B08_Attach_2b_NOCA_156728_100__CD_Drawings_Part2.pdf
PDF 20 MB Posted
- Attached to
- NOCA 156728 Stehekin WWTP Federal contract opportunity
- Solicitation number
- 140P2023R0131
About this file
This file is related to a federal solicitation for construction services at the Stehekin Wastewater Treatment Plant. The solicitation number is 140P2023R0131 and was issued by the Department of the Interior National Park Service National Office to seek proposals for work on NOCA 156728. Offerors are invited to submit proposals for construction services to upgrade the existing wastewater treatment plant located in Stehekin, Washington. The solicitation includes drawings and specifications for the work in two PDF files totaling 20MB. Proposals are due by the date specified in the solicitation document. The award is expected to be a firm-fixed-price contract issued before the end of the current fiscal year.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
38 1416/19/23
175004
39 1416/19/23
40 1416/19/23
41 1416/19/23
42 1416/19/23
DOUBLE GATE
ROLLING GATE
43 1416/19/23
SHEET 2 OF 2 SHEETS
6/11/14
44 1416/19/23
VTC
45 1416/19/23
TEST COCK #1
46 1416/19/23
47 1416/19/23
48 1416/19/23
49 1416/19/23
P5 S1
C1 S1
P1 S1
P3 P2
C1 S1
P2 P2
C2 S1
C2 S1
P4 P4
O1 O2
O5 O6
O3 O4
P4 O5 O6
O4
O5 O6
O4
O5 O6
P1 P5 S1
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
E
W
W T
P .r v t
/1
/2
:3 :1
P
M
E601 156728
DUCTBANK SCHEDULEC. BOOTH
M. GARRETT
R.D. CLARK 02-
NOTE: ALL DUCT BANKS AND UNDERGROUND CONDUITS SHALL COMPLY WITH DETAIL 1 ON 04-E501, INCLUDING CONCRETE ENCASEMENT.
O6
PER MANUFACTURER
REQUIRMENTS, MIN 2"
PVC
MULTILPE
PROVIDE PER MANUFACTURER REQUIREMENTS. SUBMIT CONDUCTOR DERATING AND
CONDUIT FILL WITH ORENCO SUBMITTAL. INCREASE CONDUCTOR SIZE BASED ON DERATING
CALCULATED IN SUBMITTAL. DO NOT EXCEED NEC ALLOWED CONDUIT FILL.
O5
PER MANUFACTURER
REQUIRMENTS, MIN 2"
PVC
MULTILPE
PROVIDE PER MANUFACTURER REQUIREMENTS. SUBMIT CONDUCTOR DERATING AND
CONDUIT FILL WITH ORENCO SUBMITTAL. INCREASE CONDUCTOR SIZE BASED ON DERATING
CALCULATED IN SUBMITTAL. DO NOT EXCEED NEC ALLOWED CONDUIT FILL.
O4
PER MANUFACTURER
REQUIRMENTS, MIN 2"
PVC
FAN-5241
PROVIDE PER MANUFACTURER REQUIREMENTS. SUBMIT CONDUCTOR DERATING AND
CONDUIT FILL WITH ORENCO SUBMITTAL. INCREASE CONDUCTOR SIZE BASED ON DERATING
CALCULATED IN SUBMITTAL. DO NOT EXCEED NEC ALLOWED CONDUIT FILL.
O3
PER MANUFACTURER
REQUIRMENTS, MIN 2"
PVC
MULTILPE
PROVIDE PER MANUFACTURER REQUIREMENTS. SUBMIT CONDUCTOR DERATING AND
CONDUIT FILL WITH ORENCO SUBMITTAL. INCREASE CONDUCTOR SIZE BASED ON DERATING
CALCULATED IN SUBMITTAL. DO NOT EXCEED NEC ALLOWED CONDUIT FILL.
O2
PER MANUFACTURER
REQUIRMENTS, MIN 2"
PVC
MULTILPE
PROVIDE PER MANUFACTURER REQUIREMENTS. SUBMIT CONDUCTOR DERATING AND
CONDUIT FILL WITH ORENCO SUBMITTAL. INCREASE CONDUCTOR SIZE BASED ON DERATING
CALCULATED IN SUBMITTAL. DO NOT EXCEED NEC ALLOWED CONDUIT FILL.
O1
PER MANUFACTURER
REQUIRMENTS, MIN 2"
PVC
MULTILPE
PROVIDE PER MANUFACTURER REQUIREMENTS. SUBMIT CONDUCTOR DERATING AND
CONDUIT FILL WITH ORENCO SUBMITTAL. INCREASE CONDUCTOR SIZE BASED ON DERATING
CALCULATED IN SUBMITTAL. DO NOT EXCEED NEC ALLOWED CONDUIT FILL.
C2 4" PVC MULTILPE
CONTROLS FROM WWTP TO SNOW STRUCTURE HANDHOLE. SUBMIT CONDUIT FILL
CALCULATION WITH ORENCO SUBMITTAL. DO NOT EXCEED NEC ALLOWED CONDUIT FILL.
C1 4" PVC MULTIPLE CONTROLS FROM WWTP TO DRAINFIELD
S1 4" PVC N/A SPARE
P5 4" PVC LP3:25 DRAINFIELD OUTLET
P4 2" PVC LP3:8 SNOW STRUCTURE LIGHTING AND OUTLET
P3 4" PVC LP3:8 SNOW STRUCTURE LIGHTING AND OUTLET
P2 4" PVC MULTIPLE
ORENCO POWER FROM ORENCO PANEL TO SNOW STRUCTURE HANDHOLE. SUBMIT
CONDUCTOR DERATING AND CONDUIT FILL WITH ORENCO SUBMITTAL. INCREASE
CONDUCTOR SIZE BASED ON DERATING CALCULATED IN SUBMITTAL, IN NO CASE SHALL
CONDUCTORS BE SMALLER THAN #10AWG. DO NOT EXCEED NEC ALLOWED CONDUIT FILL.
