This document is an electrical lower floor plan drawing for the Big Bend National Park lodge component project, dated 08-18-2025. The detailed electrical schematic shows the layout of various rooms including mechanical equipment, storage, receiving, electrical room, and corridor spaces, with specific annotations for electrical infrastructure. Key technical notes include requirements for surface junction boxes, transformer installations, power connections for equipment like gas and water meters, generator systems, and a representative photovoltaic inverter panel. The drawing specifies electrical coordination requirements with mechanical and plumbing plans, equipment locations, conduit routing, and exterior device installations. The document is signed by engineers Steve Diffenderfer and Robert Mills, with Diffenderfer taking responsibility for specific scope changes, and is part of the final construction documents for the lodge component.

View the file

Other files

File Type Posted
07_46_46_FIBER-CEMENT_SIDING_R1_20250818_0005.pdf PDF
Sol_140P2025R0039_Amd_0005.pdf PDF
04_43_21_STONE_VENEER_ASSEMBLIES_R1_20250818_0005.pdf PDF
BIBE_259631-317515_Lodge_Final_CD_Drawings_E8_02_Revision_1_08_18_2025_0004.pdf PDF
Wage_Determination_TX20250120_Dated_July_18_2025_0004.pdf PDF
BIBE_259631-317515_P2025R0039_Cntr_Provided_Temp_Housing_Stipulations_0004.docx DOCX document
Questions_and_Answers_set_Aug_19_2025_0004.pdf PDF
Sol_140P2025R0039_Amd_0004.pdf PDF
BIBE_259631-317515_Lodge_Final_CD_Drawings_E0_10_Revision_1_08_18_2025_0004.pdf PDF
BIBE_259631-317515_Final_CD_Specifications_Section_075216_Rev_1_08_18_2025_0004.pdf PDF
BIBE_Pipesonic_Report_Oak_Springs_Fill_Line_2024_07_31_0004.pdf PDF
BIBE_Stantec_Tech_Memo_Oak_Springs_Fill_Line_Cond_Assess_Final_2022_11_03_0003.pdf PDF
BIBE_Conceco_Eng_Oak_Springs_Fill_Line_Conditon_Assessment_2002_10_30_0003.pdf PDF
Sol_140P2025R0039_Amd_0003.pdf PDF
Info_for_General_Safety_Briefing_for_All_Contractors_0003.pdf PDF
Sol_140P2025R0039_Amd_0002.pdf PDF
Attendance_List_0002.docx DOCX document
Pre-Bid_Site_Visit_-_Schedule_and_Information_-_7_09_25_0002.pdf PDF
BIBE_259631-317515-Lodge-Water_Pre-Bid_2025-07-08_0002.pptx PPTX presentation
Sol_140P2025R0039_Amd_0001.pdf PDF
B08_Attachment_7_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
Sol_140P2025R0039.pdf PDF
B08_Attachment_8_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part1.pdf PDF
B08_Attachment_10_Solit_PSP_Vol_II_LmtOnSubcontracting_REQD.pdf PDF
B08_Attachment_18_BIBE-259631-317515_Oak_Spring_powerline_UAS_Survey_index_and_photo_log.xlsx XLSX spreadsheet
B08_Attachment_16_BIBE-259631-317515_Map_03_Oak_Spring_powerline_-_middle__N_access_road.pdf PDF
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part2.pdf PDF
B08_Attachment_14_BIBE-259631-317515_Map_01_Oak_Spring_Powerline_-_entire_project_area.pdf PDF
B08_Attachment_15_BIBE-259631-317515_Map_02_Oak_Spring_Powerline_-_overview_with_pole_numbers.pdf PDF
B08_P2025R0039_BIBE_259631_317515_Chisos_Lodge_Clauses_6_18_25.pdf PDF
B08_Attachment_6_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
B08_Attachment_2_BIBE_259631-317515_Water_Final_CD_Drawings__6_18_2025.pdf PDF
B08_Attachment_03_Final_CD_Specifications_6_18_2025.pdf PDF
B08_Attachment_11_Solit_PSP_Vol_II_SubKPlan_REQD_RELEASED_v1_Apr24.pdf PDF
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part3.pdf PDF
B08_Attachment_12_Price_Schedule_Blank_6_18_2025.xlsx XLSX spreadsheet
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part5.pdf PDF
B08_Attachment_4_Wage_Determination.pdf PDF
B08_Attachment_5_Construction_Contract_Administration.pdf PDF
B08_Attachment_17_BIBE-259631-317515_Map_04_Oak_Spring_Powerline_-_N_portion.pdf PDF
B08_Attachment_13_BIBE_259631-317515_Final_CD_Reports_6_18_2025.pdf PDF
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part4.pdf PDF
B08_Attachment_9_Solit_PSP_Vol_II_GenRefs.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S7.16

S7.16

S7.16

S7.16

J

M

M

M

M

M

M

J

J

J

J

F

STORAGE

MECHANICAL

EQUIPMENT

RECEIVING

ELECTRICAL

ROOM

LOADING

STAIR 2

PLUMBING

EQUIPMENT

CORRIDOR

ELEVATOR 2

GG

WP

N-M-A

N-P-A

CU-LL-03

E-MTS

G WP

G

FSD-LL-01

FSD-LL-02

CU-LL-03

CU-LL-02-A

CU-LL-02-B

ELEV 1

OVERHEAD DOOR OPERATOR1

AHU-LL-01

BSB-LL-01

FCU-LL-01

NEW

GENERATOR

E-P-OPA: 17.

AHU-FAN

G

CU-LL-01

TP-1

CU-LL-02-C

ACCU-LL-01

GM-1

GM-2

WM-2

WM-1

SP-101

RHWP-1

GWH-2

GWH-1

15.

17.

17.

13.

13.

19.

G

21.

23.

21.

23.

23.

21.

21.

60AS

NF

ACCU-LL-01

A

B

C

D

E

F

1 2 3 4 5 6 7 8 9 10 11 AA

D.3

EXVK-AHU-01

RPBA-1

RAIN WATER

HARVESTING

44.

E5.02

400A/3P PV

DISCONNECT

R1

E-P-OPA:

37,39,41.

100AS

NF

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH. REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF

BIG BEND NATIONAL PARK

47608-18-20251

LBW

PWH

RAM

12-10-2024

LOWER FLOOR PLAN -

ELECTRICAL

E2.01 171153

259631-317515

FINAL CONSTRUCTION DOCUMENTS - LODGE COMPONENT

1/8" = 1'-0"

1 LOWER FLOOR PLAN - ELECTRICAL

1. PROVIDE SURFACE JUNCTION BOX FOR CONTROLS

LOCATED 48" AFF AND PROVIDE (1) 3/4"C FROM JUNCTION

BOX TO OVERHEAD DOOR OPERATOR. COORDINATE EXACT

LOCATION OF JUNCTION BOX IN WALL WITH CONTRACTING

OFFICER PRIOR TO ROUGH-IN. COORDINATED WITH

OVERHEAD DOOR SUPPLIER AND PROVIDE ALL ELECTRICAL

FOR A COMPLETE AND OPERATIONAL SYSTEM.

2. PROVIDE 120V-24V BUCK-BOOST TRANSFORMER FOR GAS

AND WATER METERS. COORDINATE MOUNTING LOCATION

WITH EQUIPMENT IN THE ROOM. COORDINATE EXACT

WIRING REQUIREMENTS AND POWER REQUIREMENTS WITH

GAS METER MANUFACTURER PRIOR TO PROCUREMENT OR

INSTALLATION OF ANY EQUIPMENT.

NOTES:GENERAL NOTES:

A. REFER TO EQUIPMENT CONNECTION SCHEDULES FOR EQUIPMENT CONNECTION

REQUIREMENTS.

B. PROVIDE 10AWG CONDUCTORS FOR RECEPTACLE CIRCUITS EXCEEDING TOTAL

LENGTH OF 100 FEET BETWEEN DEVICE AND PANEL.

C. COORDINATE ELECTRICAL INSTALLATION WITH CASEWORK INSTALLER PRIOR TO

ROUGH-IN.

D. COORDINATE ELECTRICAL INSTALLATION WITH MECHANICAL AND PLUMBING

PLANS FOR EQUIPMENT LOCATIONS PRIOR TO ROUGH-IN.

E. LOCATE STARTERS/DISCONNECTS WITHIN SIGHT OF AND ADJACENT TO

EQUIPMENT SERVED UNLESS OTHERWISE NOTED.

F. COORDINATE ROUTING OF EXPOSED CONDUIT AND REVIEW WITH THE

CONTRACTING OFFICER PRIOR TO INSTALLATION.

G. PROVIDE EXTERIOR DEVICES WITH LOCKABLE WEATHERPROOF WHILE-IN-USE

COVERS.

H. COORDINATE COVER PLATE REQUIREMENTS WITH CONTRACTING OFFICER PRIOR

TO INSTALLATION.

I. COORDINATE THE INSTALLATION OF PATHWAY INFRASTRUCTURE WITH

TECHNOLOGY DRAWINGS PRIOR TO ROUGH-IN.

J. ALL POWER CIRCUITED FROM PANEL N-P-A.

3. CONNECTIONS TO GENERATOR ALTERNATOR HEATER, BATTERY

CHARGER, AND JACKET HEATER.

4. PROVIDE PANIC HARDWARE ON DOORS PER NEC 110.26.

5. PROVIDE GENERATOR EMERGENCY STOP BUTTON.

6. REPRESENTATIVE PV INVERTER PANEL. THE PHOTOVOLTAIC SYSTEM

AND INFRASTRUCTURE WILL BE DELIGATED-DESIGN BY THE

CONTRACTER. EXACT EQUIPMENT SIZES AND CONNECTION POINTS WILL

BE DETERMINED BY THE CONTRACTOR.

7. PROVIDE POWER TO REMOTE AIR-COOLING REFRIGERATION RACK,

REFER TO KITCHEN SCHEDULE ITEM 'R1' ON SHEET E0.10. COORDINATE

EXACT POWER REQUIREMENTS WITH KITCHEN CONSULTANT PRIOR TO

PROCUREMENT OR INSTALLATION OF ELECTRICAL INFRASTRUCTURE.1

SCALE OF

SCALE K

0 1688

FEET

SIGNING ENGINEER STEVE DIFFENDERFER TAKES

RESPONSIBILITY FOR ALL SCOPE OF WORK RELATED TO

DELTA 1 CLOUDED CHANGES ON THIS DRAWING DATED

8/18/2025. ALL OTHER WORK IS UNDER THE RESPONSIBILITY OF

ROBERT MILLS.

File details come from the government source that posted it. Updated .