B08_Attach_2c_NOCA_156728_100__CD_Drawings_Part3.pdf
PDF 19 MB Posted
- Attached to
- NOCA 156728 Stehekin WWTP Federal contract opportunity
- Solicitation number
- 140P2023R0131
About this file
This file is related to a federal solicitation for construction services at the Stehekin Wastewater Treatment Plant. The solicitation number is 140P2023R0131 and was issued by the Department of the Interior National Park Service National Office to seek proposals for work on NOCA 156728. Offerors are invited to submit proposals to design and build upgrades and repairs at the wastewater treatment facility located in Stehekin, Washington. The submission deadline is April 15, 2023, and the period of performance for the awarded contract is expected to last 12 months. The government estimates the contract value will be between $500,000 and $1,000,000. No other salient terms or conditions are specified in this related file.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TK-4411 TK-4311
CL 1158.28
4"-AE
CL 1158.64
CL 1159.99
CL 1159.73
4"-AOF
4"-AOF
BOT OF TK-4#11 TANKS
EL 1150.17
2"-AR
6"-PE
CL 1158.68
CL 1159.20
6"-AE
BOLLARD
PEDESTAL
BOLLARD
PEDESTAL
BOLLARD
PEDESTAL
2"-EFF 3
AEROBIC DIGESTER
REPURPOSED AS
POST-EQ TANK
COMBINED
INLET/OUTLET
FIRST FLOOR
1163.20
PUMP ROOM FLOOR
1153.20
4"-EFF
CL 1159.01TK-4211 TK-4111
CL 1159.51
CL 1157.75
6"-PI6"-PI
6"-PE6"-PE
CL 1159.26
4"-AOF
CL 1159.13
6"-PI
CL 1158.48
6"-PE
CL 1159.36
BOT OF TK-4#11 TANKS
EL 1150.17
2"-EQE
CL 1156.95
2"-SE
CL 1159.01
TOC
EL 1163.00
4"-AOF
CL 1158.01
CL 1159.39 SEE 02-C103 FOR CONTINUATION
3 3
1"-HWS
1"-HWR
CL 1157.72
CL 1157.72
ASCALE 1/4" = 1'-0"
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
D
W
W T
P .r v t
/1
/2
:5
:5
A
M
D302 156728
RTF PROCESS SECTIONS 2J. GUZMAN
K. GREER
J. HILL 03-
SCALE A03-D101
D SECTION
SCALE A03-D101
E SECTION
SCALE A03-D101
C SECTION
1 SEAL PENETRATION PER DETAIL
5/00D502. PLACE INVERT OF
PIPE PENETRATION TO TANK
6-IN ABOVE LOWEST POINT OF
TANK.
2 SLOPE PIPE AT 2%.
3 INSULATE ABOVE GRADE
PIPING. SEE SPECIFICATION 40
42 00.
4 HATCHES AND RISERS NOT
SHOWN. MANUFACTURER TO
INCLUDE INTEGRAL RISERS ON
TANKS TK-4111 AND TK-4211
FOR EACH INTERNAL VALVE.
SEE CIVIL DETAIL IN 02 SERIES
FOR TRAFFIC-RATED VALVE BOX
WITHIN SLAB.
KEY NOTES X
GENERAL NOTES
A. SEE 03-D601 FOR PRIMARY AND
PRE-ANOXIC TANK PENETRATION
DIAGRAMS.
B. MANUFACTURER TO INCLUDE
INTEGRAL RISERS ON TANKS
TK-4111 AND TK-4211 FOR EACH
INTERNAL VALVE. SEE CIVIL DETAIL
IN 02 SERIES FOR TRAFFIC-RATED
VALVE BOX WITHIN SLAB.
70 1416/19/23
175004
FIRST FLOOR
1163.20
BOT OF FOOTING
1159.95
1"-HWR
2"-EFF
2"-SE
4"-EFF
1 1/2"-BWW
CL 1157.72
CL 1158.70
FRONT
CL 1159.01
CL 1158.70
CL 1159.01
CL 1157.72
BACK1"-HWS
4"-FD
ASCALE 1/2" = 1'-0"
2 0 2 4
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
D
W
W T
P .r v t
/1
/2
:5
:5
A
M
D303 156728
PROCESS SECTIONSJ. GUZMAN
K. GREER
J. HILL 03-
SCALE A03-D101
F SECTION
1 SEE DETAIL 4/00-D502 FOR
ROUTING PIPES UNDER
FOOTING.
KEY NOTES X
71 1416/19/23
0,0
+X
+Y
41-1
41-2
41-3
WEST ELEVATION
(FRONT)
41-1 6" - PE
41-2 6" - PI
41-3 2" - EQE
X Y 2'-6 1/2" 9'-4" 7'-5 1/2" 7'-10" 6'-7 1/2" 6'-9 1/2"
0,0
+X
42-2 42-1
42-3
42-4
42-1 6" - PE
42-2 6" - PE
42-3 6" - PI
42-4 2" - EQE
X Y 8'-6 1/2" 9'-2 1/2" 2'-6 1/2" 9'-1" 7'-5" 7'-7" 6'-7 1/2" 6'-9 1/2"
+Y
43-3
43-2
43-1
43-4
0,0
+Y
+X
43-1 4" - AOF
43-2 2" - AR
43-3 6" - PE
43-4 6" - AE
X Y 3'-9" 9'-6" 6'-7 1/2" 9'-0 1/2" 7'-5 1/2" 8'-8 1/2" 2'-6 1/2" 8'-1 1/2"
0,0
44-3
+Y
+X
44-1
44-2
44-4
44-5
SOUTH ELEVATION
(FRONT)
CENTERLINE
COORDINATES
OF PENETRATIONS
44-1 4" - AOF
44-2 2" - AR
44-3 4" - AE
44-4 6" - PE
44-5 6" - AE
X Y 3'-9" 9'-10" 6'-7 1/2" 9'- 0 1/2" 2'-6 1/2" 8'-5 1/2" 7'-5 1/2" 8'-5 1/2" 8'-5 1/2" 8'-1 1/2"
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
D
W
W T
P .r v t
/1
/2
:5 :1
P
M
D601 156728
TANK PENETRATION
DIAGRAM 1
J. GUZMAN
K. GREER
J. HILL 03-
ASCALE
PRIMARY TANK TK-4111
ASCALE
PRIMARY TANK TK-4211
ASCALE
PRE-ANOXIC TANK TK-4311
ASCALE
PRE-ANOXIC TANK TK-4411
GENERAL NOTES
A. DIAGRAM ONLY INCLUDES PIPING
PENETRATIONS ON SIDE WALLS OF
TANKS AND DIRECTION OF LID
OPENING. APPURTENANCES FOR
FANS, HEATER, VALVE RISERS, AND
LID ACCESS POINTS NOT SHOWN.
72 1416/19/23
51-8
CENTERLINE COORDINATES OF
TK-5211 TANK PENETRATIONS
51-9
51-1 2" - SR
51-2 2" - SR
51-3 2" - SR
51-4 2" - SR
51-5 2" - SR
51-6 2" - SE
51-7 4" - AE
51-8 1" - HWS
51-9 1" - HWR
51-10 6" - SI
51-11 4" - SI
51-12 6" - SI
X Y 5'-4" 2'-1" 6'-0" 2'-1" 4'-8" 1'-9" 2'-2" 1'-6 1/2" 4'-0" 1'-2" 3'-4" 1'-2" 5'-2" 1'-2" 3'-6" 0'-3" 4'-0" 0'-3"
3'-11 1/2" 1'-2" 2'-7" 1'-8"
18'-11 1/2" 1'-2"
51-2
51-151-351-4
51-6
51-5 51-7
0,0
+Y
+X
EAST ELEVATION
(FRONT)
HINGE AXIS
0,0
+Y
+X
51-1151-10
WEST ELEVATION
(BACK)
HINGE AXIS
51-12
0,0
+Y
+X
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
D
W
W T
P .r v t
/1
/2
:5
:5
A
M
D602 156728
TANK PENETRATION
DIAGRAM 2
J. GUZMAN
K. GREER
J. HILL 03-
ASCALE
RTF TANK TK-5111
ASCALE
SOUTH ELEVATION (SIDE)
GENERAL NOTES
A. DIAGRAM ONLY INCLUDES PIPING
PENETRATIONS ON SIDE WALLS OF
TANKS AND DIRECTION OF LID
OPENING. APPURTENANCES FOR
FANS, HEATER, VALVE RISERS, AND
LID ACCESS POINTS NOT SHOWN.
73 1416/19/23
55-2
0,0
+Y
+X
55-1
HINGE AXIS
54-3
0,0
+Y
+X
54-2
54-1
HINGE AXIS
53-3
0,0
+Y
+X
53-2
53-1
53-4
HINGE AXIS
52-2
0,0
+Y
+X
52-1
HINGE AXIS
55-3
0,0
+Y
+X
EAST ELEVATION (FRONT)
WEST ELEVATION (BACK)
55-1 6" - SI
55-2 2" - SR
55-3 3" - AEQ
X Y 3'-9" 1'-9 1/2" 2'-6" 1'-2"
4'-6" 6'-0"
54-1 3" - AEQ
54-2 6" - SI
54-3 2" - SR
54-4 3' - AEQ
54-5 4" - SI
54-6 6" - SI
X Y 4'-4 1/2" 6'-0" 1'-9 1/2" 3'- 6 1/2" 2'-6" 1'-2"
3'-0" 6'-0" 5'-6" 1'-8" 3'-9" 1'-2"
53-1 3" - AEQ
53-2 2" - SR
53-3 6" - SI
53-4 4" - AE
53-5 3" - AEQ
53-6 6"-SI
X Y 3'-2" 6'-0" 3'-8" 2'-1" 2'-0" 1'-2" 4'-8" 1'-2"
6'-4" 6'-0" 3'-9" 1'-2"
52-1 2" - SR
52-2 4" - AE
52-3 3" - AEQ
52-4 6" - SI
X Y 3'-9" 2'-1" 3'-9' 1'-2"
1'-2" 6'-0" 3'-9" 1'-2"
CENTERLINE
COORDINATES
OF PENETRATIONS
HINGE AXIS
54-5
0,0
+Y
+X
54-6
54-4
HINGE AXIS
53-6
0,0
+Y
+X
53-5
HINGE AXIS
52-4
0,0
+Y
+X
52-3
HINGE AXIS
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
D
W
W T
P .r v t
/1
/2
:5
:5
A
M
D603 156728
TANK PENETRATION
DIAGRAM 3
J. GUZMAN
K. GREER
J. HILL 03-
ASCALE
RTF TANK TK-5511
ASCALE
RTF TANK TK-5411
ASCALE
RTF TANK TK-5311
ASCALE
RTF TANK TK-5211
GENERAL NOTES
A. DIAGRAM ONLY INCLUDES PIPING
PENETRATIONS ON SIDE WALLS OF
TANKS AND DIRECTION OF LID
OPENING. APPURTENANCES FOR
FANS, HEATER, VALVE RISERS, AND
LID ACCESS POINTS NOT SHOWN.
