B09-Attachment_2_-_Revised_Final_Construction_Drawings_2026_08_18_Part6_0002.pdf

PDF 25 MB Posted

Attached to
YELL 326141 YELLOWSTONE MODULAR HOUSING
Solicitation number
140P2026R0078
Issued by

About this file

This file contains revised final construction drawings for modular housing units at Yellowstone National Park, specifically plumbing plans and renderings for two-bedroom, three-bedroom, and accessible (ABA) unit configurations. The drawings are preliminary and marked "Not for Construction," indicating they are for general information and coordination purposes only. The document is dated June 18, 2026, and prepared by Stantec (Cheyenne, WY) as the prime A/E firm, with PMIS/PKG No. 94 and Drawing No. 198433.

The plumbing plans illustrate schematic layouts for kitchen, bathroom, laundry, and utility areas across multiple unit types, showing pipe sizes and routing for water supply, drainage, and vent systems. Critical notes specify that mechanical, electrical, and plumbing systems are to be engineered by the residential modular building manufacturer, with all shown engineering serving as reference only. Final design, sizing, and routing of plumbing systems remain the responsibility of the modular housing manufacturer and must comply with manufacturer recommendations, applicable codes, and Authority Having Jurisdiction (AHJ) requirements. The drawings include details on freeze-protected hose bibb locations and ADA-accessible shower provisions where applicable. All renderings are for reference purposes only and depict kitchen and common areas in day and evening conditions.

View the file

Other files

File Type Posted
B09-140P2026R0078-Amd_4_0004.pdf PDF
Sol_140P2026R0078_Amd_0004.pdf PDF
B08_Attachment_7_Limitations_on_Subcontracting_Report_0004.xlsx XLSX spreadsheet
B09_Amendment_3__Past_Performance_Questionnaire_0003.docx DOCX document
B09_Amendment_3__Project_Experience_Questionnaire_0003.docx DOCX document
Sol_140P2026R0078_Amd_0003.pdf PDF
B09_Amendment_3_Questions_and_Answers_0003.pdf PDF
B09_Amendment_3_estimated_cut_and_fill_quantities_0003.pdf PDF
B09_Amendment_3_General_References_0003.docx DOCX document
B09_Amendment_3_Yellowstone_Mammoth_Project_Report_0003.pdf PDF
B09_Amendment_3_Yellowstone_NE_Entrance_Project_Report_0003.pdf PDF
B09_Amendment_3_Yellowstone_Canyon_Project_Report_0003.pdf PDF
B09-Attachment_1_-_Revised_Final_CD_Specifications_2026_08_18_0002.pdf PDF
B09-Attachment_2_-_Revised_Final_Construction_Drawings_2026_08_18_Part4_0002.pdf PDF
B09-Attachment_2_-_Revised_Final_Construction_Drawings_2026_08_18_Part7_0002.pdf PDF
B09-Attachment_2_-_Revised_Final_Construction_Drawings_2026_08_18_Part3_0002.pdf PDF
Sol_140P2026R0078_Amd_0002.pdf PDF
B09-Attachment_2_-_Revised_Final_Construction_Drawings_2026_08_18_Part1_0002.pdf PDF
B09-140P2026R0078-Amd_2_0002.pdf PDF
B09-Attachment_2_-_Revised_Final_Construction_Drawings_2026_08_18_Part2_0002.pdf PDF
B09-Attachment_2_-_Revised_Final_Construction_Drawings_2026_08_18_Part5_0002.pdf PDF
B08-YELL_326141_MODULAR_HOUSING_Preproposal__0001.pdf PDF
Sign_In_Sheet_Page_1_0001.jpg JPG image
Sol_140P2026R0078_Amd_0001.pdf PDF
Sign_In_Sheet_Page_2_0001.jpg JPG image
B08-Attachment_2-01_YELL_326141_Final_CD_Plans_2026_07_22_Part4.pdf PDF
B08-Attachment_1A-03_YELL_326141_Final_Specification_Appendicies_2026_07_22.pdf PDF
B08-Attachment_2-01_YELL_326141_Final_CD_Plans_2026_07_22_Part6.pdf PDF
B08-Attachment_1_-_02_YELL_326141_Final_Specifications_2026_07_22.pdf PDF
B08-Attachment_2-01_YELL_326141_Final_CD_Plans_2026_07_22_Part1.pdf PDF
E15_Deliverables_LmtOnSubconRpt_REQD.xlsx XLSX spreadsheet
B08-Attachment_2-01_YELL_326141_Final_CD_Plans_2026_07_22_Part3.pdf PDF
Sol_140P2026R0078.pdf PDF
B08-Attachment_2-01_YELL_326141_Final_CD_Plans_2026_07_22_Part2.pdf PDF
B08_Solitation-140P2026R0078_v16_17June2026.pdf PDF
B08-YELL_326141_pre-proposal_project_overview_and_site_visit_(002).pdf PDF
B08-Attachment_2-01_YELL_326141_Final_CD_Plans_2026_07_22_Part5.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B

