B08_Attachment_03_Final_CD_Specifications_6_18_2025.pdf
PDF 29 MB Posted
- Solicitation number
- 140P2025R0039
About this file
This document is a comprehensive specification section (01 35 13.22) for Archaeological Protection during construction at Big Bend National Park. The specification covers archaeological monitoring and protection requirements for a project replacing the Chisos Mountains Lodge and rehabilitating the Chisos Basin Water System.
Key requirements include mandatory archaeological and tribal monitoring during all ground-disturbing work, with specific qualifications for monitors. Contractors must submit an Archaeological Resources Protection Act (ARPA) permit application, an Archaeological Monitoring Plan, and a Ground Disturbing Work Schedule at least 30-60 calendar days before any ground disturbance. If archaeological resources are discovered during construction, work must immediately cease, and the National Park Service must be notified. The monitors are responsible for documenting and protecting any discovered resources, with the NPS having final authority on resource investigation, documentation, and disposition. Monitors must be present for all ground-disturbing activities across the entire project site, including work associated with electrical service line upgrades, and must follow strict protocols for recording and protecting potential archaeological resources.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BIG BEND NATIONAL PARK
TEXAS
REPLACE THE CHISOS MOUNTAINS LODGE
AND
REHABILITATE THE CHISOS BASIN WATER SYSTEM
BIBE
PMIS 259631-317515
PROJECT SPECIFICATIONS
FINAL CONSTRUCTION DOCUMENTS
May 21, 2025
NATIONAL PARK SERVICE (NPS)
DENVER SERVICE CENTER (DSC)
BIBE 259631-317515 00 01 10-1
TABLE OF CONTENTS
Replace the Chisos Mountains Lodge and Rehabilitate the Chisos Basin Water System
Section Number
Section Name Date Issued
Current Issuance
DOCUMENT 00 01 10 - TABLE OF CONTENTS
GENERAL REQUIREMENTS
DIVISION 01 – GENERAL REQUIREMENTS
01 11 00 Summary of Work 11.04.24 05.21.25 01 26 01 Contract Modification Procedures 11.04.24 12.10.24 01 27 00 Definition of Contract Line Items 11.04.24 04.07.25 01 28 00 Contract Requirements for Park Operations And
Resource Protection
11.04.24 02.19.25
01 31 00 Project Management & Coordination 11.04.24 12.10.24 01 32 16 Construction Schedule 11.04.24 12.10.24 01 32 33 Photographic Documentation 11.04.24 12.10.24 01 33 23 Submittal Procedures 11.04.24 12.10.24 01 35 13.22 Archeological Protection 11.04.24 02.14.25 01 35 23 Safety Requirements 11.04.24 12.10.24 01 40 00 Quality Requirements 11.04.24 12.10.24 01 42 00 Reference Standards 11.04.24 12.10.24 01 50 00 Temporary Facilities and Controls 11.04.24 12.10.24 01 57 19.12 Noise & Acoustics Management 11.04.24 12.10.24 01 57 23 Temporary Storm Water Pollution Prevention 11.04.24 12.10.24 01 67 00 Product Requirements 11.04.24 12.10.24 01 73 29 Cutting and Patching 11.04.24 12.10.24 01 73 40 Execution 11.04.24 12.10.24 01 74 19 Construction Waste Management and Disposal 02.26.24 12.10.24 01 77 00 Closeout Procedures 11.04.24 12.10.24 01 78 23 Operation and Maintenance Data 11.04.24 12.10.24 01 79 00 Demonstration and Training 11.04.24 12.10.24 01 81 13.1 LEEDv4 Sustainable Design Requirements – Lodge
Component
02.26.24 12.10.24
01 81 13.2 Sustainability Requirements – Water Component 02.26.24 12.10.24 01 81 19 Indoor Air Quality (IAQ) Management 02.26.24 12.10.24 01 91 14.1 Total Building Commissioning – Lodge Component 11.04.24 12.10.24 01 91 14.2 Total Commissioning – Water Component 11.04.24 12.10.24
Replace the Chisos Mountains Lodge and Rehabilitate the Chisos Basin Water System
BIBE 259631-317515 00 01 10-2
TABLE OF CONTENTS
Section Number
Section Name Date Issued
Current Issuance
LODGE COMPONENT
FACILITY CONSTRUCTION SUBGROUP:
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 09.16.24 12.10.24 02 41 16 Structure Demolition 02.26.24 12.10.24 02 82 13 Asbestos Abatement 12.10.24 12.10.24 02 83 00 Lead Abatement 12.10.24 12.10.24 02 88 00 Other Hazardous Materials 12.10.24 12.10.24
DIVISION 03 – CONCRETE
03 10 00 Concrete Forming and Accessories 02.26.24 12.10.24 03 20 00 Concrete Reinforcing 02.26.24 12.10.24 03 30 00 Cast-In-Place Concrete (Building) 02.26.24 12.10.24 03 31 00 Cast-In-Place Concrete (Site) 12.10.24 12.10.24 03 35 43 Polished Concrete Finishing 02.26.24 12.10.24 03 53 00 Concrete Topping 11.04.24 12.10.24
DIVISION 04 – MASONRY
04 43 21 Stone Veneer Assemblies 02.26.24 12.10.24
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 02.26.24 12.10.24 05 50 00 Metal Fabrications 02.26.24 12.10.24 05 51 13 Metal Pan Stairs 02.26.24 12.10.24 05 51 16 Folded Plate Metal Stairs 02.26.24 12.10.24 05 52 13 Pipe and Tube Railings 02.26.24 12.10.24 05 52 16 Pipe and Tube Railings (Site) 02.26.24 12.10.24 05 73 00 Decorative Metal Railings 02.26.24 12.10.24 05 75 13 Decorative Metal Shelving 12.10.24 12.10.24
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 05 73 Wood Treatment 02.26.24 12.10.24 06 10 00 Rough Carpentry 02.26.24 12.10.24 06 10 05 Exterior Carpentry 09.16.24 12.10.24
BIBE 259631-317515 00 01 10-3
TABLE OF CONTENTS
Section Number
Section Name Date Issued
Current Issuance
06 10 53 Miscellaneous Rough Carpentry 02.26.24 12.10.24 06 16 00 Sheathing 02.26.24 12.10.24 06 20 00 Finish Carpentry 02.26.24 12.10.24 06 41 00 Architectural Woodwork 02.26.24 12.10.24 06 64 13 Fiberglass-Reinforced Plastic Panels 02.26.24 12.10.24