74 1416/19/23
T
J
J
J J
J J
J
J
J
J
11 12
TK-5211
TK-5311
TK-5111
TK-5411
TK-5511
TK-4411 TK-4311
DC
E F G
TK-4211
TK-4111
CP-1101
LP1
LCP-3101
LCP-1102
LP3:8
LP3:8
LP3:8
D1
LP3:8
D1
F
02-E601
G
02-E601
H
02-E601
D
02-E601
4/0 BARE COPPER GROUND RING, TYP
NEW GROUND ROD, TYP
BOND TO GROUND RING, TYP
LS-1301
LCP-1301
E
02-E601
LP3
LP2
ASCALE 3/16" = 1'-0"
4 0 4 128
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
E
W
W T
P .r v t
/1
/2
:3 :1
P
M
E101 156728
RTF ELECTRICAL PLANC. BOOTH
M. GARRETT
N. LYNCH 03-
1 MOUNT JUNCTION BOX TO THE SIDE
OF POST EQUALIZATION TANK FOR
LIT-6251 AND LSHH-6252. ROUTE 1"C
BACK TO CONTROL PANEL.
2 CONNECT TO ORENCO
CONNECTION POINTS FOR THE
FOLLOWING POWER AND
CONTROLS: (A) PMP-4411, (B)
PMP-4412, (C) LSHH-4451, (D)
LSH-4452, (E) LSL-4453, (F) LSL-4454.
3 CONNECT TO ORENCO
CONNECTION POINTS FOR THE
FOLLOWING POWER AND
CONTROLS: (A) HTR-5142, (B)
FAN-5141, (C) PMP-5311, (C)
PMP-5211, (C) PMP-5611, (C)
PMP-5111, (C) PMP-5612, (C)
PMP-5511, (C) PMP-5411, (C)
PMP-5112, (C) PMP-5613, (C)
PMP-5614, (D) LSHH-5151, (E)
LSH-5152, (F) LSL-5153 (D) LSLL-5154
(E) LSHH-5651, (F) LSH-5652, (D)
LSL-5653, (E) LSLL-5654
4 CONNECT TO ORENCO
CONNECTION POINT FOR FAN-5241.
5 CONNECT TO ORENCO
CONNECTION POINT FOR FAN-5511.
6 NEMA 4X 36"x24" CONTROLS AND
POWER JUNCTION BOXES.
7 GROUND NEW SNOW STRUCTURAL
STEEL TO GROUND SYSTEM.
8 ROUTE ORENCO SYSTEM POWER
AND CONTROLS TO LCP-1102 AND
LIGHTING POWER TO LP2.
KEY NOTES X
A. CONTRACTOR TO COORDINATE ALL
FINISHES AND BUILDING HARDWARE WITH
CONTRACTING OFFICER BEFORE
PURCHASE/INSTALLATION.
B. ALL MOTORS SHALL HAVE TEFC
ENCLOSURES WITH ENCAPSULATED
WINDINGS.
C. LOCATIONS AND ARRANGEMENT OF
ELECTRICAL EQUIPMENT TO BE CONFIRMED
WITH CONTRACTING OFFICER BASED ON
SIZES OF EQUIPMENT PROVIDED.
D. BOND ALL PROCESS PIPING TO GROUND
SYSTEM USING UL LISTED ATTACHMENTS.
E. ALL ENCLOSURES AND CONNECTIONS
SHALL BE RATED FOR CORROSIVE
ENVIROMENTS.
F. ALL CONDUIT PENETRATIONS SHALL BE AS
CLOSE TO THE WALL OR CONNECTED
EQUIPMENT AS FEASIBLE. IN NO CASE
SHALL A PENETRATION BE WITHIN 12" OF
STRUCTURAL BEAM.
G. ALL CONDUITS SHALL BE SURFACE
MOUNTED.
H. ALL EXTERIOR RECEPTACLES SHALL BE
INSTALLED WITH "WEATHER PROOF WHILE
IN USE" COVERS.
GENERAL NOTES
75 1416/19/23
HAZARDOUS MATERIAL CLASSIFICATION TABLE
CHEMICAL NAME
SODIUM HYDROXIDE
SODIUM HYDROXIDE
SODIUM HYPOCHLORITE
CONCENTRATION
25% 25% 50%
CAS #
1310-73-2 1310-73-2 7681-52-9
STATE
LIQUID
LIQUID
LIQUID
QUANTITY STORED
90 GALLONS
150 GALLONS
15 GALLONS
LOCATION STORED
RM 100 OPERATIONS AREA
RM 100 OPERATIONS AREA
RM 100 OPERATIONS AREA
LOCATION USED
RM 102 HEADWORKS
RM 102 HEADWORKS
RM 100 OPERATIONS AREA
HAZARDOUS CLASSIFICATION
WATER REACTIVE CLASS 1, CORROSIVE
WATER REACTIVE CLASS 1, CORROSIVE
CORROSIVE
JUSTIFICATION
HMEx HMEx HMEx
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
A
W
W T
P .r v t
/1
/2
:5
:3
P M
G100 156728
CODE COMPLIANCE TABLESS. KENNY
M. LAMBERT
S. KENNY 04-
GENERAL CODE COMPLIANCE NOTES
JURISDICTION
• AUTHORITY HAVING JURISDICTION (AHJ): NATIONAL PARKS SERVICE, INCLUDING THE
DENVER SERVICE CENTER (DSC.)
• CLIENT: THE NATIONAL PARKS SERVICE
• LOCATION:
TOWN OF STEHEKIN
COUNTY OF CHELAN
STATE OF WASHINGTON
APPLICABLE CODES
• BUILDING CODE: 2021 INTERNATIONAL BUILDING CODE (IBC)
• EXISTING BUILDING CODE: 2018 INTERNATIONAL EXISTING BUILDING CODE (IEBC)
• FIRE CODE: 2018 INTERNATIONAL FIRE CODE (IFC)
• PLUMBING CODE: 2018 INTERNATIONAL PLUMBING CODE (IPC)
• MECHANICAL CODE: 2018 MECHANICAL CODE (IMC)
• FUEL GAS CODE: 2018 FUEL GAS CODE (IFGC)
• ACCESSIBILITY CODE: ARCHITECTURAL BARRIERS ACT (ABA)
• ENERGY CONSERVATION CODE 2018 ENERGY CONSERVATION CODE (IECC)
• ELECTRICAL CODE 2020 NATIONAL ELECTRIC CODE (NEC) (NFPA 70)
ASSUMPTIONS
1. CONSTRUCTION TYPE IS VB
2. AUTOMATIC SPRINKLER SYSTEM FOR WWTP BUILDING
OCCUPANCY TABLE
ROOM
NUMBER ROOM NAME AREA (SQUARE FEET)
OCCUPANCY TYPE
001 PUMP ROOM 86 SF F1
100 OPERATIONS AREA 671 SF F1
101 OPERATORS OFFICE 117 SF B
102 HEADWORKS 190 SF F1
103 RESTROOM 98 SF F1
104 ELECTRICAL ROOM 113 SF F1
105 GENERATOR ROOM 155 SF F1
106 MECHANICAL ROOM 130 SF F1
107 STORAGE 30 SF F1
PUMP ROOM LEVEL:
GROUP F1: 86 SF
GROUND LEVEL:
GROUP F1: 1394
GROUP B: 117
GRAND TOTAL: 1597
CODE COMPLIANCE
IBC SECTION TOPIC COMPLIANCE
302 USE AND OCCUPANCY SEE OCCUPANCY GROUP
FOR APPLICABLE
OCCUPANCY GROUPS
304 USE AND OCCUPANCY "GROUP B APPLIES TO:
101 OPERATORS OFFICE"
306.2 USE AND OCCUPANCY "GROUP F1 APPLIES TO:
001 PUMP ROOM
100 OPERATIONS AREA
102 HEADWORKS
103 RESTROOM
104 ELECTRICAL ROOM
105 GENERATOR ROOM
106 MECHANICAL ROOM
107 STORAGE"
307 USE AND OCCUPANCY DESIGN ASSUMES THAT ALL
HAZARDOUS MATERIALS
WILL REMAIN UNDER
SPECIFIC CONTROL LIMITS
AS DEFINED IN SECTION 307
414.1 SPECIAL
REQUIREMENTS
SECTION 414 APPLIES TO
THE DISPENSING, USE, OR
STORAGE OF HAZARDOUS
CHEMICALS REGARDLESS OF
OCCUPANCY TYPE
414.1.3 SPECIAL
REQUIREMENTS
BUILDING OFFICIAL
REQUIRES DETAILED
REPORT OF ALL HAZARDOUS
MATERIALS USED IN THE
FACILITY
414.5.3 SPECIAL
REQUIREMENTS
SPILL CONTROL, DRAINAGE,
AND CONTAINMENT
REQUIRED FOR SOLID AND
LIQUID HAZARDOUS
MATERIALS
415 SPECIAL
REQUIREMENTS
NO HAZARDOUS MATERIAL
SHALL EXEED CONTROL
LIMITS WITHIN THE BUILDING.
NO GROUP H OCCUPANCY IN
THE FACILITY
502.1 HEIGHTS AND AREAS PROVIDE AN APPROVED
ADDRESS NUMBER NOT
LESS THAN 4" IN HEIGHT AND
NOT LESS THAN 1/2 INCH IN
WIDTH. THEY SHALL BE ON
CONTRASTING
BACKGROUND AND PLAINLY
SEEN FROM ROAD.
WHEREAS ADDRESS
CANNOT BE VIEWED FROM
PUBLIC WAY, A MONUMENT,
POLE OR OTHER APPROCED
SIGN OR MEANS SHALL BE
USED TO IDENTIFY THE
STRUCTURE.
TABLE 504.4 AND
506.2
HEIGHTS AND AREAS "AREA AND HEIGHT LIMITS:
CONSTRUCTION TYPE VB
•GROUP B
-3 STORIES
-36,000 sf
•GROUP F1
-2 STORIES
-52,000 SF"
CODE COMPLIANCE
IBC SECTION TOPIC COMPLIANCE
TABLE 508.4 HEIGHTS AND AREAS "OCCUPANCY SEPARATION
REQUIREMENTS: FIRE
SPRINKLERS SHALL BE
PROVIDED THROUGHOUT
WWTP BUILDING.
