING FORCES7. PRESTRESSED CONCRETE CONTINUOUS ACI318: 26.10
GROUTING OF BONDED PRESTRESSING TENDONSCONTINUOUS
INSPECT ERECTION OF PRECAST CONCRETE MEMBERS.8. PRECAST CONCRETE PERIODIC ACI 318: 26.9
VERIFY IN-SITU CONCRETE STRENGTH:
PRIOR TO STRESSING OF TENDONS IN POST-TENSIONED CONCRETE
PRIOR TO REMOVAL OF SHORES AND FORMS FROM BEAMS AND
STRUCTRUAL SLABS
9. IN-SITU CONCRETE STRENGTH PERIODIC ACI 318: 26.11.2
INSPECT FORMWORK FOR SHAPE, LOCATION, ABD DIMENSIONS OF THE
CONCRETE MEMBER BEING FORMED.
10. FORMWORK PERIODIC ACI 318: 26.11.1.2(b)
VII. ANCHOR RODS
BY ENGINEERED BUILDING DESIGNER
DESIGNATED SEISMIC FORCE RESISTING SYSTEM:
BY ENGINEERED METAL BUILDING ENGINEER
1.
A.
B.
C.
D.
E.
2.
A.
B.
C.
D.
E.
3.
A.
B.
C.
D.
4.
5.
6.
7.
8.
9.
10.
11.
A.
B.
C.
D.
E.
IX. STRUCTURAL LUMBER:
ALL STRUCTURAL SAWN LUMBER SHALL BE DOUGLAS FIR LARCH AS GRADED BY THE WWPA OR WCLIB
WITH THE FOLLOWING MINIMUM GRADES, UNLESS NOTED OTHERWISE:
2X OR 3X STUDS: NO. 2
4X AND LARGER POSTS OR STUDS: NO. 1
2X OR 3X JOISTS: NO. 2
4X AND LARGER BEAMS OR JOISTS, CONCEALED: NO. 1
4X AND LARGER BEAMS OR JOISTS, EXPOSED: SELECT STRUCTURAL
ALL STRUCTURAL COMPOSITE LUMBER (SCL) OR ENGINEERED LUMBER SHALL BE AS FOLLOWS:
I-JOISTS: TJI JOISTS MANUFACTURED BY WEYERHAUSER (ESR-1153)
LSL: TIMBERSTRAND LSL MANUFACTURED BY WEYERHAUSER (ESR-1387)
LVL: MICROLLAM LVL (2.0E) MANUFACTURED BY WEYERHAUSER (ESR-1387)
PSL: PARALLAM PSL (2.0E) MANUFACTURED BY WEYERHAUSER (ESR-1387)
SUBSTITUTION OF PRODUCTS LISTED ABOVE SHALL BE SUBMITTED TO ENGINEER FOR REVIEW AND
APPROVAL.
STRUCTURAL GLUE LAMINATED TIMBER (GLT):
GLT FABRICATION SHALL BE PERFORMED IN AN APPROVED FABRICATORS SHOP IN ACCORDANCE
WITH CBC 2303.1.3, ANSI/AITC A190.1 AND ASTM D3737.
GLT BEAMS SHALL BE 24F-V8 WITH A CAMBER OF R=1600' UNLESS NOTED OTHERWISE.
GLT EXPOSED TO WEATHER SHALL BE RATED FOR EXTERIOR USE BY THE MANUFACTURER.
FLASHING AND WATERPROOFING OF THE EXPOSED ENDS SHALL BE PROVIDED BY THE
CONTRACTOR TO PREVENT DECAY.
ALL GLT MEMBERS SHALL HAVE APPEARANCE CLASSIFICATION AS SPECIFIED ON THE
ARCHITECTURAL DRAWINGS.
ALL STRUCTURAL TIMBER FRAMING SHALL HAVE A MAXIMUM MOISTURE CONTENT OF 19% AT THE TIME OF ENCLOSURE, REGARDLESS OF THE MOISTURE CONTENT AT THE TIME OF MANUFACTURE. TIMBER FLOOR FRAMING, INCLUDING JOISTS AND BEAMS, WITH MORE THAN 2 FRAMED LEVELS ABOVE THEM SHALL BE DESIGNATED AS 'S-DRY' OR 'MC15' AND HAVE A MAXIMUM MOISTURE CONTENT OF 15% AT
THE TIME OF ENCLOSURE.
CONTRACTOR SHALL PROVIDE AT LEAST THREE RANDOM MOISTURE READINGS PERFORMED AT WALL
AND FLOOR FRAMING IN THE PRESENCE OF THE BUILDING INSPECTOR PRIOR TO APPROVAL TO
ENCLOSURE TO VERIFY IN SERVICE MOISTURE CONTENT TO SATISFY THE REQUIREMENTS ABOVE.
ALL LUMBER LOCATED IN DIRECT CONTACT WITH CONCRETE OR MASONRY INCLUDING BUT NOT
LIMITED TO SILL PLATES, NAILERS, AND LEDGERS SHALL BE PRESSURE TREATED DOUGLAS FIR.
