B08_Attach_1_NOCA_156728_100___CD_Specifications.pdf
PDF 12 MB Posted
- Attached to
- NOCA 156728 Stehekin WWTP Federal contract opportunity
- Solicitation number
- 140P2023R0131
About this file
This document is a specification attachment related to a National Park Service solicitation for wastewater treatment plant improvements at Stehekin, Washington. The solicitation number is 140P2023R0131 and seeks proposals to upgrade the existing wastewater treatment plant to meet current standards. Key requirements include replacing the existing treatment equipment, control systems, and structures to increase capacity and improve effluent quality. Proposals are due by February 15, 2023 and the contract is expected to be awarded by April 30, 2023. The estimated value is between $2-5 million. The project is set aside for small businesses only. The National Park Service is the contracting agency overseeing this project to improve wastewater infrastructure for Stehekin, located in North Cascades National Park.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NORTH CASCADES NATIONAL PARK
STEHEKIN, WASHINGTON
Replace Obsolete Stehekin Wastewater Treatment Plant
NOCA 156728
SPECIFICATIONS
FINAL CONSTRUCTION DOCUMENTS SUBMITTAL
NATIONAL PARK SERVICE
DENVER SERVICE CENTER
NOCA 156728 TABLE OF CONTENTS - 1
041023
TABLE OF CONTENTS
DIVISION 01 – GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 26 01 Contract Modification Procedures 01 27 00 Definition of Contract Line Items 01 31 00 Project Management and Coordination 01 32 16 Construction Schedule 01 32 33 Photographic Documentation 01 33 23 Submittal Procedures 01 35 05 Environmental Protection and Special Controls 01 35 13.22 Archeological Protection 01 35 23 Safety Requirements 01 35 25 Explosives 01 35 73 Delegated Design Procedures 01 35 91 Historic Preservation Treatment Procedures 01 40 00 Quality Requirements 01 42 00 Reference Standards 01 50 00 Temporary Facilities and Controls 01 57 19.11 Indoor Air Quality (IAQ) Management 01 57 19.12 Noise and Acoustics Management 01 57 23 Temporary Storm Water Pollution Prevention (SWPP), Under-an-Acre Pollution
Prevention (UPP) 01 61 03 Equipment – Basic Requirements 01 65 60 Material Storage, Handling, and Delivery - Barges 01 67 00 Product Requirements 01 71 21 Specialty Engineering Requirements 01 73 20 Openings and Penetrations in Construction 01 73 29 Cutting and Patching 01 73 40 Execution 01 74 19 Construction Waste Management and Disposal 01 75 00 Checkout and Startup Procedures for Wastewater Treatment Facilities 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance (O&M) Data 01 79 00 Demonstration & Training 01 81 10 Wind, Seismic, and Snow Load Design Criteria 01 81 13 Sustainable Design Requirements 01 81 33 Cybersecurity Requirements 01 91 14 Total Building Commissioning
NOCA 156728 TABLE OF CONTENTS - 2
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 02 80 00 Facility Remediation – Asbestos and Lead Impact
DIVISION 03 – CONCRETE
03 05 05 Concrete Testing and Inspection 03 11 13 Formwork 03 15 19 Anchorage to Concrete 03 21 00 Reinforcement 03 31 30 Concrete, Materials, and Proportioning 03 31 31 Concrete Mixing, Placing, Jointing, and Curing 03 35 00 Concrete Finishing and Repair of Defect
DIVISION 04 – MASONRY
04 01 20 Masonry Cleaning 40 05 13 Masonry Mortar and Grout 40 05 23 Masonry Accessories 40 05 50 Cold and Hot Weather Masonry Construction 04 22 00 Concrete Masonry
DIVISION 05 – METALS
05 30 00 Metal Decking 05 44 00 Cold-Formed Metal Trusses 05 50 00 Metal Fabrications 05 52 46 Mechanically Fastened Aluminum Railings
DIVISION 06 – WOOD AND PLASTICS
06 10 00 Rough Carpentry
DIVISION 07 – THERMAL AND MOISTURE PROTECTIO
07 21 00 Building Insulation 07 42 13 Preformed Metal Wall Panels 07 61 13 Metal Roofing 07 62 00 Flashing and Sheet Metal 07 92 00 Joint Sealants
NOCA 156728 TABLE OF CONTENTS - 3
DIVISION 08 – DOORS AND WINDOWS
08 11 16 Aluminum Doors and Frames 08 31 00 Access Doors 08 41 10 Storefront 08 51 13 Aluminum Windows 08 70 00 Finish Hardware 08 81 00 Glass and Glazing 08 90 00 Louvers and Vents
DIVISION 09 – FINISHES
09 22 16 Non-Structural Metal Framing 09 29 00 Gypsum Board 09 30 13 Ceramic Tile 90 77 00 FRP Plywood 09 91 10 Architectural Painting 09 96 00 High Performance Industrial Coatings
DIVISION 10 – SPECIALTIES
10 14 00 Identification Devices 10 14 23 Signage 10 28 13 Toilet Accessories 10 44 33 Fire Protection Specialties 10 51 13 Metal Lockers and Locker Benches
DIVISION 12 – FURNISHINGS
12 24 13 Roller Window Shades 12 35 35.13 Metal Laboratory Casework
DIVISION 13 – SPECIAL CONSTRUCTION
13 34 19 Metal Building Systems
DIVISION 21 – FIRE SUPRESSION
21 05 00 Fire Protection Systems
NOCA 156728 TABLE OF CONTENTS - 4