P1 4" PVC N/A
POWER FROM UTILITY METER AND DISCONNECT PEDESTAL TO SERVICE ENTRANCE RATED
ATS
CONDUIT
NUMBER
SIZE & TYPE CIRCUIT NUMBER REMARKS
DUCT BANK SCHEDULE
NOT TO SCALE03-E101
DUCTBANK FF
NOT TO SCALE03-E101
DUCTBANK GG
NOT TO SCALE03-E101
DUCTBANK HH
NOT TO SCALE03-E101
DUCTBANK DD
NOT TO SCALE02-E101
DUCTBANK AA
NOT TO SCALE02-E101
B DUCTBANK B
NOT TO SCALE02-E101
C DUCTBANK C
NOT TO SCALE03-E101
DUCTBANK EE
50 1416/19/23
51 1416/19/23
4" DRAIN (TYP, BURIED)
EXISTING SLUDGE
DRYING BEDS
EXISTING
AEROBIC
DIGESTER
EXISTING
AEROBIC
DIGESTER
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
X
W
W T
P .r v t
/1
/2
:5 :5
P
M
X501
NORTH CASCADES NATIONAL PARK
156728
SITE WORK DEMO DETAILSJ. GUZMAN
K. GREER
J. HILL
-03-
NOT TO SCALE-
IMAGE2
NOT TO SCALE-
IMAGE1
A. ALL EXISTING ELECTRICAL WIRING AND
SYSTEMS ASSOCIATED WITH THE
EXISTING AEROBIC DIGESTER TO BE
REMOVED.
B. COORDINATE DEMOLITION TIMING TO
ALLOW FOR CONTINUED OPERATION OF
EXISTING TREATMENT SYSTEM. SEE
SPECIFICATION 01 11 00 AND SHEETS 00-
G101 THROUGH 00-G104.
C. SEE SPECIFICATION 01 74 19 FOR
RECYCLING OR REUSING DEMOLISHED
CONCRETE.
GENERAL NOTES
1 REMOVE AND DISPOSE OF
ROTARY LOBE BLOWER AND ALL
ASSOCIATED APPURTENANCES
AND EQUIPMENT, INCLUDING AIR
PIPING AND DIFFUSERS WITHIN
THE DIGESTER.
2 REMOVE AND DISPOSE OF 8-IN
PLUG VALVE, DOWNSTREAM
PIPING, AND ASSOCIATED
WATER LINES. SEAL TANK
PENETRATION WITH BLIND
FLANGE DOWNSTREAM OF
TANK. SEAL WALKWAY SLAB
AND WALL PENETRATIONS.
3 DEMOLISH 5-IN THICK
CONCRETE ROOF OF TANK.
REINFORCEMENT IS #4 AT
1-FT-6-IN BY #4 AT 6-IN. REMOVE
AND DISPOSE OF LADDER
RUNGS WITHIN TANK.
4 REMOVE AND DISPOSE OF ALL
DRYING BEDS IN ACCORDANCE
WITH WASHINGTON
DEPARTMENT OF ECOLOGY
REQUIREMENTS AS REQUIRED
TO PERFORM NEW WORK,
DEMOLISH AND CAP ANY BURIED
PIPING ENCOUNTERED. FLOOR
OF DRYING BEDS CONSISTS OF
4-IN THICK CONCRETE
REINFORCED WITH WWF.
5 ALL SALVAGE ITEMS WILL BE
STORED WITHIN CONNEX
CONTAINER. CONTRACTOR TO
RELOCATE CONNEX CONTAINER
CONTAINING SALVAGE ITEMS TO
MAINTENANCE AREA WITHIN
STEHEKIN AS DIRECTED BY CO.
6 REMOVE AND DISPOSE OF
ABANDONED LAB AND ALL
UTILITY CONNECTIONS.
7 DIG OUT, REMOVE, AND
DISPOSE OF BURIED SEPTIC
TANK.
8 REPAIR ANY EXPOSED REBAR
FOLLOWING PAD DEMOLITION
PER STRUCTURAL DETAILS.
9 REMOVE EXISTING SIDEWALK
AND REPLACE ONCE SITE WORK
IS COMPLETE.
KEY NOTES X
NOT TO SCALE-
IMAGE3
52 1416/19/23
C E F G
2'-0" 21'-6" 2'-0"
25'-6"
DB
25'-6"
1'-0"
3'-0" 19'-6" 2'-0"
1'-0" 1'-0"
03-S102
04-S101
PRE ANOXIC TANKS
23'-6"
A
03-S104
/4
/4
PRIMARY TANKS
RTF TANKS
EXISTING
WWTP BUILDING
POST EQ TANK
PRE-
EQUALIZATION
TANK (BELOW)
ASCALE 3/16" = 1'-0"
4 0 4 128
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
S
W
W T
P .r v t
/1
/2
:1
:4
P M
S101 156728
WWTP YARD OVERALL
FOUNDATION PLAN
J. CORONADO
C. MULDERICK
R. NELSON 03-
A. COORDINATE THIS PLAN WITH
PROCESS AND CIVIL PLANS.
