B08_Attachment_12_Price_Schedule_Blank_6_18_2025.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
BIBE 259631-317515 Chisos Lodge & Water Solicitati
Solicitation number
140P2025R0039
Issued by

About this file

This is a Price Schedule template for a National Park Service (NPS) contract at Big Bend National Park, specifically for the Chisos Basin Project to replace the Chisos Mountains Lodge and rehabilitate the Chisos Basin Water System. The price schedule includes 24 contract line items (CLINs) divided into two primary components: a Lodge Component and a Water Component. Base price items include lodge replacement, water storage/treatment/distribution system rehabilitation, infrastructure upgrades, electric service improvements, and various site-specific infrastructure work. Optional line items cover additional site improvements, equipment installations, accessibility enhancements, photovoltaic systems, and supplementary water system upgrades.

The solicitation (Number 140P2025R0039) is issued by the Department of the Interior's National Park Service, with a project management information system (PMIS) number of 259631-317515. The price schedule requires offerors to submit pricing for both base and optional line items, with a total of 24 line items spanning construction, equipment, electrical, and infrastructure work. Pricing is to be submitted on a lump-sum or unit price basis, with specific instructions to round totals to whole dollars and ensure comprehensive coverage of all project elements. The template indicates the project involves significant infrastructure renewal and modernization at the Chisos Basin area of Big Bend National Park.

View the file

Other files

File Type Posted
07_46_46_FIBER-CEMENT_SIDING_R1_20250818_0005.pdf PDF
Sol_140P2025R0039_Amd_0005.pdf PDF
04_43_21_STONE_VENEER_ASSEMBLIES_R1_20250818_0005.pdf PDF
BIBE_259631-317515_Lodge_Final_CD_Drawings_E8_02_Revision_1_08_18_2025_0004.pdf PDF
Wage_Determination_TX20250120_Dated_July_18_2025_0004.pdf PDF
BIBE_259631-317515_Lodge_Final_CD_Drawings_E2_01_Revision_1_08_18_2025_0004.pdf PDF
BIBE_259631-317515_P2025R0039_Cntr_Provided_Temp_Housing_Stipulations_0004.docx DOCX document
Questions_and_Answers_set_Aug_19_2025_0004.pdf PDF
Sol_140P2025R0039_Amd_0004.pdf PDF
BIBE_259631-317515_Lodge_Final_CD_Drawings_E0_10_Revision_1_08_18_2025_0004.pdf PDF
BIBE_259631-317515_Final_CD_Specifications_Section_075216_Rev_1_08_18_2025_0004.pdf PDF
BIBE_Pipesonic_Report_Oak_Springs_Fill_Line_2024_07_31_0004.pdf PDF
BIBE_Stantec_Tech_Memo_Oak_Springs_Fill_Line_Cond_Assess_Final_2022_11_03_0003.pdf PDF
BIBE_Conceco_Eng_Oak_Springs_Fill_Line_Conditon_Assessment_2002_10_30_0003.pdf PDF
Sol_140P2025R0039_Amd_0003.pdf PDF
Info_for_General_Safety_Briefing_for_All_Contractors_0003.pdf PDF
Sol_140P2025R0039_Amd_0002.pdf PDF
Attendance_List_0002.docx DOCX document
Pre-Bid_Site_Visit_-_Schedule_and_Information_-_7_09_25_0002.pdf PDF
BIBE_259631-317515-Lodge-Water_Pre-Bid_2025-07-08_0002.pptx PPTX presentation
Sol_140P2025R0039_Amd_0001.pdf PDF
B08_Attachment_7_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
Sol_140P2025R0039.pdf PDF
B08_Attachment_8_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part1.pdf PDF
B08_Attachment_10_Solit_PSP_Vol_II_LmtOnSubcontracting_REQD.pdf PDF
B08_Attachment_18_BIBE-259631-317515_Oak_Spring_powerline_UAS_Survey_index_and_photo_log.xlsx XLSX spreadsheet
B08_Attachment_16_BIBE-259631-317515_Map_03_Oak_Spring_powerline_-_middle__N_access_road.pdf PDF
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part2.pdf PDF
B08_Attachment_14_BIBE-259631-317515_Map_01_Oak_Spring_Powerline_-_entire_project_area.pdf PDF
B08_Attachment_15_BIBE-259631-317515_Map_02_Oak_Spring_Powerline_-_overview_with_pole_numbers.pdf PDF
B08_P2025R0039_BIBE_259631_317515_Chisos_Lodge_Clauses_6_18_25.pdf PDF
B08_Attachment_6_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
B08_Attachment_2_BIBE_259631-317515_Water_Final_CD_Drawings__6_18_2025.pdf PDF
B08_Attachment_03_Final_CD_Specifications_6_18_2025.pdf PDF
B08_Attachment_11_Solit_PSP_Vol_II_SubKPlan_REQD_RELEASED_v1_Apr24.pdf PDF
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part3.pdf PDF
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part5.pdf PDF
B08_Attachment_4_Wage_Determination.pdf PDF
B08_Attachment_5_Construction_Contract_Administration.pdf PDF
B08_Attachment_17_BIBE-259631-317515_Map_04_Oak_Spring_Powerline_-_N_portion.pdf PDF
B08_Attachment_13_BIBE_259631-317515_Final_CD_Reports_6_18_2025.pdf PDF
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part4.pdf PDF
B08_Attachment_9_Solit_PSP_Vol_II_GenRefs.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule IGE PRICES