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 13 26 Self-Adhering Sheet Waterproofing 02.26.24 12.10.24 07 13 29 Pre-Applied Sheet Membrane Waterproofing 02.26.24 12.10.24 07 18 13 Pedestrian Traffic Coatings 11.04.24 12.10.24 07 21 00 Building Insulation 02.26.24 12.10.24 07 21 29 Sprayed Insulation 09.16.24 12.10.24 07 26 16 Integrally-Bonded-Underslab-Vapor-Retarder 11.04.24 12.10.24 07 27 26 Fluid-Applied Membrane Air Barriers, Vapor
Permeable
11.04.24 12.10.24
07 27 29 Underlayments 02.26.24 12.10.24 07 42 13.24 Aluminum Metal Plate Wall Panels 11.04.24 12.10.24 07 46 46 Fiber Cement Siding 02.26.24 12.10.24 07 52 16 SBS-Modified Bituminous Membrane Roofing 09.16.24 12.10.24 07 60 00 Flashing and Sheet Metal 02.26.24 12.10.24 07 61 00 Sheet Metal Roofing 02.26.24 12.10.24 07 72 00 Roof Accessories 02.26.24 12.10.24 07 72 43 Metal Roof Walkways 11.04.24 12.10.24 07 76 00 Composite Roof Paver System 02.26.24 12.10.24 07 84 00 Firestopping 02.26.24 12.10.24 07 92 00 Joint Sealants 02.26.24 12.10.24
DIVISION 08 – OPENINGS
08 11 13 Hollow Metal Doors and Frames 02.26.24 12.10.24 08 14 16 Flush Wood Doors 02.26.24 12.10.24 08 31 13 Access Doors 02.26.24 12.10.24 08 35 13 Folding Doors 09.16.24 12.10.24 08 36 13 Sectional Overhead Doors 09.16.24 12.10.24 08 38 00 Traffic Doors 09.16.24 12.10.24 08 41 13 Aluminum-Framed Entrances and Storefronts 02.26.24 12.10.24 08 44 13 Aluminum-Glazed Curtain Walls 02.26.24 12.10.24 08 51 13 Aluminum Windows 09.16.24 12.10.24 08 71 00 Door Hardware 09.16.24 12.10.24 08 81 00 Glass Glazing 02.26.24 12.10.24 08 91 00 Wall Louvers 02.26.24 12.10.24
BIBE 259631-317515 00 01 10-4
Section Number
Section Name Date Issued
Current Issuance
DIVISION 09 – FINISHES
09 22 16 Non-Structural Metal Framing 02.26.24 12.10.24 09 22 19 Cavity Shaft-Wall Assemblies 02.26.24 12.10.24 09 29 00 Gypsum Board 02.26.24 12.10.24 09 30 00 Tiling 02.26.24 12.10.24 09 51 13 Acoustical Panel Ceilings 09.16.24 12.10.24 09 51 23 Acoustical Tile Ceilings 02.26.24 12.10.24 09 54 37 Suspended Wood Ceilings 02.26.24 12.10.24 09 64 00 Wood Flooring 12.10.24 12.10.24 09 65 00 Resilient Flooring 02.26.24 12.10.24 09 68 13 Tile Carpeting 02.26.24 12.10.24 09 84 33 Sound-Absorbing Wall Units 02.26.24 12.10.24 09 91 00 Painting 02.26.24 12.10.24 09 97 29 Concrete Floor Sealing 02.26.24 12.10.24
DIVISION 10 – SPECIALTIES
10 14 00 Signage 02.26.24 12.10.24 10 14 05 Site Signage 09.16.24 12.10.24 10 21 13 Solid Phenolic Toilet Compartments 02.26.24 12.10.24 10 22 26 Operable Partitions 02.26.24 12.10.24 10 26 23 Impact-Resistant Wall Protection 02.26.24 12.10.24 10 28 13 Commercial Toilet Accessories 02.26.24 12.10.24 10 44 00 Fire Protection Specialties 02.26.24 12.10.24 10 71 13 Exterior Sun Control Devices 02.26.24 12.10.24
DIVISION 11 – EQUIPMENT
11 24 26 Fall Protection Devices 11.04.24 12.10.24 11 40 00 Food Service Equipment 09.16.24 12.10.24
DIVISION 12 – FURNISHINGS
12 24 13 Roller Window Shades 02.26.24 12.10.24 12 36 40 Countertops 02.26.24 12.10.24 12 48 16 Entrance Floor Grilles 02.26.24 12.10.24 12 93 00 Site Furnishings 09.16.24 12.10.24
BIBE 259631-317515 00 01 10-5
Section Name Date Issued
DIVISION 13 – SPECIAL CONSTRUCTION
13 38 00 Solar Photovoltaic Mounting System 09.16.24 12.10.24 13 46 13 Lightning Protection for Structures 09.16.24 12.10.24
DIVISION 14 – CONVEYING EQUIPMENT
14 21 00 Electric-Traction Elevators 02.26.24 12.10.24
FACILITY SERVICES SUBGROUP:
DIVISION 21 – FIRE SUPPRESSION
21 05 00 Common Work Results for Fire Suppression 02.26.24 12.10.24 21 05 23 General-Duty Valves for Water-Based Fire-
Suppression Piping
02.26.24 12.10.24
21 05 48 Vibration and Seismic Controls for Fire Suppression Piping and Equipment
02.26.24 12.10.24
21 05 53 Identification for Fire Suppression Piping and Equipment
02.26.24 12.10.24
21 11 00 Facility Fire-Suppression Water-Service Piping 02.26.24 12.10.24 21 13 00 Fire-Suppression Sprinkler Systems 02.26.24 12.10.24
DIVISION 22 – PLUMBING
22 05 00 Common Work Results for Plumbing 02.26.24 12.10.24 22 05 13 Common Motor Requirements for Plumbing
Equipment
09.16.24 12.10.24
22 05 16 Expansion Fittings and Loops for Plumbing Piping 09.16.24 12.10.24 22 05 17 Sleeves and Sleeve Seals for Plumbing Piping 09.16.24 12.10.24 22 05 19 Meters and Gauges for Plumbing 02.26.24 12.10.24 22 05 23 General Duty Valves and Specialties for Plumbing 02.26.24 12.10.24 22 05 29 Hangers and Supports for Plumbing Piping and
Equipment
02.26.24 12.10.24
22 05 48 Vibration and Seismic Controls for Plumbing Piping and Equipment
02.26.24 12.10.24
22 05 53 Identification for Plumbing Piping and Equipment 02.26.24 12.10.24 22 05 90 Pressure Testing for Plumbing Systems 02.26.24 12.10.24 22 05 93 Testing, Adjusting, and Balancing for Plumbing 02.26.24 12.10.24 22 07 19 Plumbing Piping Insulation 02.26.24 12.10.24 22 08 00 Commissioning of Plumbing 02.26.24 12.10.24 22 10 05 Plumbing Piping 09.16.24 12.10.24
BIBE 259631-317515 00 01 10-6
TABLE OF CONTENTS
Section Number
Section Name Date Issued
Current Issuance
22 10 06 Plumbing Piping Specialties 09.16.24 12.10.24 22 30 00 Plumbing Equipment 02.26.24 12.10.24 22 40 00 Plumbing Fixtures 02.26.24 12.10.24
DIVISION 23 – HEATING VENTILATING AND AIR CONDITIONING
