B08-Attachment_2-01_YELL_326141_Final_CD_Plans_2026_07_22_Part2.pdf
PDF 27 MB Posted
- Attached to
- YELL 326141 YELLOWSTONE MODULAR HOUSING
- Solicitation number
- 140P2026R0078
About this file
This file comprises detailed civil and electrical construction plans for the Yellowstone Modular Housing project (YELL 326141), prepared by Stantec for the National Park Service. The plans cover utility infrastructure, electrical distribution, and site restoration specifications across three primary locations: Mammoth, Northeast Entrance, and Canyon Village.
The civil details specify utility trench construction, water and sewer line installation and separation requirements, fire hydrant installation (Mueller Super Centurion 250 model), sanitary sewer service lines with grinder pump systems (Zoeller Simplex 48" x 120" specification), water meter installation compatible with Flexnet Radio Read systems, and thrust blocking for water line fittings. Critical specifications include water service line separation standards (minimum 10-foot horizontal separation from sewer lines, with 18-inch vertical clearance minimum), pipe bedding and backfill compaction requirements (95% relative compaction per FP-24 specifications), and cement-treated backfill (flowable fill) composition for areas where standard separation cannot be maintained. Water pressure reducing valves (PRVs) are required for services exceeding 80 PSI. The electrical plans detail underground conduit routing, communications vaults, pad-mounted transformer installations coordinated with Northwestern Energy and Flathead Electric, combination 200-ampere meter sockets with disconnects at each modular unit, and compliance with NEC 2026 standards. Electrical loads per unit total 35 kilowatts with conduit sizes ranging from 1.5 inches to 3 inches. The plans also include specifications for restoration of disturbed areas, culvert installation with riprap end treatment, modular block retaining walls (Recon Wall Systems), and utility marking tape and tracer wire requirements. All work requires coordination with the Contracting Officer and existing utility providers, with junction boxes and conduit routing to be verified and submitted prior to installation.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C7.04
UTILITY TRENCH
NOT TO SCALE
1' 1'
NOTES:
1. PIPE BEDDING CONSISTENT WITH SECTION 704.01 OF FP-24.
2. PIPE ZONE BACKFILL (UP TO 12" OVER PIPE) IS CONSISTENT WITH PIPE BEDDING MATERIAL. PIPE ZONE BACKFILL
SHALL BE PLACED AND COMPACTED IN 6" LIFTS.
PIPE BEDDING
WATER SERVICE LINE
WATER LINE VALVE AND BOX
TAPPING SLEEVE & VALVE CONNECTION TO EX WATER LINE
SENSUS iPERL REMOTE
READER
1" SENSUS/XYLEM iPERL METER
WITH RADIO READ ANTENNA
SEE NOTE 4UTILITY MARKING TAPE
PLACE 6"-12" ABOVE PIPE
SEE SPECIFICATIONS
UTILITY MARKING TAPE
TRACER WIRE
ON TOP OF PIPE
BLUE TRACER
WIRE ON TOP
OF PIPE
TRENCH
CONTRACT OFFICER
TRENCH BACKFILL
COMPACTED PER
SPECIFICATION 31 23 00,
95% RELATIVE
COMPACTION.
CONTRACT OFFICER.
DUCTILE IRON
RESILIENT GATE
33 14 00
CONTRACT OFFICER.
CONTRACT OFFICER.
CONTRACT OFFICER.
CONTRACT OFFICER.
DUCTILE IRON
RESILIENT GATE VALVE
SEE SPECIFICATIONS 33 14 00
CONTRACT OFFICER.
CONTRACT OFFICER.
C O
N
TR
AC
T
O
FF
IC
ER
C O
N
TR
AC
CONTRACCONTRAC
C O
N
TR
AC
THERMAL
COIL METER BOX,
INSTALL PLUMB
CONTRAC
CONTRAC
NOTES
1. NO EXCEPTION TO THE MINIMUM HORIZONTAL OR VERTICAL SEPARATION REQUIREMENTS ARE PERMITTED WHEN THE SEWAGE-CARRYING PIPE IS A FORCE MAIN. SERVICE LINES MAY DEVIATE FROM THE 10' REQUIREMENT IF
APPROVED BY CONTRACTING OFFICER.
2. AT CROSSINGS, ONE FULL LENGTH OF WATER LINE PIPE SHALL BE LOCATED SO THAT BOTH JOINTS WILL BE AS FAR
FROM THE SEWER LINE AS POSSIBLE.
3. "L" IS A STANDARD LENGTH OF PIPE AS SUPPLIED BY A PIPE MANUFACTURER.
4. WHERE THE 10-FOOT HORIZONTAL SEPARATION CANNOT BE MAINTAINED, THIS SEPARATION MAY BE REDUCED, PROVIDED THE BOTTOM OF THE WATER LINE IS AT LEAST 18 INCHES HIGHER THAN THE TOP OF THE SEWER LINE
AND THE FOLLOWING ADDITIONAL REQUIREMENTS ARE MET IN ACCORDANCE WITH WPWSS;
A. THE SANITARY SEWER OR STORM DRAIN SHALL BE CONSTRUCTED OF MATERIALS AND WITH JOINTS THAT ARE
EQUIVALENT TO WATER MAIN STANDARDS OF CONSTRUCTION AND SHALL BE TESTED FOR WATER TIGHTNESS BY SEWER LINE METHODS PER SPECIFICATION 33 00 00, OR THE SANITARY SEWER, STORM SEWER, OR WATER MAIN SHALL BE PLACED IN A SEPARATE CASING PIPE. IN EITHER METHOD, THE LENGTH OF SEWER LINE OR
CASING PIPE SHALL EXTEND A MINIMUM OF 9-FEET ON EACH SIDE OF THE CROSSING, AND;
B. WATER MAINS PASSING UNDER SEWER LINES SHALL, IN ADDITION TO THE ABOVE REQUIREMENTS, BE PROTECTED BY PROVIDING ADEQUATE STRUCTURAL SUPPORT FOR THE SEWER LINE. SOIL STRUCTURAL SUPPORT SHALL CONSIST OF CEMENT TREATED BACKFILL (FLOWABLE FILL) BEARING ON UNDISTURBED SOIL.
5. WHEN THE REQUIRED HORIZONTAL AND/OR VERTICAL SEPARATIONS BETWEEN WATER LINES AND SEWER LINES CANNOT BE MET, THE SEWER MAY BE ENCASED IN ONE FOOT OF CEMENT TREATED BACKFILL (FLOWABLE FILL).
6. CEMENT TREATED BACKFILL (FLOWABLE FILL) SHALL MEET THE FOLLOWING CRITERIA:
INGREDIENTS LBS/CY
CEMENT (0.45 SACK) 42
WATER (39 GALLONS) 325
COARSE AGGREGATE (SIZE NO. 57) 1,700
SAND (ASTM C-33) 1,845
THE MAXIMUM DESIRED 28-DAY STRENGTH SHALL BE 30-60 PSI. THERE IS NO COMPACTION REQUIREMENT FOR
CEMENT TREATED BACKFILL.
7. CEMENT-TREATED FILL MATERIALS & INSTALLATION SHALL COMPLY WITH WYOMING DEQ CHAPTER 12 REGULATIONS.
CONTRAC
CONTRAC CONTRAC
C O
N T
R C
C O
N T
R C
PLACE CURB STOP AS
INDICATED ON PLANS
OR AS DIRECTED BY
CONTRACT OFFICER.
WATER AND SEWER LINE SEPARATION
2" WATER SERVICE
REDUCER AND 2" WATER SERVICE
1"
NOTES:
1. INSTALL CURB STOP AT LOCATION APPROVED BY CONTRACTING OFFICER.
2. CURB STOP BOX TO INCLUDE STATIONARY ROD (STAINLESS STEEL) AND PIN;
CONTRACTOR SHALL VERIFY LENGTH.