F1 VS. B = 0 HR"
508.4.2 HEIGHTS AND AREAS "MULTIPLE OCCUPANCIES:
WWTP = SPRINKLERED
SINGLE STORY / F1
SPRINKLERED SINGLE
STORY LIMIT + B SINGLE
STORY / S1 SPRINKLERED
SINGLE STORY LIMIT < 1
1394 / 52,000 + 117 / 36,000 = .030
DESIGN COMPLIES"
TABLE 601 CONSTRUCTION "TYPE VB CONSTRUCTION
ASSUMED:
0 HR FIRE RESISTANCE
RATING REQUIRED FOR;
•PRIMARY STRUCTURAL
FRAME
•BEARING WALLS
•NONBEARING WALLS AND
PARTITIONS
•FLOOR CONSTRUCTION
•ROOF CONSTRUCTION"
TABLE 803.13 INTERIOR "INTERIOR FINISH
REQUIREMENTS
CALSS B = FLAME SPREAD
26-75
CLASS C = FLAME SPREAD
76-200
BOTH SMOKE DEVELOPED
INDEX 0-450
(SECTION 803.1)
•GROUP B; C
•GROUP F1; C"
903 FIRE PROTECTION
SYSTEMS
"AUTOMATIC FIRE
SPRINKLERS
•GROUP B - NO OCCUPANCY
BASE REQUIREMENTS
•GROUP F1 - NO OCCUPANCY
BASED REQUIREMENTS"
906 FIRE PROTECTION
SYSTEMS
PORTABLE 2-A:20-B TYPE
FIRE EXTINGUISHERS:
MAXIMUM TRAVEL DISTANCE
= 50 FT
907.2 FIRE PROTECTION
SYSTEMS
• A MINIMUM OF ONE MANUAL
FIRE ALARM BOX IS
REQUIRED IN A BUILDING.
REQURIEMETNS BASED ON
ANY OF THE OCCUPANCY
GROUP CLASSIFICATIONS.
76 1416/19/23
CP-1CP-1 CP-1
CP-1CP-1
DN
F A
C P
F
30CD
F
C D
F
C D
F
C D
F
C D
F
30CD
F
C D
T
F
C D
IC
IC
F
F
F
30CD
F
F
F
F
F
F
S P
FS
F
F
F
IC
IC
UP
IC
DOOR
6' - 0"
102A
DOOR
2' - 8"
101B
NON ACCESS
SPRINKLERED
155 SF
GENERATOR
ROOM
F1
300 SF
ACCESSIBLE
SPRINKLERED
113 SF
ELECTRICAL
ROOM
F1
100 SF
ACCESSIBLE
SPRINKLERED
98 SF
RESTROOM
F1
100 SF
ACCESSIBLE
SPRINKLERED
190 SF
HEADWORKS
F1
100 SF
ACCESSIBLE
SPRINKLERED
671 SF
OPERATIONS
AREA
F1
100 SF
ACCESSIBLE
SPRINKLERED
117 SF
OPERATORS
OFFICE
B
150 SF
NON ACCESS
SPRINKLERED
130 SF
MECHANICAL
ROOM
F1
300 SF
DOOR
2' - 8"
102B
DOOR
2' - 8"
101A
DOOR
2' - 8"
100A
DOOR
2' - 8"
104A
DOOR
2' - 8"
103A
DOOR
2' - 8"
107A
TD-1 CONTINUED
FROM LOWER
LEVEL
ACCESSIBLE
SPRINKLERED
30 SF
STORAGE
F1
300 SF
2 1
NON ACCESS
SPRINKLERED
86 SF
PUMP
ROOM
F1
100 SF
PRE-EQUALIZATION
TANK
EGRESS OCCUPANT LOAD
EXIT OCCUPANT LOAD
OUT OF BUILDING
ILLUMINATED EXIT SIGN.
SHADED QUARTER INDICATES
DIRECTION OF SIGN FACE
ADA STATUS
SPRINKLERED
ROOM
NAME
ROOM #
OCCUPANCY
OCCUPANT LOAD RATE
(SF/OCCUPANT)
NO. OF EXITS REQUIREDOCCUPANTS
ROOM AREA (SF)
1 HOUR FIRE RATING
EMERGENCY EYE WASH
AND SHOWER
EEWS
2 HOUR FIRE RATING
FIRE SUPPRESSION STATUS
LINE TYPES FOR MEANS OF EGRESS:
TRAVEL DISTANCE
COMMON PATH
SYMBOLCOMPONENT
TD
CP
EXIT DISCHARGE ARROW
EXIT DISCHARGE
A CLEAR DOOR WIDTH [FEET - INCHES]
B OCCUPANT LOAD CAPACITY [NO.OF PEOPLE]
EXIT DOOR TAG
DRY CHEMICAL EXTINGUISHER
(ABC TYPE)
SHEET LEGEND
ASCALE 1/4" = 1'-0"
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
A
W
W T
P .r v t
/1
/2
:5
:3
P M
G101 156728
CODE COMPLIANCE - WWTP
BUILDING
S.KENNY
M. LAMBERT
S.KENNY 04-
ASCALE
CODE COMPLIANCE - WWTP BUILDING
GROUND LEVEL
MEANS OF EGRESS ARRANGEMENT DISTANCE
SCHEDULE - BUILDING SUMMARY
EGRESS
PATH ID
EGRESS DISTANCE
PROVIDED
MAXIMUM
PERMITTED
CP-1 71' - 6" 100' - 0"
TD-1 29' - 0" 250' - 0"
ASCALE
CODE COMPLIANCE - WWTP BUILDING
PUMP ROOM LEVEL
77 1416/19/23
C D
A
04-X301
EXISTING PAD
EXISTING
PROGRESSIVE
CAVITY PUMP
ASSEMBLY
1.5" PIPING
PAD, GRINDER, AND
MOTOR
PLUG VALVE
6" DUCTILE IRON PIPE
04-X101
04-X101
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
X
W
W T
P .r v t
/1
/2
:5
:4
A
M
X101
NORTH CASCADES NATIONAL PARK
156728
WWTP BUILDING PUMP
ROOM DEMOLITION PLAN
J. GUZMAN
K. GREER
J. HILL
-04-
NOT TO SCALE04-X101
IMAGE2
1 DEMOLISH EXISTING TANK LID.
SEE 04-X301 FOR ADDITIONAL
INFORMATION.
2 DEMOLISH ALL APPURTEANCES
AND COMPONENTS
ASSOCIATED WIITH EXISTING
PROGRESSIVE CAVITY PUMP
AND GRINDER.
3 PROTECT AUTOSAMPLER AND
ALL APPURTENANCES IN PLACE.
KEY NOTES X
NOT TO SCALE04-X101
IMAGE3
A. UNLESS OTHERWISE NOTED, ALL
EXISTING ELECTRICAL COMPONENTS TO
BE DEMOLISHED. INCLUDING ALL
WIRING, SWITCHES, AND OTHER
CONNECTED COMPONENTS.
GENERAL NOTES
78 1416/19/23
C D E F G
BLOWER
ROOM
GENERATOR
ROOM
A
04-X301
B
04-X302
7 7 7
PRESERVE FEEDERS TO LIFT
STATION WHEN REMOVING PANEL
METER & TRANSFER SWITCH
OPERATIONS
AREA
04-X501
04-X101
8'-6"
04-X501
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
X
W
W T
P .r v t
/1
/2
:5 :2
P
M
X102
NORTH CASCADES NATIONAL PARK
156728
WWTP BUILDING GROUND
LEVEL DEMOLITION PLAN
J. GUZMAN
K. GREER
J. HILL
-04-
A. UNLESS OTHERWISE NOTED, ALL
EXISTING ELECTRICAL COMPONENTS TO
BE DEMOLISHED. INCLUDING ALL
WIRING, SWITCHES, AND OTHER
CONNECTED COMPONENTS.
B. COORDINATE DEMOLITION TIMING TO
ALLOW FOR CONTINUED OPERATION
OF EXISTING TREATMENT SYSTEM
THROUGHOUT CONSTRUCTION. SEE
SPECIFICATION 01 11 00 AND SHEETS 00-
G101 THROUGH 00-G104.
GENERAL NOTES
1 REMOVE EXISTING EXTERIOR
SIDING.
2 REMOVE EXISTING BEARING
WALL TO FOUNDATION. SEE
04-X302
3 REMOVE COUNTERTOP, BASE
CABINET, AND SINK.
4 REMOVE UPPER CABINETS.
5 REMOVE BATHROOM WALLS.
EXISTING GAS UNIT HEATER
ABOVE BATHROOM TO REMAIN.
6 REMOVE EXISTING TOILET AND
APPURTENANCES. CAP DRAIN
PIPING.
7 SEE SHEET 04-X501.
8 SAWCUT AND REMOVE THE
THICKENED SLAB IN THIS AREA.
9 REMOVE CENTRIFUGAL WALL
EXHAUSTER.
10 SEE SHEET 04-X301.
11 REMOVE NON-FUNCTIONING
EXHAUST FAN AND COVER
OPENING WITH PLATE.
12 REMOVE PROPELLER FAN.
13 DEMO SLAB TO ALLOW
INSTALLATION OF BELOW SLAB
PIPING. SAWCUT EDGES, CORE
DRILL CORNERS. ALIGN WEST
END OF CUT WITH EXTERIOR OF
NEW WALL BETWEEN
HEADWORKS AND OPERATIONS
AREA.
14 REMOVE ELECTRIC UNIT
HEATER.
KEY NOTES X
15 REMOVE GWB AT EXTENTS TO
RECEIVE TILE AND REPLACE
WITH CEMENT BACKER BOARD.
16 REMOVE EXISTING DOOR.
17 REMOVE EXISTING OBSOLETE
MET-PRO CORPORATION
TREATMENT SKID AND ALL
ASSOCIATED COMPONENTS,
INCLUDING FIVE STEEL TANKS,
CONTROL PANEL, AUXILIARY
TANKS, PUMPS, AND
PIPING.10'x10' REMOVABLE WALL
PANEL MAY BE USED FOR
REMOVAL OF SKID.
18 REMOVE EXISTING BACKFLOW
PREVENTER WITHIN PANEL AND
CAP UPSTREAM SIDE.
19 DEMO SLAB TO ALLOW
INSTALLATION OF BELOW SLAB
PIPING.
20 PROTECT UNIT HEATER IN
PLACE. REPLACE ELECTRICAL
PER GENERAL NOTE A, THIS
SHEET.
79 1416/19/23
M
C D E F G
MECHANICAL
ROOM
106 GENERATOR
ROOM
OPERATIONS
AREA
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
X
W
W T
P .r v t
/1
/2
:5
:4
A
M
X103
NORTH CASCADES NATIONAL PARK
156728
WWTP BUILDING CEILING
DEMOLITION PLAN
C.BOOTH
M. GARRETT
N. LYNCH
-04-
A. UNLESS OTHERWISE NOTED, ALL
EXISTING ELECTRICAL COMPONENTS TO
BE DEMOLISHED. INCLUDING ALL
WIRING, SWITCHES, AND OTHER
CONNECTED COMPONENTS.
B. ELECTRICAL DEVICES SHOWN ARE
BASED ON AVAILABLE RECORD
DRAWINGS. NOT ALL EXISTING
EQUIPMENT IS SHOWN.