B. SUBGRADE PREPARATION PER
GEOTECHNICAL REPORT AND
SPECIFICATION 31 23 00.
C. PRE-ENGINEERED BUILDING
DESIGN GOVERENED PER
SPECIFICATION 13 34 19.
GENERAL NOTES
06/19/2023 53 1416/19/23
B
03-S301
B
78' - 4"
1' - 0"23' - 3"21' - 0"32' - 1"1' - 0"
A
03-S301
24" THICK, 4' x 4'
FOOTING, TYP
RTF TANK #5RTF TANK #4RTF TANK #1RTF TANK #3RTF TANK #2
PRE-ANOXIC
TANK #2
PRE-ANOXIC
TANK #1
2' - 0" 6"
53' - 0"
1' - 3"
18' - 0"
1' - 7"
1' - 9"
1' - 9"
A
2 2 2
3 3 3
"8
6BUILDING
LINE
BUILDING
LINE
TYP OF 8
7TYP
BELOW
T
Y P
PEMB FRAME REACTIONS USED FOR
FOUNDATION DESIGN*:
PDL = 6.7 KIPS
PLL = 55.6 KIPS
PWL = 8.09 KIPS, -8.84 KIPS
VX = 5.90 KIPS
VY = 4.80 KIPS
"P" REACTIONS ACT VERTICALLY ON
PILASTER AND FOUNDATION.
"V" REACTIONS ACT HORIZONTALLY
ON PILASTER AND FOUNDATION
SHEAR REACTIONS ACT
SIMULTANEOUSLY.
PWL: POSITIVE VALUES ARE ACTING
DOWNWARD, NEGATIVE VALUES
ARE ACTING UPWARD.
* REACTIONS SHALL BE PROVIDED BY
METAL BUILDING MANUFACTURER
AND REVIEWED FOR ACCEPTANCE
BY CONTRACTING OFFICER.
Y
X
ASCALE 1/4" = 1'-0"
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
S
W
W T
P .r v t
/1
/2
:1
:4
P M
S102 156728
WWTP YARD SNOW
PROTECTION CANOPY
FOUNDATION PLAN
J. CORONADO
C. MULDERICK
R. NELSON 03-
A. COORDINATE THIS PLAN WITH PROCESS AND
CIVIL PLANS.
B. SUBGRADE PREPARATION PER GEOTECHNICAL
REPORT AND SPECIFICATION 31 23 00.
C. PRE-ENGINEERED BUILDING DESIGN
GOVERENED PER SPECIFICATION 13 34 19.
D.
1 SEE SECTION B/03-S301 FOR SLAB
DIMENSIONS AND REINFORCEMENT. TOP OF
CONC SLAB ELEV: 1166.20
2 REFER TO FOOTING DETAIL ON 03-S501.
TOP OF FOOTING ELEV: 1158.13.
3 2'-0" SQ PILASTER, SEE DETAIL 1/03-S501
FOR REINFORCING. TOP OF CONCRETE
ELEV: 1166.20.
4 8" THICK CONCRETE PAD. TOP OF CONC
ELEV: 1150.83. SEE SECTION B/03-S301 FOR
SEQUENCE OF CONCRETE PLACEMENT
WITH RTF TANKS.
5 BASE PLATE AND ANCHORAGE BY PEMB
DESIGNER.
6 REFER TO FOOTING DETAIL ON 03-S501.
TOP OF FOOTING ELEV: 1150.83.
7 ACCESS HATCHES, SEE 03-D101.
KEY NOTES X
GENERAL NOTES
06/19/2023 54 1416/19/23
B
S L O
P E
A
77' - 6"
10" 32' - 1" 21' - 0" 23' - 3" 4"
1 1
ASCALE 1/4" = 1'-0"
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
S
W
W T
P .r v t
/1
/2
:1
:4
P M
S103 156728
WWTP YARD SNOW
PROTECTION CANOPY
ROOF PLAN
J. CORONADO
C. MULDERICK
R. NELSON 03-
A. COORDINATE THIS PLAN WITH
PROCESS PLANS.
B. PRE-ENGINEERED BUILDING DESIGN
GOVERENED PER SPECIFICATION
13 34 19. REFER TO PRE-ENGINEERED
BUILDING SUBMITTAL FOR FRAMING
CONNECTIONS.
1 RIGID FRAME (LRFS).
2 HORIZONTAL X-BRACING (LRFS).
3 ROOF PURLINS.
KEY NOTES X
GENERAL NOTES
06/19/2023 55 1416/19/23
D
03-S302
B
03-S302
E
Q R
IS
E
R S
T
/4
21'-0"
4' - 2" 11' - 0"
15' - 2"
5' - 6" 4' - 0" 1' - 6"
A
03-S302
C
03-S302
PRIMARY TANK
(BELOW)
PRIMARY TANK
(BELOW)
E
03-S302
POST-EQUALIZATION
TANK
1'-0" TYP
5TYP
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
S
W
W T
P .r v t
/1
/2
:1
:4
P M
S104 156728
WWTP YARD
POST-EQUALIZATION TANK
J. CORONADO
C. MULDERICK
R. NELSON 03-
A. COORDINATE THIS PLAN WITH
PROCESS AND CIVIL PLANS.
B. SUBGRADE PREPARATION PER
GEOTECHNICAL REPORT AND
SPECIFICATION 31 23 00.
C. ALUMINUM STAIR AND PLATFORM
DESIGNED GOVERENED PER
SPECIFICATION 05 50 00.