3. INSIDE NUT SHALL BE HELD WITH A WRENCH WHEN CONNECTION SERVICE LINES.
4. WATER METERS SHALL BE COMPATIBLE WITH THE PARK'S EXISTING FLEXNET RADIO
READ SYSTEM AND SOFTWARE.
5. THE CONTRACTOR SHALL INSTALL PRESSURE REDUCING VALVES (PRVs) ON ANY
SERVICES EXCEEDING 80 PSI OR AS DIRECTED BY THE CONTRACTING OFFICER.
6. THE CONTRACTOR WILL PROVIDE ENOUGH PRVS TO INSTALL ONE ON EACH NEW
SERVICE. AT THE TIME OF INSTALLATION AND IN THE PRESENCE OF THE
CONTRACTING OFFICER, THE CONTRACTOR WILL COMPLETE PRESSURE TESTING AT
EACH NEW SERVICE LOCATION TO CONFIRM WHETHER A PRV IS NEEDED AT THAT
LOCATION. ANY UNINSTALLED PRVs WILL BE GIVEN TO THE CONTRACTING OFFICER
AS SPARES.
COMBINATION AIR RELEASE/VACUUM VALVE
CONTRACT OFFICER.
2"
6' -0
LOCATION SHOWN ON PLANS.
(INSTALL FLUSH WITH GROUND.)
THERMAL
COIL METER BOX,
INSTALL PLUMB
INFLOW PREVENTER RATED FOR POTABLE SUPPLY PROTECTION WITH
COMBO AIR RELEASE/
VACUUM VALVE (2" DIA)
BUG SCREEN, VAL-MATIC FLOODSAFE, OR APPROVED EQUAL BY THE CONTRACT OFFICER.
REDUCER
WATER METER
DESIGNED: SUB SHEET NO. TITLE OF SHEET
06/26/2026 YELLOWSTONE NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/2
1/
:4
PM
U
SE
R
: S O
U
TH
W O
R
TH
, P
AU
L C
:\U
SE
R S\
PS
O
U
TH
W O
R
TH
\S
TA
N
TE
C \C
R O
N
IN
, M
EG
H
AN
N
PS
\Y
EL
L\
D D
\3
1A
_3
4\
C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\N
E- C
AN
YO
N \C
AN
YO
N \C
7.
_D
ET
AI
LS
_1 .D
W G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
326141
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
CHEYENNE, WY
JC
JC
198433
BB/PS/AS
C7.04
CIVIL DETAILS
SHEET 4 OF 7
C7.05
HYDRANT INSTALLATION
THRUST BLOCKING FOR WATER LINE FITTINGS
THRUST BLOCKING
MINIMUM THRUST BLOCK DIMENSIONS
FLATTOP MANHOLE
MANHOLE CHANNEL
CONCRETE COLLAR
UTILITY MARKING TAPE
(TYP)
BLUE TRACER WIRE
(TYP)
THRUST BLOCK
NOTES:
1. HYDRANT SHALL BE A MUELLER SUPER CENTURION 250.
2. METAL TO BE WRAPPED WITH 8 mil POLYETHYLENE.
3. TRACER WIRE SHALL BE INSTALLED PER SPECIFICATIONS.
4. FIRE HYDRANT BOLTS SHALL BE COVERED WITH 8 mil POLYETHYLENE PRIOR TO POURING CONCRETE THRUST BLOCKS.
5. FIRE HYDRANT MANUFACTURER AND PRODUCT DETAILS SHALL MEET THE REQUIREMENT OF YELLOWSTONE NP PUBLIC
WORKS/MAINTENANCE DEPARTMENT TO ENSURE CONSISTENCY FOR MAINTENANCE/REPAIR.
GROUND SURFACE (DRAIN AWAY FROM HYDRANT)
CONTRACTING OFFICER.
DIRECTION OF
TRAFFIC FLOW
COATED WITH 2 COATS
OF CONTRACTING
OFFICER APPROVED
ASPHALT SEALANT
CONCRETE COLLAR AROUND
ADJUSTING RINGS & FRAME.
SEE DETAIL 7/C7.05
24"
DESIGNED: SUB SHEET NO. TITLE OF SHEET
06/18/2026 YELLOWSTONE NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
8/
:1
AM
U
SE
R
: S
AC
KE
TT
, A
BB
Y C
:\U
SE
R S\
AS
AC
KE
TT
\S
TA
N
TE
C \C
R O
N
IN
, M
EG
H
AN
N
PS
\Y
EL
L\
D D
\3
1A
_3
4\
C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\N
E- C
AN
YO
N \C
AN
YO
N \C
7.
_D
ET
AI
LS
_1 .D
W G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
326141
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
CHEYENNE, WY
JC
JC
198433
BB/PS/AS
C7.05
CIVIL DETAILS
SHEET 5 OF 7
6/18/26
C7.06
TWO-WAY SANITARY SEWER CLEANOUT
SANITARY SEWER SERVICE LINE
INSULATION BOARD INSTALLATION
GRINDER PUMP
FORCE SEWER SERVICE LINE
GREEN TRACER WIRE
ON TOP OF PIPE
(TYP)
GREEN TRACER
WIRE ON TOP
OF PIPE
(TYP)
TO GRINDER PUMP
UTILITY MARKING TAPE
PLACE 6"-12" ABOVE PIPE
SEE SPECIFICATIONS
TRACER WIRE
ON TOP OF PIPEINSULATION BOARD SHALL BE HIGH
DENSITY, EXTRUDED POLYSTYRENE
FOAM INSULATION BOARD, AND SHALL
COMPLY WITH ASTM C 578 TYPE IV
PLACE A 2"X4" STUD AT PROPERTY
LINE, MIN 12" ABOVE GROUND, AS
DIRECTED BY CONTRACT OFFICER.
FLOW
CONTRAC
CONTRAC
AS NEEDED
NOTES:
1. GRINDER PUMP SHALL BE A ZOELLER SIMPLEX 48" X 120" GRINDER PACKAGE WITH M803 OR APPROVED EQUAL IN TERMS OF SIZE, PERFORMANCE, AND FUNCTIONALITY.
2. SEE ARCHITECTURAL PLANS AND STRUCTURAL PLANS FOR WET WELL LOCATION.
3. FLOATS SHALL BE INSTALLED TO A PVC FLOAT TREE THAT IS MOUNTED TO THE SIDE OF THE WET WELL. THE FLOAT TREE SHALL BE EASILY REMOVABLE, IN ITS ENTIRETY, WITHOUT HAVING TO ENTER THE WET WELL. FLOATS SHALL BE PROGRAMMED TO TURN THE PUMP "OFF" WHEN WET WELL LEVEL IS 1.83' ABOVE THE SUMP BOTTOM, PUMP "ON" WHEN WET WELL LEVEL IS 4' ABOVE THE SUMP BOTTOM, AND PUMP "ALARM" WHEN WET WELL LEVEL IS 4.5' ABOVE THE PUMP INTAKE.
4 . FLOATS SHALL CONNECT TO THE PUMP CONTROL PANEL. PUMP CONTROL PANEL SHALL BE MOUNTED TO THE INSIDE GARAGE WALL. PUMP CONTROL PANEL SHALL INCLUDE
A HAND-OFF-AUTO (HOA) SWITCH, AN ELAPSED TIME METER, AND A PUMP CYCLE COUNTER.