23 05 00 Common Work Results for HVAC 02.26.24 12.10.24 23 05 13 Common Motor Requirements for HVAC Equipment 02.26.24 12.10.24 23 05 16 Expansion Fittings and Loops for HVAC Piping 02.26.24 12.10.24 23 05 17 Sleeves and Sleeve Seals for HVAC Piping 02.26.24 12.10.24 23 05 19 Meters and Gauges for HVAC Piping 02.26.24 12.10.24 23 05 23 General-Duty Valves for HVAC Piping 02.26.24 12.10.24 23 05 29 Hangers and Supports for HVAC Piping and
Equipment
02.26.24 12.10.24
23 05 48 Vibration and Seismic Controls for HVAC 02.26.24 12.10.24 23 05 53 Identification for HVAC Piping and Equipment 02.26.24 12.10.24 23 05 90 Pressure Testing for HVAC Systems 02.26.24 12.10.24 23 05 93 Testing, Adjusting, and Balancing for HVAC 02.26.24 12.10.24 23 07 13 Duct Insulation 02.26.24 12.10.24 23 07 16 HVAC Equipment Insulation 02.26.24 12.10.24 23 07 19 HVAC Piping Insulation 02.26.24 12.10.24 23 08 00 Commissioning of HVAC 02.26.24 12.10.24 23 09 13 Instrumentation and Control Devices for HVAC 02.26.24 12.10.24 23 09 23 Direct-Digital Control System for HVAC 02.26.24 12.10.24 23 09 34 Variable-Frequency Motor Controllers 02.26.24 12.10.24 23 23 00 Refrigerant Piping 02.26.24 12.10.24 23 31 00 HVAC Ducts and Casings 02.26.24 12.10.24 23 33 00 Air Duct Accessories 02.26.24 12.10.24 23 33 19 Duct Silencers 02.26.24 12.10.24 23 34 13 Axial HVAC Fans 02.26.24 12.10.24 23 34 16 Centrifugal HVAC Fans 02.26.24 12.10.24 23 36 00 Air Terminal Units 02.26.24 12.10.24 23 37 00 Air Outlets and Inlets 02.26.24 12.10.24 23 40 00 HVAC Air Cleaning Devices 02.26.24 12.10.24 23 51 00 Breechings, Chimneys, and Stacks 02.26.24 12.10.24 23 72 23 Packaged Air-to-Air Energy Recovery Units 02.26.24 12.10.24 23 74 33 Dedicated Outdoor Air Units 02.26.24 12.10.24 23 81 26.13 Small-Capacity Split-System Air Conditioners 02.26.24 12.10.24 23 81 29 Variable Refrigerant Flow HVAC Systems 02.26.24 12.10.24
BIBE 259631-317515 00 01 10-7
Section Name Date Issued
DIVISION 26 – ELECTRICAL
26 05 00 Common Work Results for Electrical 02.26.24 12.10.24 26 05 05 Selective Demolition for Electrical 02.26.24 12.10.24 26 05 19 Low-Voltage Electrical Power Conductors and Cables 02.26.24 12.10.24 26 05 26 Grounding and Bonding for Electrical Systems 02.26.24 12.10.24 26 05 29 Hangers and Supports for Electrical Systems 02.26.24 12.10.24 26 05 33.13 Conduit for Electrical Systems 02.26.24 12.10.24 26 05 33.16 Boxes for Electrical Systems 02.26.24 12.10.24 26 05 33.23 Surface Raceways for Electrical Systems 02.26.24 12.10.24 26 05 36 Cable Trays for Electrical Systems 02.26.24 12.10.24 26 05 43 Underground Ducts and Raceways for Electrical
Systems
02.26.24 12.10.24
26 05 53 Identification for Electrical Systems 02.26.24 12.10.24 26 05 73 Power System Studies 02.26.24 12.10.24 26 05 80 Electrical Testing 02.26.24 12.10.24 26 05 83 Wiring Connections 02.26.24 12.10.24 26 08 00 Commissioning for Electrical 02.26.24 12.10.24 26 09 16 Electric Controls and Relays 02.26.24 12.10.24 26 09 23 Lighting Control Devices 02.26.24 12.10.24 26 09 43 Network Lighting Controls 02.26.24 12.10.24 26 21 00 Low-Voltage Electrical Service Entrance 02.26.24 12.10.24 26 24 13 Switchboards 02.26.24 12.10.24 26 24 16 Panelboards 02.26.24 12.10.24 26 27 13 Electricity Metering 02.26.24 12.10.24 26 27 26 Wiring Devices 02.26.24 12.10.24 26 28 16.13 Enclosed Circuit Breakers 02.26.24 12.10.24 26 29 13 Enclosed Controllers 02.26.24 12.10.24 26 31 00 Photovoltaic Collectors 02.26.24 12.10.24 26 32 13 Engine Generators 02.26.24 12.10.24 26 32 36 Resistive Load Banks 02.26.24 12.10.24 26 33 63 Battery Energy Storage System 02.26.24 12.10.24 26 36 00 Transfer Switches 02.26.24 12.10.24 26 37 13 Microgrid Energy Management System 02.26.24 12.10.24 26 43 00 Surge Protective Devices 02.26.24 12.10.24 26 50 00 Lighting 02.26.24 12.10.24
DIVISION 27 – COMMUNICATIONS
27 05 00 Common Work Results for Communications 02.26.24 12.10.24 27 05 26 Grounding and Bonding for Communications Systems 02.26.24 12.10.24 27 05 28 Pathways for Communications Systems 02.26.24 12.10.24
BIBE 259631-317515 00 01 10-8
TABLE OF CONTENTS
Section Number
Section Name Date Issued
Current Issuance
27 05 29 Hangers and Supports for Communications Systems 02.26.24 12.10.24 27 05 43 Underground Ducts and Raceways for
Communications
02.26.24 12.10.24
27 10 00 Structured Cabling 02.26.24 12.10.24 27 11 00 Communications Equipment Room Fittings 02.26.24 12.10.24 27 11 19 Communications Termination Blocks and Patch
Panels
02.26.24 12.10.24
27 15 00 Communications Horizontal Cabling 02.26.24 12.10.24 27 41 16 Integrated Audio-Video Systems and Equipment 02.26.24 12.10.24
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security
02.26.24 12.10.24
28 10 00 Access Control 02.26.24 12.10.24 28 15 23 Intercom Entry Systems 02.26.24 12.10.24 28 20 00 Video Surveillance 02.26.24 12.10.24 28 46 00 Fire Detection and Alarm 02.26.24 12.10.24
SITE AND INFRASTRUCTURE SUBGROUP:
DIVISION 31 – EARTHWORK
31 00 00 Earthwork 11.04.24 12.10.24 31 10 00 Site Clearing 09.16.24 12.10.24 31 23 16 Structure Excavation 09.16.24 12.10.24 31 37 00 Riprap 09.16.24 12.10.24 31 63 29 Drilled Piers 02.26.24 12.10.24
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 09 00 Temporary Tree Protection 09.16.24 12.10.24 32 12 16 Asphalt Paving 09.16.24 12.10.24 32 13 13 Concrete Paving 09.16.24 12.10.24 32 13 16 Decorative Site Concrete 02.26.24 12.10.24 32 15 40 Decomposed Granite Paving 02.26.24 12.10.24 32 16 13 Combined Curb and Gutter 12.10.24 12.10.24 32 17 23 Pavement Markings 09.16.24 12.10.24 32 31 13 Chain Link Fences and Gates 09.16.24 12.10.24 32 33 00 Site Furnishings 09.16.24 12.10.24
