B09_Amd_03_Attach_03_01_27_00_Definition_of_Contract_Line_Items_Rev_1_0003.pdf

PDF 105 KB Posted

Attached to
NOCA 156728 Stehekin WWTP
Solicitation number
140P2023R0131
Issued by

About this file

This document defines eight contract line items for a federal solicitation to improve a wastewater treatment plant in Stehekin, Washington. The contract line items cover purchases of treatment equipment, demolition and construction of new facilities, site work both inside and outside the fenceline, a new access road, locating unknown utilities, a snow structure, exterior tank improvements, and a temporary irrigation system. Measurement and payment for each line item is lump sum. The document also defines four additional contract line items for potential tree removal work priced per tree by diameter size. The related federal contract opportunity is solicitation number 140P2023R0131 from the National Park Service for the NOCA 156728 Stehekin WWTP project.

View the file

Other files

File Type Posted
Sol_140P2023R0131_Amd_0004.pdf PDF
B09_Amd_03_Attach_02_Solit_Clauses_Construction_REVISED_20230828_0003.docx DOCX document
Sol_140P2023R0131_Amd_0003.pdf PDF
B09_Amd_03_Attach_04_32_62_17_Driven_Steel_Sheet_Piling_Rev_1_0003.pdf PDF
B09_Amd_03_Attach_01_140P2023R0131_QA3_0003.xlsx XLSX spreadsheet
B09_Amd_03_Attach_05_NOCA_STEHEKIN_Drawings_for_Rev_2_Structural_Updates_08-25-23_0003.pdf PDF
B09_Amd_03_SF30_NOCA_156728_140P2023R0131_0003.pdf PDF
Sol_140P2023R0131_Amd_0002.pdf PDF
B09_Amd_02_Attach_04_Specification_40_61_96_correction_0002.pdf PDF
B09_Amd_02_Attach_10_Site_Visit_Tri_Fold_NOCA_156728_0002.docx DOCX document
B09_Amd_02_Attach_11_Site_Visit_Sign-in_0002.pdf PDF
B09_Amd_02_Attach_01_140P2023R0131_QA2_0002.xlsx XLSX spreadsheet
B09_Amd_02_Attach_07_26_09_13_Electrical_Metering_Devices_Rev_1_0002.pdf PDF
B09_Amd_02_SF30_NOCA_156728_140P2023R0131_0002.pdf PDF
B09_Amd_02_Attach_05_Specification__40_66_40_correction_0002.pdf PDF
B09_Amd_02_Attach_08_26_28_00_Overcurrent_and_Short_Circuit_Protective_Devices_Rev_1_0002.pdf PDF
B09_Amd_02_Attach_03_Specification_03_31_30_correction_0002.pdf PDF
B09_Amd_02_Attach_06_Specification__46_53_25_correction_0002.pdf PDF
B09_Amd_02_Attach_02_Specification_01_73_20_correction_0002.pdf PDF
B09_Amd_02_Attach_09_NOCA_STEHEKIN_Drawings_for_Rev_1_Electrical_Updates_08-10-2023_0002.pdf PDF
Sol_140P2023R0131_Amd_0001.pdf PDF
B09_Amd_01_SF30_NOCA_156728_140P2023R0131_0001.pdf PDF
B09_Amd_01_140P2023R0131_QA1s_0001.xlsx XLSX spreadsheet
B08_Attach_3_22_07_26_-_Final_Geo-tech_Report.pdf PDF
B08_Attach_9_Solit_PSP_Vol_II_GenRefs.doc DOC document
B08_Attach_2c_NOCA_156728_100__CD_Drawings_Part3.pdf PDF
B08_Attach_8_Solit_PSP_Vol_I_PastPerf_REQD.docx DOCX document
B08_Attach_2b_NOCA_156728_100__CD_Drawings_Part2.pdf PDF
B08_Attach_2a_NOCA_156728_100__CD_Drawings_Part1.pdf PDF
B08_SF_1442_140P2023R0131.pdf PDF
B08_Attach_7_Deliverables_LmtOnSubconRpt_REQ.xlsx XLSX spreadsheet
B08_Attach_6_Construction_Contract_Administration.docx DOCX document
Sol_140P2023R0131.pdf PDF
B08_Attach_4_22_10_06_-_Geotech_Report_for_Disposal_Field_Test_Pits_-r1.pdf PDF
B08_Attach_1_NOCA_156728_100___CD_Specifications.pdf PDF
B08_Attach_5_Const_WD_DBA_WA20230065.pdf PDF
B08_Attach_2d_NOCA_156728_100__CD_Drawings_Part4.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOCA 156728 01 27 00 - 1

112122 DEFINITION OF CONTRACT LINE ITEMS

SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS

PART 1 - GENERAL

1.1 SUMMARY

A. The intent of this section is to explain, in general, what is and is not included in a contract line item, and limits or cut-off points where one item ends and another begins.

B. If no contract line item exists for a portion of work, include costs in a related item.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 LIST OF CONTRACT LINE ITEMS

A. Contract Line Item No. 0001 – ORENCO Recirculating Textile Filter

1. This item consists of the purchase of equipment provided by ORENCO for the Recirculating Textile Filter (RTF) treatment system only.

