This package contains construction drawings for structural updates to the post-equalization tank at the Stehekin Wastewater Treatment Plant in North Cascades National Park. The drawings include plans and sections depicting a new concrete slab, access hatches, tank vent, stair and platform, shoring system, and rehabilitation of the tank interior. Revisions update two structural drawings and seven electrical drawings. The related federal contract opportunity is a solicitation from the National Park Service seeking a contractor to perform the work depicted in the drawings, specifically structural updates and electrical work at the Stehekin WWTP. The solicitation number is 140P2023R0131.

View the file

Other files

File Type Posted
Sol_140P2023R0131_Amd_0004.pdf PDF
B09_Amd_03_Attach_02_Solit_Clauses_Construction_REVISED_20230828_0003.docx DOCX document
Sol_140P2023R0131_Amd_0003.pdf PDF
B09_Amd_03_Attach_04_32_62_17_Driven_Steel_Sheet_Piling_Rev_1_0003.pdf PDF
B09_Amd_03_Attach_01_140P2023R0131_QA3_0003.xlsx XLSX spreadsheet
B09_Amd_03_Attach_03_01_27_00_Definition_of_Contract_Line_Items_Rev_1_0003.pdf PDF
B09_Amd_03_SF30_NOCA_156728_140P2023R0131_0003.pdf PDF
Sol_140P2023R0131_Amd_0002.pdf PDF
B09_Amd_02_Attach_04_Specification_40_61_96_correction_0002.pdf PDF
B09_Amd_02_Attach_10_Site_Visit_Tri_Fold_NOCA_156728_0002.docx DOCX document
B09_Amd_02_Attach_11_Site_Visit_Sign-in_0002.pdf PDF
B09_Amd_02_Attach_01_140P2023R0131_QA2_0002.xlsx XLSX spreadsheet
B09_Amd_02_Attach_07_26_09_13_Electrical_Metering_Devices_Rev_1_0002.pdf PDF
B09_Amd_02_SF30_NOCA_156728_140P2023R0131_0002.pdf PDF
B09_Amd_02_Attach_05_Specification__40_66_40_correction_0002.pdf PDF
B09_Amd_02_Attach_08_26_28_00_Overcurrent_and_Short_Circuit_Protective_Devices_Rev_1_0002.pdf PDF
B09_Amd_02_Attach_03_Specification_03_31_30_correction_0002.pdf PDF
B09_Amd_02_Attach_06_Specification__46_53_25_correction_0002.pdf PDF
B09_Amd_02_Attach_02_Specification_01_73_20_correction_0002.pdf PDF
B09_Amd_02_Attach_09_NOCA_STEHEKIN_Drawings_for_Rev_1_Electrical_Updates_08-10-2023_0002.pdf PDF
Sol_140P2023R0131_Amd_0001.pdf PDF
B09_Amd_01_SF30_NOCA_156728_140P2023R0131_0001.pdf PDF
B09_Amd_01_140P2023R0131_QA1s_0001.xlsx XLSX spreadsheet
B08_Attach_3_22_07_26_-_Final_Geo-tech_Report.pdf PDF
B08_Attach_9_Solit_PSP_Vol_II_GenRefs.doc DOC document
B08_Attach_2c_NOCA_156728_100__CD_Drawings_Part3.pdf PDF
B08_Attach_8_Solit_PSP_Vol_I_PastPerf_REQD.docx DOCX document
B08_Attach_2b_NOCA_156728_100__CD_Drawings_Part2.pdf PDF
B08_Attach_2a_NOCA_156728_100__CD_Drawings_Part1.pdf PDF
B08_SF_1442_140P2023R0131.pdf PDF
B08_Attach_7_Deliverables_LmtOnSubconRpt_REQ.xlsx XLSX spreadsheet
B08_Attach_6_Construction_Contract_Administration.docx DOCX document
Sol_140P2023R0131.pdf PDF
B08_Attach_4_22_10_06_-_Geotech_Report_for_Disposal_Field_Test_Pits_-r1.pdf PDF
B08_Attach_1_NOCA_156728_100___CD_Specifications.pdf PDF
B08_Attach_5_Const_WD_DBA_WA20230065.pdf PDF
B08_Attach_2d_NOCA_156728_100__CD_Drawings_Part4.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPROVED:

RECOMMENDED:

Superintendent

Project Manager

Date

Date

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

DEPARTMENT OF THE INTERIOR

UNITED STATES

NATIONAL PARK SERVICE

DENVER SERVICE CENTER STATEREGION COUNTY

LOCATION WITHIN PARK

NAME OF PARK

TITLE OF PROJECT

A u to d e s k D o c s /1

N P

S S te h e k in

W W

T P

/0

-G G e n e ra l.

rv t

/2

/2

:0

:4

P M

NORTH CASCADES NATIONAL PARK

156728

STEHEKIN WWTP -

PACIFIC WEST CHELAN WASHINGTON

100% DRAFT

CONSTRUCTION DOCUMENTS

STEHEKIN

Mark Sheet REVISION Date Initial

2 VARIES STRUCTURAL UPDATED, REPLACE SHEETS

03-S104 AND 03-S302

08/25/23 KJG

1 VARIES ELECTRICAL UPDATES, REPLACE SHEETS

01-Y101, 04-E101, 04-E105, 04-E601, 04-E602, 04-Y502, 04-Y601, 04-Y602, 04-Y603. ADD

SHEET 04-E605

08/10/23 KJG

D

03-S302

B

03-S302

E

Q R

IS

E

R S

T

/4

21'-0"