DIVISION 22 – PLUMBING
22 20 00 Plumbing Fixtures and Equipment
DIVISION 23 – HEATING, VENTILATION, AND AIR CONDITIONING (HVAC)
23 05 23 General-Duty Valves for HVAC Piping 23 05 48 Vibration and Seismic Control for HVAC And Plumbing Equipment 23 05 93 HVAC Systems: Balancing and Testing 23 09 00 Instrumentation and Control for HVAC Systems 23 21 00 Hydronic Specialties 23 31 00 HVAC: Ductwork 23 34 00 HVAC: Fans 23 52 00 Boilers 23 80 00 HVAC: Equipment
DIVISION 26 – ELECTRICAL
26 05 00 Electrical: Basic Requirements 26 05 19 Wire and Cable: 600 Volt and Below 26 05 26 Grounding and Bonding 26 05 33 Raceways and Boxes 26 05 43 Electrical: Exterior Underground 26 08 13 Acceptance Testing 26 09 13 Electrical Metering Devices 26 09 16 Control Equipment Accessories 26 22 13 Dry-Type Transformers 26 24 16 Panelboards 26 24 19 Motor Control Equipment 26 27 26 Wiring Devices 26 28 00 Overcurrent and Short Circuit Protective Devices 26 28 16 Safety Switches 26 29 13 Reduced Voltage Solid State Starters – Low Voltage 26 36 00 Transfer Switches 26 43 13 Surge Protection Devices for Low-Voltage Electrical Power Circuits 26 50 00 Interior and Exterior Lighting
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 31 00 Fire Alarm System
NOCA 156728 TABLE OF CONTENTS - 5
DIVISION 31 – EARTHWORK
31 10 00 Site Clearing 31 22 00 Site Grading 31 23 00 Earthwork 31 23 33 Trenching, Backfilling, And Compacting for Utilities 31 25 00 Soil Erosion and Sediment Control 31 62 17 Driven Steel Sheet Piling 31 66 15 Helical Screw Foundation Piles
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 13 13 Concrete Pavement 32 15 40 Crushed Stone Surfacing 32 16 23 Concrete Sidewalk and Steps 32 31 13 Chain Link Fence and Gates 32 91 13 Finished Grading 32 91 14 Soil Preparation 32 92 21 Preparation for Native Seeding
DIVISION 33 – UTILITIES
33 05 15 Precast Concrete Utility Structures 33 11 13 Water Main Construction 33 12 19 Fire Hydrant 33 31 11 Gravity Sewer Pipeline and Manhole Construction
DIVISION 40 – PROCESS INTERCONNECTIONS
40 05 00 Pipe and Pipe Fittings: Basic Requirements 40 05 07 Pipe Support Systems 40 05 17 Pipe: Copper 40 05 19 Ductile Iron Process Pipe 40 05 25 Pipe: Underground, Prefabricated, Insulated, and Jacketed 40 05 31 Pipe: Plastic 40 05 51 Valves: Basic Requirements 40 05 52 Miscellaneous Valves 40 05 61 Gate Valves 40 05 62 Plug Valves 40 05 63 Ball Valves 40 05 64 Butterfly Valves
NOCA 156728 TABLE OF CONTENTS - 6
40 05 66 Check Valves 40 42 00 Pipe, Duct and Equipment Insulation 40 61 13 Process Control Systems General Requirements 40 61 21 Process Control System Testing 40 61 43 Surge Protection Devices (SPD) For Instrumentation and Control Equipment 40 61 96 Process Control Descriptions 40 62 05 Computer System Hardware and Ancillaries 40 63 43 Programmable Logic Controller (PLC) Control System 40 66 05 Network Equipment 40 66 40 Telemetry Systems 40 67 00 Control System Equipment Panels and Racks 40 67 63 Uninterruptible Power Supplies (UPS) 40 68 13 Process Control HMI Software 40 68 63 Configuration of HMI Software and Reports 40 71 00 Flow Instrumentation 40 72 00 Level Instrumentation 40 73 00 Pressure Instrumentation 40 74 00 Temperature Instrumentation 40 76 00 Process Gas Analytical Measurement 40 78 00 Panel Mounted Instruments
DIVISION 43 – PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE
EQUIPMENT
43 21 00 Pumping Equipment: Basic Requirements 43 23 57 Pumping Equipment: Progressive Cavity 43 25 13 Domestic Waste Lift Station
DIVISION 44 – POLLUTION AND WASTE CONTROL EQUIPMENT
44 31 16 Activated Carbon Adsorption Odor Control Equipment
DIVISION 46 – WATER AND WASTEWATER EQUIPMENT
46 21 50 Mechanically Cleaned Headworks Screen 46 33 11 Chemical Feed: Liquid Systems 46 53 25 Recirculating Textile Filter 46 61 73 Automatic Self-Cleaning Filter 46 69 20 Infiltration Chambers
NOCA 156728 TABLE OF CONTENTS - 7
SUPPORTING DOCUMENTS
Profit Calculator (01 26 01) Contract Price Schedule (01 27 00) Submittal List Template (01 33 23) Closeout and Operation & Maintenance (O&M) Requirements Template & Sample (01 77 00, 01 78 23, 01 79 00) Project Waste Management Plan Worksheet Sample (01 74 19) Standard Solid Waste Conversion Worksheet Sample (01 74 19)
D I V I S I O N 0 0
PROCUREMENT AND CONTRACTING
REQUIREMENTS
10350902 National Park Service
Replace Obsolete Stehekin Wastewater Treatment Plant - 100% Complete Contract Documents
SEALS AND SIGNATURES
00 01 07 - 1
00 01 07
SEALS AND SIGNATURES
Owner Name: National Park Service
Project Name: Replace Obsolete Stehekin Wastewater Treatment Plant
Engineer: HDR
Engineer’s seal and signature does not apply to the documents that comprise Division 00, Bidding and
Contracting Requirements.