BIBE 259631-317515 00 01 10-9
TABLE OF CONTENTS
Section Number
Section Name Date Issued
Current Issuance
32 93 00 Planting 02.26.24 12.10.24 32 94 50 Landscape Stone 09.16.24 12.10.24
DIVISION 33 – UTILITIES
33 01 10 Flushing Cleaning Disinfect Water Distribution Piping 11.04.24 12.10.24 33 01 30.86 Manhole Rim Adjustment 11.04.24 12.10.24 33 05 05.31 Hydrostatic Testing 11.04.24 12.10.24 33 11 00 Water Utility Distribution Piping 11.04.24 12.10.24 33 31 00 Wastewater Distribution Piping 12.10.24 12.10.24 33 40 00 Storm Drainage Utilities 12.10.24 12.10.24
PROCESS EQUIPMENT SUBGROUP:
DIVISION 40 – PROCESS INTERCONNECTIONS
40 05 00 Rainwater Harvesting Piping, Valves, and Appurtenances
12.10.24 12.10.24
40 05 07 Rainwater Harvesting Piping Process Pipe Support Systems
12.10.24 12.10.24
DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT
Not used
DIVISION 42 – PROCESSING HEATING, COOLING, AND DRYING
Not used
DIVISION 43 – PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND
STORAGE EQUIPMENT
Not used
DIVISION 44 – POLLUTION AND WASTE CONTROL EQUIPMENT
Not used
BIBE 259631-317515 00 01 10-10
Section Name Date Issued
DIVISION 45 – INDUSTRY SPECIFIC MANUFACTURING EQUIPMENT
DIVISION 46 – WATER AND WASTEWATER EQUIPMENT
46 07 00 Rainwater Harvest System 12.10.24 12.10.24
DIVISION 47 – RESERVED FOR FUTURE
DIVISION 48 – ELECTRICAL POWER GENERATION
BIBE 259631-317515 00 01 10-11
TABLE OF CONTENTS
Section Number
Section Name Date Issued
Current Issuance
WATER COMPONENT
FACILITY CONSTRUCTION SUBGROUP:
DIVISION 02 – EXISTING CONDITIONS
02 01 10 Existing Conditions 09.16.24 12.10.24
DIVISION 03 – CONCRETE
03 10 00 Concrete Forming and Accessories 09.16.24 12.10.24 03 20 00 Concrete Reinforcing 09.16.24 12.10.24 03 30 00 Cast-In-Place Concrete (Building) 09.16.24 12.10.24 03 31 00 Cast-In-Place Concrete (Site) 12.10.24 03 60 00 Grouting 11.04.24 12.10.24
DIVISION 04 – MASONRY
04 20 00 Unit Masonry 12.10.24 12.10.24
DIVISION 05 – METALS
05 50 00 Metal Fabrications 09.16.24 12.10.24
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 10 00 Rough Carpentry 09.16.24 12.10.24 06 16 00 Sheathing 09.16.24 12.10.24
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 01 51 Roof Replacement 09.16.24 12.10.24 07 13 26 Self-Adhering Sheet Waterproofing 12.10.24 12.10.24 07 16 00 Cementitious Coating 09.16.24 12.10.24 07 19 00 Water Repellents 12.10.24 12.10.24 07 21 29 Sprayed Insulation 12.10.24 12.10.24 07 27 29 Underlayments 12.10.24 12.10.24 07 41 13 Metal Roof Panels 09.16.24 12.10.24 07 46 23 Fiber Cement Siding 09.16.24 12.10.24 07 60 00 Flashing and Sheet Metal 09.16.24 12.10.24 07 92 00 Joint Sealants 09.16.24 12.10.24
BIBE 259631-317515 00 01 10-12
TABLE OF CONTENTS
Section Number
Section Name Date Issued
Current Issuance
DIVISION 08 – OPENINGS
08 11 13 Hollow Metal Doors and Frames 09.16.24 12.10.24 08 31 23 Floor Doors 09.16.24 12.10.24 08 71 00 Door Hardware 12.10.24
DIVISION 09 – FINISHES
09 29 00 Gypsum Board 09.16.24 12.10.24 09 90 00 Painting and Coating 09.16.24 12.10.24 09 91 00 Painting 09.16.24 12.10.24 09 96 00 High-Performance Equipment Coatings 09.16.24 12.10.24 09 97 13.24 Welded Steel Water Storage Tank Painting 09.16.24 12.10.24 09 97 29 Concrete Floor Sealing 09.16.24 12.10.24
DIVISION 10 – SPECIALTIES
Not Used
DIVISION 11 – EQUIPMENT
Not Used
DIVISION 12 – FURNISHINGS
Not used
DIVISION 13 – SPECIALCONSTRUCTION
13 46 13 Lightning Protection for Structures 12.10.24 12.10.24
DIVISION 14 – CONVEYING EQUIPMENT
Not Used
FACILITY SERVICES SUBGROUP:
DIVISION 21 – FIRE SUPPRESSION
BIBE 259631-317515 00 01 10-13
TABLE OF CONTENTS
DIVISION 23 – HEATING VENTILATING AND AIR CONDITIONING
23 05 00 Common Work Results for HVAC 11.04.24 12.10.24 23 05 29 Hangers and Supports for HVAC Piping and
Equipment
09.16.24 12.10.24
23 05 53 Identification for HVAC Piping and Equipment 09.16.24 12.10.24 23 07 19 HVAC Piping Insulation 09.16.24 12.10.24 23 08 00 Commissioning of HVAC 09.16.24 12.10.24 23 09 34 Variable-Frequency Motor Controllers for HVAC 11.04.24 12.10.24 23 23 00 Refrigerant Piping 09.16.24 12.10.24 23 81 26.13 Small-Capacity Split-System Air Conditioners 09.16.24 12.10.24
DIVISION 26 – ELECTRICAL
26 05 00 Common Work Results for Electrical 09.16.24 12.10.24 26 05 05 Selective Demolition for Electrical 09.16.24 12.10.24 26 05 19 Low-Voltage Electrical Power Conductors and Cables 09.16.24 12.10.24 26 05 26 Grounding and Bonding for Electrical Systems 09.16.24 12.10.24 26 05 29 Hangers and Supports for Electrical Systems 09.16.24 12.10.24 26 05 33.13 Conduit for Electrical Systems 09.16.24 12.10.24 26 05 33.16 Boxes for Electrical Systems 09.16.24 12.10.24 26 05 33.23 Surface Raceways for Electrical Systems 09.16.24 12.10.24 26 05 48 Vibration and Seismic Controls for Electrical Systems 09.16.24 12.10.24 26 05 53 Identification for Electrical Systems 09.16.24 12.10.24 26 05 73 Power System Studies 09.16.24 12.10.24 26 05 80 Electrical Testing 09.16.24 12.10.24 26 08 00 Commissioning for Electrical 09.16.24 12.10.24 26 21 00 Low-Voltage Electrical Service Entrance 09.16.24 12.10.24 26 24 16 Panelboards 09.16.24 12.10.24 26 27 13 Electricity Metering 11.04.24 12.10.24 26 27 26 Wiring Devices 09.16.24 12.10.24 26 28 16.13 Enclosed Circuit Breakers 09.16.24 12.10.24 26 36 00 Transfer Switches 11.04.24 12.10.24 26 43 00 Surge Protective Devices 11.04.24 12.10.24 26 50 00 Lighting 09.16.24 12.10.24