2. Measurement for payment will be each.

3. Payment will be made at the contract lump sum price.

B. Contract Line Item No. 0002 – Remaining WWTP Improvements

1. This item consists of the remaining WWTP improvements including but not limited to the demolition of existing facilities, installation of ORENCO RTF, headworks, operations office, lab, electrical room, filter, piping, valves, chemical systems, power, controls, electrical, equalization tank interior improvements, fire suppression, lighting, HVAC, site improvements, and all other remaining items associated with the construction of the WWTP except for the snow structure and Post Equalization Tank exterior improvements.

2. Measurement for payment will be each.

3. Payment will be made at the contract lump sum price.

C. Contract Line Item No. 0003 – Improvements Outside Fenceline

1. This item consists of all improvements outside the WWTP fenceline including but not limited to the effluent piping/valving/boxes, new electrical service/meter/disconnect, drainfield, fence and gates, lift station controls, tree removal as noted in the Contract Documents on the Tree Removal Plan, grading, and boulders/rocks. Item does not include the temporary irrigation system including the buried pipeline from the WWTP site, the hydrant, or the new access road.

2. Measurement for payment will be each.

3. Payment will be made at the contract lump sum price.

NOCA 156728 01 27 00 - 2

D. Contract Line Item No. 0004 – New Access Road

1. This item consists of constructing the new access road from Stehekin Valley Road to the point where it connects to the existing. This line item consists of the grading, base material, crushed surface paving, and all other materials required for the construction of the road.

2. Measurement for payment will be each.

3. Payment will be made at the contract lump sum price.

E. Contract Line Item No. 0005 – Unknown Utility Locates

1. There are unknown utilities that will be discovered during installation of the improvements.

These utilities may not be shown correctly or indicated on the plans. This item consists of locating, and if needed, crossing of the unknown utility.

2. Measurement for payment will be per each discovery (potholing) and subsequent crossing of the discovered utility. It is understood that a majority of the discoveries will require crossing. However, there will be instances where discovery is needed but the crossing is not required or avoidable.

a. Provide separate cost per each incident by:

1) Cost to Locate and Pothole Unknown Utility per each occurrence.

2) Cost to Cross the Unknown Utility per each occurrence.

3) It is understood that this proposal will be based on an estimated 15 incidents throughout the project, although payment will be made only for the actual number of potholing/crossing incidents that are discovered.

F. Contract Line Item No. 0006 – Snow Structure

1. This item consists of constructing the snow structure over the Orenco Recirculating Textile Filter treatment units.

2. Measurement for payment will be each.

3. Payment will be made at the contract lump sum price.

G. Contract Line Item No. 0007 – Post Equalization Tank Exterior Improvements

1. This item includes the exterior improvements associated with the Post Equalization Tank improvements including replacement of the tank cover, hatches, railing and stairway.

Interior rehabilitation is included in Contract Line Item No. 0002.

2. Measurement for payment will be each.

3. Payment will be made at the contract lump sum price.

H. Contract Line Item No. 0008 – Temporary Irrigation System

1. This item includes the temporary irrigation system including the buried piping from the WWTP site, above ground piping at the drainfield, hydrant, flexible hosing and sprinklers.

2. Measurement for payment will be each.

3. Payment will be made at the contract lump sum price.

I. Contract Line Item A – Tree Removal > 12” Diameter

1. There is a potential need to fell and process additional trees in this area to have a site suitable for construction activities. Government is requesting a per tree price for removing trees and requires submission of pricing per tree. This pricing will be used to price tree

MGOUGH

Strikethrough

NOCA 156728 01 27 00 - 3

felling activities that differ from what can be reasonably expected based on Construction Drawings Tree Removal Plan.

2. Trees under 4” diameter are considered part of the Clearing and Grubbing work.

J. Contract Line Item B – Tree Removal > 10” to 12” Diameter

1. There is a potential need to fell and process additional trees in this area to have a site suitable for construction activities. Government is requesting a per tree price for removing trees and requires submission of pricing per tree. This pricing will be used to price tree felling activities that differ from what can be reasonably expected based on Construction Drawings Tree Removal Plan.

2. Trees under 4” diameter are considered part of the Clearing and Grubbing work.

K. Contract Line Item C – Tree Removal > 8” to 10” Diameter

1. There is a potential need to fell and process additional trees in this area to have a site suitable for construction activities. Government is requesting a per tree price for removing trees and requires submission of pricing per tree. This pricing will be used to price tree felling activities that differ from what can be reasonably expected based on Construction Drawings Tree Removal Plan.

2. Trees under 4” diameter are considered part of the Clearing and Grubbing work.

L. Contract Line Item D – Tree Removal > 6” to 8” Diameter

1. There is a potential need to fell and process additional trees in this area to have a site suitable for construction activities. Government is requesting a per tree price for removing trees and requires submission of pricing per tree. This pricing will be used to price tree felling activities that differ from what can be reasonably expected based on Construction Drawings Tree Removal Plan.

2. Trees under 6” diameter are considered part of the Clearing and Grubbing work.

END OF SECTION 01 27 00