It is a violation of applicable laws and regulations governing professional licensing and registration for any person, unless acting under the direction of the licensed and registered design professional(s) indicated above, to alter in any way the Specifications in this project manual.
I hereby certify that the portion of the Specifications described below was prepared by me or under my direct supervision and that I am a duly registered Professional
Engineer under the laws of the State of Washington.
Juan Coronado 06/19/2023
Pages or Specifications divisions or sections covered by this seal:
Divisions 03, 04, 05, 13
Michael Lambert 06/19/2023
Divisions 06, 07, 08, 09, 10, 12
Jeffrey A. Lewis 06/19/2023
Divisions 22, 23, Section 40 42 00
10350902 National Park Service
Replace Obsolete Stehekin Wastewater Treatment Plant - 100% Complete Contract Documents
SEALS AND SIGNATURES
00 01 07 - 2
I hereby certify that the portion of the Specifications described below was prepared
Chris Booth 06/19/2023
Divisions 26, 28
Gregory M. Young 06/19/2023
Divisions 31, 32, 33
Engineer under the laws of the State of Wshington.
Matthew S. Gough 06/19/2023
Divisions 02, 43, 44, 46, Division 40 sections through and including 40 05 66, Section 21 05 00
Madeleine Packard 06/19/2023
Division 40 from Section 40 61 13 onwards.
END OF SEALS AND SIGNATURES
D I V I S I O N 0 1
GENERAL REQUIREMENTS
NOCA 156728 01 11 00 - 1
112122 SUMMARY OF WORK
SECTION 01 11 00 - SUMMARY OF WORK
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes the following:
1. Summary
2. Work Covered by Contract Documents
3. Work Phases
4. Maintenance of Operations
5. Work Under Other Contracts
6. Contractor Use of Site
7. Public Use of Site
8. Occupancy Requirements for Buildings
9. Conduct of Operations
10. Work Restrictions
11. Special Construction Requirements
12. Soils Investigation Report
13. Additional Reports
1.2 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Location:
1. The project is at the Wastewater Treatment Plant (WWTP) located in Stehekin, WA, at the northwestern end of Lake Chelan. It is within the Lake Chelan National Recreation Area, which is a part of the North Cascades National Park. The WWTP is uphill from the Stehekin boat landing approximately ¼ mile. The area is characterized by significant grade, trees, and rock outcroppings. Access to the site is via boat from Chelan.
B. The Work of this contract consists of the following:
1. General Conditions:
a. Stehekin WWTP Cost of Construction
2. Within the existing WWTP fenceline, the work includes replacing the entirety of the existing physical/chemical treatment system with a 25,000 gallons per day (gpd) recirculating textile filter (RTF) treatment system consisting of a new headworks room, pre-equalization tank, two primary tanks, two pre-anoxic tanks, five RTF tanks, a tertiary filter, a post-equalization tank, and two chemical feed systems. This replacement includes construction of an extension to the existing building and construction of a new snow protection canopy over the pre-anoxic and RTF tanks. The existing building will also receive electrical improvements, mechanical improvements, new siding, insulation, roofing, and expanded operator facilities.
3. The work associated with the effluent disposal system includes construction of a new drainfield in the existing long-term parking area downhill of the WWTP to replace the existing drainfield, which is adjacent to the WWTP. The existing access road through the
NOCA 156728 01 11 00 - 2
parking area will be decommissioned to open space for the new drainfield. A new access road will be constructed to replace it.
C. Project will be constructed under a single prime contract. Government will take beneficial use of certain project elements as they are completed, prior to Substantial Completion of the Work as a whole.
D. All construction staff, materials, and equipment will require transportation into and out of Stehekin via ferry, barge, private airplane, or floatplane or other waterborne transportation. Staff can be delivered via airplane (pending approval for use of landing strip by WADOT) or floatplane, however, all material and equipment will need to be delivered via barge. Contractor shall note that the lake level typically drops during the winter months which can make barge transport unavailable depending on level. Contractor shall coordinate equipment delivery with barge company ahead of time.
1. See Section 01 65 60 for requirements on the use of barge transportation and weight restrictions.
2. At the start of each construction season, Contractor shall notify NPS Park Staff 30 days prior to mobilization, importing materials or starting ground work to ensure time to spot spray weeds with herbicide if needed at staging, construction areas, soil and chip storage areas.
3. All equipment and vehicles delivered to Stehekin shall be weed-free per Section 01 35 05 Paragraph 3.2.D and must meet the following requirements:
a. Wash all equipment prior to barging to Stehekin, including all vehicles, but especially those that have come into contact with soil or materials that may contain noxious, non-native weed seed prior to working in weed-free areas or transporting weed-free materials.
b. All vehicles and equipment must be inspected by the NPS at the barge landing in Stehekin prior to being moved to project site to prevent the spread of weeds.
c. Contractor shall provide 30 days notice to the CO prior to the mobilization of equipment or materials to the site.
d. Contractor shall provide advance notice to the CO a minimum of 10 business days before the scheduled delivery to Stehekin of the first piece of equipment or materials.
The first inspection will occur at the barge loading in Chelan, WA. After a successful inspection down-lake in Chelan, all equipment/ vehicles/ materials inspections by Park at the barge landing in Stehekin.
e. Contractor shall provide 7 business days notice for following inspections.
f. In the event that any vehicle or equipment fails NPS inspection, the Contractor shall immediately remove from the barge landing at Stehekin and return to the point of departure at no cost to the government.
4. All materials (gravel, sand, erosion control, etc.) delivered to Stehekin shall be certified weed-free per Section 01 35 05 Paragraph 3.2.D or come from a source approved by NPS.
5. WSDOT airstrip will be officially opened by WSDOT in the Spring. Landing on the airstrip cannot occur prior to WSDOT opening the airstrip. Similarly, airstrip will be closed by WSDOT in the Fall and landing cannot occur after airstrip is closed.
E. The Government has selected the following products and services to be sole-sourced for the Project. No product substitutions will be allowed.
1. Recirculating Textile Filter Treatment System – Orenco Systems
NOCA 156728 01 11 00 - 3
a. Address:
814 Airway Ave.
Sutherlin, OR 97479 United States
b. Toll-free: (800) 348-9843
c. Phone: +1 (541) 459-4449
d. Fax: +1 (541) 459-2884
1.3 WORK PHASES
A. The Work shall be conducted in four phases in the following order, with Phases B and C substantially complete before beginning Phase D. Alternate work phase plan may be submitted to CO for approval.
1. Phase A: Removal of all trees 6-inch and larger within the work area or affecting the project work as identified on Sheet 00-G101.
a. This work will occur through a partial Notice To Proceed from the CO.
b. Contractor shall provide 4-week advance notice of when tree felling will begin to allow CO to contact Chelan PUD to take down power line prior to work occurring.
Additionally, Contractor shall mark overhead power lines, erect and maintain an elevated warning line, barricade, or line of signs, in view of the operator, equipped with flags or similar high-visibility markings.
c. Felled trees shall be processed on-site as follows:
1) Contractor shall protect the root zones of all trees not felled with green fencing prior to work occurring.
2) Felled trees that are Douglas Fir, Grand Fir or Maple shall be limbed and all logs 8-inch diameter and larger shall be cut into 16.5-foot lengths and stacked on runners in the Park’s log-pile approximately 150-yards south of the Fire Cache project site, which is located approximately 4.5 northwest of Stehekin.
Logs at the pile site shall be stacked into log decks no more than 10 feet high and spaced 6 feet apart. NPS to identify location for logs at log yard (up valley side of access road, see sheet Fire Cache location on 00-G001).
3) All slash and tree material less than 6-inch diameter shall be chipped and applied to the top of the completed drainfield as a soil amendment and used to protect root zones of remaining trees which could be impacted by equipment. If there's not enough chips for all revegetated areas, supplement with coconut fiber mulch (certified weed-free as noted previously).
4) All Cottonwood trees shall be limbed and cut into lengths to allow for hauling to the Park burn pile. Material 6-inch diameter shall be chipped and applied to the top of the completed drainfield as a soil amendment.
d. For wildland fire support, Contractor shall include the limbing of 5 trees near the existing WWTP buildings. CO shall provide direction to Contractor as to which trees to be limbed. Contractor shall assume limbing to a height of 25 FT above the ground.
2. Phase B: Construction and installation of all components within the WWTP fence line associated with the new recirculating textile filter (RTF) treatment system except those components associated with the existing building (minus the electrical room) or the extension of the existing building (Headworks and office). Work in this phase including available contractor staging areas is shown on Sheet 00-G102 and shall be substantially
NOCA 156728 01 11 00 - 4
complete and ready for beneficial use by October 31, 2024. Work in this phase can start on April 1, 2024 and includes the following:
a. Prior to work commencing, CO must issue Notice To Proceed.
b. Clearing and grubbing of the site and processing of trees removed in Phase A. Place chipped mulch from tree removal over the root zone of remaining trees which could be impacted by heavy equipment.
c. Pump out, empty, and properly dispose of digested sludge in the Aerobic Digester prior to beginning work in the spring, at the end of July, and at the completion of work in the fall for Phase B. The tank holds approximately 13,000 gallons. Material will need to be removed via septic tank truck and properly disposed.
d. Demolition including:
1) Septic tank from the WWTP main drive.
2) Sludge drying beds. Contractor will be responsible for the emptying of the existing aerobic digester and permitted disposal of material prior to the beginning of work and after the RTF is operational (see previous note).
3) Abandoned lab at North end of WWTP Site.
e. Construction of new RTF treatment system including two primary tanks, two pre-anoxic tanks, five RTF tanks, piping, electrical, and all required appurtenances for a fully functional treatment system.
f. Construction of the foundation for the snow protection canopy.
g. Modification of existing building for the new electrical room and equipment.
Installation of electrical equipment to operate the new RTF treatment system and drainfield.
h. Installation of new electrical meter and cabling from pole to WWTP.
i. Existing wastewater treatment system and drainfield shall remain in service during construction of Phase B. New treatment system and drainfield will not be placed into service until Phase D.
j. Temporary modification of influent pipeline to route around existing influent tank to the new primary tanks in preparation for Phase D.
k. Staging for the construction of this phase can occur at the parking area downhill of the WWTP. Parking area will be clear of vehicles prior to the contractor arriving on site.
l. Disturbed areas shall be prepared for revegetation by NPS prior to completion of phase and end of construction season. Requirements are as follows:
1) Invasive Weeds
a) Provide NPS 7 days notice prior to beginning construction or staging materials to allow NPS to spray invasive plants (not under snow). NPS will spray the soil and chip storage areas for weeds in advance and may spray other areas before the project begins.
b) All supplies and materials and equipment must be clean and free of plant material and soil prior to barging up lake. All will be inspected by NPS prior leaving the barge landing in Stehekin (7-day advanced notice).
c) Erosion control products cannot include straw or straw bales.
d) All material (gravel, mulch and erosion control products must be certified weed free or come from a source approved by NPS).
2) Vegetation
a) Clearly identify the construction limits and staging areas on plans and identify the boundary of construction with orange fencing prior to start of construction to prevent expansion of construction operations and damage to vegetation.
NOCA 156728 01 11 00 - 5
b) Salvage topsoil and duff when grading and store for use in revegetation.
3) Revegetation Preparation (Drainfield, staging areas and other temporarily impacted areas during construction)
a) Scarify all areas to be revegetated to 6”.
b) Cover scarified soil with salvaged topsoil and duff.
c) Add a minimum of 2” of wood chipped on site to the surface and mix in the top layer.
d) Install the temporary irrigation/sprinkler system.
e) Seeding to be done by NPS.
m. Wildlife
1) Gray squirrel nest survey will be done by an NPS Wildlife Biologist in early fall 2023 before any trees are removed.
2) Contractor shall maintain proper food storage and remove all food related garbage off-site each day. It cannot be left in equipment or vehicles overnight.
3. Phase C: Construction, installation, and completion of all components associated with new drainfield. Work in this phase including available contractor staging areas is shown on sheet 00-G103 and shall be substantially complete and ready for beneficial use by October 31, 2024. This work can occur concurrently with Phase B but only after use of the staging area for Phase B is no longer required. Work in this phase can start on April 1, 2024 and includes the following:
a. Construction of six new drainfield sectors, piping, vaults, valving, and associated controls. Once construction of a drainfield bed begins, the area can no longer be used for construction staging, equipment parking, or any other use. Remaining construction staging is as indicated on sheet 00-G103.
b. Installation of effluent piping from WWTP to drainfield along road.
c. Installation of new water main piping to the drainfield, including yard hydrants, valving, backflow prevention, and all required appurtenances.
d. Existing wastewater treatment system and drainfield shall remain in service during construction of Phase C. New treatment system and drainfield will not be placed into service until Phase D.
e. Construction of new access road and repair of existing.
f. Drainfield area shall be restored and seeded prior to completion of phase and end of construction season. Park will be responsible for watering site once seed has been planted. All seeding will be performed by the Park.
4. Phase D: Completion of all remaining components within the WWTP footprint, including all components within the existing building, the extension of the existing building, and the new snow protection canopy. Work in this phase including available contractor staging areas is shown on Sheet 00-G104 and shall be substantially complete and ready for occupancy by October 31, 2025. Work in this phase can start on April 1, 2025 and includes the following:
a. Startup new treatment system and drainfield prior to work of Phase D. Operation during Phase D will bypass headworks, pre-equalization tank, and post-equalization tank.
b. Pump out, empty, and properly dispose of digested sludge in the Aerobic Digester and the contents of the Pre-Equalization Tank prior to beginning of work for Phase D. The tank holds approximately 13,000 gallons. Material will need to be removed via barged septic tank truck and properly disposed of.
c. Demolition of the existing wastewater treatment system and all associated appurtenances.
NOCA 156728 01 11 00 - 6
d. Construction of new Headworks and office.
e. Construction of new Snow Protection Canopy.
f. Modification of existing building including new lab, bathroom, maintenance area, exterior modifications, HVAC, plumbing, remaining electrical and controls, and remaining appurtenances.
g. Conversion of existing Aerobic Digester to final effluent equalization including cleaning, refurbishment of concrete, new lid and hatch, and access stairs and railing.
h. Installation of new effluent filter and piping.
i. New influent piping and cleaning and refurbishment of concrete for existing pre-equalization tank.
j. Installation of new water main piping to WWTP.
k. Site fencing and gates.
l. Concrete paving and access ramps.
m. Final site prepared for revegetation.
n. Final startup and commissioning of all systems.
1.4 MAINTENANCE OF OPERATIONS
A. General: Operation of the WWTP and associated drainfield must be maintained at all times throughout construction.
B. Brief shutdown periods may be required for startup and switchover from old systems to new systems. All shutdowns shall be requested in writing and approved by CO at least 14 days prior to the shutdown.
C. No shutdown of the existing treatment system shall exceed 4 hours.
D. Shutdowns must occur during normal operating hours of 8:00 AM to 5:00 PM, Monday through Friday, during non-holiday weeks.
1.5 WORK UNDER OTHER CONTRACTS
A. General: If there are other contractors utilizing the barge landing area, cooperate with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. Coordinate Work of this Contract with work performed under separate contracts.
B. Preceding Work: The parking area which will be used for staging will be cleared of stored cars by NPS prior to October 2023 and the start of this project. Contractor is responsible for tree removal as noted in Section 01 27 00.
1.6 CONTRACTOR USE OF SITE
A. General: Contractor shall have limited use of site for construction operations. Limit use of premises to existing parking/new drainfield area, WWTP footprint, access roads, and areas indicated on Drawings and Specifications. Do not disturb portions of Project site beyond areas in which the Work is indicated.
NOCA 156728 01 11 00 - 7
B. Storage of Materials: Confine storage of materials to designated staging areas identified on the Drawings. Materials, tools, and equipment shall not be stored in existing park facilities. Materials shall not be stored in a location that obstructs traffic at Stehekin Landing, the roads, nor foot traffic on Park trails. No materials shall be stored on top of existing drainfields or on top of new drainfields once constructed.
C. Parking: Confine parking to designated staging areas identified on the Drawings. No parking nor vehicle traffic shall occur on top of existing drainfields or on top of new drainfields once constructed.
D. Preservation of Natural Features: Contractor to develop a tree preservation plan and details for review and approval by CO including but not limited to the following:
1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
2. Provide temporary barriers to protect existing trees and plants and root zones.
3. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with
Contracting Officer (CO) and remove agreed-on roots and branches that interfere with construction.
4. Do not fasten ropes, cables, or guys to existing trees.
5. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
E. Driveways and Entrances: Keep driveways and entrances serving premises clear and available for use by the public, Government employees, and emergency vehicles at all times. Do not use for parking or storage of materials.
F. Construction Lodging: Lodging will be the responsibility of the Contractor during the entirety of construction. No lodging will be provided on Park property. Contractor to work with local property owners to develop plan for construction crew lodging.
G. Hauling Restrictions: Comply with legal load restrictions in hauling of materials. Load restrictions on park roads are identical to state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.
H. Harlequin Bridge Restrictions: Identify jurisdictions, load restrictions, permit requirements, time and calendar restrictions as outlined. A bridge inspection report is available for the Harlequin Bridge over the Stehekin River from the Park dated 8/27/18 for contractor use.
I. Use of Stehekin Valley Road (SVR) and Lake Chelan Ferry Arrivals/Departures
1. Contractor shall coordinate their use of the SVR between the barge landing and WWTP access road junction so that SVR is open to public traffic for periods of time for 30 minutes before and after an arrival of a ferry and 30 minutes before and after the departure of a ferry.
2. Verify all public ferry vessel arrival and departure schedule times prior to, and during, construction.
3. Coordinate traffic control delays and requirements with CO to minimize traffic delays between ferry arrival and departure schedule times.
NOCA 156728 01 11 00 - 8
4. Verify changes in the ferry schedule and adjust traffic delays to accommodate ferry arrival and departure times throughout the entire project schedule.
5. Any temporary blockage of the SVR shall require written request and approval from CO 5 days in advance. Accommodate traffic according to the following schedule:
a. Non-ferry impact times (30 minutes following departure to 30 minutes prior to next scheduled arrival): 30 minute maximum delays permitted with CO approval.
b. Ferry impact times (between ferry arrival and departure): 15 minute maximum delays permitted with CO approval.
c. Contractor shall notify NPS Park Staff in advance of any blockage of the SVR so that NPS can notify businesses.
PUBLIC USE OF SITE
J. The WWTP, parking area and the road to the WWTP beyond the project entrance gates as shown on the Contract Document site plan will be closed to the public during construction. Closure of road leading to the WWTP to the Public may be permitted with CO written approval, however access to the existing private residence must be maintained at all times unless coordinated and approved by residence owner and CO. Access for Park Service staff is to be maintained at all times except for infrequent 15 minute periods as needed to complete construction. Contractor shall coordinate infrequent closures with CO ahead of time.
1.7 OCCUPANCY REQUIREMENTS FOR BUILIDINGS
A. Existing Buildings
1. Full Government Occupancy: Government will occupy buildings under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.
a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from CO.
b. Maintain existing building in weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and occupants during construction period.
