Sol_140P2025R0039_Amd_0001.pdf

PDF 84 KB Posted

Attached to
BIBE 259631-317515 Chisos Lodge & Water Solicitati
Solicitation number
140P2025R0039
Issued by

About this file

This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for Solicitation Number 140P2025R0039, issued by the National Park Service (NPS) DSC Contracting Services Division. The amendment provides instructions for a Pre-Bid Virtual Meeting scheduled for July 8, 2025 at 12 PM MST, which will be conducted via Microsoft Teams.

Potential bidders must RSVP to attend the virtual meeting by sending an email to bruce_beck@nps.gov and james_waller@nps.gov, including the name and email of each attendee. A calendar invite with the meeting link will be sent on July 07, 2025. The solicitation appears to be related to a project at Chisos Lodge & Water, though specific details about the contract's scope are not provided in this amendment document.

View the file

Other files

File Type Posted
07_46_46_FIBER-CEMENT_SIDING_R1_20250818_0005.pdf PDF
Sol_140P2025R0039_Amd_0005.pdf PDF
04_43_21_STONE_VENEER_ASSEMBLIES_R1_20250818_0005.pdf PDF
BIBE_259631-317515_Lodge_Final_CD_Drawings_E8_02_Revision_1_08_18_2025_0004.pdf PDF
Wage_Determination_TX20250120_Dated_July_18_2025_0004.pdf PDF
BIBE_259631-317515_Lodge_Final_CD_Drawings_E2_01_Revision_1_08_18_2025_0004.pdf PDF
BIBE_259631-317515_P2025R0039_Cntr_Provided_Temp_Housing_Stipulations_0004.docx DOCX document
Questions_and_Answers_set_Aug_19_2025_0004.pdf PDF
Sol_140P2025R0039_Amd_0004.pdf PDF
BIBE_259631-317515_Lodge_Final_CD_Drawings_E0_10_Revision_1_08_18_2025_0004.pdf PDF
BIBE_259631-317515_Final_CD_Specifications_Section_075216_Rev_1_08_18_2025_0004.pdf PDF
BIBE_Pipesonic_Report_Oak_Springs_Fill_Line_2024_07_31_0004.pdf PDF
BIBE_Stantec_Tech_Memo_Oak_Springs_Fill_Line_Cond_Assess_Final_2022_11_03_0003.pdf PDF
BIBE_Conceco_Eng_Oak_Springs_Fill_Line_Conditon_Assessment_2002_10_30_0003.pdf PDF
Sol_140P2025R0039_Amd_0003.pdf PDF
Info_for_General_Safety_Briefing_for_All_Contractors_0003.pdf PDF
Sol_140P2025R0039_Amd_0002.pdf PDF
Attendance_List_0002.docx DOCX document
Pre-Bid_Site_Visit_-_Schedule_and_Information_-_7_09_25_0002.pdf PDF
BIBE_259631-317515-Lodge-Water_Pre-Bid_2025-07-08_0002.pptx PPTX presentation
B08_Attachment_7_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
Sol_140P2025R0039.pdf PDF
B08_Attachment_8_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part1.pdf PDF
B08_Attachment_10_Solit_PSP_Vol_II_LmtOnSubcontracting_REQD.pdf PDF
B08_Attachment_18_BIBE-259631-317515_Oak_Spring_powerline_UAS_Survey_index_and_photo_log.xlsx XLSX spreadsheet
B08_Attachment_16_BIBE-259631-317515_Map_03_Oak_Spring_powerline_-_middle__N_access_road.pdf PDF
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part2.pdf PDF
B08_Attachment_14_BIBE-259631-317515_Map_01_Oak_Spring_Powerline_-_entire_project_area.pdf PDF
B08_Attachment_15_BIBE-259631-317515_Map_02_Oak_Spring_Powerline_-_overview_with_pole_numbers.pdf PDF
B08_P2025R0039_BIBE_259631_317515_Chisos_Lodge_Clauses_6_18_25.pdf PDF
B08_Attachment_6_Solit_PSP_Vol_I_Exp_REQD.pdf PDF
B08_Attachment_2_BIBE_259631-317515_Water_Final_CD_Drawings__6_18_2025.pdf PDF
B08_Attachment_03_Final_CD_Specifications_6_18_2025.pdf PDF
B08_Attachment_11_Solit_PSP_Vol_II_SubKPlan_REQD_RELEASED_v1_Apr24.pdf PDF
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part3.pdf PDF
B08_Attachment_12_Price_Schedule_Blank_6_18_2025.xlsx XLSX spreadsheet
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part5.pdf PDF
B08_Attachment_4_Wage_Determination.pdf PDF
B08_Attachment_5_Construction_Contract_Administration.pdf PDF
B08_Attachment_17_BIBE-259631-317515_Map_04_Oak_Spring_Powerline_-_N_portion.pdf PDF
B08_Attachment_13_BIBE_259631-317515_Final_CD_Reports_6_18_2025.pdf PDF
B08_Attachment_1_BIBE_259631-317515_Lodge_Final_CD_Drawings_6_18_2025_Part4.pdf PDF
B08_Attachment_9_Solit_PSP_Vol_II_GenRefs.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2025R0039 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 1 Denver Federal Center, Building 50 NPS, DSC Contracting Services Div

06/18/20250001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/18/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to provide instruction for the Pre-Bid Virtual Meeting:

-The meeting will take place via Microsoft Teams July 8, 2025 at 12 PM MST.

-Attendees MUST RSVP to attend the virtual Meeting.

-To attend please send a request by email to bruce_beck@nps.gov and james_waller@nps.gov.

In your request please include name and email of each attendee.

-A calendar invite that contains the link for the virtual meeting will be sent on July 07, 2025.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

James Waller

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

File details come from the government source that posted it. Updated .