B09_Amd_02_Attach_09_NOCA_STEHEKIN_Drawings_for_Rev_1_Electrical_Updates_08-10-2023_0002.pdf
PDF 5 MB Posted
- Attached to
- NOCA 156728 Stehekin WWTP
- Solicitation number
- 140P2023R0131
About this file
This package contains construction drawings and specifications for electrical system upgrades at the Stehekin Wastewater Treatment Plant for National Park Service National Office. The drawings show proposed demolition, new electrical equipment including panels and devices, instrumentation and control diagrams, and panel schedules. Key details include upgrades to switchgear, installation of new electrical panels, replacement of lift station controls, and addition of data infrastructure for SCADA integration.
The related federal contract opportunity is solicitation number 140P2023R0131 for electrical upgrades at the NOCA 156728 Stehekin WWTP issued by the Department of the Interior National Park Service National Office. The solicitation seeks bids for upgrades shown in the construction drawings including switchgear, electrical panels, instrumentation and controls. The response deadline is not provided.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPROVED:
RECOMMENDED:
Superintendent
Project Manager
Date
Date
Mark Sheet REVISION Date Initial
C :\U se rs
\n ly nc h\
A C
C D oc s\
H D
R \1
2_
N P
S S te he ki n
W W
TP
_2
2\
P ro je ct
F ile s\ H
D R
S he et s\
-G
1.
dw g, L ay ou t1 , 8
/1 0/
:5
8:
A M
, N
LY
N C
H
1 141
21032716
06/19/2023
27 1416/19/23
08/10/2023
T
J
J J
CP-1101
ATS
GENERATOR
ROOM
ELECTRICAL
ROOM
OPERATIONS
AREA
RESTROOM
HEADWORKS
OPERATORS
OFFICE
MECHANICAL
ROOM
LP1
DC
E F G
LCP-1102
STORAGE
ACT-FV-3132
ACT-FV-3131
LCP-3101
CP-3401
UH-1201
MOD-1202
MOD-1201
GF-1201
MAU-1201
EF-1203
EF-1202
EF-1201
EF-1204
GWH-1201
BP-8111
BLR-8111
HWP-8112
LP3:3
LP3:3
LP3:4
LP3:3
LP3:6
LP3:4 LP3:4
LP3:4
LP3:5LP3:5LP3:5
LP3:5
LP3:5
LP3:5
LP3:4
LP3:1
LP3:1
LP3:1
LP3:6
LP3:3
LP3:4
LP3:4
LP3:4
GEN FAN
GENERATOR
PMP-9121
PMP-9221
LP3:1
EF-1205
EF-1206
MGB
CONTROL CONNECTION TO ORENCO SYSTEM
POWER CONNECTION TO ORENCO SYSTEM
POWER CONNECTION TO LP3 FOR SITE LIGHTING
LCP-1301
LP3
WWTP RADIO
LP2
MOTORIZED
DAMPER
UH-EXIST
GWH-1202
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
GFCIGFCI
LCP-6101
WP
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
E
W
W T
P .r v t
/1
/2
:0
:1
A M
E101 156728
WWTP BUILDING
ELECTRICAL PLAN
C. BOOTH
M. GARRETT
N. LYNCH
17500404-
ASCALE
GROUND LEVEL POWER PLAN
1 REPLACE EXISTING PANEL WITH
NEW JUNCTION BOX. INTERCEPT
EXISTING FEEDER TO LIFT STATION
AND EXTEND TO PANEL LP1.
2 ALL SYSTEMS IN THE ROOM SHALL
BE RATED FOR USE IN HAZARDOUS
LOCATION CLASS 1, DIVISION 1 AND
ALL CONDUITS ENTERING OR
EXITING SHALL BE SEALED PER
NEC.
3 ENCLOSURE SHALL BE RATED FOR
USE IN HAZARDOUS LOCATION
CLASS 1, DIVISION 2 AND ALL
CONDUITS ENTERING OR EXITING
SHALL BE SEALED PER NEC.
A. CONTRACTOR TO COORDINATE ALL
FINISHES AND BUILDING HARDWARE WITH
CONTRACTING OFFICER BEFORE
PURCHASE/INSTALLATION.
B. ALL MOTORS SHALL HAVE TEFC
ENCLOSURES WITH ENCAPSULATED
WINDINGS.
