B09_Amd_02_Attach_09_NOCA_STEHEKIN_Drawings_for_Rev_1_Electrical_Updates_08-10-2023_0002.pdf

PDF 5 MB Posted

Attached to
NOCA 156728 Stehekin WWTP
Solicitation number
140P2023R0131
Issued by

About this file

This package contains construction drawings and specifications for electrical system upgrades at the Stehekin Wastewater Treatment Plant for National Park Service National Office. The drawings show proposed demolition, new electrical equipment including panels and devices, instrumentation and control diagrams, and panel schedules. Key details include upgrades to switchgear, installation of new electrical panels, replacement of lift station controls, and addition of data infrastructure for SCADA integration.

The related federal contract opportunity is solicitation number 140P2023R0131 for electrical upgrades at the NOCA 156728 Stehekin WWTP issued by the Department of the Interior National Park Service National Office. The solicitation seeks bids for upgrades shown in the construction drawings including switchgear, electrical panels, instrumentation and controls. The response deadline is not provided.

View the file

Other files

File Type Posted
Sol_140P2023R0131_Amd_0004.pdf PDF
B09_Amd_03_Attach_02_Solit_Clauses_Construction_REVISED_20230828_0003.docx DOCX document
Sol_140P2023R0131_Amd_0003.pdf PDF
B09_Amd_03_Attach_04_32_62_17_Driven_Steel_Sheet_Piling_Rev_1_0003.pdf PDF
B09_Amd_03_Attach_01_140P2023R0131_QA3_0003.xlsx XLSX spreadsheet
B09_Amd_03_Attach_05_NOCA_STEHEKIN_Drawings_for_Rev_2_Structural_Updates_08-25-23_0003.pdf PDF
B09_Amd_03_Attach_03_01_27_00_Definition_of_Contract_Line_Items_Rev_1_0003.pdf PDF
B09_Amd_03_SF30_NOCA_156728_140P2023R0131_0003.pdf PDF
Sol_140P2023R0131_Amd_0002.pdf PDF
B09_Amd_02_Attach_04_Specification_40_61_96_correction_0002.pdf PDF
B09_Amd_02_Attach_10_Site_Visit_Tri_Fold_NOCA_156728_0002.docx DOCX document
B09_Amd_02_Attach_11_Site_Visit_Sign-in_0002.pdf PDF
B09_Amd_02_Attach_01_140P2023R0131_QA2_0002.xlsx XLSX spreadsheet
B09_Amd_02_Attach_07_26_09_13_Electrical_Metering_Devices_Rev_1_0002.pdf PDF
B09_Amd_02_SF30_NOCA_156728_140P2023R0131_0002.pdf PDF
B09_Amd_02_Attach_05_Specification__40_66_40_correction_0002.pdf PDF
B09_Amd_02_Attach_08_26_28_00_Overcurrent_and_Short_Circuit_Protective_Devices_Rev_1_0002.pdf PDF
B09_Amd_02_Attach_03_Specification_03_31_30_correction_0002.pdf PDF
B09_Amd_02_Attach_06_Specification__46_53_25_correction_0002.pdf PDF
B09_Amd_02_Attach_02_Specification_01_73_20_correction_0002.pdf PDF
Sol_140P2023R0131_Amd_0001.pdf PDF
B09_Amd_01_SF30_NOCA_156728_140P2023R0131_0001.pdf PDF
B09_Amd_01_140P2023R0131_QA1s_0001.xlsx XLSX spreadsheet
B08_Attach_3_22_07_26_-_Final_Geo-tech_Report.pdf PDF
B08_Attach_9_Solit_PSP_Vol_II_GenRefs.doc DOC document
B08_Attach_2c_NOCA_156728_100__CD_Drawings_Part3.pdf PDF
B08_Attach_8_Solit_PSP_Vol_I_PastPerf_REQD.docx DOCX document
B08_Attach_2b_NOCA_156728_100__CD_Drawings_Part2.pdf PDF
B08_Attach_2a_NOCA_156728_100__CD_Drawings_Part1.pdf PDF
B08_SF_1442_140P2023R0131.pdf PDF
B08_Attach_7_Deliverables_LmtOnSubconRpt_REQ.xlsx XLSX spreadsheet
B08_Attach_6_Construction_Contract_Administration.docx DOCX document
Sol_140P2023R0131.pdf PDF
B08_Attach_4_22_10_06_-_Geotech_Report_for_Disposal_Field_Test_Pits_-r1.pdf PDF
B08_Attach_1_NOCA_156728_100___CD_Specifications.pdf PDF
B08_Attach_5_Const_WD_DBA_WA20230065.pdf PDF
B08_Attach_2d_NOCA_156728_100__CD_Drawings_Part4.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPROVED:

RECOMMENDED:

Superintendent

Project Manager

Date

Date

Mark Sheet REVISION Date Initial

C :\U se rs

\n ly nc h\

A C

C D oc s\

H D

R \1

2_

N P

S S te he ki n

W W

TP

_2

2\

P ro je ct

F ile s\ H

D R

S he et s\

-G

1.

dw g, L ay ou t1 , 8

/1 0/

:5

8:

A M

, N

LY

N C

H

1 141

21032716

06/19/2023

27 1416/19/23

08/10/2023

T

J

J J

CP-1101

ATS

GENERATOR

ROOM

ELECTRICAL

ROOM

OPERATIONS

AREA

RESTROOM

HEADWORKS

OPERATORS

OFFICE

MECHANICAL

ROOM

LP1

DC

E F G

LCP-1102

STORAGE

ACT-FV-3132

ACT-FV-3131

LCP-3101

CP-3401

UH-1201

MOD-1202

MOD-1201

GF-1201

MAU-1201

EF-1203

EF-1202

EF-1201

EF-1204

GWH-1201

BP-8111

BLR-8111

HWP-8112

LP3:3

LP3:3

LP3:4

LP3:3

LP3:6

LP3:4 LP3:4

LP3:4

LP3:5LP3:5LP3:5

LP3:5

LP3:5

LP3:5

LP3:4

LP3:1

LP3:1

LP3:1

LP3:6

LP3:3

LP3:4

LP3:4

LP3:4

GEN FAN

GENERATOR

PMP-9121

PMP-9221

LP3:1

EF-1205

EF-1206

MGB

CONTROL CONNECTION TO ORENCO SYSTEM

POWER CONNECTION TO ORENCO SYSTEM

POWER CONNECTION TO LP3 FOR SITE LIGHTING

LCP-1301

LP3

WWTP RADIO

LP2

MOTORIZED

DAMPER

UH-EXIST

GWH-1202

GFCI

GFCI

GFCI

GFCI

GFCI

GFCI

GFCI

GFCI

GFCI

GFCI

GFCI

GFCI

GFCIGFCI

LCP-6101

WP

ASCALE 3/8" = 1'-0"

2 0 2 64

SCALE OF FEET

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

TITLE OF SHEET

OFNORTH CASCADES NATIONAL PARK

A u to d e s k D o c s /1

N

P S

S te h e k in

W W

T P

/1

E

W

W T

P .r v t

/1

/2

:0

:1

A M

E101 156728

WWTP BUILDING

ELECTRICAL PLAN

C. BOOTH

M. GARRETT

N. LYNCH

17500404-

ASCALE

GROUND LEVEL POWER PLAN

1 REPLACE EXISTING PANEL WITH

NEW JUNCTION BOX. INTERCEPT

EXISTING FEEDER TO LIFT STATION

AND EXTEND TO PANEL LP1.

2 ALL SYSTEMS IN THE ROOM SHALL

BE RATED FOR USE IN HAZARDOUS

LOCATION CLASS 1, DIVISION 1 AND

ALL CONDUITS ENTERING OR

EXITING SHALL BE SEALED PER

NEC.

3 ENCLOSURE SHALL BE RATED FOR

USE IN HAZARDOUS LOCATION

CLASS 1, DIVISION 2 AND ALL

CONDUITS ENTERING OR EXITING

SHALL BE SEALED PER NEC.

A. CONTRACTOR TO COORDINATE ALL

FINISHES AND BUILDING HARDWARE WITH

CONTRACTING OFFICER BEFORE

PURCHASE/INSTALLATION.

B. ALL MOTORS SHALL HAVE TEFC

ENCLOSURES WITH ENCAPSULATED

WINDINGS.

C. LOCATIONS AND ARRANGEMENT OF

ELECTRICAL EQUIPMENT TO BE CONFIRMED

WITH CONTRACTING OFFICER BASED ON

SIZES OF EQUIPMENT PROVIDED.