4' - 2" 11' - 0"

15' - 2"

5' - 6" 4' - 0" 1' - 6"

A

03-S302

C

03-S302

PRIMARY TANK

(BELOW)

PRIMARY TANK

(BELOW)

E

03-S302

POST-EQUALIZATION

TANK

1'-0" TYP

5TYP

ASCALE 3/8" = 1'-0"

2 0 2 64

SCALE OF FEET

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

TITLE OF SHEET

OFNORTH CASCADES NATIONAL PARK

A u to d e s k D o c s /1

N

P S

S te h e k in

W W

T P

/1

S

W

W T

P .r v t

/2

/2

:0

:2

P

M

S104 156728

WWTP YARD

POST-EQUALIZATION TANK

J. CORONADO

C. MULDERICK

R. NELSON 03-

A. COORDINATE THIS PLAN WITH

PROCESS AND CIVIL PLANS.

B. SUBGRADE PREPARATION PER

GEOTECHNICAL REPORT AND

SPECIFICATION 31 23 00.

C. ALUMINUM STAIR AND PLATFORM

DESIGNED GOVERENED PER

SPECIFICATION 05 50 00.

1 NEW 12" CONCRETE SLAB, REINF W/

#5 @ 12" EACH WAY, TOP AND

BOTTOM. PLACE SHORT BARS ON

OUTER LAYERS OF SLAB.

2 48"x48" HATCH PER SPECIFICATION 08 31 00.

3 SURFACE PREP TANK AND SEAL ALL

INTERIOR SURFACES PER

SPECIFICATION 09 96 00.

4 CONCRETE SLAB OVER PRIMARY

AND PRE-ANOXIC TANKS, REFER TO

CIVIL SHEET 02-C506 FOR EXTENTS,

LOCATION, AND DETAILS.

5 ACCESS HATCHES, SEE 03-D101.

6 TANK VENT, SEE DETAIL 4/00-D503.

CENTER ALONG THE E-W SLAB

DIMENSION.

7 EXISTING RETAINING WALL TO

REMAIN IN PLACE.

8 PRIOR TO EXCAVATION FOR THE

BURIED PRIMARY TANKS,

CONTRACTOR TO DESIGN AND

INSTALL SHORING SYSTEM TO NOT

UNDERMINE THE EXISTING

FOUNDATIONS OF THE RETAINING

WALL AND THE POST-EQ TANK.

KEY NOTES X

GENERAL NOTES

REV 2 STRUCTURAL UPDATED 08/25/20232

08/25/2023

TOP OF TANK

1175.70

03-S502

TOP OF TANK

EL 1175.70

FLUSH STAIR

LANDING TO

TOP OF SLAB

TOP OF TANK

1175.70

5'-0"

TOP OF TANK

EL 1175.70

FIELD VERIFY STRINGER

ANCHOR LOCATIONS

TOP OF TANK

1175.70

TOP OF TANK

EL 1175.70

POST-EQUALIZATION

TANK

TOP OF TANK

1175.70

TOP OF TANK

EL 1175.70

TYP

POST-EQUALIZATION

TANK

MIN

3'-0"

PRIMARY TANKPRIMARY TANK

TOS

EL 1150.39

DRY BED FND

EL 1150.39

TOS

EL 1163.00

ASCALE 3/8" = 1'-0"

2 0 2 64

SCALE OF FEET

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

TITLE OF SHEET

OFNORTH CASCADES NATIONAL PARK

A u to d e s k D o c s /1

N

P S

S te h e k in

W W

T P

/1

S

W

W T

P .r v t

/2

/2

:0

:2

P

M

S302 156728

WWTP YARD

POST-EQUALIZATION TANK

SECTIONS 2

J. CORONADO

C. MULDERICK

R. NELSON 03-

SCALE A03-S302

A SECTION

SCALE A03-S302

B SECTION

SCALE A03-S104

D SECTION

SCALE A03-S302

C SECTION

A. COORDINATE THIS PLAN WITH

PROCESS AND CIVIL PLANS.

B. ALUMINUM STAIR AND PLATFORM

DESIGNED GOVERENED PER

SPECIFICATION 05 50 00.

1 CONC SLAB PER PLAN.

2 ALUMINUM GUARDRAIL PER

SPECIFICATION 05 52 46.

3 REHABILITATE INTERIOR SURFACE

AND COAT INTERIOR PER

SPECIFICATION 03 35 00.

4 CONCRETE SLAB OVER PRIMARY

AND PRE-ANOXIC TANKS, SEE

02-C506.

5 8" TANK SLABS SIM TO DETAIL

2/03-S501 IN A TWO POUR

SEQUENCE.

6 SHORING WALL SYSTEM, SEE PLAN.

SCALE A03-S302

E SECTION

KEY NOTES X

GENERAL NOTES

REV 2 STRUCTURAL UPDATED 08/25/20232

08/25/2023

00-G_General-Cover Rev2
00-G001 - COVER SHEET
10350902_04_S_WWTP - Structural Updates
03-S104 - WWTP YARD POST-EQUALIZATION TANK
03-S302 - WWTP YARD POST-EQUALIZATION TANK SECTIONS 2

File details come from the government source that posted it. Updated .