Contract Price Schedule Template
National Park Service (NPS) - Denver Service Center (DSC) | Final v3 01/28/2025 coordinated with Specifications v3 01/28/2025
Solicitation Number:
PARK - PMIS:Big Bend National Park259631-317515
(Project Management Information System)
Developed Area:Chisos Basin
Project Title:Replace the Chisos Mountains Lodge and Rehabilitate the Chisos Basin Water System
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all
option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced
line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related
item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
govern. Round totals and extended prices to whole dollars.
Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasureUnit PriceTotal Price
1Replace Chisos Mountains Lodge (Lodge Component)1L.S.
[CLIN 2 is an Optional CLIN in the section below]----
3Rehabilitate Chisos Basin Water Storage, Treatment, and Distribution System (Water Component)1L.S.
4Oak Springs Pump Replacement and Oak Springs Infrastructure Rehabilitation (Water Component)1L.S.
5Filtration Treatment System (Water Component)1L.S.
6Oak Springs to Chisos Basin Transmission (Fill) Line (Water Component)1L.S.
7Drilled Piers at the Foundation for Chisos Mountains Lodge (Lodge Component)3,860L.F.
22New Lodge Electric Service (Lodge Component)1L.S.
23Oak Springs Electric Service Upgrades (Water Component)1L.S.
24Basin Water System Electric Service Upgrades (Water Component)1L.S.

TOTAL BASE PRICE (Contract Line Item Numbers 1, 3 through 7 and 22 through 24) --------------------------------------------------------

2Site Improvements for Safe and Accessible Access in Immediate Vicinity of New Lodge (Lodge Component)1L.S.
8Kitchen Equipment (Lodge Component)1L.S.
9Retail Store Food Service Equipment (Lodge Component)1L.S.
10Accessible Route Between Lodge, Main Parking Area and Visitors Center (Lodge Component)1L.S.
11Site and Accessibility Improvements for Main Parking Area and Adjacent Areas (Lodge Component)1L.S.
12Motel Units C&D Accessible Parking and Access (Lodge Component)1L.S.
13Rehabilitate Visitor Contact Station (VCS) Restrooms (Lodge Component)1L.S.
14Demolition of Camper Store (Lodge Component)1L.S.
15Restoration of Camper Store Site not including Visitor Wayfinding or Orientation Improvements (Lodge Component)1L.S.
16Restoration of Camper Store Site including Visitor Wayfinding and Orientation Improvements (Lodge Component)1L.S.
17Not Used
18Photovoltaic Panels (Lodge Component)1L.S.
19Battery and Microgrid System (Lodge Component)1L.S.
20Enhanced Commissioning for LEED (Lodge Component)1L.S.
20Structural Upgrade to Oak Springs Pump House (Water Component)1L.S.
21Rainwater Harvesting System (Water Component)1L.S.
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 2 and 8 through 21 -----------------------------------------------------------
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 24) ----------------------------------
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.

File details come from the government source that posted it. Updated .