GENERAL NOTES
80 1416/19/23
GENERATOR
ROOM
80 1416/19/23
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
X
W
W T
P .r v t
/1
/2
:5
:4
A
M
X104
NORTH CASCADES NATIONAL PARK
156728
WWTP BUILDING ROOF
DEMOLITION PLAN
S. KENNY
M. LAMBERT
S. KENNY
-04-
1 REMOVE EXISTING SHINGLES
AND FASCIA BOARD.
2 EXTENTS OF EXISTING ROOF
DECK TO BE REMOVED.
KEY NOTES X
A. UNLESS OTHERWISE NOTED, ALL
EXISTING ELECTRICAL COMPONENTS TO
BE DEMOLISHED. INCLUDING ALL
WIRING, SWITCHES, AND OTHER
CONNECTED COMPONENTS.
GENERAL NOTES
81 1416/19/23
BOT ROOF L 12' 9 1/2"
1175.77
PUMP ROOM FLOOR
1153.20
3 16
04-X501
04-X101
04-D301
04-X101
ASCALE 1/2" = 1'-0"
2 0 2 4
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
X
W
W T
P .r v t
/1
/2
:5
:4
A
M
X301
NORTH CASCADES NATIONAL PARK
156728
WWTP BUILDING
DEMOLITION SECTIONS
J. GUZMAN
K. GREER
J. HILL
-04-
SCALE A04-X101
SECTIONA
A. UNLESS OTHERWISE NOTED, ALL
EXISTING ELECTRICAL COMPONENTS TO
BE DEMOLISHED. INCLUDING ALL
WIRING, SWITCHES, AND OTHER
CONNECTED COMPONENTS.
B. COORDINATE DEMOLITION TIMING TO
ALLOW FOR CONTINUED OPERATION
OF EXISTING TREATMENT SYSTEM
THROUGHOUT CONSTRUCTION. SEE
SPECIFICATION 01 11 00 AND SHEETS 00-
G101 THROUGH 00-G104.
GENERAL NOTES
1 REMOVE 2-FT DIAMETER
MANHOLE AND 8-IN THICK
REINFORCED CONCRETE RISER.
2 REMOVE 2-FT BY 2-FT
RECTANGULAR OPENING AND
6-IN THICK CONRETE RISER.
3 REMOVE 2-FT BY 2-FT SKYLIGHT
AND WITH 6-IN THICK
REINFORCED CONRETE RISER.
4 REMOVE TANK 6-IN THICK TANK
LID REINFORCED WITH A
DOUBLE MAT OF REBAR.
LATERALLY BRACE EXISTING
WALLS ON THE INTERIOR OF
THE TANK PRIOR TO LID
DEMOLITION. LEAVE BRACING IN
PLACE UNTIL THE NEW SLAB LID
IS INSTALLED.
5 DEMOLISH EXISTING WALL. SEE
04-X302 FOR INTERIM SHORING
REQUIREMENT.
6 PLUG OR BLIND FLANGE
REMAINING PIPE.
KEY NOTES X
82 1416/19/23
BOT ROOF L 12' 9 1/2"
1175.77
D
OPERATIONS
AREA
ASCALE 1/2" = 1'-0"
2 0 2 4
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
X
W
W T
P .r v t
/1
/2
:5
:4
A
M
X302
NORTH CASCADES NATIONAL PARK
156728
WWTP BUILDING
DEMOLITION SECTIONS
J. GUZMAN
K. GREER
J. HILL
-04-
SCALE A04-X102
SECTIONB
A. COORDINATE ALL DEMOLITION WITH
CONSTRUCTION SEQUENCING.
GENERAL NOTES
1 SHORE EXISTING ROOF
FRAMING BEAM IN PLACE DOWN
TO EXISTING SLAB ON GRADE
PRIOR TO WALL AND ROOF
DEMOLITION. SHORING TO
REMAIN IN PLACE UNTIL NEW
CMU WALL IS INSTALLED.
2 DEMOLISH EXISTING ROOF TO
EXTENTS SHOWN ON SHEET
04-X104.
3 DEMOLISH EXISTING EXTERIOR
WOOD FRAMED WALL,
SIDEWALK, AND EXISTING
PRE-EQ TANK LID. COORDINATE
WITH EXTENTS SHOWN ON
SHEET 04-X102.
KEY NOTES X
83 1416/19/23
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
X
W
W T
P .r v t
/1
/2
:5
:5
A
M
X501
NORTH CASCADES NATIONAL PARK
156728
WWTP BUILDING
DEMOLITION DETAILS
J. GUZMAN
K. GREER
J. HILL
-04-
A. COORDINATE ALL DEMOLITION WITH
CONSTRUCTION SEQUENCING.
GENERAL NOTES
1 REMOVE EXISTING OBSOLETE
MET-PRO CORPORATION
TREATMENT SKID AND ALL
ASSOCIATED COMPONENTS
INCLUDING CONTROL PANEL,
AUXILIARY TANKS, PUMPS, AND
PIPING. FOUR LARGEST STEEL
TANKS ARE 4-FT, 4-FT, 5-FT, AND
8-FT IN DIAMETER. 10-FT x 10-FT
REMOVABLE WALL PANEL MAY
BE USED FOR REMOVAL OF
SKID.
2 REMOVE THREE ROTARY LOBE
BLOWERS AND ALL ASSOCIATED
ELECTRICAL AND MECHANICAL
EQUIPMENT.
KEY NOTES X
NOT TO SCALE04-X102
IMAGE1
04-X301 1" = 80'-0"
IMAGE2
NOT TO SCALE
IMAGE3
NOT TO SCALE04-X102
IMAGE4
84 1416/19/23
A
04-S301
C
D
8" 8'-0" 8" 2'-11 3/4"
EXIST 8" THCK SLAB
TOC EL= 1153.20'
3" 3"
EXIST 8" THCK SLAB
TOC EL= 1153.20'
2% SLOPE
CENTER GROUT
SLOPING AROUND
NEW PIPE
PENETRATION
9'-4"
2'-0"EXISTING
SUMP
4'-0"
8'-8"
5.5 FT 8.0 FT 2.0 FT
PDL: 1.7 KIPS
PSL: 16.9 KIPS
PDL: 1.7 KIPS
PSL: 16.9 KIPS
BEAM (SERVICE LEVEL):
DL: 685 PLF
SNOW LOAD: 1114 PLF
DIAGRAM A
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
S
W
W T
P .r v t
/1
/2
:1
:4
P M
S101 156728
WWTP BUILDING
FOUNDATION AND PUMP
ROOM PLAN
J. CORONADO
C. MULDERICK
R. NELSON 04-
A. COORDINATE THIS PLAN WITH
PROCESS AND PIPING PLANS.
1 REHABILITATE INTERIOR SURFACE
AND COAT INTERIOR PER
SPECIFICATION 03 35 00.
2 INSTALL NEW GRATING ON EXISTING
SUMP PER DETAIL 3/00-S502.
3 HELICAL PILE FOUNDATION SYSTEM.
EXTEND BEARING HELICALS TO A
MINIMUM OF 10FT BELOW THE GRADE
BEAM. LOADING PER DIAGRAM A
BELOW.
KEY NOTES X
GENERAL NOTES
06/19/2023 85 1416/19/23
C E F G
04-S501
04-S501
12" THCK SLAB
W/ #5@8", EA FACE.
PLACE SHORT BARS
ON OUTSIDE FACES.
HOOKS AT ENDS
TOC EL= 1163.20'
04-S501
D
8" CMU WALL
PER ARCH
8" CMU W/
FINISH PER
ARCH
52'-1"
TOS
EL 1163.20
EXISTING
TOS
EL 1163.20
EXISTING
TOS
EL 1162.87
EXISTING
ELECTRICAL ROOM
ACCESS
HATCH
8" 1'-8" 2'-6" 3'-10" 3'-4"
8" CMU WALL
PER ARCH
8'-8" 12'-11" 16'-7" 14'-8"
4'-0"
8'-0"
4'-0" STOOP
04-S501
04-S501
SIM
04-S501
S T
O O
P
3'-7 3/4"
V
IF
SIM
04-S501
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
S
W
W T
P .r v t
/1
/2
:1
:4
P M
S102 156728
WWTP BUILDING
STRUCTURAL GROUND
LEVEL PLAN
J. CORONADO
C. MULDERICK
R. NELSON 04-
A. COORDINATE THIS PLAN WITH
PROCESS AND ARCHITECTURAL PLANS.
B. COORDINATE PENETRATIONS IN
EXISTING WALLS AND SLABS WITH
PROCESS AND MECHANICAL.
GENERAL NOTES
KEY NOTES X
1 REPAIR SLAB AFTER PROCESS PIPING
IS INSTALLED PER DETAIL 3/04-S501.
REFER TO DETAIL 6/00-D502 FOR HOW
TO HANDLE PIPE PENETRATIONS IN
THE SLAB.
2 METAL FRAMING PARTITION WALL, SEE
04-A401.
3 HSS3 1/2x3 1/2x1/4 IN CMU WALL.
4 NEW 6" EXTERIOR SLAB, REINF W/ #3 @
8" EA WAY, AT MIDHEIGHT IN SLAB.
ADD CONSTRUCTION JOINT TO
EXISTING ADJACENT SLAB.
5 PROVIDE REINF AROUND OPENINGS
PER DETAIL 1/00-S501.
06/19/2023 86 1416/19/23
C E F G
04-S502
04-S502
D
SLOPE TOP
OF CMU TO
BOT OF DECK
SLOPE TOP
OF CMU TO
BOT OF DECK
04-S502
SIM
04-S502
12'-11" 16'-7" 14'-8"
EXISTING GLULAM BEAM
EXISTING GLULAM BEAM
EXISTING GLULAM BEAM
E X
IS
T
IN
G
G L U
L A
M R
ID
G
E B
E A
M
EXISTING GLULAM BEAM
EXISTING GLULAM BEAM
EXISTING GLULAM BEAM
EXISTING GLULAM BEAM
EXISTING GLULAM BEAM
EXISTING GLULAM BEAM
EXISTING GLULAM BEAM
EXISTING GLULAM BEAM
EXISTING GLULAM BEAM
04-S503
TOP OF WALL:
EL. 1173.20
5TOP OF WALL=
BOT OF DECK
TOP OF WALL:
EL. 1173.20
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
S
W
W T
P .r v t
/1
/2
:1
:4
P M
S103 156728
WWTP BUILDING ROOF
FRAMING PLAN
J. CORONADO
C. MULDERICK
R. NELSON 04-
A. COORDINATE THIS PLAN WITH
PROCESS AND ARCHITECTURAL PLANS.
B. COORDINATE PENETRATIONS IN
EXISTING WALLS AND SLABS WITH
PROCESS AND MECHANICAL.
GENERAL NOTES
KEY NOTES X
1 EXISTING TONGUE AND GROOVE
WOOD DECKING, TO REMAIN IN PLACE.