5. ALL METAL FASTENERS USED IN THE WET WELL SHALL BE STAINLESS STEEL (GRADE 302).
6. SHUT-OFF VALVE SHALL BE EASILY REACHABLE AND OPERABLE FROM THE TOP OF THE WET WELL.
SOLID FIBERGLASS
COVER (BOLTED)
CHECK VALVE
SHUT OFF VALVE
6' MIN.
QUICK DISCONNECT
FITTINGS
3/4 HP GRINDER
PUMP
302 STAINLESS STEEL
LIFTING CABLE
PVC PIPING (TYP)
WATERTIGHT PIPE SEAL
FIBERGLASS
WET WELL BASIN
BASE ELBOW
RAIL SYSTEM
CONNECT WIRING TO
POWER AND PUMP
CONTROL PANEL.
INLET PIPINGGUIDE RAILS
GRADE
2" BASIN DISCHARGE PIPING
GREEN TRACER
WIRE ON TOP
OF PIPE
SELECT BACKFILL MATERIAL
SEE SPECIFICATIONS
2" PVC
TO TRANSITION MANHOLE
FORCE TO GRAVITY SERVICE TRANSITION
CONNECT TO EXISTING SEWER MAIN
WITH FLEXIBLE TAP SADDLE &
STAINLESS STEEL CLAMPS
4" PVC GRAVITY
SANITARY SEWER SERVICE
(LENGTH AS NEEDED)
(TYP)
FIBERGLASS WET WELL BASIN
FOR GRINDER PUMP
2" PVC FORCE
SEWER SERVICE
(LENGTH AS NEEDED)
(TYP)
4"x2" PVC
REDUCER
4"x4" PVC TEE
PVC BENDS AS NECESSARY
(TYP)
CLEANOUT CAPS
(SCREWED ON)
MANHOLE FOR TRANSITION OF
FORCE SERVICE TO GRAVITY SERVICE
FINISHED GRADE
BUILDING INTERFACE
FOUNDATION
REPRESENTATION
2" PVC
WYE
1/4 INCH PER FOOT
48"
6' MIN.
(FROST DEPTH)
DESIGNED: SUB SHEET NO. TITLE OF SHEET
06/26/2026 YELLOWSTONE NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/2
1/
:4
PM
U
SE
R
: S O
U
TH
W O
R
TH
, P
AU
L C
:\U
SE
R S\
PS
O
U
TH
W O
R
TH
\S
TA
N
TE
C \C
R O
N
IN
, M
EG
H
AN
N
PS
\Y
EL
L\
D D
\3
1A
_3
4\
C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\N
E- C
AN
YO
N \C
AN
YO
N \C
7.
_D
ET
AI
LS
_1 .D
W G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
326141
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
CHEYENNE, WY
JC
JC
198433
BB/PS/AS
C7.06
CIVIL DETAILS
SHEET 6 OF 7
C7.07
RESTORATION - OPEN AREAS
RESTORATION - ASPHALT PAVEMENT
CL
PROPOSED CULVERT
PROPOSED ROAD
EG
NOTES:
1. DO NOT RAISE OUTLET ABOVE EG OR DRAINAGE BED.
2. MIN COVER OVER CULVERT SHALL BE 12 INCHES TO BOTTOM OF PAVEMENT STRUCTURAL
SECTION OR GROUND SURFACE IN NON-PAVED AREAS UNLESS NOTED OTHERWISE.
3. CULVERT SHALL HAVE RIPRAP ON BOTH THE INLET AND OUTLET AS SHOWN.
12" 12"
6"
12"
PIPE BEDDING MATERIAL
CULVERT, SEE PLANS FOR DIAMETER AND MATERIAL
STRUCTURAL BACKFILL MATERIAL (95% RC)
EXISTING UNDISTURBED NATIVE SOIL
NATIVE FILL (90% RC IN NATURAL AREAS, 95% IN
ROADWAY/STRUCTURAL AREAS)
EG
CULVERT END TREATMENT:
PLACE 18" DEPTH RIPRAP
AROUND CULVERT OPENING
TOP OF BANK
12" MIN
OR PER
PLAN
SURFACE TREATMENT PER PLAN
3:1 MAX (TYP.) OR PER PLAN
PROFILE
SECTION
PIPE DIAMETER, SEE PLANS
PIPE DIAMETER, SEE PLANS
10'
10'
CULVERT END TREATMENT:
PLACE 18" DEPTH RIPRAP
AROUND CULVERT OPENING
ROCK DISSIPATER 2
C7.07
NOTES:
1. TRANSITION OVER A 10' DITCH LENGTH UNLESS OTHERWISE SHOWN ON PLAN.
2. RESTORE ALL AREAS DISTURBED OUTSIDE OF ROCK SURFACE AS DIRECTED BY NPS CONTRACTING OFFICER.
ADJUST 10-FT WIDTH WHERE
APPLICABLE DEPENDING
ON ACTUAL DITCH WIDTH
PER PLAN (FINAL)
10' PLACE CLASS 1 RIPRAP,
MIN 18-INCH THICK
PLAN
INVERT OF CULVERT
BEGIN TRANSITION TO ROCK DISSIPATER
DISSIPATER, PLACE CLASS 1 RIPRAP,
MIN 18-INCH THICK
SECTION C
FLOW LINE
MEET EG
C
24"
18"
18"
EG
FILTER
FABRIC
KEY IN FILTER FABRIC 1'
BELOW GRADE MIN
CULVERT
ROCK DISSIPATOR
UTILITY MARKING TAPE
PLACE 6"-12" ABOVE PIPE
SEE SPECIFICATIONS
UTILITY MARKING TAPE
PLACE 6"-12" ABOVE PIPE
SEE SPECIFICATIONS
8" NATIVE SOIL
MIN. 12" DRAINAGE ZONE
(3 4" CRUSHED STONE)
4°
SUBGRADE: SCARIFY 6" MINIMUM AND COMPACT TO A MINIMUM
OF 95% RELATIVE COMPACTION (MODIFIED PROCTER)
LEVELING PAD (6" MIN. THICKNESS)
UNREINFORCED CONCRETE OR CLASS E
AGGREGATE BASE COMPACTED TO 95%
MODIFIED DRY DENSITY
VARIES
DRAIN PIPE
(4" MIN.)
APPROXIMATE LIMITS OF EXCAVATION
1:1 BENCH CUT RECOMMENDED
MIN. 6" EMBEDMENT
NOTES:
1. MODULAR BLOCK RETAINING WALL SHALL BE RECON WALL SYSTEMSTM, GRAVITY RETAINING WALL, PRODUCT OR APPROVED
EQUAL IN TERMS OF SIZE, PERFORMANCE, AND FUNCTIONALITY.
2. FINISHED GRADE AT TOP OF WALL SHALL BE GRADED TO PREVENT PONDING.
2. THE LEVELING PAD MUST EXTEND 6" (MINIMUM) IN FRONT AND 6" (MINIMUM) IN BACK OF THE BASE BLOCK.
3. SET THE BASE BLOCK AND CHECK FOR LEVEL FROM FRONT TO BACK.
4. EMBEDMENT SHALL BE A MINIMUM 6" WITH LEVEL GRADE AT THE TOE.
5. COMPACTION TO THE SPECIFIED EMBEDMENT DEPTH SHALL BE DONE IN FRONT OF THE BASE BLOCK BEFORE COMPACTION IS
DONE BEHIND THE BASE BLOCK.
6. DRAIN TILE SHALL BE PERFORATED 4" PVC PIPE WRAPPED IN A NON-WOVEN GEOTEXTILE FABRIC. DRAIN TILE SHALL DAYLIGHT
AT EACH END OF THE WALL AND THRU THE WALL FACE AT 50-FT INCREMENTS.
7. DRAINAGE ZONE (3/4" CRUSHED STONE) INTERFACE SHALL BE WRAPPED IN NON-WOVEN GEOTEXTILE FABRIC ON ALL SIDES.
8. SEE BLOCK MANUFACTURER'S SPECIFICATION & INSTALLATION INSTRUCTIONS FOR MORE DETAILS.
24M
39B
24M
24T
24M
FINISHED GRADE
AWAY FROM WALL
24" DEEP TOP BLOCK
39" DEEP BASE BLOCK
24" DEEP MIDDLE BLOCKS
(AS NECESSARY)
4" PVC DRAIN PIPE
DAYLIGHT AT LOWEST ELEVATION
EVERY 50' OR AS DIRECTED BY
CONTRACTING OFFICER
FINISHED GRADE
BOTTOM OF WALL
PARTIAL WALL PROFILE
MODULAR BLOCK RETAINING WALL
12" (TYP)
DESIGNED: SUB SHEET NO. TITLE OF SHEET
06/18/2026 YELLOWSTONE NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
8/
:1
AM
U
SE
R
: S
AC
KE
TT
, A
BB
Y C
:\U
SE
R S\
AS
AC
KE
TT
\S
TA
N
TE
C \C
R O
N
IN
, M
EG
H
AN
N
PS
\Y
EL
L\
D D
\3
1A
_3
4\
C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\N
E- C
AN
YO
N \C
AN
YO
N \C
7.
_D
ET
AI
LS
_1 .D
W G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
326141
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
CHEYENNE, WY
JC
JC
198433
BB/PS/AS
C7.07
CIVIL DETAILS
SHEET 7 OF 7
BONEYARD SERVICE RD
SEE SHEET C5.01
FOR PROPOSED
WATER AND SEWER,
TYP
PR
O
SP
EC
T
TE
RR
AC
E
ST
COMMUNICATIONS VAULT
PAD MOUNTED
TRANSFORMER
EXISTING UTILITY
JUNCTION ENCLOSURE
COMMUNICATIONS VAULT
EXISTING TELECOMM PEDESTAL
1.5"C - COMM
2/0 TRIPLEX SERVICE
AND 1 #6 GND IN 2"
CONDUIT
2.5"C - COMM
3 BEDROOM MODULAR
UNIT WITH GARAGE
E10
COMMUNICATIONS BACKBOARD 4
ELECTRIC METER
LOT 1
#2AL PRIMARY
IN 2" CONDUIT
EXISTING
UTILITY
JUNCTION
ENCLOSURE
EXISTING 3PH PRIMARY
CONDUCTOR IN 3-2" CONDUIT
2.5"C - COMM
1. JUNCTION BOX LOCATIONS AND CONDUIT
ROUTING ARE SCHEMATIC. ALIGN JUNCTION
BOXES WITH PAVEMENT EDGES. CONDUIT
ROUTING SHALL AVOID TREES. SUBMIT CONDUIT
AND JUNCTION BOX LAYOUT PLAN TO ENGINEER
PRIOR TO INSTALLATION.
2. MAINTAIN AND PROTECT ALL EXISTING
UNDERGROUND UTILITIES. CONTRACTOR TO
PROVIDE LOCATE PRIOR TO ANY EXCAVATION.
PRIOR TO STARTING CONSTRUCTION,
CONTRACTOR SHALL CALL "ONE-CALL" FOR
UTILITY LOCATIONS.
3. ALL SPARE/EMPTY CONDUIT TO BE PROVIDED
WITH NYLON PULL STRINGS.
4. ALL JUNCTION BOXES AND CONDUITS ARE
SHOWN IN APPROXIMATE LOCATIONS. VERIFY
LOCATION OF PROPERTY LINE, EASEMENTS AND
UTILITIES PRIOR TO PLACEMENT.
5. ALL CONDUITS LENGTHS ARE APPROXIMATE.
6. GROUND ALL IN-GROUND JUNCTION BOXES,
HAND HOLES, AND PULL BOXES.
7. ELECTRICAL WORK SHALL COMPLY WITH NEC
2026.
KEY NOTES:
GENERAL NOTES:
LEGEND
INTERCEPT EXISTING UTILITY JUNCTION ENCLOSURE.
COORDINATE WITH NORTHWESTERN ENERGY.
INTERCEPT EXISTING TELECOMM PEDESTAL.
COORDINATE WITH SERVICE PROVIDER.
PROVIDE METER BASE AND TELECOMM BOX AT EACH
MODULAR UNIT PER UTILITY REQUIREMENTS.
COORDINATE WITH SERVING UTILITY. REFER TO
DETAIL 3 ON SHEET E4.
UTILITY PROVIDED PAD MOUNT LID AND
TRANSFORMER. COORDINATE WITH NORTHWESTERN
ENERGY.
UTILITY PROVIDED CONDUIT AND CONDUCTORS.
COORDINATE WITH NORTHWESTERN ENERGY.
UNDERGROUND RACEWAY
COMBINATION 200A METER SOCKET WITH DISCONNECT
2' X 3' X 3' COMMUNICATIONS VAULT
COMMUNICATIONS BACKBOARD
THREE PHASE PADMOUNT LID AND UTILITY TRANSFORMER
DESIGNED: SUB SHEET NO. TITLE OF SHEET
06/12/2026 YELLOWSTONE NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
0/
:0
PM
U
SE
R
: S
AC
KE
TT
, A
BB
Y C
:\U
SE
R S\
AS
AC
KE
TT
\S
TA
N
TE
C \C
R O
N
IN
, M
EG
H
AN
N
PS
\Y
EL
L\
D D
\3
1A
_3
4\
C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\M
AM
M
O
TH
\C 6.
_M
AM
M
O
TH
_E
LE
C
TR
IC
AL
.D W
G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
326141
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
CHEYENNE, WY
JC
JC
198433
BB/PS/AS
E1
MAMMOTH ELECTRICAL
AND TELECOM SITE
PLAN 1 OF 2
0 20 4020
SCALE OF FEET
60406050
POWERHOUSE RD
SEE SHEET C5.02
FOR PROPOSED
WATER AND SEWER,
TYP
H
IG
H
LAN
D
TER
R
AC
E AVE
EXISTING UTILITY
JUNCTION ENCLOSURE
COMMUNICATIONS VAULT
COMMUNICATIONS BACKBOARD
EXISTING TELECOMM PEDESTAL
2/0 TRIPLEX SERVICE
AND 1 #6 GND IN 2"
CONDUIT
1.5"C - COMM
1.5"C - COMM
#2AL PRIMARY
IN 2" CONDUIT
1.5"C - COMM
2.5"C - COMM
PAD MOUNTED
TRANSFORMER
3 BEDROOM MODULAR
UNIT WITH GARAGE,
TYP.
TYP.
LOT 2
LOT 3
LOT 4
2/0 TRIPLEX SERVICE
AND 1 #6 GND IN 2"
CONDUIT
2/0 TRIPLEX SERVICE
AND 1 #6 GND IN 2"
CONDUIT
EXISTING 3PH PRIMARY
CONDUCTOR IN 3-2" CONDUIT
2.5"C - COMM
1. JUNCTION BOX LOCATIONS AND CONDUIT
ROUTING ARE SCHEMATIC. ALIGN JUNCTION
BOXES WITH PAVEMENT EDGES. CONDUIT
ROUTING SHALL AVOID TREES. SUBMIT CONDUIT
AND JUNCTION BOX LAYOUT PLAN TO ENGINEER
PRIOR TO INSTALLATION.
2. MAINTAIN AND PROTECT ALL EXISTING
UNDERGROUND UTILITIES. CONTRACTOR TO
PROVIDE LOCATE PRIOR TO ANY EXCAVATION.