1 NEW 12" CONCRETE SLAB, REINF W/
#5 @ 12" EACH WAY, TOP AND
BOTTOM. PLACE SHORT BARS ON
OUTER LAYERS OF SLAB.
2 48"x48" HATCH PER SPECIFICATION 08 31 00.
3 SURFACE PREP TANK AND SEAL ALL
INTERIOR SURFACES PER
SPECIFICATION 09 96 00.
4 CONCRETE SLAB OVER PRIMARY
AND PRE-ANOXIC TANKS, REFER TO
CIVIL SHEET 02-C506 FOR EXTENTS,
LOCATION, AND DETAILS.
5 ACCESS HATCHES, SEE 03-D101.
6 TANK VENT, SEE DETAIL 4/00-D503.
CENTER ALONG THE E-W SLAB
DIMENSION.
KEY NOTES X
GENERAL NOTES
06/19/2023 56 1416/19/23
2 10
03-S501
03-S501
5 8
CONCRETE PAD OVER PRIMARY AND
PRE-ANOXIC TANKS. REFER TO CIVIL
FOR SLAB DESIGN AND BOLLARDS.
4'-0"
2'-0"
2'-0"
2'-0"
4'-0"2
2'-0"1
4'-0"
2'-0"
21'-7"
2'-0"
4'-7"
RTF TANK #5 RTF TANK #4 RTF TANK #3 RTF TANK #2 RTF TANK #1
PRE-ANOXIC
TANK #2
B
SIM
03-S501
A
TOC
EL 1163.20
FINISHED GRADE
SEE 02-C402
TOS
EL 1181.33
HIGH SIDE FRAME
EL 1181.33
TOS
EL 1175.29
LOW SIDE FRAME
EL 1175.29
RTF TANK
ASCALE 1/4" = 1'-0"
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
S
W
W T
P .r v t
/1
/2
:3
:2
A
M
S301 156728
WWTP YARD SNOW
PROTECTION CANOPY
SECTIONS 1
J. CORONADO
C. MULDERICK
R. NELSON 03-
SCALE A03-S102
B CANOPY FOUNDATION SECTION
SCALE A03-S102
A CANOPY FOUNDATION SECTION
TANK BASE SLAB CONSTRUCTION SEQUENCE:
1. EXCAVATE TO LOWER TANK SLAB
ELEVATION. COMPACT SUBGRADE.
2. PLACE 8" BASE CONCRETE SLABS BELOW
TANKS.
3. PLACE TANKS WITH ANTI-BUOYANCY TUBE
FRAMES ON LOWER SLAB.
4. PLACE PERIMETER FOOTING PADS AND
UPPER SLAB OVER FRAMING TUBES
BETWEEN TANKS AND PERIMETERS.
5. PLACE PILASTERS CONCRETE UP TO FRAME
BASE ELEVATION.
06/19/2023 57 1416/19/23
TOP OF TANK
1175.70
03-S502
TOP OF TANK
EL 1175.70
FLUSH STAIR LANDING
TO TOP OF SLAB
TOP OF TANK
1175.70
5'-0"
TOP OF TANK
EL 1175.70
FIELD VERIFY STRINGER
ANCHOR LOCATIONS
TOP OF TANK
1175.70
TOP OF TANK
EL 1175.70
POST-EQUALIZATION
TANK
TOP OF TANK
1175.70
TOP OF TANK
EL 1175.70
TYP
POST-EQUALIZATION
TANK
PRIMARY TANKPRIMARY TANK
TOS
EL 1150.39
DRY BED FND
EL 1150.39
TOS
EL 1163.00
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
S
W
W T
P .r v t
/1
/2
:1
:4
P M
S302 156728
WWTP YARD
POST-EQUALIZATION TANK
SECTIONS 2
J. CORONADO
C. MULDERICK
R. NELSON 03-
SCALE A03-S302
A SECTION
SCALE A03-S302
B SECTION
SCALE A03-S104
D SECTION
SCALE A03-S302
C SECTION
A. COORDINATE THIS PLAN WITH
PROCESS AND CIVIL PLANS.
B. ALUMINUM STAIR AND PLATFORM
DESIGNED GOVERENED PER
SPECIFICATION 05 50 00.
1 CONC SLAB PER PLAN.
2 ALUMINUM GUARDRAIL PER
SPECIFICATION 05 52 46.
3 REHABILITATE INTERIOR SURFACE
AND COAT INTERIOR PER
SPECIFICATION 03 35 00.
4 CONCRETE SLAB OVER PRIMARY
AND PRE-ANOXIC TANKS, SEE
02-C506.
5 8" TANK SLABS SIM TO DETAIL
2/03-S501 IN A TWO POUR
SEQUENCE.