C

PRELIMINARY

NOT FOR

CONSTRUCTION

Not for permits, pricing or other official purposes. This document has not been completed or checked and is for general information or comment only.

YELLOWSTONE NATIONAL PARK

TITLE OF SHEET

PMIS/PKG NO.

DRAWING NO.SUB SHEET NO.DESIGNED:

JC

CADD:

BB/PS/AS

TECH. REVIEW:

LF

DATE:

A/E: FIRM

PRIME:

STANTEC

CHEYENNE, WY

SHEET

OF

P

LO

T D

A

TE

R

E V

IT

V

E R

SI

O

N

198433

:2

:4

P M

A u to d e sk

D o c s:

Y

E L L N

P S /0 a rc h b d r.

rv t

3BR RENDERINGS

326141A901C

Designer 06/12/2026

KITCHEN - DAY

KITCHEN - EVENING

ALL RENDERINGS FOR REFERENCE ONLY

OF 9476D7606/18/2026

A

B

C

PRELIMINARY

NOT FOR

CONSTRUCTION

Not for permits, pricing or other official purposes. This document has not been completed or checked and is for general information or comment only.

YELLOWSTONE NATIONAL PARK

TITLE OF SHEET

PMIS/PKG NO.

DRAWING NO.SUB SHEET NO.DESIGNED:

JC

CADD:

BB/PS/AS

TECH. REVIEW:

LF

DATE:

A/E: FIRM

PRIME:

STANTEC

CHEYENNE, WY

SHEET

OF

P

LO

T D

A

TE

R

E V

IT

V

E R

SI

O

N

198433

:3

:4

P M

A u to d e sk

D o c s:

/1

Y

E L L N

P S a rc h b d r_ a d a .r v t

3BR ABA RENDERINGS

326141A901D

06/12/2026

KITCHEN - DAY

KITCHEN - EVENING

ALL RENDERINGS FOR REFERENCE ONLY

06/18/2026

R a n g e

WH

FD

R e fr ig e ra to r

DW

A

C

B

1 2 3

BEDROOM 01

BEDROOM 02

BATH 02

LAUNDRY/UTILITY

KITCHEN

GREAT ROOM

MUD ROOM

BATH 01

HALL

DISHWASHER

A5

A10

PROVIDE FREEZE-PROTECTED HOSE BIBB.

LOCATION MAY VARY. COORDINATE WITH

MODULAR BUILDINGS MANUFACTURER.

RE: SHOP DRAWINGS.

3"

2"

SHOWER

1 1/2"

3"

2"

2"

DRAIN

VENT

1 1/2"

LAV

WC

OWNER/PURCHASER

RESPONSIBILITY

BATH 01

3" VTR

***THIS PLUMBING LAYOUT IS PROVIDED FOR REFERENCE AND COORDINATION PURPOSES ONLY.

FINAL DESIGN, SIZING, AND ROUTING OF PLUMBING SYSTEMS SHALL BE COMPLETED BY

MODULAR HOUSING MANUFACTURER.

BATH 02

LAUNDRY/

UTILITY

KITCHEN

3" VTR

3"

3"

2"

2"

2"

2"

3"

1 1/2"

1 1/2"

1 1/2"

1 1/2" 1 1/2"

1 1/2"

1 1/2"

LAV

WC

FLOOR

DRAIN

2"

KIT.SINK

2"

WASHER

2" TUB/

SHOWER

1 1/2"

DRAIN

VENT

OWNER/PURCHASER

RESPONSIBILITY

***THIS PLUMBING LAYOUT IS PROVIDED FOR REFERENCE AND COORDINATION PURPOSES ONLY.

FINAL DESIGN, SIZING, AND ROUTING OF PLUMBING SYSTEMS SHALL BE COMPLETED BY

MODULAR HOUSING MANUFACTURER.