PRIOR TO STARTING CONSTRUCTION,
CONTRACTOR SHALL CALL "ONE-CALL" FOR
UTILITY LOCATIONS.
3. ALL SPARE/EMPTY CONDUIT TO BE PROVIDED
WITH NYLON PULL STRINGS.
4. ALL JUNCTION BOXES AND CONDUITS ARE
SHOWN IN APPROXIMATE LOCATIONS. VERIFY
LOCATION OF PROPERTY LINE, EASEMENTS AND
UTILITIES PRIOR TO PLACEMENT.
5. ALL CONDUITS LENGTHS ARE APPROXIMATE.
6. GROUND ALL IN-GROUND JUNCTION BOXES,
HAND HOLES, AND PULL BOXES.
7. ELECTRICAL WORK SHALL COMPLY WITH NEC
2026.
KEY NOTES:
GENERAL NOTES:
LEGEND
INTERCEPT EXISTING UTILITY JUNCTION ENCLOSURE.
COORDINATE WITH NORTHWESTERN ENERGY.
INTERCEPT EXISTING TELECOMM PEDESTAL.
COORDINATE WITH SERVICE PROVIDER.
PROVIDE METER BASE AND TELECOMM BOX AT EACH
MODULAR UNIT PER UTILITY REQUIREMENTS.
COORDINATE WITH SERVING UTILITY. REFER TO
DETAIL 3 ON SHEET E4.
UTILITY PROVIDED PAD MOUNT LID AND
TRANSFORMER. COORDINATE WITH NORTHWESTERN
ENERGY.
UTILITY PROVIDED CONDUIT AND CONDUCTORS.
COORDINATE WITH NORTHWESTERN ENERGY.
UNDERGROUND RACEWAY
COMBINATION 200A METER SOCKET WITH DISCONNECT
2' X 3' X 3' COMMUNICATIONS VAULT
COMMUNICATIONS BACKBOARD
THREE PHASE PADMOUNT LID AND UTILITY TRANSFORMER
DESIGNED: SUB SHEET NO. TITLE OF SHEET
06/12/2026 YELLOWSTONE NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
0/
:0
PM
U
SE
R
: S
AC
KE
TT
, A
BB
Y C
:\U
SE
R S\
AS
AC
KE
TT
\S
TA
N
TE
C \C
R O
N
IN
, M
EG
H
AN
N
PS
\Y
EL
L\
D D
\3
1A
_3
4\
C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\M
AM
M
O
TH
\C 6.
_M
AM
M
O
TH
_E
LE
C
TR
IC
AL
.D W
G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
326141
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
CHEYENNE, WY
JC
JC
198433
BB/PS/AS
E2
MAMMOTH ELECTRICAL
AND TELECOM SITE
PLAN 2 OF 2
E
E
E
E
G G
G G
OHW
2.5"C - COMM
1.5"C - COMM
COMMUNICATIONS
BACKBOARD
SEE SHEET C5.03
FOR PROPOSED
WATER AND SEWER,
TYP.
3"C - PRIMARY
3"C - 3 #3/0, 1 #6 GND.
(SECONDARY)
EXISTING UTILITY POLE
EXISTING TELECOMM PEDESTAL
PAD MOUNTED
TRANSFORMER VAULT
1.5"C - COMM
3"C - 3 #3/0, 1 #6 GND.
(SECONDARY)
MERIDIAN RD
2 BEDROOM
MODULAR UNIT,
TYP.
EXISTING PAD MOUNTED
TRANSFORMER VAULT
ELECTRIC METER
TYP.
EXISTING 4-PLEX
ST
ST
ST
ST
LO
T 2
LO
T
3"C - PRIMARY
PRIMARY PULLING VAULT 1
1. JUNCTION BOX LOCATIONS AND CONDUIT
ROUTING ARE SCHEMATIC. ALIGN JUNCTION
BOXES WITH PAVEMENT EDGES. CONDUIT
ROUTING SHALL AVOID TREES. SUBMIT CONDUIT
AND JUNCTION BOX LAYOUT PLAN TO ENGINEER
PRIOR TO INSTALLATION.
2. MAINTAIN AND PROTECT ALL EXISTING
UNDERGROUND UTILITIES. CONTRACTOR TO
PROVIDE LOCATE PRIOR TO ANY EXCAVATION.
PRIOR TO STARTING CONSTRUCTION,
CONTRACTOR SHALL CALL "ONE-CALL" FOR
UTILITY LOCATIONS.
3. ALL SPARE/EMPTY CONDUIT TO BE PROVIDED
WITH NYLON PULL STRINGS.
4. ALL JUNCTION BOXES AND CONDUITS ARE
SHOWN IN APPROXIMATE LOCATIONS. VERIFY
LOCATION OF PROPERTY LINE, EASEMENTS AND
UTILITIES PRIOR TO PLACEMENT.
5. ALL CONDUITS LENGTHS ARE APPROXIMATE.
6. GROUND ALL IN-GROUND JUNCTION BOXES,
HAND HOLES, AND PULL BOXES.
7. ELECTRICAL WORK SHALL COMPLY WITH NEC
2026.
KEY NOTES:GENERAL NOTES:LEGEND
UNDERGROUND RACEWAY
COMBINATION 200A METER SOCKET WITH DISCONNECT
COMMUNICATIONS BACKBOARD
THREE PHASE PRIMARY VAULT WITH PAD MOUNTED TRANSFORMER LID
PRIMARY PULLING VAULT
INTERCEPT EXISTING PAD MOUNTED TRANSFORMER
VAULT. PROVIDE RIGID STEEL SWEEP AND RISER 10'
UP POLE. COORDINATE WITH FLATHEAD ELECTRIC.
INTERCEPT EXISTING TELECOMM PEDESTAL.
COORDINATE WITH SERVICE PROVIDER.
PROVIDE METER BASE AND TELECOMM BOX AT EACH
MODULAR UNIT PER UTILITY REQUIREMENTS.
COORDINATE WITH SERVING UTILITY. REFER TO
DETAIL 3 ON SHEET E8.
PROVIDE THREE PHASE PRIMARY VAULT WITH PAD
MOUNT TRANSFORMER LID PER UTILITY
REQUIREMENTS. COORDINATE WITH FLATHEAD
ELECTRIC.
DESIGNED: SUB SHEET NO. TITLE OF SHEET
06/12/2026 YELLOWSTONE NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
0/
:0
PM
U
SE
R
: S
AC
KE
TT
, A
BB
Y C
:\U
SE
R S\
AS
AC
KE
TT
\S
TA
N
TE
C \C
R O
N
IN
, M
EG
H
AN
N
PS
\Y
EL
L\
D D
\3
1A
_3
4\
C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\N
E- C
AN
YO
N \C
AN
YO
N \C
6.
_N E_
EL
EC
TR
IC
AL
.D
W G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
326141
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
CHEYENNE, WY
JC
JC
198433
BB/PS/AS
E3
NE ENTRANCE
ELECTRICAL SITE
PLAN
BOXES WITH PAVEMENT EDGES. CONDUIT
ROUTING SHALL AVOID TREES. SUBMIT CONDUIT
AND JUNCTION BOX LAYOUT PLAN TO ENGINEER
PRIOR TO INSTALLATION.
2. MAINTAIN AND PROTECT ALL EXISTING
UNDERGROUND UTILITIES. CONTRACTOR TO
PROVIDE LOCATE PRIOR TO ANY EXCAVATION.
PRIOR TO STARTING CONSTRUCTION,
CONTRACTOR SHALL CALL "ONE-CALL" FOR
UTILITY LOCATIONS.
3. ALL SPARE/EMPTY CONDUIT TO BE PROVIDED
WITH NYLON PULL STRINGS.