SCALE A03-S302
E SECTION
KEY NOTES X
GENERAL NOTES
06/19/2023 58 1416/19/23
8" CONC SLAB
REINF W/ #5 @ 8" EA WAY,
PLACED MID-DEPTH
RTF TANKS PER
PROCESS. ENCASE
PROJECTED FRAME
IN SLAB
RTF TANKS PER
PROCESS. ENCASE
PROJECTED FRAME
IN SLAB
LEAVE SURFACE ROUGHENED
FOR SECOND POUR PLACEMENT
8" CONCRETE SLAB ALONG
THE PERIMETER OF THE
TANKS. REINF W/ #5 @ 8" EA
WAY, PLACED MID-DEPTH
BACKFILL BETWEEN
TANKS PER SPEC 31 23 00
HSS FRAME BRACKET,
TYPICAL, BY TANK
SUPPLIER
BUILDING FRAME ANCHORAGE:
ANCHOR RODS DESIGNED BY
PEMB MANUFACTURER. CAST
RODS USING BOLTING
TEMPLATE PROVIDED BY
PEMB MANUFACTURER
TYPICAL PILASTER:
24" SQUARE PILASTER W/ (10) #7
DOWELS AND VERTS, #4 TIES AT
12". TIGHTEN SPACING OF TIES TO
4" AT THE TOP 1'-0 OF THE
PILASTER
TYPICAL FOOTING:
24" THICK, 5'-0" x 5'-0"
FOOTING. REINF W/
#6 @ 9" EW, EA FACE
L A
P L d
TOC
EL 1166.20SEE PLAN
RE: CIVIL FOR
GRAD ELEV
TOC
TOC
EL 1158.13
TOC
SEE PLAN
ASCALE 1" = 1'-0"
1 0 1 2
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
S
W
W T
P .r v t
/1
/2
:1
:4
P M
S501 156728
WWTP YARD SNOW
PROTECTION CANOPY
DETAILS 1
J. CORONADO
C. MULDERICK
R. NELSON 03-
SCALE A03-S301
2 DETAIL
SCALE A03-S301
1 DETAIL
06/19/2023 59 1416/19/23
3/8" STITCH PL
@ 1/3 POINTS
BOLT TO L3x3
2-L3 1/2x3 1/2x3/8 BRACE
PRECAST OR
CONC WALL
WF8x8.32
C12x8.64
STRINGERS
(MIN) TYP
ALUMINUM
TREAD
L6x4x3/8
WP @
WF8
NOTES:
1. ALL METAL IS ALUMINUM UNLESS NOTED OTHERWISE.
2. SEE ARCH DRAWINGS FOR RAILINGS.
SEE
NOTE 4
SEE
NOTE 4
6 KIP
(SERVICE)
SEE ARCH 6"
6 KIP
(SERVICE)
3"
03-S502
03-S502
03-S502
03-S502
DIAGONAL
BRACE
4-3/4" DIA SST ADHESIVE
ANCHORS @ 5" GAGE
FACE OF
PRECAST OR
CONC WALL
ALUM 2-L4x4x3/8x0'-9"
(BENT PL @ SKEWED CONN)
ALUM BEAM-
TRIM BOTTOM
FLANGE AS REQD
2-3/4" DIA
ALUM BOLTS
2"
1"
PERPENDUCULAR
M
IN
2" 6"
CONC WALL
GRATING OR PLANKING
WHERE OCCURS
SEE PLAN
ALUM CHANNEL OR BEAM
TRIM FLANGES AS REQD
2-3/4" DIA SST
ADHESIVE
ANCHORS
PARALLEL
NOTES:
1. COAT ALL ALUMINAUM SURFACES IN CONTACT WITH CONCRETE
PER SPECIFICATION 09 96 00
ALUM
PL 3/8
DIAGONAL BRACE
W/2-3/4" DIA
ALUM BOLTS
3/16
WF8
2"
3"2"
2" T
Y P
NOTES:
1. COAT ALL ALUMINUM SURFACES IN CONTACT
WITH CONCRETE PER SPECIFICATION 09 96 00.
2. FOR ADDITIONAL INFORMATION SEE 1/03-S502.
NOTES:
1. FOR ADDITIONAL INFORMATION, SEE 1/03-S502.
ALUM
PL 3/8
3/16
DIAGONAL
BRACE
4-3/4" DIA SST
ADHESIVE ANCHORS
@ 5" GAGE
FACE OF
PRECAST OR
CONC WALL
ALUM PL
3/8x8x1'-1"
WF8
1/4
ALUM
L6x4x3/8 LLV
C12
STRINGER
2-3/4" DIA
ALUM BOLTS
GUSSET PL
3/8x3x0'-5"
3 1/2"
GAGE
BSCALE
ASCALE
SCALE OF INCHES
12 6 12 1-1/2" = 1'-0"
3/4" = 1'-0"
SCALE OF FEET
0 1 2 3
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
S
W
W T
P .r v t
/1
/2
:1
:4
P M
S502 156728
WWTP YARD
POST-EQUALIZATION TANK
DETAILS 2
J. CORONADO
C. MULDERICK
R. NELSON 03-
SCALE A03-S502
1 MTL-STAIR SUPPORT
SCALE B03-S502
2 ALUM BEAM TO WALL CONNECTION
SCALE B03-S502
3 ALUM BRACE CONNECTION
SCALE B03-S502
4 ALUM BRACE TO WALL CONNECTION
SCALE B03-S502
5 ALUM STRINGER CONNECTION
06/19/2023 60 1416/19/23
-A
-A
-A
-A
A
03-A301
A
03-A301
SNOW
CANOPY
B
03-A301
B
03-A301
25810
A
B
502435
1'-0"23'-3"21'-0"32'-1"1'-0"
ASCALE 1/4" = 1'-0"
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
A
W
W T
P .r v t
/1
/2
:5
:5
P M
A101 156728
SNOW PROTECTION
CANOPY GROUND LEVEL
FLOOR PLAN
S. KENNY
M. LAMBERT
S. KENNY 03-
GENERAL NOTES
22 RIGID FRAME
24 FACTORY FINISH METAL WALL
PANEL
35 PREFINISHED METAL LINER
PANEL
48 CONCRETE SLAB; SEE 02-C506
49 PROCESS EQUIPMENT; SEE
03-D101
50 CONCRETE PILASTER; SEE
03-S102
KEY NOTES X
A. PROVIDE IN-WALL BLOCKING IN NEW AND EXISTING
WALLS FOR WALL-MOUNTED ITEMS, INCLUDING
CABINETS, SHELVING, TOILET & BATH ACCESSORIES, &
SIMILAR ITEMS. BLOCKING FOR WALL STOPS SHALL BE
REQUIRED IN NEW WALLS ONLY. FOR BLOCKING AND
FRAMING DETAILS SEE 04-503.
B. VERIFY MECHANICAL AND ELECTRICAL DRAWINGS FOR
SCOPE AND INTERFACE. CONTRACTOR TO COORDINATE
LOCATION FOR ALL MECHANICAL AND ELECTRICAL ITEMS
WITH GENERAL CONSTRUCTION. REVIEW ANY
DISCREPANCIES WITH THE CO PRIOR TO INSTALLATION
AND/OR FABRICATION.
C. CONTRACTOR TO REPAIR AND PATCH EXISTING ITEMS,
SUBSTRATES, COATINGS, FINISHES BUILDING MATERIALS,
ETC. DAMAGED BY CONSTRUCTION ACTIVITY TO LIKE
NEW CONDITION.
61 1416/19/23
A
03-A301
A
03-A301
77'-8"
B
03-A301
:1
D
N
ASCALE 1/4" = 1'-0"
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
A
W
W T
P .r v t
/1
/2
:5
:0
P M
A102 156728
SNOW PROTECTION
CANOPY ROOF PLAN
S. KENNY
M. LAMBERT
S. KENNY 03-
8 STANDING SEAM METAL
ROOFING
9 FACTORY FINISH METAL FASCIA
12 SNOW GUARDS TYPICAL
25 EDGE TRIM
KEY NOTES X
62 1416/19/23
STANDING SEAM METAL
ROOFING
FACTORY FINISH METAL
FASCIA
RIGID FRAME
PROCESS TANK; SEE
PROCESS
FACTORY FINISH METAL
WALL PANEL
LIGHT FIXTURE; SEE
ELECTRICAL
CONCRETE PILASTER; SEE
STRUCTURAL
GRADE VARIES; SEE CIVIL
SNOW GUARDS TYPICAL
BOTTOM OF PANEL
1163.70
CANOPY CLEAR
HEIGHT
1174.37
FACTORY FINISH METAL
FASCIA
RIGID FRAME
PROCESS TANK; SEE
PROCESS
PREFINISHED METAL LINER
PANEL
CONCRETE PILASTER; SEE
STRUCTURAL
GRADE VARIES; SEE CIVIL
LIGHT FIXTURE; SEE
ELECTRICAL
CONCRETE SLAB; SEE
02-C506
BOTTOM OF PANEL
1163.70
CANOPY CLEAR
HEIGHT
1174.37
ASCALE 1/4" = 1'-0"
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
A
W
W T
P .r v t
/1
/2
:5
:0
P M
A201 156728
SNOW PROTECTION
CANOPY EXTERIOR
ELEVATIONS 1
S. KENNY
M. LAMBERT
S. KENNY 03-
SCALE A03-A101
2 EXTERIOR ELEVATION SOUTH
SCALE A03-A101
1 EXTERIOR ELEVATION EAST
63 1416/19/23
STANDING SEAM METAL
ROOFING
FACTORY FINISH METAL
FASCIA
SNOW GUARDS TYPICAL
FACTORY FINISH METAL
WALL PANEL
CONCRETE PILASTER; SEE
STRUCTURAL
GRADE VARIES; SEE CIVIL
BOTTOM OF PANEL
1163.70
CANOPY CLEAR
HEIGHT
1174.37
STANDING SEAM METAL
ROOFING
FACTORY FINISH METAL
FASCIA
FACTORY FINISH METAL
WALL PANEL
GRADE VARIES; SEE CIVIL
CONCRETE PILASTER; SEE
STRUCTURAL
SNOW GUARDS TYPICAL
BOTTOM OF PANEL
1163.70
CANOPY CLEAR
HEIGHT
1174.37
ASCALE 1/4" = 1'-0"
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
A
W
W T
P .r v t
/1
/2
:5
:0
P M
A202 156728
SNOW PROTECTION
CANOPY EXTERIOR
ELEVATIONS 2
S. KENNY
M. LAMBERT
S. KENNY 03-
SCALE A03-A101
1 EXTERIOR ELEVATION NORTH
SCALE A03-A101
2 EXTERIOR ELEVATION WEST
64 1416/19/23
A B
GRADE VARIES; SEE CIVIL
BOTTOM OF PANEL
1163.70
CANOPY CLEAR
HEIGHT
1174.37
03-A301
CONCRETE PILASTER
BEYOND
A
03-A301
A
03-A301
2 5 8 10
GRADE VARIES; SEE CIVIL
BOTTOM OF PANEL
1163.70
CANOPY CLEAR
HEIGHT
1174.37
A
CANOPY CLEAR
HEIGHT
1174.37
BUILDING
STRUCTURE
STANDING SEAM
METAL ROOF PANEL
ROOF PANEL TO
FASCIA FLASHING
FASCIA TRIM
SNOW GUARD
METAL LINER PANEL
BSCALE
ASCALE
SCALE OF INCHES
12 6 12 1-1/2" = 1'-0"
3/16" = 1'-0" 4 0 4 128
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
A
W
W T
P .r v t
/1
/2
:5
:0
P M
A301 156728
SNOW PROTECTION
CANOPY SECTIONS
S. KENNY
M. LAMBERT
S. KENNY 03-SCALE A03-A101