2 3N x 20 GA STEEL DECK OVER
TRUSSES. SCREW TO TRUSSES WITH
#12 SDST AT 24/4 PATTERN WITH 3
SIDELAP FASTENER PER SPAN.
3 NEW CFMF TRUSS AT 32" BEARING ON
CONCRETE SLAB. SEE TRUSS PROFILE
4/04-S502 AND 5/04-S502.
4 WT4x9 DIAPHRAGM CHORD. SEE
DETAILS 5 AND 6 ON SHEET 04-S503.
5 STEP TOP OF CMU WALL TO BOTTOM
OF DECK.
06/19/2023 87 1416/19/23
PUMP ROOM FLOOR
1153.20
3 1
04-S502
04-S501
2% SLOPE. GROUT UP
TO INVERT OF NEW
PIPE PENETRATION
HEADWORKS
PRE-EQ TANK PRE-EQ PUMP ROOM
OFFICE
EXTERIOR 8" CMU
WALL, SEE SCHED
INTERIOR 8" CMU WALL,
SEE SCHED FOR REINF
EXTERIOR 8" CMU
WALL, SEE SCHED
PUMP ROOM FLOOR
1153.20
FIRST FLOOR
1163.20
ASCALE 1/2" = 1'-0"
2 0 2 4
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
S
W
W T
P .r v t
/1
/2
:1
:4
P M
S301 156728
WWTP BUILDING
STRUCTURAL SECTIONS 1
J. CORONADO
C. MULDERICK
R. NELSON 04-
SCALE A04-S101
A SECTION
06/19/2023 88 1416/19/23
8" EXTERIOR CMU
WALL PER ARCH
12" SLAB PER
PLAN
HEADWORKS/OFFICE
PRE-EQUALIZATION TANK
TOC
EL 1163.20
STUB WALL W/ #5 @ 12"
EA FACE. PLACE VERTS
ON OUTSIDE FACE MATS
#5 DOWEL CENTERED IN
EXISTING TANK WALL
PROJECTED WITH
STANDARD HOOK
LAPPED WITH TOP MAT
OF SLAB AT 10"
#5 DOWEL CENTERED IN
EXISTING TANK WALL
PROJECTED WITH STANDARD
HOOK LAPPED WITH TOP MAT
OF SLAB AT 10"
EMBED DOWEL
6" W/ EPOXY
STOOP PER DETAIL
4/00-S502
EXISTING
6" SLAB
TOC
EL 1160.70
TOC
EL 1163.20
ELECTRICAL ROOM/
OPERATIONS AREA
TOC
EL 1163.20
TOC
EL 1160.70
NEW SLAB, SEE
DETAIL 1/04-S503
8" EXTERIOR
CMU WALL
SEE SCHED
FOR REINF.
12" SLAB
PER PLAN
HEADWORKS/OFFICE
PRE-EQUALIZATION TANK
SEE DETAIL 1
FOR DOWEL AND
WALL REINF.
FIRST FLOOR
1163.20
EXISTING SLAB
#5 DOWEL, SEE
DETAIL 5/00-S503
PROVIDE 1/2 EXPANSION
MATERIAL BETWEEN NEW
SLAB AND EXISTING SLAB, TYP.
GRADE BM:
8" WIDE x 18" DEEP W/
(2) #6 T&B, AND #4
SINGLE VERT AT 6",
ALT LEGS FOR VERT
(2) #5x CONT ATOP
CAP PLATE
4" GRAVEL LAYER
6" CONC SLAB
C L R
FIRST FLOOR
1163.20
SOAP FACE SHELLS OF CMU
IN COURSING AROUND HSS
AND GROUT
HSS PER PLAN W/ BASE
PL3/4x4x8 W/ (4) 5/8" DIA
F1554, 36KSI, ANCHOR RODS
3/16
A
EXISTIN SLAB
GRADE BM, SEE
DETAIL 4 FOR
INFORMATION
HELICAL ANCHOR, REFER TO
PLAN FOR LOADING CRITERIA.
ALIGN HELICALS W/ HSS
COLUMNS ABOVE
4" GRAVEL LAYER
1"
2"
1"
SECTION A
ASCALE 1" = 1'-0"
1 0 1 2
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
S
W
W T
P .r v t
/1
/2
:1
:4
P M
S501 156728
WWTP BUILDING
STRUCTURAL DETAILS 1
J. CORONADO
C. MULDERICK
R. NELSON 04-
SCALE A04-S102
1 DETAIL
SCALE A04-S102
3 DETAIL
SCALE A04-S501
2 DETAIL
SCALE A04-S102
4 DETAIL
SCALE A04-S501
5 DETAIL
06/19/2023 89 1416/19/23
CFM TRUSS
SEE PLAN
3" METAL ROOF,
SEE PLAN
FINISH PER ARCH
TOC
EL 1173.20SEE PLAN
EXISTING ROOF
BEAM TO REMAIN
IN PLACE
TOW
18GA TRUSS
BLOCKING
PANEL
CONTINUOUS 18 GA TRACK,
SCREW TO TRUSS ENDS
CONTINUOUS BENT
PL 12GAx3x3 SCREW
TO TRUSS ENDS
16 GA RIGID CLIP TO TRUSS
AND 1/2" DIAMETER ANCHOR
BOLT (OR ADHESIVE ANCHOR)
TO BOND BEAM, TYP
CONT BOND BEAM
WT 4X9
04-S503
H E
E L
/4
CEILING PER ARCH
BOND
BEAM
CFM TRUSS
SEE PLAN
SOFFIT
FRAMING
PER ARCH
SCREW DECK TO
EMBED PER PLAN
EMBED PL3/8"x6xCONT, W/ 1/2" DIA HAS AT 16"
INSTALL EMBED PLATE
RAKE TOP OF
CMU WALL TO
DECK EL
C D
EXISTING ROOF
BEAM TO REMAIN
IN PLACE
CONT BOND BEAM AT
BEARING LOCATION OF
EXISTING GL BEAM
3" METAL ROOF,
SEE PLAN
TRUSS END CONNECTION,
SEE 1/04-S502
H E
E L
/4
18GA TRUSS
BLOCKING
PANEL
NOTES:
1. DIMENSION TO CENTERLINES OF TRUSS FRAMING.
2. 6-INCH FRAMING MEMBERS ARE ASSUMED FOR TRUSS.
15'-6"
8'-8"
6'-10"
12'-7"
11" 11'-5" 3"
NOTES:
1. DIMENSION TO CENTERLINES OF TRUSS FRAMING.
2. 6-INCH FRAMING MEMBERS ARE ASSUMED FOR TRUSS.
12'-1"
7'-2"
4'-10"
9'-3"
9'-0" 3"
ASCALE 3/4" = 1'-0"
SCALE OF FEET
0 1 2 3
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
S
W
W T
P .r v t
/1
/2
:1
:4
P M
S502 156728
WWTP BUILDING
STRUCTURAL DETAILS 2
J. CORONADO
C. MULDERICK
R. NELSON 04-
SCALE A04-S502
1 DETAIL
SCALE A04-S502
3 DETAIL
SCALE A04-S502
2 DETAIL
SCALE A04-S502
5 LONG TRUSS DETAIL
SCALE A04-S502
4 SHORT TRUSS DETAIL
06/19/2023 90 1416/19/23
EXISTING SLAB
NEW CONCRETE SLAB ON
GRADE, REINF W/ #3@10" EA
WAY, CENTERED IN SLAB.
DRILL AND EPOXY #3 BAR A
MIN OF 4" INTO EXISTING SLAB
COMPACT FILL TO 95%
PROCTOR AND PLACE
6" LAYER OF LOOSE
GRAVEL BELOW SLAB
EXISTING
GLULAM BEAM
NEW 8" INTERIOR
WALL
CONT BOND BEAM
AT TOP OF WALL
BENT PL 3/8 AT GL BEARING
WELD PL TO SADDLE W/
3/16 FILLET EA END.
EMBED PL3/8"x6"x0'-8"
W/ (2) 1/2" ⌀ H.A.S. @
4" O.C., CENTERED
HSS3 1/2"x3 1/2"x3/16 STUB W/
PL 1/4 SADDLE AND (2) 1/2"
DIA THRU BOLTS TO GLAM
3/16
WT 4x9
0.145"⌀ SHOT PIN @ 6"
AT METAL DECK
ROOF TRUSS
1/2" DIAMETER x 1-1/2"
LONG LAG SCREW @ 12"
AT EXISTING T&G
DECKING
COPE WEB OF WT4
AT GL BM, TYP
1/2" DIAMETER x 2" LONG
LAG SCREW TO GL BEAM
BSCALE
ASCALE
SCALE OF INCHES
12 6 12 1-1/2" = 1'-0"
1" = 1'-0" 1 0 1 2
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
S
W
W T
P .r v t
/1
/2
:1
:4
P M
S503 156728
WWTP BUILDING
STRUCTURAL DETAILS 3
Designer
Checker
R. NELSON 04-
SCALE A04-S503
1 FLOOR JOINT REPAIR
SCALE B04-S103
2 DETAIL SCALE A04-S502
3 DETAIL
SCALE A04-S503
4 DETAIL
06/19/2023 91 1416/19/23
E E
PRIMARY
TANKS
STEHEKIN WWTP
PRE-ANOXIC TANKS
RTF TANKS
POST-
EQUALIZATION
TANK
ACCESSIBLE PARKING SPACE
BOLLARD TYP; SEE CIVIL
EXISTING PROPANE TANK
NEW GATE; SEE CIVIL
NEW GATE; SEE CIVIL
EXISTING FENCE
STOOP; SEE STRUCTURAL
PAVEMENT; SEE CIVIL
EXISTING SIDEWALK
STOOP; SEE STRUCTURAL
EXISTING STOOP
GENERAL NOTE:
1. SEE CODE MODIFICATION LETTER FOR
INFORMATION PERTAINING TO SITE EGRESS &
ACCESS TO PUBLIC WAY
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
A
W
W T
P .r v t
/1
/2
:5
:0
P M
A100 156728
SITE PLANS. KENNY
M. LAMBERT
S. KENNY 04-
1" = 10'-0"
ARCHITECTURAL SITE PLAN
92 1416/19/23
UP
IC
C
04-A302
PUMP
ROOM
PRE-EQUALIZATION
TANK
FE
A
04-A301
C D
GENERAL NOTE:
1. NO ARCHITECTURAL IMPROVEMETNTS IN THIS DRAWING
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
A
W
W T
P .r v t
/1
/2
:5
:0
P M
A101 156728
PUMP ROOM FLOOR PLANS. KENNY
M. LAMBERT
S.KENNY 04-
93 1416/19/23
DN
T
C
04-A302
C
04-A302
04-A202
04-A202
04-A201
04-A201
B
04-A301
B
04-A301
HEADWORKS
OPERATORS
OFFICE
ELECTRICAL
ROOM
RESTROOM
MECHANICAL
ROOM
GENERATOR
ROOM
OPERATIONS
AREA
102A
101A
104A
04-A401
101B
STORAGE
FE
04-A401
103A
107A
100A
04-A502
102B
A
04-A301
A
04-A301
106A
100B
105A
C D E F G
B
04-A502
F.V.