4. ALL JUNCTION BOXES AND CONDUITS ARE
SHOWN IN APPROXIMATE LOCATIONS. VERIFY
LOCATION OF PROPERTY LINE, EASEMENTS AND
UTILITIES PRIOR TO PLACEMENT.
5. ALL CONDUITS LENGTHS ARE APPROXIMATE.
6. GROUND ALL IN-GROUND JUNCTION BOXES,
HAND HOLES, AND PULL BOXES.
7. ELECTRICAL WORK SHALL COMPLY WITH NEC
2026.
KEY NOTES:
GENERAL NOTES:
INTERCEPT EXISTING TELECOMM PEDESTAL.
COORDINATE WITH SERVICE PROVIDER.
UTILITY PROVIDED CONDUIT AND CONDUCTORS.
COORDINATE WITH NORTHWESTERN ENERGY.
LEGEND
UNDERGROUND RACEWAY
COMBINATION 200A METER SOCKET WITH DISCONNECT
2' X 3' X 3' COMMUNICATIONS VAULT
COMMUNICATIONS BACKBOARD
THREE PHASE PADMOUNT LID AND UTILITY TRANSFORMER
W
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW OHW OHW OHW OHW OHW
EXISTING TELECOMM PEDESTAL
2.5"C - COMM
COMMUNICATIONS VAULT 2
COMMUNICATIONS VAULT
2.5"C - COMM
2.5"C - COMM
EXISTING UTILITY POLE 1PH PRIMARY IN
2" CONDUIT
DESIGNED: SUB SHEET NO. TITLE OF SHEET
06/12/2026 YELLOWSTONE NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
0/
:0
PM
U
SE
R
: S
AC
KE
TT
, A
BB
Y C
:\U
SE
R S\
AS
AC
KE
TT
\S
TA
N
TE
C \C
R O
N
IN
, M
EG
H
AN
N
PS
\Y
EL
L\
D D
\3
1A
_3
4\
C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\N
E- C
AN
YO
N \C
AN
YO
N \C
6.
_C
AN
YO
N
_E
LE
C
TR
IC
AL
.D W
G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
326141
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
CHEYENNE, WY
JC
JC
198433
BB/PS/AS
E4
CANYON VILLAGE
ELECTRICAL SITE
PLAN SHEET 1 OF 3
0 20 4020
SCALE OF FEET
SE
E
SH
EE
T E5
BOXES WITH PAVEMENT EDGES. CONDUIT
ROUTING SHALL AVOID TREES. SUBMIT CONDUIT
AND JUNCTION BOX LAYOUT PLAN TO ENGINEER
PRIOR TO INSTALLATION.
2. MAINTAIN AND PROTECT ALL EXISTING
UNDERGROUND UTILITIES. CONTRACTOR TO
PROVIDE LOCATE PRIOR TO ANY EXCAVATION.
PRIOR TO STARTING CONSTRUCTION,
CONTRACTOR SHALL CALL "ONE-CALL" FOR
UTILITY LOCATIONS.
3. ALL SPARE/EMPTY CONDUIT TO BE PROVIDED
WITH NYLON PULL STRINGS.
4. ALL JUNCTION BOXES AND CONDUITS ARE
SHOWN IN APPROXIMATE LOCATIONS. VERIFY
LOCATION OF PROPERTY LINE, EASEMENTS AND
UTILITIES PRIOR TO PLACEMENT.
5. ALL CONDUITS LENGTHS ARE APPROXIMATE.
6. GROUND ALL IN-GROUND JUNCTION BOXES,
HAND HOLES, AND PULL BOXES.
7. ELECTRICAL WORK SHALL COMPLY WITH NEC
2026.
KEY NOTES:
GENERAL NOTES:
PROVIDE METER BASE AND TELCOMM BOX AT EACH
MODULAR UNIT PER UTILITY REQUIREMENTS.
COORDINATE WITH SERVING UTILITY. REFER TO
DETAIL 3 ON SHEET E9.
UTILITY PROVIDED PAD MOUNT LID AND
TRANSFORMER. COORDINATE WITH NORTHWESTERN
ENERGY.
UTILITY PROVIDED CONDUIT AND CONDUCTORS.
COORDINATE WITH NORTHWESTERN ENERGY.
LEGEND
UNDERGROUND RACEWAY
COMBINATION 200A METER SOCKET WITH DISCONNECT
2' X 3' X 3' COMMUNICATIONS VAULT
COMMUNICATIONS BACKBOARD
THREE PHASE PADMOUNT LID AND UTILITY TRANSFORMER
UTILITY JUNCTION ENCLOSURE
E
T
T
SD
X X
X X
X
X
X
X
X X
X
O H
W O
H W
O H
W O
H W
O H
W O
H W
O H
W
OHW
OHW
OHW
OHW OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
O H
W
O H
W O
H W
O H
W O
H W
COMMUNICATIONS VAULT
COMMUNICATIONS
BACKBOARD
COMMUNICATIONS VAULT
SEE SHEETS C5.04 THROUGH C5.07
FOR PROPOSED WATER AND SEWER,
TYP
1.5"C - COMM
1.5"C - COMM
1.5"C - COMM
2 BEDROOM
MODULAR UNIT,
TYP.
2/0 TRIPLEX SERVICE AND
1 #6 GND IN 2" CONDUIT
E10
ELECTRIC METER
TYP.
ST
ST
ST
2.5"C - COMM
LOT 1
LOT 2
LOT 3
1PH LBC4 UTILITY
JUNCTION ENCLOSURE
1PH PRIMARY IN
2" CONDUIT
2.5"C - COMM
2.5"C - COMM
COMMUNICATIONS VAULT
PAD MOUNTED TRANSFORMER
PAD MOUNTED TRANSFORMER
2/0 TRIPLEX SERVICE AND
1 #6 GND IN 2" CONDUIT
2/0 TRIPLEX SERVICE AND
1 #6 GND IN 2" CONDUIT
PAD MOUNTED TRANSFORMER
1PH LBC4 UTILITY
JUNCTION ENCLOSURE
1PH PRIMARY IN 2" CONDUIT
1PH PRIMARY IN
2" CONDUIT
1PH PRIMARY IN 2" CONDUIT
2.5"C - COMM
DESIGNED: SUB SHEET NO. TITLE OF SHEET
06/12/2026 YELLOWSTONE NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
0/
:0
PM
U
SE
R
: S
AC
KE
TT
, A
BB
Y C
:\U
SE
R S\
AS
AC
KE
TT
\S
TA
N
TE
C \C
R O
N
IN
, M
EG
H
AN
N
PS
\Y
EL
L\
D D
\3
1A
_3
4\
C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\N
E- C
AN
YO
N \C
AN
YO
N \C
6.
_C
AN
YO
N
_E
LE
C
TR
IC
AL
.D W
G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
326141
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
CHEYENNE, WY
JC
JC
198433
BB/PS/AS
E5
CANYON VILLAGE
ELECTRICAL SITE
PLAN SHEET 2 OF 3
0 20 4020
SCALE OF FEET
SE
E
SH
EE
T E6
SE
E
SH
EE
T E4
COMMUNICATIONS
BACKBOARD
C O
M M
U N
IC
AT
IO
N
S
VA
U
LT
PAD MOUNTED
TRANSFORMER
PAD MOUNTED
TRANSFORMER
BADGER RD
1.5"C - COMM
2.5"C - COMM
1.5"C - COMM
1.5"C - COMM
2/0 TRIPLEX SERVICE
AND 1 #6 GND IN 2"
CONDUIT
1.5"C - COMM
1.5"C - COMM
1.5"C - COMM
1PH PRIMARY IN
2" CONDUIT
COMMUNICATIONS VAULT
2 BEDROOM
MODULAR UNIT,
TYP.
