B08_Attach_2_MORA_313019_331809_312439_Final_Drawings_Part4.pdf

PDF 2 MB Posted

Attached to
MORA/ 313019A, 312439 & 313809, Rehabilitate Ohana
Solicitation number
140P2024R0077
Issued by

About this file

This document appears to be a set of technical drawings and specifications for the electrical work required as part of the Rehabilitate Ohanapecosh Campground project at Mount Rainier National Park. The key details are:

The electrical contractor (EC) shall furnish and install a new 7.2kV/120/240V, 1-phase, pad-mounted transformer, including all primary cabling, trenching/backfilling, and secondary connections. The EC shall also provide new medium voltage primary electrical conduit and conductors between the existing electrical vault and the new transformer, and between the new transformers. The work is part of the larger MORA/ 313019A, 312439 & 313809 project to rehabilitate the Ohanapecosh Campground, which is being solicited by the National Park Service. The period of performance is from 06/21/2024 to 07/31/2024.

View the file

Other files

File Type Posted
B09_Amd_9_2024_Quarry_Survey_Summary__0009.docx DOCX document
Sol_140P2024R0077_Amd_0009.pdf PDF
Sol_140P2024R0077_Amd_0008.pdf PDF
B09_AMD_7_Attach_(4)_20240813-Enclosure4_CertComp_0007.pdf PDF
B09_AMD_7_Attach_(6)_20240813-NWPVerifLtr-NWS-2024-570_0007.pdf PDF
B09_AMD_7_Attach_(1)_019-GC10_Amendment_07_0007.pdf PDF
B09_AMD_7_Attach_(2)_20240813-Enclosure1-PmtDrawings_NWS-2024-570_0007.pdf PDF
B09_AMD_7_Attach_(5)_20240813-Enclosure302021-NWP18_0007.pdf PDF
B09_AMD_7_Attach_(3)_20240813-Enclosure2_2021-NWP03_0007.pdf PDF
Sol_140P2024R0077_Amd_0007.pdf PDF
B09_AMD_6_Attach_(2)_MORA_HazMat_051523_REV1_FTC_0006.pdf PDF
Sol_140P2024R0077_Amd_0006.pdf PDF
B09_AMD_6_Attach_(1)_MORA_Amphitheater_Drain_Exhibit_0006.pdf PDF
B09_AMD_6_Attach_(3)_MORA_20-GC10_0006.pdf PDF
Sol_140P2024R0077_Amd_0005.pdf PDF
B09_Amd_4_Attach_1_33_40_00_-_Storm_Drainage_0004.pdf PDF
B09_Amd_4_Attach_3c_IMG_0890_0004.jpg JPG image
B09_Amd_4_Attach_2_33_31_13_-_Site_Sanitary_Sewerage_Gravity_Piping_0004.pdf PDF
B09_Amd_4_Attach_3a_IMG_0888_0004.jpg JPG image
B09_Amd_4_Attach_3d_IMG_0891_0004.jpg JPG image
B09_Amd_4_Attach_3b_IMG_0889_0004.jpg JPG image
Sol_140P2024R0077_Amd_0004.pdf PDF
Sol_140P2024R0077_Amd_0003.pdf PDF
B09_AMEND_02_Attach_(5)_31_20_00_-_Earth_Moving_MORA_Ohana_AMEND02_0002.pdf PDF
Sol_140P2024R0077_Amd_0002.pdf PDF
B09_AMEND_02_Attach_(3)_01_32_16-ConstructionSchedule_MORA_Ohana_AMEND02_0002.pdf PDF
B09_AMEND_02_Attach_(2)_01_11_00-SummaryOfWork_MORA_Ohana_AMEND02_0002.pdf PDF
B09_AMEND_02_Attach_(6)_Revised_drawing_sheets_MORA_Ohana_AMEND02_0002.pdf PDF
B09_AMEND_02_Attach_(4)_01_50_00_TemporaryFacilitiesAndControls_MORA_Ohana_AMEND02_0002.pdf PDF
B09_AMEND_02_Attach_(1)_00_01_10-1_MORA_Ohana_AMEND02_0002.pdf PDF
B11_Preproposal_SignIn_(3)_0001.pdf PDF
B11_Preproposal_SignIn_(1)_0001.pdf PDF
B11_Preproposal_SignIn_(2)_0001.pdf PDF
B11__Site_Visit_Tri_Fold_MORA_Ohanapecosh_0001.docx DOCX document
Sol_140P2024R0077_Amd_0001.pdf PDF
B08_Attach_2_MORA_313019_331809_312439_Final_Drawings_Part1.pdf PDF
B08_Attach_2_MORA_313019_331809_312439_Final_Drawings_Part3.pdf PDF
B08_Attach_6_Solit_PSP_Vol_I_PastPerf_REQD(1).docx DOCX document
B08_Attach_1_MORA_313019_331809_312439_Final_Specifications_App_B.pdf PDF
B08_Attach_2_MORA_313019_331809_312439_Final_Drawings_Part2.pdf PDF
Sol_140P2024R0077.pdf PDF
B08_Attach_1_MORA_313019_331809_312439_Final_Specifications.pdf PDF
B08_Attach_1_MORA_313019_331809_312439_Final_Specifications_App_A.pdf PDF
B08_Attach_5_Solit_PSP_Vol_I_Exp_REQD.docx DOCX document
B08_Attach_7_Construction_Contract_Administration.docx DOCX document
B08_Attach_3_WD_WA20240051_20240524.pdf PDF
B08_Attach_4_Deliverables_LmtOnSubconRpt_REQD.xlsx XLSX spreadsheet
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S