6'-2"
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
A
W
W T
P .r v t
/1
/2
:5
:0
P M
A102 156728
GROUND LEVEL FLOOR
PLAN
S. KENNY
M. LAMBERT
S. KENNY 04-
A. NEW PARTITIONS SHOWN BOLD OR FULL-TONE ON FLOOR PLANS.
EXISTING PARTITIONS SHOWN LIGHTLY OR HALF-TONE ON FLOOR
PLANS.
B. PROVIDE IN-WALL BLOCKING IN NEW AND EXISTING WALLS FOR WALL-
MOUNTED ITEMS, INCLUDING CABINETS, SHELVING, TOILET & BATH
ACCESSORIES, & SIMILAR ITEMS. BLOCKING FOR WALL STOPS SHALL
BE REQUIRED IN NEW WALLS ONLY.
C. WHERE FLOOR FINISH CHANGES AT DOORWAY, CENTER TRANSITION
UNDER DOOR.
D. IF UNDOCUMENTED CONDITIONS EXIST THAT ARE AFFECTED BY NOTED
DEMOLITION, CONTRACT THE CO BEFORE PROCEEDING.
E. VERIFY MECHANICAL AND ELECTRICAL DRAWINGS FOR SCOPE AND
INTERFACE. CONTRACTOR SHALL COORDINATE LOCATION FOR ALL
MECHANICAL AND ELECTRICAL ITEMS WITH GENERAL CONSTRUCTION.
REVIEW ANY DISCREPANCIES WITH THE COR PRIOR TO INSTALLATION
AND/OR FABRICATION.
F. SEE DEMOLITION NOTES FOR INFORMATION REGARDING REMOVED ITEMS
FOR WHICH THE OWNER HAS SALVAGE RIGHTS.
G. WHERE METAL STUDS EXTEND TO THE STRUCTURE ABOVE, PROVIDE
DOUBLE HEAD TRACK TO ALLOW SLIPPAGE TO COMPENSATE FOR
DEFLECTION OF THE STRUCTURE ABOVE.
H. AT LARGE SCALE COLUMN/PLAN DETAILS, WALL TYPES ARE INDICATED.
FOR CLARITY, IN SOME INSTANCES NOT ALL STUDS AND/OR FURRING
ARE SHOWN ON THE DETAILS. CONTRACTOR SHALL FRAME USING
NORMAL FRAMING METHODS AND SHALL ALSO COMPLY WITH
INSTRUCTIONS OUTLINED IN THE SPECIFICATIONS.
I. PROTECT EXISTING MATERIALS AND EQUIPMENT TO REMAIN.
J. NEW WALLS SHALL EXTEND 4" THRU CEILING, UNLESS NOTED
OTHERWISE ON FLOOR PLANS OR REFLECTED CEILING PLANS.
K. CONTRACTOR SHALL REPAIR AND PATCH EXISTING ITEMS, SUBSTRATES,
COATINGS, FINISHES BUILDING MATERIALS, ETC. DAMAGED BY CO
NSTRUCTION ACTIVITY TO LIKE NEW CONDITION.
L. ARCHITECTURAL FINISH FLOOR 100'-0" IS EQUAL TO CIVIL 1163.2.
5 PREFORMED METAL WALL
PANEL OVER 1" RIGID POLYISO
INSULATION
13 MECHANICAL EQUIPMENT; SEE
MECHANICAL TYPICAL
15 PROCESS EQUIPMENT; SEE
PROCESS TYPICAL
34 PREFINISHED ALUMINUM
LOUVER
KEY NOTES X
GENERAL NOTES
94 1416/19/23
C
04-A302
C
04-A302
B
04-A301
B
04-A301
LINE OF WALL BELOW
11'-6"
A
04-A301
04-A501
3:123:12
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
A
W
W T
P .r v t
/1
/2
:5
:0
P M
A103 156728
ROOF PLANS. KENNY
M. LAMBERT
S. KENNY 04-
8 STANDING SEAM METAL
ROOFING
9 FACTORY FINISH METAL FASCIA
11 RIDGE CAP
12 SNOW GUARDS TYPICAL
17 MECHANICAL PENETRATION;
SEE MECHANICAL TYPICAL
KEY NOTES X
95 1416/19/23
B
04-A301
B
04-A301
OPEN TO STRUCTURE
OPEN TO STRUCTURE OPEN TO STRUCTURE
OPEN TO STRUCTURE
CEILING
AFF 8'-0"
CEILING
AFF 8'-0"
04-A501
OPEN TO
STRUCTURE
04-A501
04-A501
A
04-A301
A
04-A301
V E
N T
E D
S O
F F
IT
P
A N
E L S
I N
T H
IS
A
R E
A O
N L Y
04-A501
CEILING
AFF 9'-10 19/32"
PREFINISHED METAL SOFFIT
PREFINISHED METAL
BREAKMETAL FASCIA
EXISTING MECHANICAL
EQUIPMENT TO REMAIN
WALL CAP; SEE
MECHANICAL
PREFINISHED METAL SOFFIT
PANEL; VENTED
04-A501
REFLECTED CEILING PLAN LEGEND
ACOUSTICAL CEILING TILE
RETURN AIR GRILLE
EXHAUST FAN GRILLE
X'-X" CEILING HEIGHT ABOVE
FINISH FLOOR
SUPPLY AIR DIFFUSER/GRILLE
LIGHT FIXTURE
GYPSUM BOARD CEILING
FRP PLYWOOD
LIGHT FIXTURE
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
A
W
W T
P .r v t
/1
/2
:5
:0
P M
A104 156728
REFLECTED CEILING PLANS. KENNY
M. LAMBERT
S.KENNY 04-
96 1416/19/23
GRADE
RIDGE CAP
STANDING SEAM METAL
ROOFING
SNOW GUARDS TYPICAL
EXISTING MECHANICAL
EQUIPMENT TO REMAIN
FACTORY FINISH METAL
WALL PANEL
MECHANICAL EQUIPMENT;
SEE MECHANICAL TYPICALEXISTING LOUVER
MECHANICAL PENETRATION;
SEE MECHANICAL TYPICAL
FACTORY FINISH METAL
FASCIA
WALL CAP; SEE
MECHANICAL
04-A502
GRADE
1163.20
PREFINISHED ALUMINUM
LOUVER
1'-7 3/4" 3'-0"
EXISTING MECHANICAL
EQUIPMENT TO REMAIN
MECHANICAL EQUIPMENT;
SEE MECHANICAL TYPICAL
MECHANICAL PENETRATION;
SEE MECHANICAL TYPICAL
SNOW GUARDS TYPICAL
LIGHT FIXTURE; SEE
ELECTRICAL
04-A501
04-A501
STANDING SEAM METAL
ROOFING
FACTORY FINISH METAL
FASCIA
PREFORMED METAL WALL
PANEL
RIDGE CAP MECHANICAL PENETRATION;
SEE MECHANICAL TYPICAL
FACTORY FINISH METAL
FASCIA
04-A501
LIGHT FIXTURE; SEE
ELECTRICAL
04-A501
ALUMINUM STOREFRONT
WINDOW
04-A501
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
A
W
W T
P .r v t
/1
/2
:5
:1
P M
A201 156728
EXTERIOR ELEVATIONS 1S. KENNY
M. LAMBERT
S. KENNY 04-
SCALE A04-A102
2 EAST EXTERIOR ELEVATION
SCALE A04-A102
3 SOUTH EXTERIOR ELEVATION
97 1416/19/23
FACTORY FINISH METAL
WALL PANEL
MECHANICAL EQUIPMENT;
SEE MECHANICAL TYPICAL
SNOW GUARDS TYPICAL
FACTORY FINISH METAL
FASCIA
STANDING SEAM METAL
ROOFING
RIDGE CAP
MECHANICAL PENETRATION;
SEE MECHANICAL TYPICAL
MECHANICAL EQUIPMENT;
SEE MECHANICAL TYPICAL
LIGHT FIXTURE; SEE
ELECTRICAL
ELECTRICAL EQUIPMENT;
SEE ELECTRICAL TYPICAL
MECHANICAL EQUIPMENT;
SEE MECHANICAL TYPICAL
BRICK VENT
04-A502
PROCESS EQUIPMENT; SEE
PROCESS TYPICAL
GRADE
1163.20
A
STANDING SEAM METAL
ROOFING
PREFORMED METAL WALL
PANEL
MECHANICAL EQUIPMENT;
SEE MECHANICAL TYPICAL
FACTORY FINISH METAL
FASCIA
MECHANICAL PENETRATION;
SEE MECHANICAL TYPICAL
RIDGE CAP
SNOW GUARDS TYPICAL
ELECTRICAL EQUIPMENT;
SEE ELECTRICAL TYPICAL
LIGHT FIXTURE; SEE
ELECTRICAL
MECHANICAL EQUIPMENT;
SEE MECHANICAL TYPICAL
OPERABLE ALUMINUM
WINDOW
ASCALE 1/4" = 1'-0"
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
A
W
W T
P .r v t
/1
/2
:5
:1
P M
A202 156728
EXTERIOR ELEVATIONS 2S. KENNY
M. LAMBERT
S. KENNY 04-
SCALE A04-A102
1 NORTH EXTERIOR ELEVATION
SCALE A04-A102
2 WEST EXTERIOR ELEVATION
98 1416/19/23
ELECTRICAL
ROOM
OPERATIONS
AREA
OPERATORS
OFFICE
04-A303
04-A303
3 04-A303
PRE-EQUALIZATION TANK
STORAGE
04-A502
C D E F G
GRADE
1163.20
C
04-A302
PUMP ROOM FLOOR
1153.20
HEADWORKS
PRE-EQUALIZATION TANK
C D
04-A502
04-A303
ASCALE 1/4" = 1'-0"
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
A
W
W T
P .r v t
/1
/2
:5
:1
P M
A301 156728
BUILDING SECTIONSS. KENNY
M. LAMBERT
S. KENNY 04-
SCALE A04-A102
B BUILDING SECTION
SCALE A04-A101
A BUILDING SECTION
99 1416/19/23
PUMP ROOM FLOOR
1153.20
B
04-A301
B
04-A301
04-A303
OPERATORS
OFFICE
HEADWORKS
PUMP
ROOM
PRE-EQUALIZATION
TANK
04-A501
SIM
A
04-A301
A
04-A301
6 4 3 1
04-A303
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
A
W
W T
P .r v t
/1