A CANOPY SECTION
SCALE A03-A101
CANOPY SECTIONB
SCALE B03-A301
1 EAVE DETAIL
65 1416/19/23
03-A502
11'-0"
MECHANICALLY FASTENED
ALUMINUM RAILING
FAD-2
DN
RAILING OPENINGS MUST
NOT ALLOW A SPHERE 21
INCHES IN DIAMETER TO
PASS THROUGH
MECHANICALLY FASTENED
ALUMINUM RAILING
CONCRETE TANK LID; SEE STRUCTURAL
DN
2'-10"
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
A
W
W T
P .r v t
/1
/2
:5
:0
P M
A501 156728
POST-EQUALIZATION TANK
PLAN
S. KENNY
M. LAMBERT
S. KENNY 03-
SCALE A
1 POST-EQUALIZATION TANK PLAN
66 1416/19/23
T
/4
03-A502
3'-6" 8"
MECHANICALLY FASTENED
ALUMINUM RAILING
DN
JOINT BETWEEN METAL
GRATING AND
CONCRETE TANK LID
TANK SIDE WALK
LEVEL
1166.70
TOP OF TANK
1175.70
5'-0 3/4" 17 T @ 10" = 14'-2"
R
.3
MECHANICALLY FASTENED
ALUMINUM RAILING
STRUCTURAL FRAMING; SEE
STRUCTURAL
NEW CONCRETE TANK LID; SEE STRUCTURAL
CONC STRUCTURE
BASE PLATE
SEE 6/03A502
TOEBOARD
GUARDRAIL
E
Q U
A L
S P
A C
E S
3"
PLAN
ELEVATION
TREAD
DEPTH
UP
BASE PLATE
SEE 6/03A502
METAL STAIRS
SEE STRUCTURAL
HANDRAIL
GUARDRAIL
GUARDRAIL
HANDRAIL
RETURN HANDRAIL
TO GUARDRAIL
" 3
E Q
U A
L
E Q
U A
L
1'-0"
C L
ELEVATION
PLAN
DOWN
METAL STAIRS
SEE STRUCTURAL
BASE PLATE
SEE 6/03A502
HANDRAIL
GUARDRAIL
GUARDRAIL
RETURN HANDRAIL
TO GUARDRAILGUARDRAIL
HANDRAIL
E Q
U A
L
E Q
U A
L
1'-0" 4
/2
/2
1'-0"
TOE BOARD BEYOND
PLAN VIEW SIDE VIEW
VERTICAL POST
VOID SPACE
VERTICAL POST
THREADED
ANCHORS
ASCALE 1/2" = 1'-0"
2 0 2 4
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
A
W
W T
P .r v t
/1
/2
:5
:0
P M
A502 156728
TANK STAIR PLAN &
SECTION
S. KENNY
M. LAMBERT
S. KENNY 03-
SCALE A03-A501
1 TANK STAIR ENLARGED PLAN
SCALE A03-A502
2 POST-EQUALIZATION TANK STAIR SECTION
SCALE A
3 GUARDRAIL ON CONCRETE STRUCTURE
SCALE A
4 STAIR RAIL BOTTOM ON METAL STAIR
SCALE A
5 STAIR RAIL TOP
SCALE A
6 BASEPLATE DETAIL
67 1416/19/23
UP
C
03-D302
6"-SI
6"-SI
4"-AE
6"-AE
04-D102
4"-AE
A
03-D301
D
03-D302
E
03-D302
03-D302
2"-SR
2"-AR
4"-EFF
4"-EFF
TK-4111
TK-4211
TK-5511
TK-5411
TK-5111
TK-5311
TK-5211
TK-4411 TK-4311
SEE 02-C103
FOR CONTINUATION
FAN-5541
FAN-5241
SNOW
CANOPY
WITHIN BOX
1'-0" 10'-0" 2'-0" 10'-0" 1'-0"
11'-0" 21'-0"1'-0"
EXISTING AEROBIC DIGESTER
REPURPOSED AS
POST-EQ TANK
B
03-D301
FTR-6111
6"-SI
4"-SI
6"-SI
6"-VT
F
03-D303
6"-PE
PRIMARY TANKS
6"-PI
4"-AOF
3"-AEQ
RTF TANKS
3"-AEQ
4"-AOF
PRE-ANOXIC TANKS
2"-EFF
2"-EQE
2"-EQE
2"-EQE
4"-FM
02-C501
6"-PE
2"-SR 2"-DW
2"-EFFB
6"-PW
SEE 02-C103
FOR CONTINUATION
4"-FD
2"-SR
LS-1301
BOLLARD (TYP)
WITHIN BOX
SEE 04-D101 FOR
CONTINUATION
FAN-5141
WITHIN BOX
HTR-5142
EXPANSION JOINT (TYP)
EXPANSION JOINT (TYP)
C
03-D302
E
03-D302
B
03-D301
1"-HWS
1"-HWR
F
03-D303
SEE 04-D101 FOR
CONTINUATION
02-C501
1"-LPG
ASCALE 3/16" = 1'-0"
4 0 4 128
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
D
W
W T
P .r v t
/1
/2
:3
:3
P
M
D101 156728
OVERALL PROCESS PLANJ. GUZMAN
K. GREER
J. HILL 03-
1 TRAFFIC-RATED SLAB ABOVE
PRIMARY AND PRE-ANOXIC
TANKS IS TRANSPARENT FOR
CLARITY. SEE 02-C506 FOR SLAB
DESIGN.