S

P

P

P

S

S

S

S

S

APPROXIMATE LOCATION OF NEW 7.2kV/120/240V, 1-PHASE, PAD MOUNTED

TRANSFORMER. EC SHALL FURNISH AND INSTALL TRANSFORMER AS WELL AS ALL

PRIMARY CABLING BETWEEN THE DISTRIBUTION POINT AND THE PRIMARY CONNECTION

POINT AT THE TRANSFORMER. ALL PRIMARY TRENCHING/BACKFILLING BETWEEN

DISTRIBUTION POINT AND THE TRANSFORMER SHALL BE FURNISHED/INSTALLED BY THE

EC. THE EC SHALL PERFORM ALL TRENCHING AND BACKFILLING ON THE SECONDARY

SIDE OF THE TRANSFORMER. EC SHALL MAKE ALL CONNECTIONS OF SECONDARY

CABLING AT THE TRANSFORMER LANDINGS. THE EC SHALL FURNISH AND INSTALL THE

REQUIRED TRANSFORMER VAULT BASIS OF DESIGN OLD CASTLE INFRASTRUCTURE

504-LA OR APPROVED EQUAL AS COORDINATED WITH CO. REFER TO ELECTRICAL

ONE-LINE DIAGRAM FOR MORE INFORMATION.

EC SHALL PROVIDE NEW MEDIUM VOLTAGE PRIMARY ELECTRICAL CONDUIT AND

CONDUCTORS BETWEEN EXISTING ELECTRICAL VAULT AND NEW TRANSFORMER.

ELECTRICAL SHALL SHARE TRENCH WITH WATER LINES WHERE POSSIBLE. REFER TO

ELECTRICAL ONE-LINE DIAGRAM FOR MORE INFORMATION.

EC SHALL PROVIDE NEW MEDIUM VOLTAGE PRIMARY ELECTRICAL CONDUIT AND

CONDUCTORS BETWEEN NEW TRANSFORMERS. ELECTRICAL TO SHARE TRENCH WITH

WATER LINES WHERE POSSIBLE. REFER TO ELECTRICAL ONE-LINE DIAGRAM AND CIVIL

DRAWING DETAILS SHEET 00-G4.0 FOR MORE INFORMATION.

EC SHALL TIE IN 7.2kV 1PH MEDIUM VOLTAGE CONNECTION IN EXISTING VAULT 9.

PROVIDE NEW 4 SPACE LOADBREAK JUNCTION, ARRESTORS AND CONNECTIONS FOR A

COMPLETE INSTALLATION.

TITLE OF SHEETSUB SHEET NO.

DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF

A

M J

N

P

M

O R

A

O h a n a p e c o s h

C a m p g r o u n d E l e c E

E l e c t r i c a l

S i t e

P l a n

L o o p

E

H d w g

AE DESIGN

REHABILITATE OHANAPECOSH CAMPGROUND

MOUNT RAINIER NATIONAL PARK

192077

313019, 331809, & 312439

BJLV, KMD

BJJ

06/28/2024 562

ELECTRICAL SITE PLAN

LOOP E & H21-

E004

BASE SCOPE: ALL WORK ON THIS SHEET UON

06/21/2024 07/31/2024

VOL.X -UTILITIES - MORA 313019 331809 312439 100% CD
21-ELECT
21- E004 - ELECTRICAL SITE PLAN LOOP E & H