D. BOND ALL PROCESS PIPING TO GROUND

SYSTEM USING UL LISTED ATTACHMENTS.

E. ALL ENCLOSURES AND CONNECTIONS

SHALL BE RATED FOR CORROSIVE

ENVIROMENTS.

F. ALL CONDUIT PENETRATIONS SHALL BE AS

CLOSE TO THE WALL OR CONNECTED

EQUIPMENT AS FEASIBLE. IN NO CASE

SHALL A PENETRATION BE WITHIN 12" OF

STRUCTURAL BEAM.

G. ALL CONDUITS SHALL BE SURFACE

MOUNTED.

H. NEW EQUIPMENT SHALL BE NEMA 12

GASKETED WHERE FEASIBLE FROM

MANUFACTURER.

I. PROVIDE #10AWG CONDUCTORS FOR 20A

CIRCUITS GREATER THAN 50LF.

J. ALL INTERIOR AREAS ARE TO BE

CONSIDERED "DRY, NON-CORROSIVE"

UNLESS SPECIFICALLY NOTED OTHERWISE.

K. ALL EXTERIOR RECEPTACLES SHALL BE

GFCI TYPE INSTALLED WITH "WEATHER

PROOF WHILE IN USE" COVERS.

GENERAL NOTES

KEY NOTES X

REV 1 ELECTRICAL UPDATES 08/10/2023

124 1416/19/23

T

IC

IC

IC

IC

IC

IC

IC

IC

IC

IC

E E

IC

IC

ICICIC

IC

IC

DC

E F G

GENERATOR

ROOM

ELECTRICAL

ROOM

MECHANICAL

ROOM

OPERATIONS

AREA

HEADWORKS

OPERATORS

OFFICE

LP1

ATS

LIT

LIT

LSHH

LSLL

LIT

LCP-3101

AE/AIT

FE/FIT

LCP-1102

ORENCO LCP

CP-1101

RESTROOM

STORAGE

HAZARDOUS

CLASS 1, DIV 1

SCR-3111

SCR-3112

FV-3131

FV-3132

IN PRE-EQUALIZATION

TANK TK-3311 BELOW

GO/NO GO

PANEL

CP-3401

EF-1201

WWTP CP

DPT

DPT

FSH

SCREEN PANEL

ACT-FV-3131

ACT-FV-3132

YL

YA

ANTENNA, NOCA

DIRECT

BP-8111

BLR-8111

HWP-8112

PMP-9121

PMP-9221

TE/TIT

TE/TIT

FV-6031

LSL

LSH

LSHH

PMP-1312

PMP-1311

ACT-FV-6031

LCP-1301

DW LIFT STATION

PSH

PSH

WWTP RADIO

FV-6231

LCP-6101

LP2

LP3

ACT-FV-6231

ASCALE 3/8" = 1'-0"

2 0 2 64

SCALE OF FEET

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

TITLE OF SHEET

OFNORTH CASCADES NATIONAL PARK

A u to d e s k D o c s /1

N

P S

S te h e k in

W W

T P

/1

E

W

W T

P .r v t

/1

/2

:0

:0

A M

E105 156728

WWTP BUILDING

INSTRUMENTATION PLAN

M. PACKARD

M. GARRETT

N. LYNCH

17500404-

ASCALE

GROUND LEVEL INSTRUMENTATION PLAN

A. ALL INTERIOR AREAS ARE TO BE

CONSIDERED "DRY, NON-CORROSIVE"

UNLESS SPECIFICALLY NOTED

OTHERWISE.

GENERAL NOTES

1 PROVIDE DATA JACK FOR SCADA

WORKSTATION.

2 PROVIDE DOMESTIC WASTE LIFT

STATION CONTROL PANEL OUTSIDE

OF CLASS I, DIVISION 2 BOUNDARY.

KEY NOTES X

REV 1 ELECTRICAL UPDATES 08/10/2023 128 1416/19/23

21032716

06/19/2023

150A 3P

LP1

240V

3PH, 4W

T-1

50KVA ,3PH

240-208/120V

UTILITY POLE

MOUNTED

TRANSFORMER ,3PH

240V

HIGHLEG DELTA

60kW G

100A

(3)

LP2

208/120V

3PH, 4W

A P

SERVICE

ENTRANCE

RATED ATS

150A

INFLUENT

LIFT

STATION

WH

WH

LP3

208/120V

3PH, 4W

3P

EXIST PNL

UTILITY POLE

MOUNTED

TRANSFORMER ,3PH

240V

HIGHLEG DELTA

60kW G

3P

A P

MECH

INTERLOCKED

WH

INFLUENT

LIFT

STATION

4#2/0, #4 GND, 4"C

4#1/0, #6 GND, 2"C

4#1/0, #6 GND, 2"C

4#1/0, #6 GND, 2"C

4#1/0, #6 GND, 2"C

#4 GROUNDING ELECTRODE CONDUCTOR

#4 GNDVERIFY GENERATOR IS

SEPERATLY DERIVED

SYSTEM AND INCLUDE

VERIFICATION WITH

ATS SUBMITTAL.

EXISTING GENERATOR DOES NOT HAVE ISSUES OF

WET STACKING DUE TO UNDERLOADED

CONDITIONS. AS SUCH NO LOADBANK WILL BE

PROVIDED UNDER THIS PROJECT.

23.7 KAIC

3.8 KAIC

4#1/0, #6 GND, 2"C

NEMA 4X SERVICE ENTRANCE

RATED FUSED DISCONNECT

SWITCH 200A RATED WITH

100A FUSES AND CAPABLE OF

ACCEPTING 150A FUSES

SPLICE

BOX

REPLACE EXISTING

PANEL WITH NEW

SPLICE BOX AND

EXTEND FEEDERS

TO NEW PANEL LP1

4#1 AWG PER RECORD DRAWINGS

4#1, #4 GND, 2"C

GROUND AND TEST

WELL PER 04-E501

4#2/0, 4"C

INSTALL PER UTILITY REQUIREMENTS

4"C STUBUP AT BASE OF UTILITY POLE PER

UTILITY REQUIREMENTS. UTILITY WILL INSTALL

DOWN CONDUCTORS FROM TRANSFORMERS.

4#2/0, 2"C

4#1/0, #6 GND, 2"C

NPS METERING

NEW UTILITY HANDHOLE SEE 02-E101 FOR ADDITION INFORMATION

4#1 AWG

PRESERVE WIRING

FOR RECONNECTION

TO NEW PANEL LP1

PRESERVE WIRING FOR

RECONNECTION TO NEW ATS

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

TITLE OF SHEET

OFNORTH CASCADES NATIONAL PARK

A u to d e s k D o c s /1

N

P S

S te h e k in

W W

T P

/1

E

W

W T

P .r v t

/1

/2

:0

:4

A M

E601 156728

ELECTRICAL DIAGRAMC. BOOTH

P. DAVILA

N. LYNCH

17500404-

NOT TO SCALE

NEW ONELINE

NOT TO SCALE

DEMOLITION ONELINE

• MAXIMUM HISTORICAL KWH FROM 02/2007 THROUGH 07/2023 IS 7833 KWH.

• ESTIMATED MAXIMUM KHW FOR NEW WWTP IN A MONTH IS 3989 KHW.

• PEAK HISTORICAL KW FROM 02/2007 THROUGH 07/2023 IS 21.3 KW.

• PEAK KW OCCURRED ON 7/11/2019, 1/14/20, 7/15/2020, AND 12/10/2020.

• ESTIMATED MAXIMUM CONNECTED LOAD DURING LOAD SHEDDING FOR NEW WWTP IS 18.8 KVA.

REV 1 ELECTRICAL UPDATES 08/10/2023 132 1416/19/23

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

TITLE OF SHEET

OFNORTH CASCADES NATIONAL PARK

A u to d e s k D o c s /1

N

P S

S te h e k in

W W

T P

/1

E

W

W T

P .r v t

/1

/2

:0

:1

A M

E602 156728

ELECTRICAL PANEL

SCHEDULES

C. BOOTH

M. GARRETT

R.D. CLARK

17500404-

Notes:

MISC 740 VA 100.00% 740 VA

PROC 20974 VA 100.00% 20974 VA

MTR 8909 VA 100.00% 8909 VA PANEL DEMAND: 132 A

REC 5040 VA 100.00% 5040 VA SPARE CAPACITY: 25.00%

LTG 1624 VA 100.00% 1624 VA TOTAL CONNECTED: 106 A

HTG 4229 VA 100.00% 4229 VA TOTAL CONNECTED LOAD: 43868 VA

HVAC 2352 VA 100.00% 2352 VA

LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND

PANEL TOTALS

TOTAL... 109 A 109 A 101 A

TOTAL... 14916 VA 15010 VA 13941 VA

41 SPACE -- -- 1 -- -- 1 -- -- SPACE 42

39 SPACE -- -- 1 -- -- 1 -- -- SPACE 40

37 SPACE -- -- 1 -- -- 1 -- -- SPACE 38

35 SPACE -- -- 1 -- -- 1 -- -- SPACE 36

33 SPACE -- -- 1 -- -- 1 -- -- SPACE 34

31 SPACE -- -- 1 -- -- 1 -- -- SPACE 32

29 SPACE -- -- 1 -- -- 1 -- -- SPACE 30

27 SPACE -- -- 1 -- -- 1 -- -- SPACE 28

25 SPACE -- -- 1 -- -- 1 -- -- SPACE 26

23 SPACE -- -- 1 -- -- 1 -- -- SPACE 24

21 SPACE -- -- 1 -- -- 1 -- -- SPACE 22

19 SPACE -- -- 1 -- -- 1 -- -- SPACE 20

17 SPACE -- -- 1 -- -- 1 -- -- SPACE 18

15 SPACE -- -- 1 -- -- 1 -- -- SPACE 16

13 SPACE -- -- 1 -- -- 1 -- -- SPACE 14

11 SPACE -- -- 1 -- -- 1 -- -- SPACE 12

9 SPACE -- -- 1 -- -- 1 -- -- SPACE 10

7 SPACE -- -- 1 -- -- 1 -- -- SPACE 8

5 1600.0 12341.3 6

3 1600.0 13410.1 4

LIFT STATION PROC 50 A 3

1600.0 13316.1

3 150 A Spare;

HVAC;...

LP2 FED VIA TRANSFORMER T-1

CKT CIRCUIT DESCRIPTION CLASS TRIP P A B C P TRIP CLASS CIRCUIT DESCRIPTION CKT

Service Entrance Label: No 200% Neutral: No

Enclosure: NEMA 12 Integral SPD: Yes MCB Rating: 150 A

Mounting: SURFACE Wires: 4 Mains Rating: 150 A

Supply From: ATS Phases: 3 Mains Type: MCB

Location: ELECTRICAL ROOM 104 Volts: 120/240 DELTA A.I.C. Rating: 10000

Branch Panel: LP1

1) FIRE ALARM BREAKER SHALL BE COLORED RED FROM THE MANUFACTURER.

2) WIRING TO LCP-1102 SHALL BE 4#4, #8GRD, 1-1/2"C

Notes:

MISC 740 VA 100.00% 740 VA

PROC 16174 VA 100.00% 16174 VA

MTR 8909 VA 100.00% 8909 VA PANEL DEMAND: 136 A

REC 5040 VA 100.00% 5040 VA SPARE CAPACITY: 25.00%

LTG 1624 VA 100.00% 1624 VA TOTAL CONNECTED: 108 A

HTG 4229 VA 100.00% 4229 VA TOTAL CONNECTED LOAD: 39068 VA

HVAC 2352 VA 100.00% 2352 VA

LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND

PANEL TOTALS

TOTAL... 112 A 113 A 103 A

TOTAL... 13316 VA 13410 VA 12341 VA

41 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 42

39 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 40

37 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 38

35 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 36

33 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 34

31 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 32

29 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 30

27 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 28

25 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 26

23 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 24

21 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 22

19 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 20

17 576.4 400.8 1 20 A HTG GAS WATER HEATERS 18

15 576.4 240.0 1 20 A PROC WWTP RADIO 16

EF-1201 MTR 20 A 3

576.4 510.0 1 20 A PROC CP-1101 14

11 444.0 240.0 1 20 A MISC FIRE ALARM 12

9 444.0 1176.0 1 20 A HVAC MAU-1201 10

LCP-3101 PROC 20 A 3

444.0 180.0 1 20 A PROC ACT/V-3131 & ACT/V-3132 & LCP-6101 8

5 7968.1 2712.0 6

3 8261.7 2712.0 4

LP3

Spare;

HVAC;...

100 A 3

8893.7 2712.0

3 70 A PROC LCP-1102 (3)

CKT CIRCUIT DESCRIPTION CLASS TRIP P A B C P TRIP CLASS CIRCUIT DESCRIPTION CKT

Service Entrance Label: No 200% Neutral: No

Enclosure: NEMA 12 Integral SPD: Yes MCB Rating: 150 A

Mounting: SURFACE Wires: 4 Mains Rating: 150 A

Supply From: T-1 Phases: 3 Mains Type: MCB

Location: ELECTRICAL ROOM 104 Volts: 120/208 Wye A.I.C. Rating: 10,000

Branch Panel: LP2

REFER TO 04-E605 FOR PANEL LOAD SHED REQUIREMENTS.

Notes:

MISC 500 VA 100.00% 500 VA

PROC 5776 VA 100.00% 5776 VA

MTR 7180 VA 100.00% 7180 VA PANEL DEMAND: 87 A

REC 5040 VA 100.00% 5040 VA SPARE CAPACITY: 25.00%

LTG 1624 VA 100.00% 1624 VA TOTAL CONNECTED: 70 A

HTG 3828 VA 100.00% 3828 VA TOTAL CONNECTED LOAD: 25124 VA

HVAC 1176 VA 100.00% 1176 VA

LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND

PANEL TOTALS

TOTAL... 74 A 69 A 66 A

TOTAL... 8894 VA 8262 VA 7968 VA

41 SPARE -- 20 A 1 0.0 1176.0 1 20 A MTR EXST SUMP PUMP 42

39 SPARE -- 20 A 1 0.0 500.0 1 20 A MISC GENERATOR BATTERY 40

37 SPARE -- 20 A 1 0.0 528.0 1 20 A MTR GEN RM FAN 38

35 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 36

33 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 34

31 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 32

29 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 30

27 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 28

25 DRAIN FIELD OUTLET REC 20 A 1 180.0 480.0 1 20 A PROC PMP-9121 & PMP-9221 26

23 GF-1201 HVAC 20 A 1 1176.0 360.0 1 20 A MTR DAMPERS 24

21 936.7 1034.4 1 20 A MTR EF-1204 & EF-1204 22

19 936.7 1176.0 1 20 A MTR EF-1203 20

PMP-3311 PROC 20 A 3

936.7 553.2 1 20 A MTR EF-1202 & EF-1205 18

15 828.6 1176.0 1 20 A MTR LCP-1301 16

13 828.6 1497.6 14

HWP-8112 PROC 20 A 3

828.6 1497.6

2 30 A HTG EUH-1201

9 SPARE -- 20 A 1 0.0 1446.1 1 20 A LTG WWTP INTERIOR LIGHTING 10

7 BP-8111 MTR 20 A 1 1176.0 538.0 1 20 A REC; LTG EXTERIOR LTG 8

5 RCPT 101 REC 20 A 1 1080.0 360.0 1 20 A REC RCPT RESTROOM 6

3 RCPT ELEC & STORAGE REC 20 A 1 720.0 1620.0 1 20 A REC OP AREA 100 4

1 RCPT EXTERIOR REC 20 A 1 720.0 832.8 1 20 A HTG GAS HEATING CONTROLS 2

CKT CIRCUIT DESCRIPTION CLASS TRIP P A B C P TRIP CLASS CIRCUIT DESCRIPTION CKT

Service Entrance Label: No 200% Neutral: No

Enclosure: NEMA 12 Integral SPD: Yes MCB Rating: 100 A

Mounting: SURFACE Wires: 4 Mains Rating: 100 A

Supply From: LP2 Phases: 3 Mains Type: MCB

Location: ELECTRICAL ROOM 104 Volts: 120/208 Wye A.I.C. Rating: 10,000

Branch Panel: LP3

REV 1 ELECTRICAL UPDATES 08/10/2023

133 1416/19/23

8/10/23

137 1416/19/23

06/19/2023

138 1416/19/23

06/19/2023

139 1416/19/23

06/19/2023

140 1416/19/23

06/19/2023

00-G001
Sheets and Views
Layout1
01-Y101 Plot (1)
04-E101
Sheets
04-E101 - WWTP BUILDING ELECTRICAL PLAN
04-E105
Sheets
04-E105 - WWTP BUILDING INSTRUMENTATION PLAN
04-E601
Sheets
04-E601 - ELECTRICAL DIAGRAM
04-E602
Sheets
04-E602 - ELECTRICAL PANEL SCHEDULES
04-E605
04-Y502
04-Y601
04-Y602
04-Y603

File details come from the government source that posted it. Updated .