A

B

C

PRELIMINARY

NOT FOR

CONSTRUCTION

Not for permits, pricing or other official purposes. This document has not been completed or checked and is for general information or comment only.

YELLOWSTONE NATIONAL PARK

TITLE OF SHEET

PMIS/PKG NO.

DRAWING NO.SUB SHEET NO.DESIGNED:

JC

CADD:

BB/PS/AS

TECH. REVIEW:

LF

DATE:

A/E: FIRM

PRIME:

STANTEC

CHEYENNE, WY

SHEET

OF

P

LO

T D

A

TE

R

E V

IT

V

E R

SI

O

N

198433

:4

:1

P M

A u to d e sk

D o c s:

Y

E L L N

P S /0 a rc h b d r.

rv t

2BR PLUMBING PLAN

326141P101A

06/12/2026

1/4" = 1'-0"P101A

A1 LEVEL 01

PLUMBING NOTES

1 SEE ALL GENERAL NOTES & DISCIPLINE NOTES LOCATED ON A001

2 MECHANICAL, ELECTRICAL AND PLUMBING SYSTEMS TO BE ENGINEERED BY RESIDENTIAL MODULAR

BUILDING MANUFACTURER. ALL ENGINEERING SHOWN IS SCHEMATIC AND FOR REFERENCE ONLY. ALL

SYSTEMS MUST MEET MANUFACTURER RECOMMENDATIONS, ALL APPLICABLE CODES AND AHJ

REQUIREMENTS.

n g e

M ic ro w a v e

WH

FD

R e fr ig e ra to r

DW

A

B

C

1 2 3

BEDROOM 02

BEDROOM 01

HALL

BATH 02 ABA

BATH 01

MUD ROOM

GREAT ROOM

KITCHEN

DISHWASHER

ADA SHOWER

B8

PROVIDE ACCESSIBLE FREEZE-PROTECTED HOSE BIBB.

LOCATION MAY VARY. COORDINATE WITH MODULAR

BUILDINGS MANUFACTURER. RE: SHOP DRAWINGS.

3"

2"

SHOWER

1 1/2"

3"

2"

2"

DRAIN

VENT

1 1/2"

LAV

WC

OWNER/PURCHASER

RESPONSIBILITY

BATH 01

3" VTR

***THIS PLUMBING LAYOUT IS PROVIDED FOR REFERENCE AND COORDINATION PURPOSES ONLY.

FINAL DESIGN, SIZING, AND ROUTING OF PLUMBING SYSTEMS SHALL BE COMPLETED BY

MODULAR HOUSING MANUFACTURER.

BATH 02 ABA

KITCHEN

3" VTR

3"

2"

2"

2"

3"

1 1/2"

1 1/2"

1 1/2"

1 1/2"

DRAIN

VENT

OWNER/PURCHASER

RESPONSIBILITY

2"

3"

1 1/2" 2"

WASHER

2"

SHOWER

FLOOR

DRAIN

WC

1 1/2"

LAV

2"

KIT. SINK

2"

1 1/2"

***THIS PLUMBING LAYOUT IS PROVIDED FOR REFERENCE AND COORDINATION PURPOSES ONLY.

FINAL DESIGN, SIZING, AND ROUTING OF PLUMBING SYSTEMS SHALL BE COMPLETED BY

MODULAR HOUSING MANUFACTURER.

A

B

C

PRELIMINARY

NOT FOR

CONSTRUCTION

Not for permits, pricing or other official purposes. This document has not been completed or checked and is for general information or comment only.

YELLOWSTONE NATIONAL PARK

TITLE OF SHEET

PMIS/PKG NO.

DRAWING NO.SUB SHEET NO.DESIGNED:

JC

CADD:

BB/PS/AS

TECH. REVIEW:

LF

DATE:

A/E: FIRM

PRIME:

STANTEC

CHEYENNE, WY

SHEET

OF

P

LO

T D

A

TE

R

E V

IT

V

E R

SI

O

N

198433

:0

:1

P M

A u to d e sk

D o c s:

/1

Y

E L L N

P S a rc h b d r_ a d a .r v t

2BR ABA PLUMBING PLAN

326141A/326104P101B

07/15/25

1/4" = 1'-0"P101B

A1 LEVEL 1

PLUMBING NOTES

1 SEE ALL GENERAL NOTES & DISCIPLINE NOTES LOCATED ON A001

2 MECHANICAL, ELECTRICAL AND PLUMBING SYSTEMS TO BE ENGINEERED BY RESIDENTIAL MODULAR

BUILDING MANUFACTURER. ALL ENGINEERING SHOWN IS SCHEMATIC AND FOR REFERENCE ONLY. ALL

SYSTEMS MUST MEET MANUFACTURER RECOMMENDATIONS, ALL APPLICABLE CODES AND AHJ

06/12/202606/18/2026 n g e

R e fr ig e ra to r

WH

FD

D W

A

B

C

2 31

LIVING ROOM BEDROOM 1

BATH 01

WIC 01

KITCHEN

DINING

FOYER

BEDROOM 02

LAUNDRY

HALL

BEDROOM 03

BATH 02

PROVIDE FREEZE-PROTECTED HOSE BIBB.

LOCATION MAY VARY. COORDINATE WITH

MODULAR BUILDINGS MANUFACTURER.

RE: SHOP DRAWINGS.

DRAIN

VENT

OWNER/PURCHASER

RESPONSIBILITY

BATH 01

KITCHEN

2"

SHOWER

WC

1 1/2"

LAV

2"

KIT. SINK

2"

2"

3" 2"

1 1/2"

1 1/2"

1 1/2"

1 1/2"

2"

3"

3" VTR

***THIS PLUMBING LAYOUT IS PROVIDED FOR REFERENCE AND COORDINATION PURPOSES ONLY.

FINAL DESIGN, SIZING, AND ROUTING OF PLUMBING SYSTEMS SHALL BE COMPLETED BY

MODULAR HOUSING MANUFACTURER.

3"

2"

SHOWER

1 1/2"

3"

2"

2"

DRAIN

VENT

1 1/2"

LAV

WC

OWNER/PURCHASER

RESPONSIBILITY

BATH 02

3" VTR

1 1/2"

1 1/2"

1 1/2"

1 1/2"

2"

2"

FLOOR

DRAIN

3"

LAUNDRY

MECH/

STORAGE

2"

WASHER

***THIS PLUMBING LAYOUT IS PROVIDED FOR REFERENCE AND COORDINATION PURPOSES ONLY.

FINAL DESIGN, SIZING, AND ROUTING OF PLUMBING SYSTEMS SHALL BE COMPLETED BY

MODULAR HOUSING MANUFACTURER.

A

B

C

PRELIMINARY

NOT FOR

CONSTRUCTION

Not for permits, pricing or other official purposes. This document has not been completed or checked and is for general information or comment only.

YELLOWSTONE NATIONAL PARK

TITLE OF SHEET

PMIS/PKG NO.

DRAWING NO.SUB SHEET NO.DESIGNED:

JC

CADD:

BB/PS/AS

TECH. REVIEW:

LF

DATE:

A/E: FIRM

PRIME:

STANTEC

CHEYENNE, WY

SHEET

OF

P

LO

T D

A

TE

R

E V

IT

V

E R

SI

O

N

198433

:2

:4

P M

A u to d e sk

D o c s:

Y

E L L N

P S /0 a rc h b d r.

rv t

3BR PLUMBING PLAN

326141P101C

06/12/2026

3/16" = 1'-0"P101C

1A LEVEL 01 PLUMBING PLAN

PLUMBING NOTES

1 SEE ALL GENERAL NOTES & DISCIPLINE NOTES LOCATED ON A001

2 MECHANICAL, ELECTRICAL AND PLUMBING SYSTEMS TO BE ENGINEERED BY RESIDENTIAL MODULAR

BUILDING MANUFACTURER. ALL ENGINEERING SHOWN IS SCHEMATIC AND FOR REFERENCE ONLY. ALL

SYSTEMS MUST MEET MANUFACTURER RECOMMENDATIONS AND ALL APPLICABLE CODES AND AHJ

File details come from the government source that posted it. Updated .