COMMUNICATIONS VAULT 2
TYP.
LO
T
LOT 4
LOT 5
LO
T 6
LOT 7
LOT 8
LOT 9
LOT 10
1.5"C - COMM
COMMUNICATIONS
BACKBOARD
2/0 TRIPLEX SERVICE
AND 1 #6 GND IN 2"
CONDUIT
2/0 TRIPLEX SERVICE AND
1 #6 GND IN 2" CONDUIT
2/0 TRIPLEX SERVICE AND
1 #6 GND IN 2" CONDUIT
2/0 TRIPLEX SERVICE
AND 1 #6 GND IN 2"
CONDUIT
1PH PRIMARY IN 2"
CONDUIT
2.5"C - COMM
1PH PRIMARY
IN 2" CONDUIT
PAD MOUNTED
TRANSFORMER
COMMUNICATIONS
BACKBOARD
2/0 TRIPLEX SERVICE AND
1 #6 GND IN 2" CONDUIT
2/0 TRIPLEX SERVICE AND
1 #6 GND IN 2" CONDUIT
2.
5"
C
C O
M M
1. JUNCTION BOX LOCATIONS AND CONDUIT
ROUTING ARE SCHEMATIC. ALIGN JUNCTION
BOXES WITH PAVEMENT EDGES. CONDUIT
ROUTING SHALL AVOID TREES. SUBMIT CONDUIT
AND JUNCTION BOX LAYOUT PLAN TO ENGINEER
PRIOR TO INSTALLATION.
2. MAINTAIN AND PROTECT ALL EXISTING
UNDERGROUND UTILITIES. CONTRACTOR TO
PROVIDE LOCATE PRIOR TO ANY EXCAVATION.
PRIOR TO STARTING CONSTRUCTION,
CONTRACTOR SHALL CALL "ONE-CALL" FOR
UTILITY LOCATIONS.
3. ALL SPARE/EMPTY CONDUIT TO BE PROVIDED
WITH NYLON PULL STRINGS.
4. ALL JUNCTION BOXES AND CONDUITS ARE
SHOWN IN APPROXIMATE LOCATIONS. VERIFY
LOCATION OF PROPERTY LINE, EASEMENTS AND
UTILITIES PRIOR TO PLACEMENT.
5. ALL CONDUITS LENGTHS ARE APPROXIMATE.
6. GROUND ALL IN-GROUND JUNCTION BOXES,
HAND HOLES, AND PULL BOXES.
7. ELECTRICAL WORK SHALL COMPLY WITH NEC
2026.
KEY NOTES:
GENERAL NOTES:
PROVIDE METER BASE AND TELCOMM BOX AT EACH
MODULAR UNIT PER UTILITY REQUIREMENTS.
COORDINATE WITH SERVING UTILITY. REFER TO
DETAIL 3 ON SHEET E9.
UTILITY PROVIDED PAD MOUNT LID AND
TRANSFORMER. COORDINATE WITH NORTHWESTERN
ENERGY.
UTILITY PROVIDED CONDUIT AND CONDUCTORS.
COORDINATE WITH NORTHWESTERN ENERGY.
LEGEND
UNDERGROUND RACEWAY
COMBINATION 200A METER SOCKET WITH DISCONNECT
2' X 3' X 3' COMMUNICATIONS VAULT
COMMUNICATIONS BACKBOARD
THREE PHASE PADMOUNT LID AND UTILITY TRANSFORMER
UTILITY JUNCTION ENCLOSURE
DESIGNED: SUB SHEET NO. TITLE OF SHEET
06/12/2026 YELLOWSTONE NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
0/
:0
PM
U
SE
R
: S
AC
KE
TT
, A
BB
Y C
:\U
SE
R S\
AS
AC
KE
TT
\S
TA
N
TE
C \C
R O
N
IN
, M
EG
H
AN
N
PS
\Y
EL
L\
D D
\3
1A
_3
4\
C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\N
E- C
AN
YO
N \C
AN
YO
N \C
6.
_C
AN
YO
N
_E
LE
C
TR
IC
AL
.D W
G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
326141
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
CHEYENNE, WY
JC
JC
198433
BB/PS/AS
E6
CANYON VILLAGE
ELECTRICAL SITE
PLAN SHEET 3 OF 3
0 20 4020
SCALE OF FEET
SE
E
SH
EE
T
SEE SHEET E5
E7
MAMMOTH
ELECTRICAL ONE
LINE DIAGRAM
DESIGNED: SUB SHEET NO. TITLE OF SHEET
06/12/2026 YELLOWSTONE NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
0/
:0
PM
U
SE
R
: S
AC
KE
TT
, A
BB
Y C
:\U
SE
R S\
AS
AC
KE
TT
\S
TA
N
TE
C \C
R O
N
IN
, M
EG
H
AN
N
PS
\Y
EL
L\
D D
\3
1A
_3
4\
C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\M
AM
M
O
TH
\E 3_
EL
EC
TR
IC
AL
_O
N E
LI
N
ES
.D
W G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
326141
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
CHEYENNE, WY
JC
JC
198433
BB/PS/AS
UTILITY-
120/240V
LOT 1 PNL
200A MCB
120/240V
35KW LOAD
BASEBOARD HEAT
DRYER
WATER TANK
RANGE
IF ELECTRIC: # UNITS LOAD
ELECTRICAL LOAD DETAILS - LOT 1
KW
UTILITY TRANSFORMER
TO UTILITY
1 10
SUMP
GENERAL LIGHTS
GENERAL RECEPTACLES
GENERAL APPLIANCES
KW1 5
KW1 5
KW1 4
KW1 1
KW1 2
KW1 3
KW1 5
TOTAL CONNECTED LOAD KW35
UTILITY-
120/240V
LOT 2 PNL
200A MCB
120/240V
35KW LOAD
LOT 3 PNL
200A MCB
120/240V
35KW LOAD
LOT 4 PNL
200A MCB
120/240V
35KW LOAD
ELECTRICAL LOAD DETAILS - LOTS 2-4
UTILITY TRANSFORMER
TO UTILITY
2"C-(3)2/0, (1)#6 GND
2"C-(3)2/0, (1)#6 GND 2"C-(3)2/0,
(1)#6 GND
2"C-(3)2/0, (1)#6 GND
BASEBOARD HEAT
DRYER
WATER TANK
RANGE
IF ELECTRIC: # UNITS LOAD
KW1 10
SUMP
GENERAL LIGHTS
GENERAL RECEPTACLES
GENERAL APPLIANCES
KW1 5
KW1 5
KW1 4
KW1 1
KW1 2
KW1 3
KW1 5
TOTAL CONNECTED LOAD KW35
GROUND
METER
UTILITY TRANSFORMER
LEGEND
E8
NE ENTRANCE
ELECTRICAL ONE
LINE DIAGRAM
DESIGNED: SUB SHEET NO. TITLE OF SHEET
06/12/2026 YELLOWSTONE NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
0/
:0
PM
U
SE
R
: S
AC
KE
TT
, A
BB
Y C
:\U
SE
R S\
AS
AC
KE
TT
\S
TA
N
TE
C \C
R O
N
IN
, M
EG
H
AN
N
PS
\Y
EL
L\
D D
\3
1A
_3
4\
C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\N
E- C
AN
YO
N \C
AN
YO
N \E
4_
EL
EC
TR
IC
AL
_O N
E
LI
N
ES
.D W