DIVISION 27 – COMMUNICATIONS
Not used
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
BIBE 259631-317515 00 01 10-14
TABLE OF CONTENTS
Section Number
Section Name Date Issued
Current Issuance
DIVISION 27 – COMMUNICATIONS
Not used
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
Not used
SITE AND INFRASTRUCTURE SUBGROUP:
DIVISION 31 – EARTHWORK
31 00 00 Earthwork 09.16.24 12.10.24 31 23 16.20 Trenching, Backfilling & Compaction 11.04.24 12.10.24 31 25 00 Erosion Sedimentation Control 09.16.24 12.10.24
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 12 16 Asphalt Paving 09.16.24 12.10.24
DIVISION 33 – UTILITIES
33 01 10 Flushing, Cleaning, and Disinfecting of Water Distribution Piping and Equipment
09.16.24 12.10.24
33 01 10.59 Disinfection of Water Utility Storage Tanks 09.16.24 12.10.24 33 05 00 Common Work Results for Utilities 09.16.24 12.10.24 33 05 05.31 Hydrostatic Testing 09.16.24 12.10.24 33 09 04 Drive-By Radio Frequency Meter Reading Equipment 09.16.24 12.10.24 33 11 00 Water Distribution Piping 09.16.24 12.10.24 33 14 23 Backflow Prevention Enclosure 09.16.24 12.10.24 33 16 23.10 Glass-Infused Bolted Steel Water Storage Tank 09.16.24 12.10.24 33 19 26 Ultrasonic Smart Meter 09.16.24 12.10.24 33 31 00 Wastewater Distribution Piping 11.04.24 12.10.24
DIVISION 34 – TRANSPORTATION
34 41 16 Traffic Control Equipment 11.04.24 12.10.24
DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION
Section Number
Section Name Date Issued
Current Issuance
PROCESS EQUIPMENT SUBGROUP:
DIVISION 40 – PROCESS INTERCONNECTIONS
40 05 06 Couplings, Adapters, and Specials for Process Piping 09.16.24 12.10.24 40 05 07 Hangers and Supports for Process Piping 09.16.24 12.10.24 40 05 19 Ductile Iron Process Pipe 09.16.24 12.10.24 40 05 24 Steel Process Pipe 09.16.24 12.10.24 40 05 31 Thermoplastic Process Pipe 12.10.24 12.10.24 40 05 51 Common Requirements for Process Valves 09.16.24 12.10.24 40 05 53 Identification for Process Piping 09.16.24 12.10.24 40 05 57 Actuators for Process Valves and Gates 09.16.24 12.10.24 40 05 61 Gate Valves 09.16.24 12.10.24 40 05 63 Ball Valves 09.16.24 12.10.24 40 05 65.23 Swing Check Valves 09.16.24 12.10.24 40 05 67.39 Pressure-Relief Valves 09.16.24 12.10.24 40 05 71.16 Flap Valves 11.04.24 12.10.24 40 05 78.19 Combination Air Valves for Water Service 12.10.24 12.10.24 40 05 81.26 Freeze-Proof Yard Hydrants 09.16.24 12.10.24 40 05 93 Common Motor Requirements for Process Equipment 11.04.24 12.10.24 40 23 23 Raw and Treated Water Piping 12.10.24 12.10.24 40 42 13 Process Piping Insulation 09.16.24 12.10.24 40 61 13 Process Control System General Requirements 09.16.24 12.10.24 40 61 21 Process Control System Testing 09.16.24 12.10.24 40 61 96 Process Control Descriptions 09.16.24 12.10.24 40 62 05 Computer System Hardware and Ancillaries 09.16.24 12.10.24 40 63 43 Programmable Logic Controllers 09.16.24 12.10.24 40 66 05 Network Equipment 09.16.24 12.10.24 40 66 40 Telemetry Systems 09.16.24 12.10.24 40 67 00 Control System Equipment Panels and Racks 09.16.24 12.10.24 40 70 00 Instrumentation for Process Systems 09.16.24 12.10.24
DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT
Not used
DIVISION 42 – PROCESSING HEATING, COOLING, AND DRYING
Not used
BIBE 259631-317515 00 01 10-15
BIBE 259631-317515 00 01 10-16
TABLE OF CONTENTS
Section Number
Section Name Date Issued
Current Issuance
DIVISION 43 – PROCESS GAS AND LIQUID HANDLING, PURIFICATION,
AND STORAGE EQUIPMENT
43 12 11 Centrifugal Compressors 09.16.24 12.10.24 43 23 13.27 Overhung Close-Coupled Horizontal Centrifugal
Pumps
09.16.24 12.10.24
43 23 31.31 Multistage Vertical Turbine Pumps 09.16.24 12.10.24 43 41 43 Vertical High Density Cross-Linked Polyethylene
Storage Tanks
12.10.24 12.10.24
DIVISION 44 – POLLUTION AND WASTE CONTROL EQUIPMENT
Not used
DIVISION 45 – INDUSTRY SPECIFIC MANUFACTURING EQUIPMENT
Not used
DIVISION 46 – WATER AND WASTEWATER EQUIPMENT
46 05 48 Vibration and Seismic Controls for Water and Wastewater Equipment
09.16.24 12.10.24
46 05 53 Identification for Water and Wastewater Equipment 09.16.24 12.10.24 46 33 41 Liquid Chemical Feed System Coordination and
Integration
09.16.24 12.10.24
46 33 42 Diaphragm-Type Metering Pumps 09.16.24 12.10.24 46 33 53 Drum Pumps 09.16.24 12.10.24 46 33 83 Liquid Chemical Feed Accessories and Safety
Equipment
09.16.24 12.10.24
46 41 23 Tank Mixing 11.04.24 12.10.24 46 61 33 Ultrafiltration Membrane Equipment 09.16.24 12.10.24
DIVISION 47 – RESERVED FOR FUTURE
DIVISION 48 – ELECTRICAL POWER GENERATION
END OF DOCUMENT 00 01 10
GENERAL REQUIREMENTS
Replace the Chisos Mountains Lodge and Lodge and Water Components
BIBE 259631-317515 01 11 00 - 1
112723 SUMMARY OF WORK
SECTION 01 11 00 - SUMMARY OF WORK
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes the following:
1. Work Covered by Contract Documents
2. Work Phasing and Sequencing
3. Work Under Other Contracts
4. Construction Contractor Use of Site
5. Public Use of Site
6. Occupancy Requirements for Buildings
7. Conduct of Operations
8. Work Restrictions
9. Special Construction Requirements
10. Soils Investigation Report
11. Additional Reports
1.2 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Location: Big Bend National Park, Chisos Basin and Oaks Springs, Texas.
B. The Work of this project consists of replacing the existing Chisos Mountains Lodge with a new facility and rehabilitating the Chisos Basin Water System. This is a single project organized into two components as described below:
1. Lodge Component: The Lodge component of this project will demolish and replace the Chisos Mountains Lodge and provide adjacent site improvements.
a. Bid options under the Lodge Component include kitchen equipment, a new accessible route between the main parking lot and Lodge, additional site improvements, expansion of the Chisos Mountains Visitor Contact Station building, demolition of the Camper Store, restoration of the Camper Store site, a rainwater harvesting system, a battery and microgrid system, and photovoltaic panels at the Lodge.
b. The Lodge Component is designed to comply with a Silver Certification Level according to the United States Green Building Council's (USGBC) Leadership in Energy & Environmental Design (LEED™) Rating System, as specified in Section 01 81 13 "Sustainable Design Requirements – Lodge Component."
2. Water Component: This item consists of all demolition, repair, and replacement work on the Chisos Basin water system including storage tanks, treatment facilities, distribution system, and SCADA systems associated with the Chisos Basin public water system (PWS).
BIBE 259631-317515 01 11 00 - 2
112723 SUMMARY OF WORK
The Water Component includes new pumps at Oak Springs and associate required building improvements, and a new ultrafiltration building and system at Chisos Basin.
C. Project will be constructed under a single prime contract.
D. Construction operations and sequencing shall be organized between the two components to most efficiently and cost effectively accomplish the project. Rework in areas where the components overlap is to be avoided.
1.3 RELATED SECTIONS
A. Section 01 28 00 – Contract Requirements for Park Operations and Resource Protection
1.4 WORK PHASING AND SEQUENCING
A. The Lodge and Water Components are to be constructed concurrently. The Lodge component shall be constructed in a single phase. The Water component requires specific sequencing to maintain the water system’s operation throughout construction as described below.
B. Phasing and Sequencing of Work in Archeologically Sensitive Areas: For both the Lodge and Water components of the project, the Contractor shall schedule and sequence the work so as to avoid activities which involve ground disturbing work in archeologically sensitive areas from being or becoming critical path, to the greatest extent possible.
C. Water Distribution System Sequencing:
1. Phase 1 – Campground Distribution
a. Shut down Basin campgrounds service.
b. Provide temporary water service via trailer mounted pressure washer stationed at the existing Wastewater Treatment Plant (WWTP) to be used for cleaning purposes until water service is re-established.
c. Construct new water main and related services and appurtenances in kind at the campgrounds. Once complete, test, chlorinate and activate the new lines.
d. Return service to WWTP. Remove/return temporary pressure washer.
e. Simultaneously construct the offset parallel water main in non-sensitive archaeological areas (to be tied in later). Those locations include the areas between the Visitor Contact Station parking area and the lower campgrounds. Parallel alignments in that area include the residences and public restroom (group campgrounds), as well as the ‘cross country’ areas between those locations.
f. Install new water service meters at existing meter locations.
g. Tie-in to existing system near the parking lot of the Visitor Contact Station.
h. Once complete, test, chlorinate and activate new lines.
2. Phase 2: Remaining Site Distribution
a. Install above ground temporary water main and services at the lodge parking lot area and tie-in to the newly installed offset parallel mains from Phase 1.
BIBE 259631-317515 01 11 00 - 3
112723 SUMMARY OF WORK
b. Perform tie-in work at the residences area to connect the offset main coming from the lodging area to the new downstream distribution system.
c. Utilize the existing water distribution infrastructure ‘upstream’ from the Lodge area to connect to a temporary water line at the lodge area and the new system downstream of the lodge area, while the lodge area pipe is replaced in place.
1) A new fire hydrant south of the lodging area parking lot may need to be installed for fire suppression
d. Construct a new replace in place water main and related services and appurtenances in kind at the lodge area.
e. Install new water service meters for lodge area at existing meter locations.
f. Perform tie-ins to offset mains from Phase I.
g. Once complete, test, chlorinate and activate the new distribution system.
C. Chisos Basin Treatment and Tank Site Sequencing: The removal and replacement of water storage at the Chisos Basin t reatment and tank site, shall be conducted in three (3) phases, with each phase substantially complete as indicated. Refer also to sheets C1.05, C1.06, and C1.07 of the Water Component set.
1. Phase 1:
a. Demolish the existing 125,000-gal concrete storage tank.
b. Construct the yard piping to connect the effluent piping from disinfection to the influent piping of the cartridge filters and the effluent piping from the cartridge filters to the existing yard piping to the existing 500,000-gallon tank.
c. Install 10,000 gallon temporary break tank to be used for raw water storage from the Oak Springs Pump Station. Connect the temporary break tank to the fill line feeding the Chisos Basin site. This tank will require daily pumping at Oak Springs for approximately 4-6 hours. The temporary break tank will be installed with a liquid level indicator and overflow piping with associated valves and appurtenances.
d. Control of the existing cartridge filter transfer pumps in the Filter Building will be changed to be controlled by the liquid level indicator in the 10,000-gal break tank, turning off at the low-level elevation.
e. Filtered water will be stored in the existing 500,000-gal storage tank to maintain service to the distribution system while the new tank is being constructed.
2. Phase 2:
a. Continue using 10,000 gallon break tank for temporary raw water storage. Pumping controls will be similar to Phase 1 controls. The existing 500,000-gallon water storage tank will continue to be used as the finished water storage tank during Phase 2 construction.
b. Construct the remaining yard piping at the Chisos Basin tank site.
c. Construct a new 500,000-gal glass-lined, glass-infused steel storage tank.
d. Begin construction of the ultrafiltration (UF) building and equipment.
3. Phase 3:
a. Upon substantial completion of the new 500,000-gallon water storage tank and yard piping, the new 500,000-gallon water storage tank shall be brought online for use.
BIBE 259631-317515 01 11 00 - 4
052125 SUMMARY OF WORK
b. Filtered water will be stored in the new 500,000-gal storage tank to maintain service to the distribution system while the existing 500,000-gallon tank is being rehabilitated.
c. Clean and rehabilitate the existing 500,000-gal steel storage tank.
d. Startup and testing of full water system.
e. Remove 10,000 gallon break tank.
D. Substantial Completion of Intermediate Phases: Perform Final Inspections, Substantial Com-pletion, and Acceptance Procedures per Section 01 77 00 Closeout Procedures at completion of each of the following intermediate phases for the Water Component:
1. Oak Springs Building Improvements and Treatment System
2. New Tank Installation and Yard Piping at Chisos Basin
3. Ultrafiltration (UF) Building, UF Treatment System, and Rehabilitation of Existing Tank at Chisos Basin
4. Campground Water System Distribution
5. Residential Area Water System Distribution
6. Lodge Area Water System Distribution
1.5 WORK UNDER OTHER CONTRACTS
A. General: Cooperate with separate Construction Contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. Coordinate Work of this Contract with work performed under separate contracts.
B. Concurrent Work: Government (or a concessionaire operating under contract to NPS) will award separate contract(s) for the following construction operations at Project site. Those operations will be conducted simultaneously with work under this Contract.
1. Rio Grande Lodge Improvements: interior and exterior improvements to Motel Buildings
1 & 2.
2. Casa Grande Lodge Improvements: interior and exterior improvements to Lodge
Buildings A, B, C, & D.
3. Emory Peak Lodge Improvements: interior and exterior improvements to the two Emory
Peak Lodge buildings located near the cottages.
4. Roosevelt Cottages: interior and exterior improvements to all cottage buildings.
5. Cottage Road Sewer Line Repair/Replacement: repair and/or replacement of the sewer line which runs along the road serving the Cottages and Emory Peak Lodge Buildings; this is the sewer line which the Contractor is required to tie the new sewer line serving the Chisos Basin UF Treatment Building into under this contract; close coordination will be required.
C. Future Work: Government will award separate contract(s) for the following additional work to be performed at site after Substantial Completion. Completion of that work will depend on successful completion of preparatory work under this Contract.
1. Lodge Furnishings: A separate contract will be awarded to a Construction Contractor and/or Furniture Supplier to provide furnishings and equipment for the Lodge Dining Room and Retail Shop.
1.6 CONSTRUCTION CONTRACTOR USE OF SITE
A. General: Construction Contractor shall have limited use of site for construction operations. Limit use of premises to areas within the Construction limits indicated on drawings. Do not disturb portions of Project site beyond areas in which the Work is indicated.
BIBE 259631-317515 01 11 00 - 5
052125 SUMMARY OF WORK
B. Stockpiling and Storage of Materials: Confine stockpiling and storage of materials to staging or storage areas approved by Contracting Officer.
C. Preservation of Natural Features:
1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
2. Provide temporary barriers to protect existing trees and plants and root zones.
3. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with
Contracting Officer (CO) and remove agreed-on roots and branches that interfere with construction.
4. Do not fasten ropes, cables, or guys to existing trees.
5. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
6. Refer to Section 32 09 00 – Temporary Tree Protection and Section 01 28 00 - Contract
Requirements for Park Operations and Resource Protection for further requirements.
D. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Government employees, and emergency vehicles at all times. Do not use for parking or storage of materials.
1. Schedule deliveries to minimize use of driveways and entrances.
2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
E. Construction Camp: Establishment of a camp within the park will not be permitted.
F. Hauling Restrictions: Comply with legal load restrictions in hauling of materials. Load restrictions on park roads are specified in Section 01 28 00 - Contract Requirements for Park Operations and Resource Protection. Additional information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent.
Construction Contractor is liable for damage which may result from moving of equipment.
G. Bridge and Culvert Restrictions on Park Roads: Refer to Section 01 28 00 - Contract Requirements for Park Operations and Resource Protection.
1.7 PUBLIC USE OF SITE
A. Portions of the Chisos Basin will be closed to the public during construction, however visitors will have access to trails in the area and certain personnel will be authorized access to Chisos Basin at all times. Construction Contractor shall conduct his operations to ensure the least inconvenience to the public and to authorized users.
1. Refer to Section 01 28 00 for further information.
1.8 OCCUPANCY REQUIRMENTS FOR BUILIDINGS
A. Existing Buildings
A. General: Construction Contractor shall have limited use of site for construction operations.
Limit use of premises to areas within the Construction limits indicated on drawings. Do not disturb portions of Project site beyond areas in which the Work is indicat
1. Refer to Section 01 28 00 – Contract Requirements for Park Operations and Resource Protection.
1. Refer to Section 01 28 00 – Contract Requirements for Park Operations and Resource Protection.
BIBE 259631-317515 01 11 00 - 6
052125 SUMMARY OF WORK
1. Partial Government Occupancy: Government will occupy premises during entire construction period, with exception of areas under construction. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform Work so as not to interfere with Government’s operations.
Maintain existing exits, roadways, and site circulation, unless otherwise indicated.
a. Do not close or obstruct roadways or other occupied or used facilities without written permission from Contracting Officer.
b. Refer to Section 01 28 00 for specific requirements.
B. New Buildings
1. Government Occupancy of Completed Areas of Construction: Government reserves the right to occupy and to place and install equipment in completed areas of building, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and partial occupancy shall not constitute acceptance of the entire project.
a. Contracting Officer will prepare a Beneficial Occupancy letter for each specific portion of the Work to be occupied before Government occupancy.
b. Obtain a Certificate of Occupancy from National Park Service (NPS) before Government occupancy.
c. Before partial Government occupancy, mechanical and electrical systems shall be fully operational, and required tests and inspections shall be successfully completed.
d. On occupancy, Government will assume responsibility for maintenance and custodial service for occupied portions of building.
1.9 CONDUCT OF OPERATIONS
A. Construction Contractor shall conduct his operations in conformance with rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by Park Superintendent.
B. Work on Saturdays, Sundays, Federal holidays or outside of the specified on-site work hours is limited according to the Work Restrictions specified in Section 01 28 00. Prior consent from the Contracting Officer is required to perform Work during these time periods, refer to Section 01 28 00 for details and requirements.
C. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
1.10 WORK RESTRICTIONS
A. On-Site Work Hours:
1. Refer to Section 01 28 00 for further information.
B. Existing Utilities
1. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.
BIBE 259631-317515 01 11 00 - 7
112723 SUMMARY OF WORK
2. Construction Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.
3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
1. Refer to Section 01 28 00 for additional requirements.
D. Nonsmoking Building/Tobacco Use/Vaping: Smoking is not permitted within building or within 25 feet of entrances, operable windows, or outdoor air intakes.
1.11 SPECIAL CONSTRUCTION REQUIREMENTS
A. Project Management and Communication Software: Software administered by NPS shall be used to manage communication and document sharing during construction.
1. See Section 01 31 00 "Project Management and Coordination" for requirements on using NPS project management and communication software.
1.12 SOILS INVESTIGATION REPORT
A. The report titled “Geotechnical Study – Chisos Basin Lodge Restaurant” prepared by Kleinfelder and dated March 11, 2021, is provided. The report is 51 pages.
B. Addendum No.1 to the Geotechnical Study for the Chisos Basin Lodge Restaurant, dated November 4, 2024. The addendum is 2 pages.
C. The report titled “Geotechnical Engineering Study – Chisos Basin Lodge Visitor Center” prepared by Kleinfelder and dated January 11, 2022, is provided. The report is 51 pages.
D. Addendum No.1 to the Geotechnical Engineering Study for the Chisos Basin Lodge Visitor Center, dated November 4, 2024. The addendum is 2 pages.
E. The report titled “Geotechnical Engineering Study - NPS: Big Bend Chisos Basin Water System
– Revision No. 2” by Kleinfelder and dated October 29, 2024, is provided. The report is 92 pages.
F. In case of conflict between report and drawings or specifications, the drawings and specifications govern.
BIBE 259631-317515 01 11 00 - 8
112723 SUMMARY OF WORK
1.13 ADDITIONAL REPORTS
A. The report titled ‘Hazardous Building Material Assessment Services’ prepared by Kleinfelder and dated July 2, 2024, is provided. The report is 169 pages.
B. In case of conflict between report and drawings or specifications, drawings and specifications govern.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01 11 00
BIBE 259631-317515 01 26 01 - 1
012721 CONTRACT MODIFICATION PROCEDURES
SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section consists of administrative and procedural requirements for contract modifications.
1.2 DEFINITIONS AND ALLOWANCES
A. Home Office Overhead: Costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):
1. Rent
2. Utilities
3. Furnishings
4. Office equipment
5. Executive and management staff not exclusively assigned to the project
6. Support, accounting, and administrative staff
7. Preparation of cost proposals, estimating, and schedule analyses connected with
Modifications
8. Estimating and preconstruction services
9. Mortgage costs
10. Real estate and corporate taxes
11. Automobile maintenance and travel costs for home office personnel
12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.
13. Depreciation of equipment and other assets
14. Home office supplies (paper, staples, etc.)
15. Legal services
16. Accounting and data processing
17. Professional fees/registration
B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with preparation of modifications will not be allowed. Costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:
1. Project Manager (PM), Assistant Project Manager
2. Superintendent, Assistant Superintendent
3. Quality Control, Safety Officer, Environmental Manager, etc.
4. Engineers
5. Travel, lodging, and per diem (as established by Federal Travel Regulations)
6. Scheduling
BIBE 259631-317515 01 26 01 - 2
012721 CONTRACT MODIFICATION PROCEDURES
7. Field Office Trailers and associated temporary utilities
8. Field office supplies
a. Mailing and couriers
b. Reproduction costs
c. Storage
d. Phones
e. Computers
f. Copiers
9. Personal vehicles i.e. Superintendent Pickup trucks
C. General Requirements: Costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate.
The following items, if applicable, are considered allowable costs for calculating General Requirements:
1. Hoisting
2. Material handling
3. Temporary fencing
4. Port-a-lets
5. Trash removal, dumpsters
6. Barricades
7. Small tools
8. Safety supplies
9. Scaffolding
10. Daily cleaning
11. Traffic control
12. Temporary signage
13. Temporary heating and power
D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on project site. Modification costs for salaried workers are only allowed within the structure of a 40-hour week and no overtime or holiday pay will be allowed.
1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:
a. Base Rate: The hourly rate paid directly to the worker
b. Labor Burden: Employer payments of all applicable burdens; includes insurance and taxes the business must pay on behalf of the worker to government entities and educational forums, such as:
1) Social Security
2) Medicare
3) Workers Compensation – Policy and company calculation to be made available.
4) Federal Unemployment Tax Act (FUTA) - Cap Rate and percentage to be proportionally allocated over one year.
5) State Unemployment Tax Act (SUTA) - Cap Rate and percentage to be proportionally allocated over one year.
BIBE 259631-317515 01 26 01 - 3
012721 CONTRACT MODIFICATION PROCEDURES
6) Union agreement costs - Other costs required under an enforceable collective bargaining agreement.
c. Fringe Benefits: Various non-wage compensations provided to employees such as:
1) Health Care Insurance Premiums
2) Cell Phone
3) Clothing
4) 401K and Pensions
5) Vehicle allowances
6) Gas allowance
7) Life insurance premiums
8) Disability insurance
9) Other Fringe Benefits required under an enforceable collective bargaining agreement
E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.
F. General Liability Insurance: An insurance policy that protects Contractor from claims resulting from bodily injury or property damage to a third party. Include as a separate line item within all modification proposals and provide a current insurance quote upon request.
G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees the Contractor will pay the labor and material costs incurred. Banks and Insurance companies charge a premium for individual project based on a sliding scale related to the size of the project.
Include as a separate line item in modification proposals and provide current company bonding rates upon request.
H. Builder’s Risk Insurance: Covers the contractor’s loss due to fire, high winds, or other natural forces. Not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.
1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS
A. General:
1. Proposal be received in the format and within the time frame specified in the Request for Proposal (RFP) letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.
2. Proposal shall be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed they are included in the hourly rate shown, or contractor is not requesting reimbursement. Contractor may utilize the government provided Contractor Estimate Form, or their own form, provided that it contains the same information and level of detail as the Government’s form.
http://en.wikipedia.org/wiki/Employee http://en.wikipedia.org/wiki/Surety_bond http://en.wikipedia.org/wiki/Insurance http://en.wikipedia.org/wiki/Bank http://www.nps.gov/dscw/publicforms.htm#CP___PAGEID=396735|
BIBE 259631-317515 01 26 01 - 4
012721 CONTRACT MODIFICATION PROCEDURES
3. Requests for extensions of contract…