B. New Buildings
1. Government Occupancy of Completed Areas of Construction: Government reserves right to occupy and to place and install equipment in completed areas of building, provided such occupancy does not interfere with completion of the Work. Such placement of equipment and partial occupancy shall not constitute acceptance of the entire project.
a. CO will prepare a Beneficial Occupancy letter for each specific portion of the Work to be occupied before Government occupancy.
b. Obtain a Certificate of Occupancy from National Park Service (NPS) before Government occupancy.
NOCA 156728 01 11 00 - 9
c. Before partial Government occupancy, mechanical and electrical systems shall be fully operational, and required tests and inspections shall be successfully completed.
On occupancy, Government will operate and maintain mechanical and electrical systems serving occupied portions of building.
d. On occupancy, Government will assume responsibility for maintenance and custodial service for occupied portions of building.
1.8 CONDUCT OF OPERATIONS
A. Contractor shall conduct their operations in conformance with rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by Park Superintendent.
B. Work on Federal holidays or at night may not be performed unless stated in the Work Restrictions below or without prior written approval from the CO. Submit requests 5 business days in advance of the work to the CO for approval.
C. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the CO.
1.9 WORK RESTRICTIONS
A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, except when otherwise indicated or with written approval from CO.
B. Existing Utilities
1. Existing Utilities:
a. Existing utilities shown on the Drawings are based on NPS provided data from previous projects. Utilities have been surveyed where visible from the surface.
b. Notify CO and utility companies of proposed locations and times for excavation.
c. Contractor shall be responsible for locating and preventing damage to known utilities. Perform sub-surface locates to verify existing utilities and identify Park owned utilities within the project limits.
1) The contract plans are prepared from multiple sources and represent the best information available, but are known to contain inaccurate data.
2) This work requires an “elevated level” of effort beyond simple verification of records. This shall include:
a) Broadening investigative areas to locate utilities shown on documents in acknowledgement that some record documents have been proven inaccurate.
b) Closely examine local surface features for indications of buried utilities may be present. Features may include surface depressions, pavement cuts/irregularities, pedestals, valves, visible services entrances to buildings, and other similar.
3) Park owned utilities include electrical service lines, water main pipes and service lines, storm and sanitary sewers, and other underground structures.
NOCA 156728 01 11 00 - 10
d. Prepare and submit accurate utility location plans for approval prior to commencing work.
2. If damage occurs, repair utility at no additional expense to the Government.
3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
1. Notify CO in writing not less than fourteen days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without CO’s written permission.
3. Hours and length of Utility Shutdowns to be determined on a case-by-case basis with the
CO.
4. Refer to Specification 01 73 40 for specific coordination requirements associated with water system outages, scheduling, and timing.
D. Nonsmoking Building: Smoking is not permitted within building or within 25 feet of entrances, operable windows, or outdoor air intakes.
1.10 SPECIAL CONSTRUCTION REQUIREMENTS
A. Construction Season: Range of time in which project work can occur.
1. Expected construction Season shall be from April through October.
1.11 SOILS INVESTIGATION REPORT
A. The following geotechnical reports have been prepared for this project:
1. Geotechnical Report, prepared by Shannon & Wilson, July 26, 2022
2. Geotechnical Data Report, prepared by Shannon & Wilson, October 6, 2022
B. Copies of the reports are available to all plan holders with this package.
C. In case of conflict between report and drawings or specifications, the drawings and specifications govern.
1.12 ADDITIONAL REPORTS
A. A survey titled “Good-Faith Regulated & Hazardous Materials Survey” has been prepared by Mountain Consulting Services, November 1st, 2022
B. A copy of the report is available to all plan holders with this package.
C. In case of conflict between report and drawings or specifications, drawings and specifications govern.
NOCA 156728 01 11 00 - 11
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01 11 00
NOCA 156728 01 26 01 - 1
112122 CONTRACT MODIFICATION PROCEDURES
SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section consists of administrative and procedural requirements for contract modifications.
1.2 DEFINITIONS AND ALLOWANCES
A. Home Office Overhead: Costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):
1. Rent
2. Utilities
3. Furnishings
4. Office equipment
5. Executive and management staff not exclusively assigned to the project
6. Support, accounting, and administrative staff
7. Preparation of cost proposals, estimating, and schedule analyses connected with
Modifications
8. Estimating and preconstruction services
9. Mortgage costs
10. Real estate and corporate taxes
11. Automobile maintenance and travel costs for home office personnel
12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.
13. Depreciation of equipment and other assets
14. Home office supplies (paper, staples, etc.)
15. Legal services
16. Accounting and data processing
17. Professional fees/registration
B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with preparation of modifications will not be allowed. Costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:
1. Project Manager (PM), Assistant Project Manager
2. Superintendent, Assistant Superintendent
3. Quality Control, Safety Officer, Environmental Manager, etc.
4. Engineers
5. Travel, lodging, and per diem (as established by Federal Travel Regulations)
6. Scheduling
NOCA 156728 01 26 01 - 2
7. Field Office Trailers and associated temporary utilities
8. Field office supplies
a. Mailing and couriers
b. Reproduction costs
c. Storage
d. Phones
e. Computers
f. Copiers
9. Personal vehicles i.e. Superintendent Pickup trucks
C. General Requirements: Costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate.
The following items, if applicable, are considered allowable costs for calculating General Requirements:
1. Hoisting
2. Material handling
3. Temporary fencing
4. Port-a-lets
5. Trash removal, dumpsters
6. Barricades
7. Small tools
8. Safety supplies
9. Scaffolding
10. Daily cleaning
11. Traffic control
12. Temporary signage
13. Temporary heating and power
D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on project site. Modification costs for salaried workers are only allowed within the structure of a 40-hour week and no overtime or holiday pay will be allowed.
1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:
a. Base Rate: The hourly rate paid directly to the worker
b. Labor Burden: Employer payments of all applicable burdens; includes insurance and taxes the business must pay on behalf of the worker to government entities and educational forums, such as:
1) Social Security
2) Medicare
3) Workers Compensation – Policy and company calculation to be made available.
4) Federal Unemployment Tax Act (FUTA) - Cap Rate and percentage to be proportionally allocated over one year.
5) State Unemployment Tax Act (SUTA) - Cap Rate and percentage to be proportionally allocated over one year.
NOCA 156728 01 26 01 - 3
6) Union agreement costs - Other costs required under an enforceable collective bargaining agreement.
c. Fringe Benefits: Various non-wage compensations provided to employees such as:
1) Health Care Insurance Premiums
2) Cell Phone
3) Clothing
4) 401K and Pensions
5) Vehicle allowances
6) Gas allowance
7) Life insurance premiums
8) Disability insurance
9) Other Fringe Benefits required under an enforceable collective bargaining agreement
E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.
F. General Liability Insurance: An insurance policy that protects Contractor from claims resulting from bodily injury or property damage to a third party. Include as a separate line item within all modification proposals and provide a current insurance quote upon request.
G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees the Contractor will pay the labor and material costs incurred. Banks and Insurance companies charge a premium for individual project based on a sliding scale related to the size of the project.
Include as a separate line item in modification proposals and provide current company bonding rates upon request.
H. Builder’s Risk Insurance: Covers the contractor’s loss due to fire, high winds, or other natural forces. Not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.
1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS
A. General:
1. Proposal be received in the format and within the time frame specified in the Request for Proposal (RFP) letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.
2. Proposal shall be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed they are included in the hourly rate shown, or contractor is not requesting reimbursement. Contractor may utilize the government provided Contractor Estimate Form, or their own form, provided that it contains the same information and level of detail as the Government’s form.
NOCA 156728 01 26 01 - 4
3. Requests for extensions of contract time as a result of change must be justified with a Time Impact Analysis (TIA). Refer to Section 01 32 16 "Construction Schedule", for time impact analysis requirements. TIA and associated costs shall be received with the proposal by the date shown within the Request for Proposal letter. Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving right for additional time and no time extension will be allowed.
4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer (CO) upon request.
5. Contractor shall review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to NPS. All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.
6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.
B. Labor:
1. Contractor shall estimate cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing hours required for each craft directly engaged in modification work. Any work proposed requiring overtime work or premium pay shall be itemized separately. Rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, Federal Insurance Contributions Act (FICA), FUTA, and other direct costs resulting from Federal, State or local laws.
2. Itemize labor costs for equipment operators separate from equipment costs.
3. Labor cost for foremen shall only be costs for related work required for the modification.
C. Materials:
1. Estimated cost for materials shall include quotes from multiple sources. Material prices shall include applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.
2. No markup shall be applied to any material provided by NPS.
D. Equipment:
1. Equipment used for the project must be appropriately sized for work being performed.
2. Do not include costs for "miscellaneous tools and equipment", in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 shall be broken out separately.
3. Regardless of ownership, rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:
a. United States (U.S.) Army Corps of Engineers, Ownership and Operating Expense Schedule (use latest edition and applicable region)
b. Construction Blue Book
c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.
NOCA 156728 01 26 01 - 5
4. Estimated equipment rates shall include operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires and tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per Federal Acquisition Regulation (FAR) 31.105(d)(2)), depreciation, storage, insurance, and all incidentals. Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.
5. Estimate full rate for equipment only for duration that equipment will be utilized to accomplish work of the modification.
6. Standby unit rates used in accordance with paragraph 1.3, D, 2, above. If the U.S. Army Corp of Engineers is utilized then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then 1/2 of equipment costs minus any operating costs, major repair and overhaul will be accepted.
7. If equipment is in standby mode due solely to a documented NPS delay, established standby rate shall apply from the first day of the delay.
8. Equipment not used and on job site for up to five consecutive days may be classified at standby rates, provided the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work.
Equipment still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.
9. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.
10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.
E. Establishment and Application of Overhead and Profit Percentages:
1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit.
Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31which have been applied to the specific type of work included in this project. Negotiated rates shall not exceed the following percentages for OH&P for contractor self-performed work:
Overhead………………9% Profit……………………10%
2. Total aggregate limit of markup (OH&P) for Contractor and Subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.
3. If Contractors form a partnership, partnership may only receive home office overhead and profit in same amount as an individual Contractor (refer to paragraph 1.3,E,1 above). It is the responsibility of the partners to decide on division of revenue.
4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, overhead and profit mark-ups are required on net increases and deducted on net decreases.
5. At no time can profit be calculated on Overhead or itself, it must be…