G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
326141
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
CHEYENNE, WY
JC
JC
198433
BB/PS/AS
UTILITY-
120/240V
LOT 2 PNL
200A MCB
120/240V
35KW LOAD
BASEBOARD HEAT
DRYER
WATER TANK
RANGE
IF ELECTRIC: # UNITS LOAD
ELECTRICAL LOAD DETAILS - LOT 1
KW
UTILITY TRANSFORMER
TO UTILITY
1 10
SUMP
GENERAL LIGHTS
GENERAL RECEPTACLES
GENERAL APPLIANCES
KW1 5
KW1 5
KW1 4
KW1 1
KW1 2
KW1 3
KW1 5
TOTAL CONNECTED LOAD KW35
3"C-(3)3/0, (1)#6 GND
LOT 1 PNL
200A MCB
120/240V
35KW LOAD
3"C-(3)3/0, (1)#6 GND
BASEBOARD HEAT
DRYER
WATER TANK
RANGE
IF ELECTRIC: # UNITS LOAD
ELECTRICAL LOAD DETAILS - LOT 2
KW1 10
SUMP
GENERAL LIGHTS
GENERAL RECEPTACLES
GENERAL APPLIANCES
KW1 5
KW1 5
KW1 4
KW1 1
KW1 2
KW1 3
KW1 5
TOTAL CONNECTED LOAD KW35
GROUND
METER
E9
CANYON VILLAGE
ELECTRICAL ONE
LINE DIAGRAM
DESIGNED: SUB SHEET NO. TITLE OF SHEET
06/12/2026 YELLOWSTONE NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
0/
:0
PM
U
SE
R
: S
AC
KE
TT
, A
BB
Y C
:\U
SE
R S\
AS
AC
KE
TT
\S
TA
N
TE
C \C
R O
N
IN
, M
EG
H
AN
N
PS
\Y
EL
L\
D D
\3
1A
_3
4\
C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\N
E- C
AN
YO
N \C
AN
YO
N \E
4_
EL
EC
TR
IC
AL
_O N
E
LI
N
ES
.D W
G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
326141
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
CHEYENNE, WY
JC
JC
198433
BB/PS/AS
UTILITY-
120/240V
LOT 4 PNL
200A MCB
120/240V
35KW LOAD
LOT 5 PNL
200A MCB
120/240V
35KW LOAD
LOT 6 PNL
200A MCB
120/240V
35KW LOAD
BASEBOARD HEAT
DRYER
WATER TANK
RANGE
IF ELECTRIC: # UNITS LOAD
ELECTRICAL LOAD DETAILS - LOTS 1-10
KW
UTILITY TRANSFORMER
TO UTILITY
1 10
SUMP
GENERAL LIGHTS
GENERAL RECEPTACLES
GENERAL APPLIANCES
KW1 5
KW1 5
KW1 4
KW1 1
KW1 2
KW1 3
KW1 5
TOTAL CONNECTED LOAD KW35
2"C-(3)2/0, (1)#6 GND 2"C-(3)2/0,
(1)#6 GND
2"C-(3)2/0, (1)#6 GND
LOT 3 PNL
200A MCB
120/240V
35KW LOAD
2"C-(3)2/0, (1)#6 GND
LOT 2 PNL
200A MCB
120/240V
35KW LOAD
2"C-(3)2/0, (1)#6 GND
LOT 1 PNL
200A MCB
120/240V
35KW LOAD
2"C-(3)2/0, (1)#6 GND
LOT 7 PNL
200A MCB
120/240V
35KW LOAD
2"C-(3)2/0, (1)#6 GND
LOT 8 PNL
200A MCB
120/240V
35KW LOAD
2"C-(3)2/0, (1)#6 GND
LOT 9 PNL
200A MCB
120/240V
35KW LOAD
2"C-(3)2/0, (1)#6 GND
LOT 10 PNL
200A MCB
120/240V
35KW LOAD
2"C-(3)2/0, (1)#6 GND
GROUND
METER
POWER METER AND TELECOM BOX
COMMUNICATIONS BACKBOARD
PRIMARY PULLING/PAD MOUNT TRANSFORMER VAULT
COMMUNICATIONS VAULT
DRY UTILITY TRENCH
FINISHED GRADE OR PAVING
18"
32"
42"
42"
36"
TOP VIEW (WITHOUT COVER)
24"
6"
4'-0"
ELECT.
4'-0"
4'-0"
SECTION VIEW
COMBINATION 200A METER
SOCKET WITH DISCONNECT
PAINTED NEMA 3R
HINGED STEEL
ENCLOSURE. 24" X 24"
WITH SCREW DOWN
COVER AND PAD LOCK
HASP.
2"C
3"C
1"C
2"
42"
24"
PAINTED NEMA 3R HINGED STEEL
ENCLOSURE. 24" X 24" WITH SCREW
DOWN COVER AND PAD LOCK HASP.
3" ROUND
METAL POST
60"
60"
42"
42"
3"W RECTANGULAR
SUPPORT BRACE
CONCRETE
3,000 PSI MIN.
24" 12"
36" MIN.
SELECTED BACKFILL
METALLIC MARKER TAPE
PVC CONDUIT
SCHEDULE 40
SIZE AS INDICATED,
TYP
PROVIDE OPENING
FOR GROUND ROD6" SUMP DEEP
OVER GRAVEL FILL
2 LIFT HOLES
1-1/4" DIA
16"X12" KNOCKOUT
2 EA. SIDE
4 LIFTING INSERTS
5/8" DIA.
COVER
24"X36" HINGED LOCKING
STEEL COVER
(2) 2" CHANNEL
24" LONG
PROVIDE OPENING
FOR GROUND ROD
6" SUMP DEEP
OVER GRAVEL FILL
LIFT HOLE 1-1/2"
EACH SIDE
KNOCKOUTS
4 EACH SIDE
LIFT HOLE 1-1/2"
EACH SIDE
RECESSED LIFT HANDLE
COVER-SPRING ASSISTED
DIAMOND PLATE W/ LOCKING
LATCH, TRAFFIC RATING H20
PULLING IRON
1 EACH SIDE
KNOCKOUTS
4 EACH SIDE
(4) 5/8" DIA. LIFTING
INSERTS
CONTENT DESIGNATION
(POWER, TEL, ETC.)
4-"C" GALVANIZED
CHANNELS 24" LONG
(2) 2-1/2" DIA.
GROUND ROD
KNOCKOUT
NOTE: PROVIDE 36" MINIMUM COVER
FOR PRIMARY AND SECONDARY
CONDUIT. PROVIDE 24" MIN COVER
FOR ALL OTHER CONDUIT.
NOTE: PROVIDE PAD MOUNT LID PER
UTILITY REQUIREMENTS WHERE PAD
MOUNT TRANSFORMERS ARE LOCATED.
2.5"C. RGS - INCOMING
1.5" C. RGC - OUTGOING
DESIGNED: SUB SHEET NO. TITLE OF SHEET
06/12/2026 YELLOWSTONE NATIONAL PARK
CADD:
PL
O
T D
AT
E:
/1
0/
:0
PM
U
SE
R
: S
AC
KE
TT
, A
BB
Y C
:\U
SE
R S\
AS
AC
KE
TT
\S
TA
N
TE
C \C
R O
N
IN
, M
EG
H
AN
N
PS
\Y
EL
L\
D D
\3
1A
_3
4\
C
AD
V2
2D R
AW
IN
G S\
C
IV
IL
\N
E- C
AN
YO
N \C
AN
YO
N \C
7.
_D
ET
AI
LS
_1 .D
W G
TECH. REVIEW:
DATE:
DRAWING NO.
OF
326141
PMIS / PKG NO.
SHEET
A/E FIRM
PRIME:
STANTEC
CHEYENNE, WY
JC
JC
198433
BB/PS/AS
E10
ELECTRICAL
AND TELECOM
DETAILS