2 SEE SECTION 44 31 16 FOR
HEADWORKS ACTIVATED
CARBON ODOR CONTROL
SYSTEM INFORMATION.
3 MANUFACTURER TO INCLUDE
INTEGRAL RISERS ON TANKS
TK-4111 AND TK-4211 FOR EACH
INTERNAL VALVE. SEE CIVIL
DETAIL IN 02 SERIES FOR
TRAFFIC-RATED VALVE BOX
WITHIN SLAB.
4 PUMPS: PMP-4411, PMP-4412
ARE LOCATED WITHIN TANK
TK-4411 AND NOT SHOWN.
5 PUMPS: PMP-5111, PMP-5112,
PMP-5211, PMP-5311, PMP-5411,
PMP-5511, PMP-5611, PMP-5612,
PMP-5613, PMP-5614 ARE
LOCATED WITHIN TANK TK-5111
AND NOT SHOWN.
KEY NOTES X
68 1416/19/23
6"-SI
4"-AE
TK-5511 TK-5411 TK-5111 TK-5311 TK-5211
TK-4311
FAN-5541
FAN-5241
CL 1158.64
CL 1159.24
6"-SI
6"-SI
CL 1158.64
CL 1158.64
6"-PE
CL 1159.24
BOT OF TK-4#11 TANKS
EL 1150.17
BOT OF TK-5#11 TANKS
EL 1157.47
2"-SR
CL 1158.64
2"-SR
CL 1159.54
2"-AR
CL 1159.20
2"-SE
CL 1159.01
6"-PE
CL 1158.96CL 1163.45
CL 1163.45
6"-AEQ
6"-AEQ
3"-AEQ
3"-AEQ
BOLLARD
PEDESTAL
1"-HWS
1"-HWR
CL 1157.72
CL 1157.72
6"-SI
4"-SI
6"-SI6"-SI
4"-AE
CL 1158.64 CL 1158.64
CL 1159.15
CL 1158.64CL 1158.64
6"-AE
CL 1158.28
4"-AOF
CL 1159.98
TK-5511TK-5411TK-5111TK-5311TK-5211
TK-4411
BOT OF TK-4#11 TANKS
EL 1150.17
BOT OF TK-5#11 TANKS
EL 1157.47
2"-AR
CL 1159.20
3"-AEQ
CL 1161.49
3"-AEQ
CL 1161.49
BOLLARD
PEDESTAL
ASCALE 1/4" = 1'-0"
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
D
W
W T
P .r v t
/1
/2
:5
:5
A
M
D301 156728
RTF PROCESS SECTIONS 1J. GUZMAN
K. GREER
J. HILL 03-
SCALE A03-D101
A SECTION
SCALE A03-D101
B SECTION
1 SLOPE PIPE AT 2%.
2 EXPOSED SIDEWALL DEPTH OF
RTF TANK TK-5211 AT NORTH
END.
KEY NOTES X
GENERAL NOTES
A. SEE 03-D602 AND 03-D603
FOR RTF TANK PENETRATION
DIAGRAMS.
69 1416/19/23
| 02 - SITE WORK SERIES |
| 02--C104 - 4” TREATED EFFLUENT YARD PIPE PLAN & PROFILE |
| 02--C105 - EROSION & SEDIMENT CONTROL PLAN |
| 02--C401 - DRAINFIELD PLAN |
| 02--C402 - ENLARGED FACILITY GRADING PLAN |
| 02--C501 - CIVIL DETAILS |
| 02--C502 - CIVIL DETAILS |
| 02--C503 - CIVIL DETAILS |
| 02--C504 - EROSION & SEDIMENT CONTROL DETAILS |
| 02--C505 - DRAINFIELD AND FIRE HYDRANT ENCLOSURE DETAILS |
| 02--C506 - TRAFFIC RATED SLAB DETAILS |
| 02--E101 - ELECTRICAL SITE PLAN |
| 02--E401 - ELECTRICAL DRAINFIELD PLAN |
| 02--E601 - DUCTBANK SCHEDULE |
| 03 - WWTP YARD SERIES |
| 03--X101 - SITE WORK DEMO PLAN |
| 03--X501 - SITE WORK DEMO DETAILS |
| 03--S101 - WWTP YARD OVERALL FOUNDATION PLAN |
| 03--S102 - WWTP YARD SNOW PROTECTION CANOPY FOUNDATION PLAN |
| 03--S103 - WWTP YARD SNOW PROTECTION CANOPY ROOF PLAN |
| 03--S104 - WWTP YARD POST-EQUALIZATION TANK |
| 03--S301 - WWTP YARD SNOW PROTECTION CANOPY SECTIONS 1 |
| 03--S302 - WWTP YARD POST-EQUALIZATION TANK SECTIONS 2 |
| 03--S501 - WWTP YARD SNOW PROTECTION CANOPY DETAILS 1 |
| 03--S502 - WWTP YARD POST-EQUALIZATION TANK DETAILS 2 |
| 03--A101 - SNOW PROTECTION CANOPY GROUND LEVEL FLOOR PLAN |
| 03--A102 - SNOW PROTECTION CANOPY ROOF PLAN |
| 03--A201 - SNOW PROTECTION CANOPY EXTERIOR ELEVATIONS 1 |
| 03--A202 - SNOW PROTECTION CANOPY EXTERIOR ELEVATIONS 2 |
| 03--A301 - SNOW PROTECTION CANOPY SECTIONS |
File details come from the government source that posted it. Updated .