C. LOCATIONS AND ARRANGEMENT OF
ELECTRICAL EQUIPMENT TO BE CONFIRMED
WITH CONTRACTING OFFICER BASED ON
SIZES OF EQUIPMENT PROVIDED.
D. BOND ALL PROCESS PIPING TO GROUND
SYSTEM USING UL LISTED ATTACHMENTS.
E. ALL ENCLOSURES AND CONNECTIONS
SHALL BE RATED FOR CORROSIVE
ENVIROMENTS.
F. ALL CONDUIT PENETRATIONS SHALL BE AS
CLOSE TO THE WALL OR CONNECTED
EQUIPMENT AS FEASIBLE. IN NO CASE
SHALL A PENETRATION BE WITHIN 12" OF
STRUCTURAL BEAM.
G. ALL CONDUITS SHALL BE SURFACE
MOUNTED.
H. NEW EQUIPMENT SHALL BE NEMA 12
GASKETED WHERE FEASIBLE FROM
MANUFACTURER.
I. PROVIDE #10AWG CONDUCTORS FOR 20A
CIRCUITS GREATER THAN 50LF.
J. ALL INTERIOR AREAS ARE TO BE
CONSIDERED "DRY, NON-CORROSIVE"
UNLESS SPECIFICALLY NOTED OTHERWISE.
K. ALL EXTERIOR RECEPTACLES SHALL BE
GFCI TYPE INSTALLED WITH "WEATHER
PROOF WHILE IN USE" COVERS.
GENERAL NOTES
KEY NOTES X
REV 1 ELECTRICAL UPDATES 08/10/2023
124 1416/19/23
T
IC
IC
IC
IC
IC
IC
IC
IC
IC
IC
E E
IC
IC
ICICIC
IC
IC
DC
E F G
GENERATOR
ROOM
ELECTRICAL
ROOM
MECHANICAL
ROOM
OPERATIONS
AREA
HEADWORKS
OPERATORS
OFFICE
LP1
ATS
LIT
LIT
LSHH
LSLL
LIT
LCP-3101
AE/AIT
FE/FIT
LCP-1102
ORENCO LCP
CP-1101
RESTROOM
STORAGE
HAZARDOUS
CLASS 1, DIV 1
SCR-3111
SCR-3112
FV-3131
FV-3132
IN PRE-EQUALIZATION
TANK TK-3311 BELOW
GO/NO GO
PANEL
CP-3401
EF-1201
WWTP CP
DPT
DPT
FSH
SCREEN PANEL
ACT-FV-3131
ACT-FV-3132
YL
YA
ANTENNA, NOCA
DIRECT
BP-8111
BLR-8111
HWP-8112
PMP-9121
PMP-9221
TE/TIT
TE/TIT
FV-6031
LSL
LSH
LSHH
PMP-1312
PMP-1311
ACT-FV-6031
LCP-1301
DW LIFT STATION
PSH
PSH
WWTP RADIO
FV-6231
LCP-6101
LP2
LP3
ACT-FV-6231
ASCALE 3/8" = 1'-0"
2 0 2 64
SCALE OF FEET
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
E
W
W T
P .r v t
/1
/2
:0
:0
A M
E105 156728
WWTP BUILDING
INSTRUMENTATION PLAN
M. PACKARD
M. GARRETT
N. LYNCH
17500404-
ASCALE
GROUND LEVEL INSTRUMENTATION PLAN
A. ALL INTERIOR AREAS ARE TO BE
CONSIDERED "DRY, NON-CORROSIVE"
UNLESS SPECIFICALLY NOTED
OTHERWISE.
GENERAL NOTES
1 PROVIDE DATA JACK FOR SCADA
WORKSTATION.
2 PROVIDE DOMESTIC WASTE LIFT
STATION CONTROL PANEL OUTSIDE
OF CLASS I, DIVISION 2 BOUNDARY.
KEY NOTES X
REV 1 ELECTRICAL UPDATES 08/10/2023 128 1416/19/23
21032716
06/19/2023
150A 3P
LP1
240V
3PH, 4W
T-1
50KVA ,3PH
240-208/120V
UTILITY POLE
MOUNTED
TRANSFORMER ,3PH
240V
HIGHLEG DELTA
60kW G
100A
(3)
LP2
208/120V
3PH, 4W
A P
SERVICE
ENTRANCE
RATED ATS
150A
INFLUENT
LIFT
STATION
WH
WH
LP3
208/120V
3PH, 4W
3P
EXIST PNL
UTILITY POLE
MOUNTED
TRANSFORMER ,3PH
240V
HIGHLEG DELTA
60kW G
3P
A P
MECH
INTERLOCKED
WH
INFLUENT
LIFT
STATION
4#2/0, #4 GND, 4"C
4#1/0, #6 GND, 2"C
4#1/0, #6 GND, 2"C
4#1/0, #6 GND, 2"C
4#1/0, #6 GND, 2"C
#4 GROUNDING ELECTRODE CONDUCTOR
#4 GNDVERIFY GENERATOR IS
SEPERATLY DERIVED
SYSTEM AND INCLUDE
VERIFICATION WITH
ATS SUBMITTAL.
EXISTING GENERATOR DOES NOT HAVE ISSUES OF
WET STACKING DUE TO UNDERLOADED
CONDITIONS. AS SUCH NO LOADBANK WILL BE
PROVIDED UNDER THIS PROJECT.
23.7 KAIC
3.8 KAIC
4#1/0, #6 GND, 2"C
NEMA 4X SERVICE ENTRANCE
RATED FUSED DISCONNECT
SWITCH 200A RATED WITH
100A FUSES AND CAPABLE OF
ACCEPTING 150A FUSES
SPLICE
BOX
REPLACE EXISTING
PANEL WITH NEW
SPLICE BOX AND
EXTEND FEEDERS
TO NEW PANEL LP1
4#1 AWG PER RECORD DRAWINGS
4#1, #4 GND, 2"C
GROUND AND TEST
WELL PER 04-E501
4#2/0, 4"C
INSTALL PER UTILITY REQUIREMENTS
4"C STUBUP AT BASE OF UTILITY POLE PER
UTILITY REQUIREMENTS. UTILITY WILL INSTALL
DOWN CONDUCTORS FROM TRANSFORMERS.
4#2/0, 2"C
4#1/0, #6 GND, 2"C
NPS METERING
NEW UTILITY HANDHOLE SEE 02-E101 FOR ADDITION INFORMATION
4#1 AWG
PRESERVE WIRING
FOR RECONNECTION
TO NEW PANEL LP1
PRESERVE WIRING FOR
RECONNECTION TO NEW ATS
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
E
W
W T
P .r v t
/1
/2
:0
:4
A M
E601 156728
ELECTRICAL DIAGRAMC. BOOTH
P. DAVILA
N. LYNCH
17500404-
NOT TO SCALE
NEW ONELINE
NOT TO SCALE
DEMOLITION ONELINE
• MAXIMUM HISTORICAL KWH FROM 02/2007 THROUGH 07/2023 IS 7833 KWH.
• ESTIMATED MAXIMUM KHW FOR NEW WWTP IN A MONTH IS 3989 KHW.
• PEAK HISTORICAL KW FROM 02/2007 THROUGH 07/2023 IS 21.3 KW.
• PEAK KW OCCURRED ON 7/11/2019, 1/14/20, 7/15/2020, AND 12/10/2020.
• ESTIMATED MAXIMUM CONNECTED LOAD DURING LOAD SHEDDING FOR NEW WWTP IS 18.8 KVA.
REV 1 ELECTRICAL UPDATES 08/10/2023 132 1416/19/23
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OFNORTH CASCADES NATIONAL PARK
A u to d e s k D o c s /1
N
P S
S te h e k in
W W
T P
/1
E
W
W T
P .r v t
/1
/2
:0
:1
A M
E602 156728
ELECTRICAL PANEL
SCHEDULES
C. BOOTH
M. GARRETT
R.D. CLARK
17500404-
Notes:
MISC 740 VA 100.00% 740 VA
PROC 20974 VA 100.00% 20974 VA
MTR 8909 VA 100.00% 8909 VA PANEL DEMAND: 132 A
REC 5040 VA 100.00% 5040 VA SPARE CAPACITY: 25.00%
LTG 1624 VA 100.00% 1624 VA TOTAL CONNECTED: 106 A
HTG 4229 VA 100.00% 4229 VA TOTAL CONNECTED LOAD: 43868 VA
HVAC 2352 VA 100.00% 2352 VA
LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND
PANEL TOTALS
TOTAL... 109 A 109 A 101 A
TOTAL... 14916 VA 15010 VA 13941 VA
41 SPACE -- -- 1 -- -- 1 -- -- SPACE 42
39 SPACE -- -- 1 -- -- 1 -- -- SPACE 40
37 SPACE -- -- 1 -- -- 1 -- -- SPACE 38
35 SPACE -- -- 1 -- -- 1 -- -- SPACE 36
33 SPACE -- -- 1 -- -- 1 -- -- SPACE 34
31 SPACE -- -- 1 -- -- 1 -- -- SPACE 32
29 SPACE -- -- 1 -- -- 1 -- -- SPACE 30
27 SPACE -- -- 1 -- -- 1 -- -- SPACE 28
25 SPACE -- -- 1 -- -- 1 -- -- SPACE 26
23 SPACE -- -- 1 -- -- 1 -- -- SPACE 24
21 SPACE -- -- 1 -- -- 1 -- -- SPACE 22
19 SPACE -- -- 1 -- -- 1 -- -- SPACE 20
17 SPACE -- -- 1 -- -- 1 -- -- SPACE 18
15 SPACE -- -- 1 -- -- 1 -- -- SPACE 16
13 SPACE -- -- 1 -- -- 1 -- -- SPACE 14
11 SPACE -- -- 1 -- -- 1 -- -- SPACE 12
9 SPACE -- -- 1 -- -- 1 -- -- SPACE 10
7 SPACE -- -- 1 -- -- 1 -- -- SPACE 8
5 1600.0 12341.3 6
3 1600.0 13410.1 4
LIFT STATION PROC 50 A 3
1600.0 13316.1
3 150 A Spare;
HVAC;...
LP2 FED VIA TRANSFORMER T-1
CKT CIRCUIT DESCRIPTION CLASS TRIP P A B C P TRIP CLASS CIRCUIT DESCRIPTION CKT
Service Entrance Label: No 200% Neutral: No
Enclosure: NEMA 12 Integral SPD: Yes MCB Rating: 150 A
Mounting: SURFACE Wires: 4 Mains Rating: 150 A
Supply From: ATS Phases: 3 Mains Type: MCB
Location: ELECTRICAL ROOM 104 Volts: 120/240 DELTA A.I.C. Rating: 10000
Branch Panel: LP1
1) FIRE ALARM BREAKER SHALL BE COLORED RED FROM THE MANUFACTURER.
2) WIRING TO LCP-1102 SHALL BE 4#4, #8GRD, 1-1/2"C
Notes:
MISC 740 VA 100.00% 740 VA
PROC 16174 VA 100.00% 16174 VA
MTR 8909 VA 100.00% 8909 VA PANEL DEMAND: 136 A
REC 5040 VA 100.00% 5040 VA SPARE CAPACITY: 25.00%
LTG 1624 VA 100.00% 1624 VA TOTAL CONNECTED: 108 A
HTG 4229 VA 100.00% 4229 VA TOTAL CONNECTED LOAD: 39068 VA
HVAC 2352 VA 100.00% 2352 VA
LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND
PANEL TOTALS
TOTAL... 112 A 113 A 103 A
TOTAL... 13316 VA 13410 VA 12341 VA
41 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 42
39 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 40
37 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 38
35 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 36
33 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 34
31 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 32
29 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 30
27 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 28
25 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 26
23 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 24
21 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 22
19 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 20
17 576.4 400.8 1 20 A HTG GAS WATER HEATERS 18
15 576.4 240.0 1 20 A PROC WWTP RADIO 16
EF-1201 MTR 20 A 3
576.4 510.0 1 20 A PROC CP-1101 14
11 444.0 240.0 1 20 A MISC FIRE ALARM 12
9 444.0 1176.0 1 20 A HVAC MAU-1201 10
LCP-3101 PROC 20 A 3
444.0 180.0 1 20 A PROC ACT/V-3131 & ACT/V-3132 & LCP-6101 8
5 7968.1 2712.0 6
3 8261.7 2712.0 4
LP3
Spare;
HVAC;...
100 A 3
8893.7 2712.0
3 70 A PROC LCP-1102 (3)
CKT CIRCUIT DESCRIPTION CLASS TRIP P A B C P TRIP CLASS CIRCUIT DESCRIPTION CKT
Service Entrance Label: No 200% Neutral: No
Enclosure: NEMA 12 Integral SPD: Yes MCB Rating: 150 A
Mounting: SURFACE Wires: 4 Mains Rating: 150 A
Supply From: T-1 Phases: 3 Mains Type: MCB
Location: ELECTRICAL ROOM 104 Volts: 120/208 Wye A.I.C. Rating: 10,000
Branch Panel: LP2
REFER TO 04-E605 FOR PANEL LOAD SHED REQUIREMENTS.
Notes:
MISC 500 VA 100.00% 500 VA
PROC 5776 VA 100.00% 5776 VA
MTR 7180 VA 100.00% 7180 VA PANEL DEMAND: 87 A
REC 5040 VA 100.00% 5040 VA SPARE CAPACITY: 25.00%
LTG 1624 VA 100.00% 1624 VA TOTAL CONNECTED: 70 A
HTG 3828 VA 100.00% 3828 VA TOTAL CONNECTED LOAD: 25124 VA
HVAC 1176 VA 100.00% 1176 VA
LOAD CLASSIFICATION CONNECTED LOAD DEMAND FACTOR ESTIMATED DEMAND
PANEL TOTALS
TOTAL... 74 A 69 A 66 A
TOTAL... 8894 VA 8262 VA 7968 VA
41 SPARE -- 20 A 1 0.0 1176.0 1 20 A MTR EXST SUMP PUMP 42
39 SPARE -- 20 A 1 0.0 500.0 1 20 A MISC GENERATOR BATTERY 40
37 SPARE -- 20 A 1 0.0 528.0 1 20 A MTR GEN RM FAN 38
35 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 36
33 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 34
31 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 32
29 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 30
27 SPARE -- 20 A 1 0.0 0.0 1 20 A -- SPARE 28
25 DRAIN FIELD OUTLET REC 20 A 1 180.0 480.0 1 20 A PROC PMP-9121 & PMP-9221 26
23 GF-1201 HVAC 20 A 1 1176.0 360.0 1 20 A MTR DAMPERS 24
21 936.7 1034.4 1 20 A MTR EF-1204 & EF-1204 22
19 936.7 1176.0 1 20 A MTR EF-1203 20
PMP-3311 PROC 20 A 3
936.7 553.2 1 20 A MTR EF-1202 & EF-1205 18
15 828.6 1176.0 1 20 A MTR LCP-1301 16
13 828.6 1497.6 14
HWP-8112 PROC 20 A 3
828.6 1497.6
2 30 A HTG EUH-1201
9 SPARE -- 20 A 1 0.0 1446.1 1 20 A LTG WWTP INTERIOR LIGHTING 10
7 BP-8111 MTR 20 A 1 1176.0 538.0 1 20 A REC; LTG EXTERIOR LTG 8
5 RCPT 101 REC 20 A 1 1080.0 360.0 1 20 A REC RCPT RESTROOM 6
3 RCPT ELEC & STORAGE REC 20 A 1 720.0 1620.0 1 20 A REC OP AREA 100 4
1 RCPT EXTERIOR REC 20 A 1 720.0 832.8 1 20 A HTG GAS HEATING CONTROLS 2
CKT CIRCUIT DESCRIPTION CLASS TRIP P A B C P TRIP CLASS CIRCUIT DESCRIPTION CKT
Service Entrance Label: No 200% Neutral: No
Enclosure: NEMA 12 Integral SPD: Yes MCB Rating: 100 A
Mounting: SURFACE Wires: 4 Mains Rating: 100 A
Supply From: LP2 Phases: 3 Mains Type: MCB
Location: ELECTRICAL ROOM 104 Volts: 120/208 Wye A.I.C. Rating: 10,000
Branch Panel: LP3
REV 1 ELECTRICAL UPDATES 08/10/2023
133 1416/19/23
8/10/23
137 1416/19/23
06/19/2023
138 1416/19/23
06/19/2023
139 1416/19/23
06/19/2023
140 1416/19/23
06/19/2023
| 00-G001 |
| Sheets and Views |
| Layout1 |
| 01-Y101 Plot (1) |
| 04-E101 |
| Sheets |
| 04-E101 - WWTP BUILDING ELECTRICAL PLAN |
| 04-E105 |
| Sheets |
| 04-E105 - WWTP BUILDING INSTRUMENTATION PLAN |
| 04-E601 |
| Sheets |
| 04-E601 - ELECTRICAL DIAGRAM |
| 04-E602 |
| Sheets |
| 04-E602 - ELECTRICAL PANEL SCHEDULES |
| 04-E605 |
| 04-Y502 |
| 04-Y601 |
| 04-Y602 |
| 04-Y603 |
File details come from the government source that posted it. Updated .