ALL HARDWARE SHALL BE SIMPSON STRONG-TIE CO INSTALLED PER MANUFACTURERS
RECOMMENDATIONS. SUBSTITUTION OF EQUIVALENT HARDWARE FROM AN ALTERNATE
MANUFACTURER SHALL BE SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL.
MINIMUM FASTENING AND NAILING OF TIMBER COMPONENTS SHALL BE IN ACCORDANCE WITH IBC
TABLE 2304.10.1.
FASTENERS SHALL BE PROVIDED NEW AND WITHOUT EXCESSIVE RUST. ALL FASTENERS EXPOSED TO
WEATHER SHALL BE GALVANIZED.
ALL METAL FASTENERS IN CONTACT WITH PRESERVATIVE-TREATED LUMBER SHALL BE STAINLESS STEEL OR OTHERWISE CERTIFIED BY THE MANUFACTURER TO RESIST CORROSION CAUSED BY THE
SPECIFIC TREATMENT APPLIED TO THE WOOD.
NAILS:
ALL NAILS SHALL BE COMMON WIRE NAILS UNLESS NOTED OTHERWISE
MINIMUM NAIL PENETRATION SHALL BE 10 TIMES THE SHANK DIAMETER UNLESS NOTED
OTHERWISE.
EDGE DISTANCES, END DISTANCES, AND FASTENER SPACINGS SHALL BE SUFFICIENT TO PREVENT
SPLITTING OF THE WOOD.
BORED PILOT HOLES SHALL BE PERMITTED FOR ALL NAILS TO HELP PREVENT WOOD FROM
SPLITTING. BORED HOLES SHALL BE MANDATORY FOR 20d AND LARGER NAILS. WHEN UTILIZED
BORED HOLES SHALL HAVE A DIAMETER NOT EXCEEDING 75% OF THE NAIL DIAMETER.
TOE NAILS SHALL BE DRIVEN AT AN ANGLE OF APPROXIMATELY 30 DEGREES WITH THE MEMBER
AND STARTED APPROXIMATELY 1/3 THE LENGTH OF THE FASTENER FROM THE MEMBER END.
1.
2.
3.
A.
B.
C.
4.
5.
A.
B.
C.
D.
6.
7.
8.
VIII. DEFERRED STRUCTURAL SUBMITTALS
SOME STRUCTURAL SYSTEMS ARE DEFINED AS VENDOR-DESIGNED COMPONENTS PER THE
STRUCTURAL DOCUMENTS. THESE ELEMENTS OF THE DESIGN ARE DEFERRED SUBMITTAL
COMPONENTS AND HAVE NOT BEEN PERMITTED UNDER THE BASE BUILDING APPLICATION. THE
CONTRACTOR WILL BE REQUIRED TO SUBMIT THE STAMPED COMPONENT SYSTEM DOCUMENTS TO
THE BUILDING OFFICIAL FOR APPROVAL.
DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE ARCHITECT, WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING OFFICIAL WITH A NOTATION INDICATION THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND BEEN FOUND TO BE IN GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE DESIGN AND SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
OFFICIAL.
SUBMITTALS TO BE PREPARED BY A LICENSED ENGINEER LAWFULLY ELIGIBLE TO DESIGN THE
ELEMENT OR COMPONENT (SPECIALTY ENGINEER) AND SHALL BE SEALED IN ACCORDANCE WITH
STATE LAW. SUBMITTALS SHALL INCLUDE:
CALCULATIONS
DIAGRAMS SHOWING LOADS APPLIED TO THE PRIMARY STRUCTURE INCLUDING MAGNITUDES,
LOCATIONS, AND DIRECTIONS, SEPARATED INTO DEAD, LIVE, WIND AND/OR SEISMIC COMPONENTS.
ERECTION OR DESIGN DRAWINGS AS NECESSARY TO DESCRIBE THE SYSTEM OR COMPONENT AND
ITS CONNECTION TO THE PRIMARY STRUCTURE.
SUBMIT (1) REPRODUCIBLE COPY, (1) SET SEALED COPY FOR THE SEOR'S FILE, AND ADDITIONAL COPIES AS NECESSARY FOR THE BUILDING DEPARTMENT. SUBMITTALS CONTAINING EXCEPTIONS, CORRECTIONS, OR OTHER REVIEW COMMENTS ARE NOT ACCEPTABLE FOR SUBMITTAL TO THE
BUILDING DEPARTMENT.
THE SEOR'S REVIEW IS STRICTLY LIMITED TO THE FOLLOWING:
DRAWINGS AND CALCULATIONS ARE PROPERLY SEALED.
LOAD CRITERIA IS CONSISTENT WITH CONTRACT DOCUMENTS.
CONNECTIONS TO THE PRIMARY STRUCTURE ARE CONSISTENT WITH THE PRIMARY STRUCTURE
DESIGN.