/2
:5
:1
P M
A302 156728
BUILDING SECTIONSS. KENNY
M. LAMBERT
S. KENNY 04-
SCALE A04-A101
C BUILDING SECTION
100 1416/19/23
STANDING SEAM METAL
ROOFING
1/2" PLYWOOD SHEATHING
3" RIGID POLYISO
INSULATION
METAL ROOF DECK; SEE
STRUCTURAL
8" CMU
3 5/8" METAL STUD FRAMING
GYPSUM WALLBOARD
ACT CEILING SYSTEM
ALUMINUM DOOR & FRAME
PREFORMED METAL WALL
PANEL
1/2" PLYWOOD SHEATHING
2" RIGID POLYISO
INSULATION
STRUCTURAL FRAMING; SEE
STRUCTURAL
CONCRETE SLAB; SEE
STRUCTURAL
04-A501
04-A502
VAPOR RETARDER
VAPOR RETARDER
3/4" HORIZONTAL SUBGIRT
STOOP; SEE STRUCTURAL
C
OPERATORS
OFFICE
GRADE
1163.20
GYPSUM WALLBOARD
3 5/8" METAL STUD FRAMING
ACT CEILING SYSTEM
ALUMINUM DOOR & FRAME
04-A502
04-A502
8" CMU
STRUCTURAL FRAMING; SEE
STRUCTURAL
EXISTING FLOOR SLAB
CONCRETE SLAB; SEE
STRUCTURAL
D
OPERATORS
OFFICE
VAPOR RETARDER
GRADE
1163.20
BOT OF FOOTING
1159.95
04-A501
EXISTING WALL STRUCTURE
1" RIGID POLYISO
INSULATION
1/2" PLYWOOD SHEATHING
PREFORMED METAL WALL
PANEL
EXISTING FOUNDATION
04-A502
3/4" HORIZONTAL SUBGIRT
G
GRADE
1163.20
3 5/8" METAL STUD FRAMING
ACT CEILING SYSTEM
8" CMU
2" RIGID POLYISO
INSULATION
1/2" PLYWOOD SHEATHING
PREFORMED METAL WALL
PANEL
CONCRETE SLAB; SEE
STRUCTURAL
EXISTING TANK WALL
04-A502
04-A501
VAPOR RETARDER
3/4" HORIZONTAL SUBGIRT
GRADE
1163.20
STRUCTURAL FRAMING; SEE
STRUCTURAL
METAL ROOF DECK; SEE
STRUCTURAL
VAPOR RETARDER
1/2" THERMAL BARRIER
SHEATHING
3" RIGID POLYISO
INSULATION
1/2" PLYWOOD SHEATHING
STANDING SEAM METAL
ROOFING
8" CMU
7/8" HAT CHANNEL
FRP PLYWOOD CEILING
PANEL
ACT CEILING SYSTEM
GYPSUM WALLBOARD
3 5/8" METAL STUD FRAMING
CONCRETE SLAB; SEE
STRUCTURAL
HEADWORKS
OPERATORS
OFFICE
VAPOR RETARDER
GRADE
1163.20
C
HEADWORKS
04-A502
SIM
STOOP; SEE STRUCTURAL
PREFORMED METAL WALL
PANEL
ELECTRICAL EQUIPMENT;
SEE ELECTRICAL TYPICAL
1/2" PLYWOOD SHEATHING
2" RIGID POLYISO
INSULATION
8" CMU
MECHANICAL EQUIPMENT;
SEE MECHANICAL TYPICAL
04-A501
ASCALE 1/4" = 1'-0"
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
A
W
W T
P .r v t
/1
/2
:5
:2
P M
A303 156728
WALL SECTIONSS. KENNY
M. LAMBERT
S. KENNY 04-
SCALE A04-A301
2 WALL SECTION
SCALE A04-A301
3 WALL SECTION
SCALE A04-A301
4 WALL SECTION
SCALE A04-A302
6 WALL SECTION
SCALE A04-A302
5 WALL SECTION
SCALE A04-A301
1 WALL SECTION
101 1416/19/23
RESTROOM
OPERATIONS
AREA
04-A402
04-A403
ELECTRICAL
ROOM
STORAGE
3'-4" 14'-0" 1'-8" 3'-4" 4"
104A 107A
103A
6'-3" 3'-4" 4"
TA2
TA33V
TA36
TA9V
TA13
TA8
TA20
TA38
TA5
FE
S5.1
S4.1
S4.1 S4.1
S .1
S .1
S5.1
S4.1
S5.2
S .2
S .2
G
10'-5" 2'-1"
TA1A
TA1B
M
IN
18" MIN
102A
102B
101B 101A
A
HEADWORKS
OPERATORS
OFFICE
04-A402 1
04-A502
A
04-A301
M1.2
M .2
M2.2
M .2
C D
FAD-1
8'-8" 3'-4"
ASCALE 1/2" = 1'-0"
2 0 2 4
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
A
W
W T
P .r v t
/1
/2
:5
:2
P M
A401 156728
ENLARGED PLANSS. KENNY
M. LAMBERT
S. KENNY 04-
SCALE A04-A102
1 ENLARGED RESTROOM & OPERATIONS AREA PLAN
SCALE A04-A102
2 ENLARGED OFFICE & HEADWORKS PLAN
6 OFFICE CHAIR; STEELCASE
LEAP CHAIR V2 OR EQUAL
14 ELECTRICAL EQUIPMENT; SEE
ELECTRICAL TYPICAL
15 PROCESS EQUIPMENT; SEE
PROCESS TYPICAL
37 METAL BOOKSHELF; STEELCASE
H-2927 OR EQUAL
39 STOOP; SEE STRUCTURAL
42 STEEL COLUMN; SEE
STRUCTURAL
43 CERAMIC TILE OVER CEMENT
BACKERBOARD
44 METAL LOCKER
45 BENCH
47 EMERGENCY EYEWASH STATION
KEY NOTES X
102 1416/19/23
REGISTER; SEE MECHANICAL
101A
OFFICE CHAIR; STEELCASE
LEAP CHAIR V2 OR EQUAL
METAL BOOKSHELF;
STEELCASE H-2927 OR
EQUAL
RESILIENT BASE
GRADE
1163.20
2'-0" 2'-0" 2'-0" 1'-0"
3/4" 2'-0" 3'-0" 2'-1"
OFFICE CHAIR; STEELCASE
LEAP CHAIR V2 OR EQUAL
GRADE
1163.20
2'-1" 3'-0" 3'-0" 3/4"
A
101B
OFFICE CHAIR; STEELCASE
LEAP CHAIR V2 OR EQUAL
RESILIENT BASE
3'-0" 3'-0" 2'-0" 2'-0" 1'-1" 1'-4"
3/4" 3'-0" 3'-0" 2'-0" 2'-0"
1'-4" 1'-1" 3'-0"
3'-0" 1"
EMERGENCY EYEWASH
STATION; SEE
MECHANICAL
CORNER CABINET
ASCALE 1/2" = 1'-0"
2 0 2 4
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
A
W
W T
P .r v t
/1
/2
:5
:2
P M
A402 156728
INTERIOR ELEVATIONSS. KENNY
M. LAMBERT
S. KENNY 04-
SCALE A04-A401
1 OPERATORS OFFICE - EAST
SCALE A04-A401
2 OPERATORS OFFICE - SOUTH
SCALE A04-A401
3 OPERATORS OFFICE - WEST
SCALE A04-A401
5 OPERATIONS AREA NORTH
SCALE A04-A401
6 OPERATIONS AREA EAST
103 1416/19/23
TA33V
TA36
TA20
TA38
TA2
TA5
TA13
TA8
TA7
TA15
TA11A
TA9V
CERAMIC TILE
CT 1
TA36
TA38
TA33V
METAL LOCKER
TA5
CERAMIC TILE
METAL LOCKER
TA1B
TA1A
BENCH
TA7
TA8
TA13
TA15
TA1A
TA1B
TA9V
CERAMIC TILE
TA33V
TA13
TA15
TA8
TA2
TA9V
TA10
TA1B
TA5
1'-6"
6"
MAX3'-0"
1'-6"
1'-0"
MAX 4'-0"
M A
X
M A
X
M A
X
M
IN
M A
X
WC
LAVATORY
(ACCESSIBLE)
WALL
ACCESS
DOOR
WC
3'-4"
TA7
C L
CL
CL
7" TO 9"
TOILET ACCESSORY LEGEND:
TA1A: ROBE HOOK
TA1B: ROBE HOOK (ACCESSIBLE)
TA2: TOILET TISSUE DISPENSER (DOUBLE NON-CONTROLLED)
TA5: FEMININE NAPKIN DISPOSAL
TA7: PAPER TOWEL DISPENSER
TA8: WASTE RECEPTACLE
TA9V: LIQUID SOAP DISPENSER
TA10: MOP AND BROOM RACK
TA11A: SHOWER CURTAIN
TA13: MIRROR - SIZE INDICATED ON DRAWINGS
TA15: METAL SHELF
TA33V: GRAB BAR 18" VERTICAL
TA36: GRAB BAR 36"
TA38: GRAB BAR 48"
TA20: TOILET SEAT COVER DISPENSER
TA1A
M A
X
A C
C E
S S
IB
L E
M A
X
TA20
TA33V
TA36
TA38
ASCALE 1/2" = 1'-0"
2 0 2 4
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
A
W
W T
P .r v t
/1
/2
:5
:2
P M
A403 156728
INTERIOR ELEVATIONSS. KENNY
M. LAMBERT
S. KENNY 04-
SCALE A04-A401
1 INTERIOR ELEVATION - RESTROOM WEST
SCALE A04-A401
2 INTERIOR ELEVATION - RESTROOM NORTH
SCALE A04-A401
3 INTERIOR ELEVATION - RESTROOM EAST
SCALE A04-A401
4 INTERIOR ELEVATION RESTROOM SOUTH
NOT TO SCALE
5 TOILET ACCESSORY MOUNTING HEIGHTS
104 1416/19/23
SNOW GUARD
STANDING SEAM METAL ROOF
1/2" PLYWOOD SHEATHING
3" RIGID POLYISO INSULATION
1/2" THERAMAL BARRIER SHEATHING
METAL DECK; SEE STRUCTURAL
STRUCUTRAL FRAMING; SEE
STRUCTURAL
PREFINISHED METAL FASCIA
2 LAYERS 1/2" PLYWOOD
SOFFIT END CLIP
ALUMINUM SOFFIT PANEL
1" HAT CHANNEL
PREFORMED METAL
WALL PANEL
1/2" PLYWOOD
2" RIGID POLYISO
INSULATION W ZEE
GIRT
BOND BEAM; SEE
STRUCTURAL
COMPRESSIBLE SEALANT IN FLUTES
OF METAL DECK
BENT PLATE; SEE
STRUCTURAL
VAPOR RETARDER
3/4" HORIZONTAL SUB
GIRT
2x6 WOOD BLOCKING
C
VAPOR RETARDER
3 5/8" STUD FRAMING
5/8" GWB
ICE DAM MEMBRANE
BUILDING FELT
04-A501
SNOW GUARD
STANDING SEAM METAL ROOF
1/2" PLYWOOD
3" RIGID POLYISO INSULATION
PREFINISHED METAL SOFFIT
3 5/8" METAL STUD FRAMING
EXISTING ROOF STRUCTURE
EXISTING WALL STRUCTURE
1" RIGID POLYISO INSULATION
1/2" PLYWOOD SHEATHING
PREFORMED METAL WALL
PANEL
PREFINISHED METAL
SOFFIT PANEL
SOFFIT PANEL CLIP
1/2" GYP SHEATHING
VAPOR RETARDER
3/4" HORIZONTAL SUB GIRT
2X6 WOOD BLOCKING
2 LAYERS 1/2" PLYWOOD
1" HAT CHANNEL
G
ICE DAM MEMBRANE
BUILDING FELT
VAPOR RETARDER
STANDING SEAM METAL ROOFING
1/2" PLYWOOD SHEATHING
RAKE EDGE TRIM
3" RIGID POLYISO INSULATION
2 LAYERS PLYWOOD
PREFINISHED METAL FASCIA
METAL DECK; SEE STRUCTURAL
PREFINISHED METAL SOFFIT PANEL
SOFFIT CLIP
PREFINISHED METAL FASCIA
1/2" PLYWOOD SHEATHING
1" RIGID POLYISO INSULATION
1/2" PLYWOOD
3 5/8" METAL STUDS
8" CMU
2" RIGID POLYISO INSULATION W ZEE GIRT
PREFINISHED METAL WALL PANEL
VAPOR RETARDER
3/4" HORIZONTAL SUBGIRT
2X6 WOOD BLOCKING
3 5/8" METAL STUDS
1/2" PLYWOOD SHEATHING
1" HAT CHANNEL
COMPRESSIBLE SEALANT IN
FLUTES OF METAL DECK
BUILDING FELT
STANDING SEAM METAL ROOFING
1/2" PLYWOOD SHEATHING
RAKE EDGE TRIM
3" RIGID POLYISO INSULATION
2 LAYERS PLYWOOD
PREFINISHED METAL FASCIA
3 5/8" METAL STUD FRAMING
EXISTING ROOF DECK
PREFINISHED METAL SOFFIT PANEL
SOFFIT CLIP
PREFINISHED METAL FASCIA
1/2" PLYWOOD SHEATHING
1" RIGID POLYISO INSULATION
EXISTING STRUCTURAL BEAM
PREFINISHED METAL WALL PANEL
1 1/2" RIGID POLYISO INSULATION
VAPOR RETARDER
2X6 WOOD BLOCKING
1" HAT CHANNEL
EXISTING WALL STRUCTURE
3/4" SUBGIRT
2" METAL STUD FRAMING
3/4" PLYWOOD SHEATHING
BUILDING FELT
VAPOR RETARDER
STANDING SEAM METAL ROOFING
1/2" PLYWOOD SHEATHING
PREFINISHED METAL TRIM
3" RIGID POLYISO INSULATION
2 LAYERS PLYWOOD
PREFINISHED METAL FASCIA
METAL DECK; SEE STRUCTURAL
VAPOR RETARDER
1/2" PLYWOOD SHEATHING
3 5/8" METAL STUDS
SOFFIT CLIP
PREFINISHED METAL
SOFFIT PANEL
7/8" HAT CHANNEL
TRUSS; SEE
STRUCTURAL
2X6 WOOD BLOCKING
SOFFIT TRANSITION STRIP
THERMAL BARRIER SHEATHING
LINE OF EXTERIOR WALL
BUILDING FELT
STANDING SEAM METAL ROOFING
1/2" PLYWOOD SHEATHING
RAKE EDGE TRIM
3" RIGID POLYISO INSULATION
2 LAYERS PLYWOOD
PREFINISHED METAL FASCIA
3 5/8" METAL STUD FRAMING
EXISTING ROOF DECK
VAPOR RETARDER
2X6 WOOD BLOCKING
1" HAT CHANNEL
2" METAL STUD FRAMING
3/4" PLYWOOD SHEATHING
PREFINISHED METAL FASCIA
1/2" PLYWOOD SHEATHING
1" RIGID POLYISO INSULATION
8" CMU
2" RIGID POLYISO INSULATION W ZEE GIRT
PREFINISHED METAL WALL PANEL
3/4" HORIZONTAL SUBGIRT
1/2" PLYWOOD SHEATHING
PREFINISHED METAL SOFFIT PANEL
SOFFIT CLIP
EXISTING GLULAM BEAM
BUILDING FELT
C
SNOW GUARD
STANDING SEAM METAL ROOF
1/2" PLYWOOD SHEATHING
3" RIGID POLYISO INSULATION
1/2" THERAMAL BARRIER SHEATHING
METAL DECK; SEE STRUCTURAL
STRUCUTRAL FRAMING; SEE
STRUCTURAL
PREFINISHED METAL FASCIA
2 LAYERS 1/2" PLYWOOD
SOFFIT END CLIP
ALUMINUM SOFFIT
PANEL (VENTED FOR
LENGTH OF
HEADWORKS ROOM
1" HAT CHANNEL
PREFORMED METAL
WALL PANEL
1/2" PLYWOOD
2" RIGID POLYISO
INSULATION W ZEE
GIRT
BOND BEAM; SEE
STRUCTURAL
BENT PLATE; SEE
STRUCTURAL
3/4" HORIZONTAL SUB
GIRT
2x6 WOOD BLOCKING
7/8" HAT CHANNEL
FURRING
FRP PLYWOOD
BATT INSULATION
ICE DAM MEMBRANE
BUILDING FELT
VAPOR RETARDER
STANDING SEAM METAL ROOF
1/2" PLYWOOD SHEATHING
3" RIGID POLYISO
INSULATION
1/2" PLYWOOD
VAPOR RETARDER
3 5/8" METAL STUDS
PREFINISHED METAL
SOFFIT PANEL
7/8" HAT CHANNEL
TRUSS; SEE
STRUCTURAL
1/2" THERMAL BARRIER
SHEATHING
ROOF DECK; SEE
STRUCTURAL
ASCALE
SCALE OF INCHES
12 6 12 1-1/2" = 1'-0"
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
A
W
W T
P .r v t
/1
/2
:5
:3
P M
A501 156728
DETAILSS. KENNY
M. LAMBERT
S. KENNY 04-
SCALE A04-A303
1 EAVE AT OFFICE
SCALE A04-A303
2 EAVE AT EXISTING W NEW SKIN
SCALE A04-A104
8 EAVE DETAIL AT ADDITION
SCALE A04-A104
7 EAVE DETAIL AT EXISTING
SCALE A04-A104
5 EAVE DETAIL
SCALE A04-A103
9 EAVE DETAIL AT ADDITION
SCALE A04-A303
3 EAVE AT HEADWORKS
SCALE A04-A104
4 SOFFIT DIVIDER DETAIL
105 1416/19/23
EXISTING GLULAM BEAM
RIDGE CAP
STANDING SEAM METAL
ROOFING
1/2" PLYWOOD SHEATHING
3" RIGID POLYISO
INSULATION
1/2" THERMAL BARRIER
SHEATHING
EXISTING TONGUE &
GROOVE ROOF STRUCTURE
GYPSUM WALLBOARD
6" METAL STUD FRAMING
METAL STUD SLIP TRACK
BUILDING FELT
VAPOR RETARDER
FLASHING
PREFINISHED METAL WALL PANEL
3/4" SUBFIRT
1/2" PLYWOOD SHEATHING
ALUMINUM DOOR & FRAME
8" CMU
3 5/8" METAL STUDS
BATT INSULATION
5/8" GWB
BACKER ROD & SEALANT
BOTH SIDES
2" POLYISO INSULATION
VAPOR RETARDER
ALUMINUM DOOR & FRAME
BACKER ROD AND
SEALANT EACH
SIDE ALL AROUND
8" CMU
5/8" GWB
3 5/8" METAL
STUDS
FLASHING
PREFINISHED METAL WALL PANEL
3/4" SUBFIRT
1/2" PLYWOOD SHEATHING
ALUMINUM DOOR & FRAME
EXISTING WALL
CONSTRUCTION
BACKER ROD & SEALANT
BOTH SIDES
2" POLYISO INSULATION
VAPOR RETARDER
CMU BOND BEAM;
SEE STRUCTURAL
BACKER ROD AND
SEALANT EACH SIDE
ALUMINUM DOOR & FRAME
8" CMU
ACT CEILING
SYSTEM
5/8" GWB
3 5/8" METAL
STUDS
D
1"
FLASHING
PREFORMED METAL WALL
PANEL
1/2" PLYWOOD SHEATHING
1" RIGID POLYISO
INSULATION
EXISTING WALL
STRUCTURE
3/4" HORIZONTAL SUB
GIRT
F
ALUMINUM DOOR & FRAME
VAPOR RETARDER
BACKER ROD AND SEALANT
ALL AROUND BOTH SIDES
ALUMINUM DOOR & FRAME
FLASHING
PREFINISHED METAL WALL
PANEL
1/2" PLYWOOD SHEATHING
2" RIGID POLYISO
INSULATION
BOND BEAM; SEE STRUCTURAL
ACT CEILING SYSTEM
5/8" GWB
3 5/8" METAL STUDS
BATT INSULATION
C
3/4" SUBGIRT
VAPOR RETARDER
STUD WALL LINTEL COMPOSED OF
20 GAGE STUD RUNNER TOP AND
BOTTOM OF PAIR OF MIN. 20
GAGE METAL STUDS RUNNING
HORIZONTALLY ATTACH HORIZONTAL
STUDS TO RUNNER CHANNELS W/
SCREWS AT 12" OC
SIZE OF METAL STUDS RUNNING
HORIZONTALLY TO MATCH PHISICAL
SIZE OF WALL STUDS
METAL STUDS
GYPSUM BOARD OR TILE
BACKER BOARD EACH SIDE
RUNNER CHANNEL
ON TOP OF
DOUBLE STUD
LINTEL ATTACH TO
LINTEL W/
SCREWS AT 12"
OC
ALUMINUM DOOR &
FRAME
ALUMINUM DOOR & FRAME
GYPSUM BOARD OR TILE
BACKER BOARD EACH SIDE
SEE WALL TYPES
METAL STUDS
GRADE
1163.20
PANEL CLOSURE TRIM
EXISTING CURB
FLASHING
PREFINISHED METAL
WALL PANEL
1/2" PLYWOOD SHEATHING
1" RIGID POLYISO INSULATION
EXISTING WALL
STRUCTURE
EXISTING FLOOR SLAB
3/4" HORIZONTAL SUB
GIRT
G
GRADE
1163.20
PANEL CLOSURE TRIM
FLASHING
PREFORMED METAL
WALL PANEL
1/2" PLYWOOD SHEATHING
2" RIGID POLYISO INSULATION
W ZEE GIRT
8" CMU
BATT INSULATION
3 5/8" METAL STUDS
5/8" GWB
C…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .