B09_Amd_02_Attach_10_Site_Visit_Tri_Fold_NOCA_156728_0002.docx
DOCX document 4 MB Posted
- Attached to
- NOCA 156728 Stehekin WWTP Federal contract opportunity
- Solicitation number
- 140P2023R0131
About this file
This document provides details for a National Park Service solicitation seeking proposals to replace an existing wastewater treatment plant in Stehekin, Washington. Offerors are requested to submit proposals by August 30, 2023 to design and install a new recirculating textile filter treatment system, rehabilitate the existing building, and demolish and remove the package skid and tanks from the current site. The project is intended to be awarded as a firm-fixed-price contract. Evaluation factors include technical approach, logistics and schedule, project experience, safety on a remote project, and past performance. The government may award without discussions and expects work to commence within 10 days of notice to proceed and be completed within 595 calendar days, with liquidated damages of $2,621 per day for any delays.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AFTER PREPROPOSAL CONFERENCE
· Direct all questions to both Dayna Asuncion, Contracting Officer, and Patrick Naulty, Contracting Specialist. Please submit all questions no later than August 23, 2023.
· Questions directed to any other Government team member will be redirected to Ms. Mascarenas or Mr. Naulty. No answers will be provided by any other team member. All questions and answers will be provided to all prospective offerors by amendment to the solicitation
· Request for Proposal (Solicitation Document) shall only be changed by formal amendment issued by the Contracting Officer at the website – www.SAM.gov Award of a Contract:
Best Value Tradeoff Alternate proposals shall not be accepted or evaluated The government intends to evaluate proposals and award a contract without discussions with offerors, therefore the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The government reserves the right to conduct discussions if the CO later determines them to be necessary.
Project Location:
North Cascades National Park During Site Visit Direct all Questions to Patrick Naulty
Responses do not change the solicitation document
Changes to the solicitation document shall be made by formal written amendment only
Pre-proposal Conference/Site Visit meeting notes, questions, and answers will be issued by a formal written amendment to the solicitation for information only
Preproposal Conference/ Site Visit- Thursday, August 10, 2023
Request for Proposals No. 140P2023R0131 CO: Dayna Asuncion dayna_asuncion@nps.gov CS: Patrick Naulty patrick_naulty@nps.gov
NOCA 156728 Stehekin WWTP
Clauses 52.211-10 Commencement, Prosecution, and Completion of Work - Commence work within 10 days after NTP. Complete not later than 595 days after NTP.
52.211-12 Liquidated Damages – Construction - If contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2,621 for each calendar day of delay until the work is completed or accepted.
Special Requirement 2 – Key Personnel: Project Manager, Job-Site Superintendent, Quality Control Manager, Safety Manager. Prospective contractor shall not be allowed to change key personnel during the first 90 days of performance.
DIAR 1452.228-70 Liability Insurance-Department of the Interior: The contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the CO by an insurance company which is acceptable to the CO. The amounts of insurance shall be not less than:
Construction $100,000 each person $500,000 each occurrence $1,000,000 property damage
52.225-11 Buy American – CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (NOV 2021)– Refer to Clause for specific requirements
Submission and Evaluation Section L Instructions for the Submission of Offers
· Proposals Due August 30, 2023, 1:00 PM PT
· Volume I – Non-Price Proposal
· Volume II Business and Price Proposal
· Alternate proposals SHALL NOT be considered
· Government may award without discussion
· Send electronic proposals to: CS_DSC_Proposal_Submission@nps.gov Dayna_asuncion@nps.gov Patrick_naulty@nps.gov
· Submissions shall contain the solicitation number, park-PMIS, and number of total emails (example in solicitation) Evaluation Factors: The evaluation factors are correlated to the proposal preparation instructions. Factors 1- 5 are equally important. Overall: All evaluation factors, other than price, when combined, are approximately equally important to price.
FACTOR 1- TECHNICAL APPROACH AND KEY PERONNEL
FACTOR 2- LOGISTICS AND SCHEDULE
FACTOR 3- PROJECT EXPERIENCE
FACTOR 4- SAFETY ON A REMOTE PROJECT
FACTOR 5- PAST PERFORMANCE
Overview of project This project will replace existing Stehekin Wastewater Treatment Plant (WWTP) with a modern facility. Project scope includes demolition and removal of existing package skid and tanks, rehabilitation and upgrade of the building, and installation of new recirculating textile filter treatment system capable of meeting new discharge permit standards set by the State of Washington Department of Health (DOH). The new treatment system will be cost effective, simple to operate and capable of meeting new DOH groundwater discharge permit requirements. This project will also eliminate the biosolids handling process in favor of a primary tank to reduce overall operations and maintenance requirements.
image1.png image2.jpeg