THE BASE STRUCTURE IS CAPABLE OF SUPPORTING IMPOSED LOADS.
THE SPECIALTY ENGINEER'S SEAL WILL CERTIFY THAT THE ITEMS DESIGNED BY THE SPECIALTY ENGINEER CONFORM TO THE CRITERIA WITHIN THE CONTRACT DOCUMENTS AND ALL APPLICABLE
CODES AND STANDARDS.
IF THE LOADS IMPOSED ON THE STRUCTURE EXCEED THE CRITERIA WITHIN THE CONTRACT
DOCUMENTS THE SUBMITTALS WILL BE REJECTED. CHANGES TO THE PRIMARY STRUCTURE TO
ACCOMMODATE SPECIALTY ITEMS WILL ONLY BE MADE AT COST AFTER.
THE FOLLOWING LIST INCLUDES THE ITEMS THAT ARE DEFINED AS DEFERRED STRUCTURAL
SUBMITTAL COMPONENTS. REFER TO THE ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND CIVIL
DRAWINGS FOR ADDITIONAL DEFERRED SUBMITTAL COMPONENTS.
A. ENGINEERED METAL BUILDING
GENERAL NOTES
12.
A.
B.
C.
D.
E.
13.
A.
B.
C.
D.
E.
F.
G.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
IX. STRUCTURAL LUMBER - CONT.:
WOOD SCREWS:
WOOD SCREWS SHALL MEET THE DIMENSIONAL STANDARDS OF ANSI/ASME B18.6.1.
MINIMUM SCREW PENETRATION SHALL BE 10 TIMES THE SCREW DIAMETER UNLESS NOTED
OTHERWISE.
EDGE DISTANCES, END DISTANCES, AND FASTENER SPACINGS SHALL BE SUFFICIENT TO PREVENT
SPLITTING OF THE WOOD.
BORED LEAD HOLES SHALL BE PROVIDED WITH A DIAMETER EQUAL TO APPROXIMATELY 7/8 OF THE
SCREW ROOT DIAMETER.
WOOD SCREWS SHALL BE TURNED, NOT DRIVEN INTO PLACE. SOAP OR OTHER LUBRICANTS MAY BE
PROVIDED TO FACILITATE INSERTION AND TO PREVENT DAMAGE TO THE SCREWS.
BOLTS AND LAG SCREWS:
BOLTS AND LAG SCREWS SHALL CONFORM TO ASTM A307 AND MEET THE DIMENSIONAL
STANDARDS OF ANSI/ASME B18.2.1.
HOLES FOR BOLTS SHALL BE A MINIMUM 1/32" TO A MAXIMUM OF 1/16" LARGER THAN THE BOLT
DIAMETER.
BOLTS SHALL BE ACCURATELY ALIGNED IN MAIN MEMBERS AND SIDE PLATES. BOLTS SHALL NOT BE
FORCIBLY DRIVEN INTO PLACE.
BORED LEAD HOLES FOR LAG SCREWS SHALL BE 40-70% OF THE SHANK DIAMETER AT THE
THREADED PORTION OF THE SCREW, AND THE SAME DIAMETER AS THE SHANK AT THE SHANK.
LAG SCREWS SHALL BE TURNED, NOT DRIVEN INTO PLACE.
ALL BOLTS, NUTS, AND LAG SCREWS SHALL BE PROVIDED WITH FLAT OR MALLEABLE WASHERS
WHERE BEARING AGAINST DIRECTLY AGAINST WOOD.
ALL BOLTS AND LAG SCREWS SHALL BE TIGHTENED UPON INSTALLATION AND RE-TIGHTENED
BEFORE CLOSING IN OR AT COMPLETION OF JOB.
ALL BUILT UP, DOUBLE 2X BEAMS AND JOISTS SHALL BE FASTENED TOGETHER WITH 2-ROWS 10d NAILS
AT 12" OC.
PROVIDE DOUBLE FLOOR JOISTS UNDER PARTITION WALLS RUNNING PARALLEL TO JOIST SPAN.
PROVIDE SOLID BLOCKING IN JOIST FRAMING ABOVE ALL SUPPORTS, BELOW PARTITION WALLS, AND
AT MIDSPAN OF JOISTS SPANNING GREATER THAN 10 FEET.
SUPPORT ALL UPPER LEVEL POSTS AND TRIMMERS IN LOWER LEVELS WITH EQUIVALENT FRAMING
AND/OR BLOCKING OR OTHERWISE FRAME POSTS THROUGH FLOOR SYSTEMS.
FIRE BLOCK STUD WALLS AT MID-HEIGHT WHERE STUD LENGTH EXCEEDS 10 FEET.
NOTCHING OR CUTTING STUDS TO CLEAR ANCHOR BOLTS IS NOT PERMITTED. STUDS SHALL HAVE
FULL BEARING ON THE SILL PLATE.
LET-IN BRACES SHALL NOT BE USED FOR TEMPORARY BRACING ON ANY WALL FRAME. STEEL STRAPS
WHICH DO NOT REQUIRE THE CUTTING OF STUDS ARE AN ACCEPTABLE ALTERNATIVE.
WHERE POSTS ARE SPECIFIED WITH CAPS AND/OR BASES, THE LOAD SHALL BE TRANSFERRED TO THE
FOUNDATION BY VERTICAL GRAIN ONLY.
DO NOT CUT, BORE, COUNTERSINK OR NOTCH WOOD MEMBERS EXCEPT WHERE EXPLICITLY SHOWN IN
THE DETAILS.
HOLDOWNS SHALL BE INSTALLED 1/2" MINIMUM ABOVE THE PLATE TO ALLOW FOR TIGHTENING OF THE ANCHOR BOLT. THE HOLDOWN SHALL BE INSTALLED TIGHT TO THE POST WITHOUT FILLERS. DO NOT
BEND HOLDOWN ANCHORS. TIGHTEN ANCHORS PER MANUFACTURERS RECOMMENDATIONS PRIOR TO
COVERING THE WALL FRAMING.
YELLOWSTONE NATIONAL PARK
TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
A/E: FIRM
PRIME:
STANTEC
CHEYENNE, WY
SHEET
OF
PL
O
T D
AT
E:
R
EV
IT
V
ER
SI
O N
198433
326141
T. VHAY
M. LITZINGER
M. PUCKETT
06/12/2026
6/
/2
4:
:1
PM
Au to de sk
D oc s:
//1
_Y
EL
L_ N
PS
/0
3_ st ru c_
8_ 3b dr .rv t
STRUCTURAL SPECIAL
INSPECTIONS, TESTS
AND GENERAL NOTESS002
88 9406/19/2026 948806/18/2026
A
B
C
40' - 0" 8' - 0"
0"
0"
0"
2 3
S500
7' - 0"
CL
12" SQ NWC PEDESTAL
TYP
CF24A
CF
A
CF24A
5' - 6"
ACCESS OPNG
3' - 0"
�CRAWLSPACE
CF
CL
CL
CF60
CF24
CF24
CF
48' - 0"
8"
MODULAR BLDG
BY OTHERS
S500
S500
S500
FOC FOC
CW8
CW
CW8
CW8
CW
CW
FOC
FOC
CW
CF
S500
TYP @ FTG
INTERSECTION
S500
TYP @ STEM WALL
INTERSECTION
S501
3"
4" 4 1
/2"
NOTE:
1. SEE DETAILS , , FOR DEFINITIONS OF LENGTH, WIDTH AND DEPTH.5/ S500 8/ S500 9/ S500
NOTE:
1. CENTER STEM WALL ON FTG UON.
A
B
C
PRELIMINARY
NOT FOR
CONSTRUCTION
Not for permits, pricing or other official purposes. This document has not been completed or checked and is for general information or comment only.
YELLOWSTONE NATIONAL PARK
TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.SUB SHEET NO.DESIGNED:
T. VHAY
CADD:
M. LITZINGER
TECH. REVIEW:
M. PUCKETT
DATE:
A/E FIRM
SHEET
OF5/01/2025
326141A/326104 Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to Stantec without delay. Copyrights to all designs and drawings are the property of Stantec.
Reproduction or use for any purpose other than that authorized by Stantec is forbidden.
Cheyenne, Wyoming 82009 Tel: +1307.634.7848
6/
/2
4:
:5
PM
Au to de sk
D oc s:/ /1
_Y
EL
L_
NP
S/
_s tru c_
8_
2b dr
.rv t
FOUNDATION PLAN - 2BR 185706708
S101 89 94
1/4" = 1'-0"S101
1 2 BDR FOUNDATION PLAN
N
FOOTING SCHEDULE
MARK LENGTH (IN) WIDTH (IN) DEPTH (IN)
LONG.
REINFORCEMENT TRANS REINFORCEMENT
CF24 CONT 24" 12" (2) #5 CONT TOP & BOTT #5 NONE OC
CF24A CONT 24" 24" (2) #5 CONT TOP & BOTT # 4 TIES @ 12"OC
CF60 CONT 60" 12" (5) #5 CONT TOP & BOTT #5 NONE OC
CONCRETE STEM WALL SCHEDULE
MARK WIDTH (IN)
REINFORCING
VERTICAL HORIZONTAL
CW8 8" #5 @ 18" OC #5 @ 18" OC
06/19/2026
PRIME:
STANTEC
CHEYENNE, WY
DRAWING NO.
198433
326141
948906/18/2026
B
C
40' - 0" 8' - 0"
0"
0"
0"
2 3
CF24
CF
CF
CF24
CF60
12" SQ NWC PEDESTAL
TYP
S500
48' - 0"
7' - 0"
CL
5' - 6"
ACCESS OPNG
3' - 0"
�CRAWLSPACE
S500
S500
S500
CF24A
CF24A
CF
A
CL
CL
MODULAR BLDG
BY OTHERS
0"
CW8
FOC FOC
FOC
FOC
CW
CF
CW
CW8
CW
CW
S500
TYP @ FTG
INTERSECTION
S500
TYP @ STEM WALL
INTERSECTION
CW8
S501
4 1 /2"
3"
4 1 /2"
NOTE:
1. SEE DETAILS , , FOR DEFINITIONS OF LENGTH, WIDTH AND DEPTH.5/ S500 8/ S500 9/ S500
NOTE:
1. CENTER STEM WALL ON FTG UON.
PRELIMINARY
NOT FOR
CONSTRUCTION
Not for permits, pricing or other official purposes. This document has not been completed or checked and is for general information or comment only.
YELLOWSTONE NATIONAL PARK
TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
A/E: FIRM
PRIME:
STANTEC
CHEYENNE, WY
SHEET
OF
PL
O
T D
AT
E:
R
EV
IT
V
ER
SI
O N
198433
326141
T. VHAY
M. LITZINGER
M. PUCKETT
06/12/2026
6/
/2
4:
:5
PM
Au to de sk
D oc s:
//1
_Y
EL
L_ N
PS
/0
3_ st ru c_
8_ 2b dr _a da .rv t
FOUNDATION PLAN
2BR - ADAS111
90 94
1/4" = 1'-0"S111
1 2 BDR FOUNDATION PLAN - ADA
N
FOOTING SCHEDULE
MARK LENGTH (IN) WIDTH (IN) DEPTH (IN)
LONG.
REINFORCEMENT TRANS REINFORCEMENT
CF24 CONT 24" 12" (2) #5 CONT TOP & BOT #5 @ 12" OC
CF24A CONT 24" 24" (2) #5 CONT TOP & BOT # 4 TIES @ 12"OC
CF60 CONT 60" 12" (5) #5 CONT TOP & BOT #5 @ 12" OC
CONCRETE STEM WALL SCHEDULE
MARK WIDTH (IN)
REINFORCING
VERTICAL HORIZONTAL
CW8 8" #5 @ 18" OC #5 @ 18" OC
06/19/2026 949006/18/2026
B
C
76' - 0"
0"
0"
0"
8" 54' - 8" 8"
CF24
CF
CF24
CF
CF60
20' - 0" 56' - 0"
2'
- 0
2"
5'
- 0
2"
2'
- 0
S500
PER AND
BEARING WALL FOOTING
CL
7' - 0"
5' - 6"
ACCESS OPNG
3' - 0"
CRAWLSPACE
MODULAR BLDG
BY OTHERS
S500
S500
S500
6" NWC SOG W/
#4 @ 12" OC EW
15/ S500
5/ 8"
0"
5/
8"
6/ S500
S500
TYP @ FTG
INTERSECTION
S500
TYP @ STEM WALL
INTERSECTION
FOC FOC
FOC
FOC
CW8
CW
CF
CW
CW8
CW8
CW
CF
CW
S501
GRINDER PUMP, SAD
FOR EXACT LOCATION
NOTE:
1. SEE DETAILS , , FOR DEFINITIONS OF LENGTH, WIDTH AND DEPTH. 5/ S500 8/ S500 9/ S500
NOTE:
1. CENTER STEM WALL ON FTG UON.
YELLOWSTONE NATIONAL PARK
TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
A/E: FIRM
PRIME:
STANTEC
CHEYENNE, WY
SHEET
OF
PL
O
T D
AT
E:
R
EV
IT
V
ER
SI
O N
198433
326141
T. VHAY
M. LITZINGER
M. PUCKETT
06/12/2026
6/
/2
4:
:1
PM
Au to de sk
D oc s:
//1
_Y
EL
L_ N
PS
/0
3_ st ru c_
8_ 3b dr .rv t
FOUNDATION PLAN - 3BR
S201 91 94
1/4" = 1'-0"S201
1 3 BDR FOUNDATION PLAN
N
FOOTING SCHEDULE
MARK LENGTH (IN) WIDTH (IN) DEPTH (IN)
LONG.
REINFORCEMENT TRANS REINFORCEMENT
CF24 CONT 24" 12" (2) #5 CONT TOP & BOT #5 NONE OC
CF24A CONT 24" 24" (2) #5 CONT TOP & BOT # 4 TIES @ 12"OC
CF60 CONT 60" 12" (5) #5 CONT TOP & BOT #5 NONE OC
CONCRETE STEM WALL SCHEDULE
MARK WIDTH (IN)
REINFORCING
VERTICAL HORIZONTAL
CW8 8" #5 @ 18" OC #5 @ 18" OC
06/19/2026 949106/18/2026
B
C
76' - 0"
0"
0"
0"
CF24
CF
CF24
CF
CF60
20' - 0" 56' - 0"
2'
- 0
2"
5'
- 0
2"
2'
- 0
S500
CL
7' - 0"
5' - 6"
ACCESS OPNG
3' - 0"
CRAWLSPACE
MODULAR BLDG
BY OTHERS
S500
S500
S500
__________________________6" NWC SOG W/
#4 @ 12" OC EW
0 1 /8"
0 1 /8"
0"
S500
TYP @ FTG
INTERSECTION
S500
TYP @ STEM WALL
INTERSECTION
FOC FOC
FOC
FOC
CW8
CW
CW
CW8
CW8
CW
CW
CF
CF
S501
GRINDER PUMP, SAD
FOR EXACT LOCATION
PER AND
BEARING WALL FOOTING
6/ S500 15/ S500
NOTE:
1. SEE DETAILS , AND FOR DEFINITIONS OF LENGTH, WIDTH AND DEPTH.5/ S500 8/ S500
NOTE:
1. CENTER STEM WALL ON FTG UON.
9/ S500
PRELIMINARY
NOT FOR
CONSTRUCTION
Not for permits, pricing or other official purposes. This document has not been completed or checked and is for general information or comment only.
YELLOWSTONE NATIONAL PARK
TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
A/E: FIRM
PRIME:
STANTEC
CHEYENNE, WY
SHEET
OF
PL
O
T D
AT
E:
R
EV
IT
V
ER
SI
O N
198433
326141
T. VHAY
M. LITZINGER
M. PUCKETT
06/12/2026
6/
/2
4:
:3
PM
Au to de sk
D oc s:
//1
_Y
EL
L_ N
PS
/0
3_ st ru c_
8_ 3b dr _a da .rv t
FOUNDATION PLAN
3BR - ADAS211
92 94
1/4" = 1'-0"S211
1 3 BDR FOUNDATION PLAN - ADA
N
FOOTING SCHEDULE
MARK LENGTH (IN) WIDTH (IN) DEPTH (IN)
LONG.
REINFORCEMENT TRANS REINFORCEMENT
CF24 CONT 24" 12" (2) #5 CONT TOP & BOT #5 NONE OC
CF24A CONT 24" 24" (2) #5 CONT TOP & BOT # 4 TIES @ 12"OC
CF60 CONT 60" 12" (5) #5 CONT TOP & BOT #5 @ 12" OC
CONCRETE STEM WALL SCHEDULE
MARK WIDTH (IN)
REINFORCING
VERTICAL
HORIZONTA
L
CW8 8" #5 @ 18" OC #5 @ 18" OC
06/19/2026 949206/18/2026
T/FOUNDATION
99' - 0 1/2"
GRADE
98' - 4 1/2"
2 CL
8"
MA
X 3'
- 6
1'
- 0
7' - 0"
MAX
3' - 0"5' - 6"
15/ S500SOG PER ,
FOR 3-BR PLAN
ONLY
EXTERIOR STEM
WALL PER 9/ S500
(2) #5 JAMB REINF
EA SIDE
GRID
GROUND LINEBACKFILL PER GENERAL NOTES
(OR SPECS) & GEOTECHNICAL
SOIL REPORT TYP
BOT OF TRENCH
EXCAVATION SHALL
NOT EXTEND BELOW
THIS LINE
1.
2.
3.
4.
NOTES:
REINF NOT SHOWN (SEE FOOTING DETAILS).
COMPACTED FILL SHALL BE APPROVED BY THE SEOR/ GEOTECHNICAL ENGINEER.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR SHORING, SHEATHING OR
OTHERWISE MAINTAINING THE SIDES OF THE EXCAVATION FROM CAVING UNTIL ALL
BACKFILL IS COMPLETED.
THE CONTRACTOR SHALL COORDINATE ALL EXCAVATION OPERATIONS WITH BUILDING
FOUNDATION REQUIREMENTS
�10'-0" MIN
9"
FTG PER PLAN
MIN
1' -6"
TRENCH EXCAVATION
B.O.F. ELEV
FTG PER PLAN
FINISH GRADE (SAD
AND/OR CIVIL DWGS)
CONTRACTOR TO LOWER BOT OF
FTG ELEV TO AVOID SURCHARGE
ON (E) SUBGRADE UTILITIES
(E) UTILITY (SEE CIVIL DWGS
FOR SIZE AND LOCATION)
1.
2.
NOTE:
REINF NOT SHOWN (SEE FOOTING DETAILS).
BOF MAY BE LOWERED WITH ADDITIONAL
CONCRETE OR SLURRY UNDERNEATH THE
BOT OF FTG.
1.
NOTES:
SEE PLAN FOR ACTUAL NUMBER
OF REINF BARS.
90° STANDARD
HOOK @ ALL
TERMINATED
REINF TYP T&B
FTG PER PLAN
FTG REINF T&BFTG REINF T&B
90° STD HOOK @ ALL
TERMINATED REINF
TYP T&B
CASE A - CORNER CASE B - T-INTERSECTION
PE
R
PL
AN
W
ID
TH
TIES @ GRADE BEAMS
(WHERE OCCURS PER SCHED)
PE
R
PL
AN
W
ID
TH
TY
P
DE
TA
IL
LA
P
SP
LIC
E
PE
R
TYP DETAIL
LAP SPLICE PER
TY
PS
TY
P
S/
TIES @ GRADE BEAMS
(WHERE OCCURS PER
SCHED)
TYP DETAIL
LAP SPLICE PERBENT BARS TO MATCH SIZE OF FTG
REINF TYP TOP & BOT, ALTERNATE
BENDS WHERE POSSIBLE
2"x4" KEYWAY AT
SEPARATE POURS
TY
P
DE
TA
IL
LA
PS
S
PL
IC
E
PE
R
PER PLAN
WIDTH
BENT BARS TO
MATCH SIZE OF
FTG REINF TYP
TOP & BOT
PROVIDE #5 OR TYPICAL
VERTICAL WALL REINF
WHICHEVER IS GREATER
ALTERNATE BEND
SINGLE CURTAIN
LAP SPLICE
WIDTH PER SCHEDULE
PE
R
SC
HE
DU
LE
DE
PT
H
NWC STEMWALL
& REINF PER PLAN
NWC FTG PER PLAN
OPTIONAL CJ
6"
REINF PER PLAN�
4'
- 0 " M
IN
MODULAR BLDG
BY OTHERS
EQ EQ
CLR
3"
CL
R3"
AB BY OTHERS
6" �
REINF PER PLAN
NWC FTG PER PLAN
WIDTH PER SCHEDULE
PE
R
SC
HE
DU
LE
DE
PT
H
OPTIONAL CJ
FINISH GRADE OR SOG
WHERE OCCURS
EQ EQ
MODULAR BLDG BY
OTHERS
MI
N
4'
- 0
3" C
LR
3" CLR
NWC STEMWALL &
REINF PER PLAN
AB BY OTHERS
ELEVATION
'T'
CL
R2"
CL
R3"
TYP
LAP SPLICE
MIN TYP
2X S
Ld M
IN
T
YP
2" 3"
TY
P
S (1
'-6 " M
AX
MIN TYP
2X S
CLR
3"
(1 '-6
" M
AX
) T
YP
S
T MIN
TYP FTG REINFNWC FTG TYP (WALL ABV
NOT SHOWN FOR CLARITY)
DOWELS TO MATCH WALL
REINF SIZE & SPACING W/ 90
#4 NOSE BAR TYP
TYP FTG REINF SEE PLANS & SOILS
REPORT FOR
SUBGRADE PREP
INDICATES TOF STEP
PARTIAL PLAN
S
S
S
S
TOF ELEV
PER PLAN
TOF ELEV
PER PLAN
CLASS A VAPOR BARRIER
EQ
EQ
PROVIDE CHAIRS OR DOBIE BLOCKS
TO SUPPORT REINFORCING
SLAB ON GRADE, SEE PLAN
FOR THICKNESS AND REINF
1.
NOTES:
SEE GENERAL NOTES FOR SUB-SLAB PREPARATION REQUIREMENTS.
MI
N
1'
- 0
(2) #4 CONT
8"
DOWELS TO MATCH SLAB
REINF SIZE AND SPACING
FINISH GRADE,
PAVING, ETC.
SEE ARCH AND/OR
CIVIL DWGS
SLAB ON GRADE
SEE PLAN FOR
THK AND REINF
2' - 0"
STRUCTURAL FILL TO
EXTEND 4'-0" MIN
2' - 0"
EN SOG PER PLAN
DOWELS W/ SIZE &
SPACING TO MATCH
SLAB REINF
OPTIONAL
CONST JOINT
12" MIN 3"
C
LR
" M
IN
(2) #5 TOP & BOT, TYP
8" M
IN
7" E
MB
ED
CLR
3"
MODULAR BLDG
BY OTHERS
AB BY OTHERS
YELLOWSTONE NATIONAL PARK
TITLE OF SHEET
PMIS/PKG NO.
DRAWING NO.SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
A/E: FIRM
PRIME:
STANTEC
CHEYENNE, WY
SHEET
OF
PL
O
T D
AT
E:
R
EV
IT
V
ER
SI
O N
198433
326141
T. VHAY
M. LITZINGER
M. PUCKETT
06/12/2026
6/
/2
4:
:1
PM
Au to de sk
D oc s:
//1
_Y
EL
L_ N
PS
/0
3_ st ru c_
8_ 3b dr .rv t
FOUNDATION DETAILS
S500 93 94
NTSS500
14 CRAWLSPACE ACCESS OPENING
NTSS500
2 TYP EXCAVATION PARALLEL TO FOOTING
NTSS500
TYP FOOTING
PARALLEL TO (E) UTILITY
NTSS500
5 TYPICAL CONTINUOUS FOOTING INTERSECTIONS
NTSS500
TYPICAL CONCRETE WALL
REINFORCING AT INTERSECTION
NTSS500
TYPICAL RAISED FLOOR FRAMING
AT INTERIOR STEM WALL
NTSS500
TYPICAL RAISED FLOOR FRAMING
AT EXTERIOR STEM WALL
NTSS500
12 TYPICAL STEPPED FOOTING
NTSS500
15 TYPICAL SLAB ON GRADE SECTION
NTSS500
10 EDGE OF SLAB ON GRADE
NTSS500
6 EXTERIOR BEARING WALL FOOTING
06/19/2026 949306/18/2026
6" 3'
- 0
9" MIN 9" MIN
D = Ø OF SLEEVE
D + 1'- 6"
PIPES THRU STEM WALL
SLEEVES, 1" MIN CLR
ALL AROUND PIPES,
CONDUITS, DUCTS, ETC
WALL FOOTING, TYP
FOR PIPES IN THIS AREA
STEP FOOTING SO PIPES
PASS THRU STEM WALL
EXTEND FOOTING
AROUND SLEEVES
1.
NOTES:
FOR PIPES 3'-0" OR LESS BELOW BOTTOM OF FOOTINGS PROVIDE SLEEVE AND CONCRETE AS
SHOWN. FOR PIPES MORE THAN 3'-0" USE STEPPED FOOTING TO STAY WITHIN 3'-0" LIMIT.
FOUNDATION
�DISTRIBUTED
WALL REINF
FLOOR
DOWELS TO MATCH VERT
WALL REINF SIZE & SPACING
3'-0" TYP
'OPENING
REINF'
SEE TYPICAL
WALL REINF
SCHEDULE
WHERE
OPENINGS
STACK EXTEND
REINF BEYOND
FURTHEST
OPENING
(2) #5 x 6'-0" LG
@ EACH CORNER
EXTEND 3' - 0"
OR PROVIDE
HOOK @ TOP
OF WALL
1.
NOTES:
WHERE CLEAR DISTANCE BETWEEN SLEEVES IS NOT POSSIBLE OR WALL
REINFORCEMENT IS INTERRUPTED, TREAT AS A WALL OPENING AND PROVIDE
ADDITIONAL REINFORCING PER TYPICAL DETAILS.
D
3D OR 4" MIN
CONCRETE WALL,
REINF NOT SHOWN
CONDUIT OR PIPING
SLEEVE AT WALL
STANDARD HOOK
ALL GRADES
DIA - FINISHED BEND DIAMETER
BAR SIZE DIA 90° HOOK 180° HOOK
#3 2.25 4.5 2.5 #4 3 6 2.5 #5 3.75 7.5 2.5 #6 4.5 9 3 #7 5.25 10.5 3.5 #8 6 12 4 #9 9 13.5 4.5 #10 10.25 15.25 5 #11 11.25 17 5.75 #14 17 20.25 6.75 #18 22.5 27 9
DIA -
d
90° HOOK
d
180° HOOK
DIA
POINT AT WHICH
BAR IS DEVELOPED
POINT AT WHICH
BAR IS DEVELOPED
Iext b b
BEND
90.000000000000°
BE
ND
0.0
0°
Iext
I ex t
Idh
Idh
Iext
(ALL DIM IN INCHES)
STANDARD HOOK FOR STIRRUPS, TIES AND HOOPS
ALL GRADES
DIA - FINISHED BEND DIAMETER (ALL DIM IN INCHES)
BAR SIZE DIA
90° HOOK 135° HOOK
#3 1.5 3 3 #4 2 3 3 #5 2.5 3.75 3.75 #6 4.5 9 4.5 #7 5.25 10.5 5.25 #8 6 12 6
DIA -
d
90° HOOK
d
135° HOOK
DIA
d
180° HOOK
DIA
180° HOOK
2.5 2.5 2.5
3.5 b BEND
90.000000000000°
BEND
135.000000000000° b
BE
ND
0.0
0°b
Iext Iext
I ex t
I ext
Iext
Iext
1.
NOTES:
DEVELOPMENT LENGTHS IN TABLE ARE FOR NORMAL WEIGHT CONCRETE.
WHERE LIGHTWEIGHT AGGREGATE CONCRETE IS USED, INCREASE
DEVELOPMENT LENGTH BY 33%.
BAR
SIZE
CONCRETE STRENGTH
0'-8"#3 #4 #5 #6 f'c = 3000 PSI
Ldh, DEVELOPMENT LENGTH (1)
#7 #8 #9
#10 #11
0'-11" 1'-2" 1'-4" 1'-7" 1'-10" 2'-1" 2'-3" 2'-6"
0'-7" f'c = 4000 PSI
0'-9" 1'-0" 1'-2" 1'-5" 1'-7" 1'-9" 2'-0" 2'-2"
0'-6" f'c = 3000 PSI
0'-9" 0'-11" 1'-1" 1'-3" 1'-5" 1'-7" 1'-10" 2'-0"
Ldh LdhSPLICE LENGTH OF BARS IN TENSION - L st (inches)
BAR SIZE
#3
Fy
TOP TYP
28 22 f'c (psi)
25 19 22 17 20 16 #4…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .