B08_Attachment_10_Solit_PSP_Vol_II_LmtOnSubcontracting_REQD.pdf

PDF 67 KB Posted

Attached to
BIBE 259631-317515 Chisos Lodge & Water Solicitati
Solicitation number
140P2025R0039
Issued by

About this file

This document is a Report on Limitations on Subcontracting template designed for small business, 8(a), or other socio-economic set-aside service contracts priced at or above $150,000. The template requires prime contractors to report subcontracting details, specifically tracking the percentage of work performed by the prime contractor and similarly situated subcontractors (SSS) versus non-similarly situated subcontractors (NSS).

The template provides specific subcontracting limitations based on service type: 50% maximum may be subcontracted for services, 85% for general construction, and 75% for construction by special trade contractors. It includes sections for calculating participation percentages, recording total amounts paid to SSS and NSS subcontractors, and mandates a corrective action plan if subcontracting percentages do not comply with contract clauses. This particular template is associated with a National Park Service solicitation (Solicitation Number: 140P2025R0039) for the BIBE 259631-317515 Chisos Lodge & Water Solicitation, though the specific contract details are not filled in on this template.

View the file

Other files

File Type Posted
07_46_46_FIBER-CEMENT_SIDING_R1_20250818_0005.pdf PDF
Sol_140P2025R0039_Amd_0005.pdf PDF
04_43_21_STONE_VENEER_ASSEMBLIES_R1_20250818_0005.pdf PDF
BIBE_259631-317515_Lodge_Final_CD_Drawings_E8_02_Revision_1_08_18_2025_0004.pdf PDF
Wage_Determination_TX20250120_Dated_July_18_2025_0004.pdf PDF
BIBE_259631-317515_Lodge_Final_CD_Drawings_E2_01_Revision_1_08_18_2025_0004.pdf PDF
BIBE_259631-317515_P2025R0039_Cntr_Provided_Temp_Housing_Stipulations_0004.docx DOCX document
Questions_and_Answers_set_Aug_19_2025_0004.pdf PDF
Sol_140P2025R0039_Amd_0004.pdf PDF
BIBE_259631-317515_Lodge_Final_CD_Drawings_E0_10_Revision_1_08_18_2025_0004.pdf PDF
BIBE_259631-317515_Final_CD_Specifications_Section_075216_Rev_1_08_18_2025_0004.pdf PDF
BIBE_Pipesonic_Report_Oak_Springs_Fill_Line_2024_07_31_0004.pdf PDF
BIBE_Stantec_Tech_Memo_Oak_Springs_Fill_Line_Cond_Assess_Final_2022_11_03_0003.pdf PDF
BIBE_Conceco_Eng_Oak_Springs_Fill_Line_Conditon_Assessment_2002_10_30_0003.pdf PDF
Sol_140P2025R0039_Amd_0003.pdf PDF
Info_for_General_Safety_Briefing_for_All_Contractors_0003.pdf PDF
Sol_140P2025R0039_Amd_0002.pdf PDF
Attendance_List_0002.docx DOCX document
Pre-Bid_Site_Visit_-_Schedule_and_Information_-_7_09_25_0002.pdf PDF
BIBE_259631-317515-Lodge-Water_Pre-Bid_2025-07-08_0002.pptx PPTX presentation
Sol_140P2025R0039_Amd_0001.pdf PDF
B08_Attachment_7_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
Sol_140P2025R0039.pdf PDF
B08_Attachment_8_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part1.pdf PDF
B08_Attachment_18_BIBE-259631-317515_Oak_Spring_powerline_UAS_Survey_index_and_photo_log.xlsx XLSX spreadsheet
B08_Attachment_16_BIBE-259631-317515_Map_03_Oak_Spring_powerline_-_middle__N_access_road.pdf PDF
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part2.pdf PDF
B08_Attachment_14_BIBE-259631-317515_Map_01_Oak_Spring_Powerline_-_entire_project_area.pdf PDF
B08_Attachment_15_BIBE-259631-317515_Map_02_Oak_Spring_Powerline_-_overview_with_pole_numbers.pdf PDF
B08_P2025R0039_BIBE_259631_317515_Chisos_Lodge_Clauses_6_18_25.pdf PDF
B08_Attachment_6_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
B08_Attachment_2_BIBE_259631-317515_Water_Final_CD_Drawings__6_18_2025.pdf PDF
B08_Attachment_03_Final_CD_Specifications_6_18_2025.pdf PDF
B08_Attachment_11_Solit_PSP_Vol_II_SubKPlan_REQD_RELEASED_v1_Apr24.pdf PDF
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part3.pdf PDF
B08_Attachment_12_Price_Schedule_Blank_6_18_2025.xlsx XLSX spreadsheet
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part5.pdf PDF
B08_Attachment_4_Wage_Determination.pdf PDF
B08_Attachment_5_Construction_Contract_Administration.pdf PDF
B08_Attachment_17_BIBE-259631-317515_Map_04_Oak_Spring_Powerline_-_N_portion.pdf PDF
B08_Attachment_13_BIBE_259631-317515_Final_CD_Reports_6_18_2025.pdf PDF
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part4.pdf PDF
B08_Attachment_9_Solit_PSP_Vol_II_GenRefs.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Number:

Prime Contractor:

Current Total Contract Price:

Type of Set Aside:

Period of Performance MM/DD/YYYY - MM/DD/YY

Type of Service (Required Participation):

$0

$0 Total Amount Paid To: [Insert SSS company name] $0 Total Amount Paid To: [Insert SSS company name] $0 Total Amount Paid To: [Insert SSS company name] $0 Total Amount Paid To: [Insert SSS company name] $0

Total Amount Paid To: [Insert SSS company name] $0 Add additional rows if more than 5

SSS

$0

Total Amount Paid To: [Insert NSS company name] $0 Total Amount Paid To: [Insert NSS company name] $0 Total Amount Paid To: [Insert NSS company name] $0 Total Amount Paid To: [Insert SSS company name] $0

Total Amount Paid To: [Insert SSS company name] $0 Add additional rows if more than 5

NSS

#DIV/0! Modify formula if additional rows added above

#DIV/0! Modify formula if additional rows added above

[Insert the amount of the original contract + all excuted contract modifications]

If the NSS % noted in line 5 above is not in compliance with the % required by contract clause 52.219-3, 14, 27,29,30 then the prime contractor shall provide a written corrective action plan below:

Corrective Action Plan

Report on Limitations on Subcontracting [Template Version 7/25/19]

1) Services (except construction). 50% maximum may be subcontracted to non-similary situated Subcontractors

2) General construction. 85% maximum may be subcontracted to non-similary situated Subcontractors

3) Construction by special trade contractors. 75% maximum may be subcontracted to non-similary situated Subcontractors

This report is required for small business, 8(a) or other socio-economic set-aside service contracts (including construction) priced at or above $150,000.

[Insert prime contractor's company name]

[Insert contract #]

[Put an X in the applicable box below per clause 52.219-3, 14, 27,29,30]

1) Amount Invoiced by the Prime Contractor:

[Insert type of set-aside: Small Business, HUBZone, SDVOSB, WOSB, 8(a), etc.]

Amounts shown below shall include amounts from all previous invoices and the current invoice. Exclude the cost of materials.

* Similarly Situated Subcontractor (SSS): is a small business subcontractor that is a participant of the same Small Business Administration (SBA) program that qualified the prime contractor as an eligible offeror and awardee of the contract as defined in 13 CFR 125.6 (i.e. Small Business, HUBZone Business, Service Disabled Veteran Owned Small Business (SDOVB), etc.)

2) Portion of Amount Invoiced for All Similarly Situated Subcontractors (SSS)*

3) Portion of Amount Invoiced for Non-Similarly Situated Subcontractors (NSS)

4) Prime & SSS Participation %

** Limitation on Subcontracting Percentage = (Total amount invoiced by the Prime Contractor - Portion of total amount invoiced for Non-Similarly Situated Subcontractors (NSS)/ Total amount invoiced by the Prime Contractor)

Participartion Calculation as of the Current Invoice

5) % subcontracted to NSS

File details come from the government source that posted it. Updated .