This document is a Pre-Bid Site Visit information packet for a project at Big Bend National Park involving replacing the Chisos Mountains Lodge and rehabilitating the Chisos Basin Water System. The pre-bid site visit is scheduled for July 16-17, 2025, with strict RSVP requirements by Monday, July 14 at 5pm CT. Potential bidders must email specific park contacts with details including firm name, attendee names, and vehicle information for entry into the park.

The two-day site visit includes detailed itineraries for both days, with Day 1 focusing on the Chisos Basin area and involving tours of water tanks, the lodge, visitor center, and campground facilities. Day 2 will be a restricted tour of Oak Springs Water Line Work, with special vehicle requirements mandating 4WD and high clearance vehicles. Contractors will be grouped and scheduled in specific time slots between 0830 and 1730 hours, with access limited due to terrain constraints. Safety guidelines emphasize preparing for hot conditions, uneven terrain, potential wildlife encounters, and limited cell service throughout the park.

View the file

Other files

File Type Posted
07_46_46_FIBER-CEMENT_SIDING_R1_20250818_0005.pdf PDF
Sol_140P2025R0039_Amd_0005.pdf PDF
04_43_21_STONE_VENEER_ASSEMBLIES_R1_20250818_0005.pdf PDF
BIBE_259631-317515_Lodge_Final_CD_Drawings_E8_02_Revision_1_08_18_2025_0004.pdf PDF
Wage_Determination_TX20250120_Dated_July_18_2025_0004.pdf PDF
BIBE_259631-317515_Lodge_Final_CD_Drawings_E2_01_Revision_1_08_18_2025_0004.pdf PDF
BIBE_259631-317515_P2025R0039_Cntr_Provided_Temp_Housing_Stipulations_0004.docx DOCX document
Questions_and_Answers_set_Aug_19_2025_0004.pdf PDF
Sol_140P2025R0039_Amd_0004.pdf PDF
BIBE_259631-317515_Lodge_Final_CD_Drawings_E0_10_Revision_1_08_18_2025_0004.pdf PDF
BIBE_259631-317515_Final_CD_Specifications_Section_075216_Rev_1_08_18_2025_0004.pdf PDF
BIBE_Pipesonic_Report_Oak_Springs_Fill_Line_2024_07_31_0004.pdf PDF
BIBE_Stantec_Tech_Memo_Oak_Springs_Fill_Line_Cond_Assess_Final_2022_11_03_0003.pdf PDF
BIBE_Conceco_Eng_Oak_Springs_Fill_Line_Conditon_Assessment_2002_10_30_0003.pdf PDF
Sol_140P2025R0039_Amd_0003.pdf PDF
Info_for_General_Safety_Briefing_for_All_Contractors_0003.pdf PDF
Sol_140P2025R0039_Amd_0002.pdf PDF
Attendance_List_0002.docx DOCX document
BIBE_259631-317515-Lodge-Water_Pre-Bid_2025-07-08_0002.pptx PPTX presentation
Sol_140P2025R0039_Amd_0001.pdf PDF
B08_Attachment_7_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
Sol_140P2025R0039.pdf PDF
B08_Attachment_8_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part1.pdf PDF
B08_Attachment_10_Solit_PSP_Vol_II_LmtOnSubcontracting_REQD.pdf PDF
B08_Attachment_18_BIBE-259631-317515_Oak_Spring_powerline_UAS_Survey_index_and_photo_log.xlsx XLSX spreadsheet
B08_Attachment_16_BIBE-259631-317515_Map_03_Oak_Spring_powerline_-_middle__N_access_road.pdf PDF
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part2.pdf PDF
B08_Attachment_14_BIBE-259631-317515_Map_01_Oak_Spring_Powerline_-_entire_project_area.pdf PDF
B08_Attachment_15_BIBE-259631-317515_Map_02_Oak_Spring_Powerline_-_overview_with_pole_numbers.pdf PDF
B08_P2025R0039_BIBE_259631_317515_Chisos_Lodge_Clauses_6_18_25.pdf PDF
B08_Attachment_6_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
B08_Attachment_2_BIBE_259631-317515_Water_Final_CD_Drawings__6_18_2025.pdf PDF
B08_Attachment_03_Final_CD_Specifications_6_18_2025.pdf PDF
B08_Attachment_11_Solit_PSP_Vol_II_SubKPlan_REQD_RELEASED_v1_Apr24.pdf PDF
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part3.pdf PDF
B08_Attachment_12_Price_Schedule_Blank_6_18_2025.xlsx XLSX spreadsheet
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part5.pdf PDF
B08_Attachment_4_Wage_Determination.pdf PDF
B08_Attachment_5_Construction_Contract_Administration.pdf PDF
B08_Attachment_17_BIBE-259631-317515_Map_04_Oak_Spring_Powerline_-_N_portion.pdf PDF
B08_Attachment_13_BIBE_259631-317515_Final_CD_Reports_6_18_2025.pdf PDF
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part4.pdf PDF
B08_Attachment_9_Solit_PSP_Vol_II_GenRefs.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BIG BEND NATIONAL PARK

REPLACE THE CHISOS MOUNTAINS LODGE AND REHABILITATE

THE CHISOS BASIN WATER SYSTEM

BIBE PMIS 259631-317515

Pre-Bid Site Visit: July 16 & 17, 2025

RSVP Instructions

• RSVP DEADLINE is Monday, July 14 by 5pm CT.

• Please email Marcello_arroio@nps.gov, Doug_denk@nps.gov, James_waller@nps.gov, Bruce_beck@nps.gov with the following information:

o Firm Name o Names of Attendees o Number of Vehicles entering the Park on Wednesday July 16 o Number of Vehicles entering the Park on Thursday July 17 o Number of Vehicles traveling to Oak Springs on Thursday July 17 o Confirmation of understanding of vehicle requirements for Oak Springs visit, see below

• We will try to accommodate any attendees arriving without RSVP, but access to Oak Springs without RSVPing is not guaranteed.

General Information

• General info o Entrance fees: There is an entrance fee to enter the Park, however the RSVP list for the site visit will be provided to the entrance stations. Please provide your firm name and reason for visit to the attendant.

o Please carpool as much as possible o There is no food available in Basin – Lunch will NOT be provided o Cell service is very limited and may not be available throughout the Park

• Vehicle Requirements o Make sure you have a reliable vehicle, Park does not provide emergency vehicle services o Special vehicle requirements for vehicles traveling to Oak Springs on Day 2, see below

• Safety o Please read through Big Bend NP Safety Information prior to visit o It will be very hot - bring plenty of water o Site Visit will involve walking on uneven & rocky terrain - wear proper footwear o Bring sun protection & sunscreen o Please be aware that wildlife, including snakes, encounters are possible. Be aware of your surroundings at all times.

mailto:Marcello_arroio@nps.gov mailto:Doug_denk@nps.gov mailto:James_waller@nps.gov mailto:Bruce_beck@nps.gov https://www.nps.gov/bibe/planyourvisit/safety.htm

Day 1 – Wednesday, July 16, 2025

Event Meeting Location Start Time

End Time

Introduction/ Safety Briefing Motel Parking Lot * 08:30 09:00 Chisos Basin Water Tanks Starting from Motel Parking 09:00 10:00 Chisos Basin Lodge Lodge Main Entrance * 10:15 11:45 Visitor Center Outside of Visitor Center * 12:00 12:30 Camper Store Camper Store Entrance 12:30 12:45 Main TH Camper Store Parking 12:45 13:00

Lunch 13:00 13:45 Water Line Work Briefing Amphitheater Overflow * 14:00 14:15 Unguided Campgrounds/Housing Tour Amphitheater Overflow 14:15 15:15 Sewer Plant Access Gated Access Road in Campground* 15:15 15:45 Unguided Free Time N/A

*Google Maps Link

Day 2 – Thursday, July 17, 2025

Day 2 will be a Tour of Oak Springs Water Line Work. Contractors will be scheduled at specific times due to very restricted vehicle access. There will be 2 stops during the tour.

• Special Vehicle Requirements o Make sure you have a reliable vehicle, Park does not provide emergency vehicle services o Vehicle must be 4WD and high clearance o AWD NOT acceptable o Edges of Oak Springs Road are overgrown with desert vegetation, vehicles will likely come in contact with vegetation while driving.

• Oak Springs Visit information o Meeting Location: Oak Springs Trailhead* o First Stop: Heritage Tree* o Second Stop: Oak Springs Tanks * *Google Maps Link

Schedule

• Final schedule will be sent on Tuesday, July 15

• Contracts will be placed in groups in the order RSVPs are received

• Groups time slots are as follows:

o Group 1 – 0830 to 1000 o Group 2 – 1000 to1130 o Group 3 – 1130 to 1300 o Group 4 – 1300 to 1430 o Group 5 – 1430 to 1600 o Group 6 – 1600 to 1730

Attached Maps

• Chisos Basin Meeting Points

• Chisos Basin Campground Meeting Points

• Oak Springs Points

• Big Bend NP Park Map

• Map of Staging Areas https://maps.app.goo.gl/qbfz4xgtsZwU2pzD7 https://maps.app.goo.gl/Rn6jArVv2fid9CJN8 https://maps.app.goo.gl/KQffHLzZMmqQRMZs9 https://maps.app.goo.gl/bobQiJSM8vYNHPhp8 https://maps.app.goo.gl/UUU37JvPdLMfL6xu5 https://maps.app.goo.gl/XoHX5CMYhxxSxU2Y9 https://maps.app.goo.gl/8TW8pGDmHVmMpJAH7 https://maps.app.goo.gl/8mm7Ap5cAFJneYAr5

Map of Chisos Basin

Map of Chisos Basin Campground

Oak Springs Points marroiobebiannosim Callout Day 2: Oak Springs Meeting Point marroiobebiannosim Callout Day 1: Chisos Basin Meeting Points

Not Available Helipad

AREA 1

BIG BEND NATIONAL PARK CONDITIONAL STAGING AREAS KEY PLAN

N.T.S

AREA 1 - CHISOS BASIN

N.T.S

AREA 2 - OCOTILLO FOREST TRAIL

N.T.S

1. FOR ALL REQUIREMENTS ASSOCIATED WITH EACH

CONDITIONAL STAGING AREA, REFER TO DIVISION 1

SPECIFICATION 01 28 00 - CONTRACT REQUIREMENTS

FOR PARK OPERATIONS AND RESOURCE PROTECTION

GENERAL NOTES

AREA 2

AREA 3

AREA 4

AREA 6

AREA 5

AREA 7

AREA 3 - OAK SPRINGS

N.T.S

AREA 4 - HANNOLD DRAW

N.T.S

1. FOR ALL REQUIREMENTS ASSOCIATED WITH EACH

CONDITIONAL STAGING AREA, REFER TO DIVISION 1

SPECIFICATION 01 28 00 - CONTRACT REQUIREMENTS

FOR PARK OPERATIONS AND RESOURCE PROTECTION

GENERAL NOTES

AREA 5 - TORNILLO CREEK ROAD

N.T.S

AREA 6 - DAGGER FLAT ROAD

N.T.S

AREA 7 - NORTH OF GLEN SPRINGS ROAD

N.T.S