This document is a site grading and earthwork quantification summary presenting cubic yard calculations for three distinct project areas: Mammoth, NE Entrance, and Canyon. Each section provides comparative data on rough grading to finish grade (EG) conditions, measuring cut volumes, fill volumes, and net cut or import/export quantities in cubic yards.

The Mammoth area shows a net export of 1,294.79 cubic yards, with 1,717.41 cubic yards of cut and 422.63 cubic yards of fill. The NE Entrance area demonstrates a net export of 1,936.71 cubic yards from 2,293.67 cubic yards of cut and 356.95 cubic yards of fill. The Canyon area requires net fill (import) of 1,819.86 cubic yards, calculated from 1,880.1 cubic yards of cut and 3,699.95 cubic yards of fill. All calculations exclude foundation excavation outside the building envelope and do not account for asphalt, concrete, base, and subbase material quantities. Work scope includes pavement and base section punching, sidewalk preparation, parking areas, curb and gutter work, and v-pans as applicable to each site area.

View the file

Other files

File Type Posted
Sol_140P2026R0078_Amd_0004.pdf PDF
B08_Attachment_7_Limitations_on_Subcontracting_Report_0004.xlsx XLSX spreadsheet
B09-140P2026R0078-Amd_4_0004.pdf PDF
B09_Amendment_3__Project_Experience_Questionnaire_0003.docx DOCX document
B09_Amendment_3_General_References_0003.docx DOCX document
B09_Amendment_3_Yellowstone_Canyon_Project_Report_0003.pdf PDF
B09_Amendment_3_Yellowstone_NE_Entrance_Project_Report_0003.pdf PDF
B09_Amendment_3_Yellowstone_Mammoth_Project_Report_0003.pdf PDF
Sol_140P2026R0078_Amd_0003.pdf PDF
B09_Amendment_3__Past_Performance_Questionnaire_0003.docx DOCX document
B09_Amendment_3_Questions_and_Answers_0003.pdf PDF
B09-Attachment_2_-_Revised_Final_Construction_Drawings_2026_08_18_Part7_0002.pdf PDF
B09-Attachment_2_-_Revised_Final_Construction_Drawings_2026_08_18_Part5_0002.pdf PDF
B09-Attachment_2_-_Revised_Final_Construction_Drawings_2026_08_18_Part2_0002.pdf PDF
B09-Attachment_2_-_Revised_Final_Construction_Drawings_2026_08_18_Part6_0002.pdf PDF
Sol_140P2026R0078_Amd_0002.pdf PDF
B09-Attachment_1_-_Revised_Final_CD_Specifications_2026_08_18_0002.pdf PDF
B09-Attachment_2_-_Revised_Final_Construction_Drawings_2026_08_18_Part1_0002.pdf PDF
B09-Attachment_2_-_Revised_Final_Construction_Drawings_2026_08_18_Part4_0002.pdf PDF
B09-140P2026R0078-Amd_2_0002.pdf PDF
B09-Attachment_2_-_Revised_Final_Construction_Drawings_2026_08_18_Part3_0002.pdf PDF
Sol_140P2026R0078_Amd_0001.pdf PDF
Sign_In_Sheet_Page_1_0001.jpg JPG image
Sign_In_Sheet_Page_2_0001.jpg JPG image
B08-YELL_326141_MODULAR_HOUSING_Preproposal__0001.pdf PDF
B08-Attachment_2-01_YELL_326141_Final_CD_Plans_2026_07_22_Part4.pdf PDF
B08-Attachment_2-01_YELL_326141_Final_CD_Plans_2026_07_22_Part2.pdf PDF
B08-Attachment_2-01_YELL_326141_Final_CD_Plans_2026_07_22_Part1.pdf PDF
B08-Attachment_2-01_YELL_326141_Final_CD_Plans_2026_07_22_Part5.pdf PDF
B08-Attachment_1A-03_YELL_326141_Final_Specification_Appendicies_2026_07_22.pdf PDF
B08_Solitation-140P2026R0078_v16_17June2026.pdf PDF
E15_Deliverables_LmtOnSubconRpt_REQD.xlsx XLSX spreadsheet
Sol_140P2026R0078.pdf PDF
B08-Attachment_2-01_YELL_326141_Final_CD_Plans_2026_07_22_Part6.pdf PDF
B08-Attachment_2-01_YELL_326141_Final_CD_Plans_2026_07_22_Part3.pdf PDF
B08-YELL_326141_pre-proposal_project_overview_and_site_visit_(002).pdf PDF
B08-Attachment_1_-_02_YELL_326141_Final_Specifications_2026_07_22.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .