This document amends specifications for a recirculating textile filter system for the Stehekin Wastewater Treatment Plant. The specifications outline seasonal scenarios for limiting equipment operation to reduce the overall electric load at the plant. For summer operation from April 1 to October 31, no more than one feed pump, one small recirculation pump, two large recirculation pumps, one discharge pump, and one anoxic return pump can operate at a time, with a total of four pumps. The fan inlet heater cannot operate. For winter operation from November 1 to May 31, the same limits apply except large recirculation pumps cannot operate and the fan inlet heater cannot operate during pump operation. The amended specifications relate to solicitation number 140P2023R0131 from the National Park Service National Office for the Stehekin Wastewater Treatment Plant.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADD the following to Specification Section 46 53 25 – Recirculating Textile Filter System Article 2.8.D.
10. Limiting equipment operation to reduce the overall WWTP electric load per the following operator defined seasonal scenarios:
a. Summer Operation to be operator adjustable with a default of April 1 – October 31.
b. Winter Operation to be operator adjustable with a default of November 1 – May 31.
c. Summer Operation
1) Operation of no more than one RTF Feed Pump (PMP‐4411 and PMP‐4412) at any given time.
2) Operation of no more than one Small Recirculation Pump (PMP‐5111 and PMP‐ 5112) at any given time.
3) Operation of no more than two Large Recirculation Pumps (PMP‐5211, PMP‐5311, PMP‐5411, and PMP‐5511) at any given time.
4) Operation of no more than one RTF Discharge Pump (PMP‐5613 and PMP‐5614) at any given time.
5) Operation of no more than one Anoxic Return Pump (PMP‐5611 and PMP‐5612) at any given time.
6) Operation of no more than 4 pumps total at any given time. The order of priority is:
a) RTF Feed Pumps (PMP‐4411 and PMP‐4412)
b) RTF Discharge Pumps (PMP‐5613 and PMP‐5614)
c) Large Recirculation Pumps (PMP‐5211, PMP‐5311, PMP‐5411, and PMP‐5511)
d) Small Recirculation Pumps (PMP‐5111 and PMP‐5112
e) Anoxic Return Pumps (PMP‐5611 and PMP‐5612)
7) No operation of fan inlet heater (HTR‐5142).
d. Winter Operation
1) Operation of no more than one RTF Feed Pump (PMP‐4411 and PMP‐4412 at any given time.
2) Operation of no more than one Small Recirculation Pump (PMP‐5111 and PMP‐ 5112) at any given time.
3) No Operation of Large Recirculation Pumps (PMP‐5211, PMP‐5311, PMP‐5411, and
PMP‐5511).
4) Operation of no more than one RTF Discharge Pump (PMP‐5613 and PMP‐5614) at any given time.
5) Operation of no more than one Anoxic Return Pump (PMP‐5611 and PMP‐5612) at any given time.
6) No operation of fan inlet heater (HTR‐5142) during pump operation.