B08-Attachment_2-01_YELL_326141_Final_CD_Plans_2026_07_22_Part4.pdf

PDF 22 MB Posted

Attached to
YELL 326141 YELLOWSTONE MODULAR HOUSING
Solicitation number
140P2026R0078
Issued by

About this file

This document is a preliminary architectural drawing set for a Yellowstone National Park project (PMIS/PKG No. 198433, Drawing No. 326141) prepared by Stantec in Cheyenne, Wyoming. The drawings are marked "NOT FOR CONSTRUCTION" and dated June 12, 2026, with updates through June 18, 2026.

The document contains interior elevation drawings and 3D renderings for residential units featuring both standard and Americans with Disabilities Act (ABA) compliant designs. The 3BR ABA unit includes detailed elevations for an ABA-compliant bathroom, kitchen (front and rear views), dining area, laundry room, and hall closet, with specifications for accessible features such as grab bars, ABA toe kicks, accessible faucets, cabinet pulls, and countertop heights. The 2BR unit includes both standard and ABA renderings showing kitchen layouts in day and evening lighting conditions. Key design elements across all spaces include accessible cabinetry, countertops with backsplashes, appropriate clearances and heights per ABA standards, appliance placements (dishwasher, range, oven, refrigerator), and bathroom fixtures with blocking provisions. Drawings are provided at 1/4" = 1'-0" scale and include dimensional notations throughout. This preliminary documentation is intended for general information and comments only, pending final completion and technical review.

View the file

Other files

File Type Posted
Sol_140P2026R0078_Amd_0004.pdf PDF
B08_Attachment_7_Limitations_on_Subcontracting_Report_0004.xlsx XLSX spreadsheet
B09-140P2026R0078-Amd_4_0004.pdf PDF
B09_Amendment_3__Project_Experience_Questionnaire_0003.docx DOCX document
B09_Amendment_3_General_References_0003.docx DOCX document
Sol_140P2026R0078_Amd_0003.pdf PDF
B09_Amendment_3__Past_Performance_Questionnaire_0003.docx DOCX document
B09_Amendment_3_Questions_and_Answers_0003.pdf PDF
B09_Amendment_3_estimated_cut_and_fill_quantities_0003.pdf PDF
B09_Amendment_3_Yellowstone_NE_Entrance_Project_Report_0003.pdf PDF
B09_Amendment_3_Yellowstone_Mammoth_Project_Report_0003.pdf PDF
B09_Amendment_3_Yellowstone_Canyon_Project_Report_0003.pdf PDF
B09-Attachment_2_-_Revised_Final_Construction_Drawings_2026_08_18_Part7_0002.pdf PDF
B09-Attachment_2_-_Revised_Final_Construction_Drawings_2026_08_18_Part3_0002.pdf PDF
Sol_140P2026R0078_Amd_0002.pdf PDF
B09-Attachment_1_-_Revised_Final_CD_Specifications_2026_08_18_0002.pdf PDF
B09-Attachment_2_-_Revised_Final_Construction_Drawings_2026_08_18_Part1_0002.pdf PDF
B09-Attachment_2_-_Revised_Final_Construction_Drawings_2026_08_18_Part4_0002.pdf PDF
B09-140P2026R0078-Amd_2_0002.pdf PDF
B09-Attachment_2_-_Revised_Final_Construction_Drawings_2026_08_18_Part5_0002.pdf PDF
B09-Attachment_2_-_Revised_Final_Construction_Drawings_2026_08_18_Part2_0002.pdf PDF
B09-Attachment_2_-_Revised_Final_Construction_Drawings_2026_08_18_Part6_0002.pdf PDF
Sol_140P2026R0078_Amd_0001.pdf PDF
Sign_In_Sheet_Page_1_0001.jpg JPG image
B08-YELL_326141_MODULAR_HOUSING_Preproposal__0001.pdf PDF
Sign_In_Sheet_Page_2_0001.jpg JPG image
B08-Attachment_2-01_YELL_326141_Final_CD_Plans_2026_07_22_Part2.pdf PDF
B08-Attachment_2-01_YELL_326141_Final_CD_Plans_2026_07_22_Part1.pdf PDF
Sol_140P2026R0078.pdf PDF
B08-Attachment_2-01_YELL_326141_Final_CD_Plans_2026_07_22_Part6.pdf PDF
B08-Attachment_2-01_YELL_326141_Final_CD_Plans_2026_07_22_Part3.pdf PDF
B08-YELL_326141_pre-proposal_project_overview_and_site_visit_(002).pdf PDF
B08-Attachment_1_-_02_YELL_326141_Final_Specifications_2026_07_22.pdf PDF
B08_Solitation-140P2026R0078_v16_17June2026.pdf PDF
E15_Deliverables_LmtOnSubconRpt_REQD.xlsx XLSX spreadsheet
B08-Attachment_2-01_YELL_326141_Final_CD_Plans_2026_07_22_Part5.pdf PDF
B08-Attachment_1A-03_YELL_326141_Final_Specification_Appendicies_2026_07_22.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5'-5" 3'-4" 1'-4" 3'-0" 1"

**CABINETS/DRAWERS

**PULL

**COUNTERTOP & BACKSPLASH

**ABA TOE KICK

**GRAB BARS INSTALLED PER ABA

REQUIREMENTS; PROVIDE BLOCKING

**ABA FAUCET

**MIRROR

'-1

'-2

8 1/2"

2'-3" 4'-10"

M A

X

'-1

'-6

'-6

**COUNTERTOP & BACKSPLASH

**PULL

**CABINETS

**TOE KICK

**UPPER CABINETS

'-1

1'-0" 2'-0" 3'-0"

1'-6"

1'-6"

**COUNTERTOP

**DRAWER

**PULL

**TOE KICK

**CABINETS

**DISHWASHER

1'-0" 2'-0" 3'-0" 1'-6" 1'-6"

OPEN TO

BEYOND

M A

X

'-1

3'-1" 3'-0" 3'-0"

M A

X

'-1

**COUNTERTOP

**PULL

**CABINETS

**TOE KICK

3'-0" 3'-0" 3'-0"

OPEN TO

BEYOND

'-1

M A

X

'-1

'-8

'-6

'-0

2'-7" 2'-6" 2'-6" 2'-6" 3'-1" 4"

4"

**UPPER CABINETS

**REFRIGERATOR

**COUNTERTOP & BACKSPLASH

**PULL

**LOWER DRAWERS

**OVEN/RANGE

**TOE KICK

'-0

**RANGE HOOD

**FALSE DRAWER

**SWITCHES FOR RANGE HOOD & LIGHT

'-6

'-0

'-0

'-0

'-0

'-6

5'-4"

**SHELVES8

'-0

**MIRROR

**SHOWERHEAD

**SHOWER ROD

**HAND TOWEL

**FAUCET

**DRAWERS

**PULL

**SPOUT

**BATHTUB

**TOE KICK

**CABINET

**TOILET PAPER HOLDER

1'-9" 1'-9"

'-6

A

B

C

PRELIMINARY

NOT FOR

CONSTRUCTION

Not for permits, pricing or other official purposes. This document has not been completed or checked and is for general information or comment only.

YELLOWSTONE NATIONAL PARK

TITLE OF SHEET

PMIS/PKG NO.

DRAWING NO.SUB SHEET NO.DESIGNED:

JC

CADD:

BB/PS/AS

TECH. REVIEW:

LF

DATE:

A/E: FIRM

PRIME:

STANTEC

CHEYENNE, WY

SHEET

OF

P

LO

T D

A

TE

R

E V

IT

V

E R

SI

O

N

198433

:3

:4

P M

A u to d e sk

D o c s:

/1

Y

E L L N

P S a rc h b d r_ a d a .r v t

3BR ABA INTERIOR

ELEVATIONS

326141A610D

06/12/2026

1/4" = 1'-0"A610D

A1 ABA BATH 01 - FRONT

1/4" = 1'-0"A610D

B2 ABA LAUNDRY - FRONT

1/4" = 1'-0"A610D

C2 ABA KITCHEN - REAR

1/4" = 1'-0"A610D

C3 ABA DINING - FRONT

1/4" = 1'-0"A610D

C1 ABA KITCHEN - FRONT

1/4" = 1'-0"A610D

B3 ABA HALL CLOSET - LEFT

1/4" = 1'-0"A610D

B1 BATH 02 - RIGHT

06/18/2026

A

B

C

PRELIMINARY

NOT FOR

CONSTRUCTION

Not for permits, pricing or other official purposes. This document has not been completed or checked and is for general information or comment only.

YELLOWSTONE NATIONAL PARK

TITLE OF SHEET

PMIS/PKG NO.

DRAWING NO.SUB SHEET NO.DESIGNED:

JC

CADD:

BB/PS/AS

TECH. REVIEW:

LF

DATE:

A/E: FIRM

PRIME:

STANTEC

CHEYENNE, WY

SHEET

OF

P

LO

T D

A

TE

R

E V

IT

V

E R

SI

O

N

198433

:4

:1

P M

A u to d e sk

D o c s:

Y

E L L N

P S /0 a rc h b d r.

rv t

2BR RENDERINGS

326141A901A

06/12/2026

KITCHEN - EVENING

KITCHEN - DAY

06/18/2026

A

B

C

PRELIMINARY

NOT FOR

CONSTRUCTION

Not for permits, pricing or other official purposes. This document has not been completed or checked and is for general information or comment only.

YELLOWSTONE NATIONAL PARK

TITLE OF SHEET

PMIS/PKG NO.

DRAWING NO.SUB SHEET NO.DESIGNED:

JC

CADD:

BB/PS/AS

TECH. REVIEW:

LF

DATE:

A/E: FIRM

PRIME:

STANTEC

CHEYENNE, WY

SHEET

OF

P

LO

T D

A

TE

R

E V

IT

V

E R

SI

O

N

198433

:0

:1

P M

A u to d e sk

D o c s:

/1

Y

E L L N

P S a rc h b d r_ a d a .r v t

2BR ABA RENDERINGS

326141A/326104A901B

07/23/25

KITCHEN - DAY

KITCHEN - EVENING

06/12/202606/18/2026

File details come from the government source that posted it. Updated .