This document is a letter from the U.S. Army Corps of Engineers, Seattle District, to the National Park Service, Mount Rainier National Park, regarding a nationwide permit authorization for work on the Ohanapecosh Campground sewer line and weir.
The letter states that the Army Corps has reviewed the National Park Service's application to discharge dredged or fill material and remove an existing weir structure within wetland and stream areas at the Ohanapecosh Campground. The Corps has determined that Nationwide Permits 3 (Maintenance) and 18 (Minor Discharges) authorize the proposed work, provided it is performed in accordance with the terms and conditions of those permits. The Corps has completed the required environmental consultations under the Endangered Species Act and National Historic Preservation Act. The authorization is valid until March 14, 2026, and the National Park Service must comply with all permit conditions. The letter provides instructions for submitting a compliance report upon project completion.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS, SEATTLE DISTRICT
4735 EAST MARGINAL WAY SOUTH, BLDG 1202
SEATTLE, WA 98134-2388
Regulatory Branch August 13, 2024
Greg Dudgeon National Park Service, Mount Rainier National Park 55210 238th Avenue E Ashford, Washington 98304
Reference: NWS-2024-570 National Park Service, Ohanapecosh Campground, sewer line and weir
Dear Mr. Dudgeon:
We have reviewed your application to discharge up to 18 cubic yards of dredged or fill material and large wood within 774 square feet of Wetland 17 and 504 square feet of area waterward of the ordinary high water mark of Stream 5 all off 205 Ohanapecosh Road at Packwood, Washington in order to replace an existing sewer line and remove an existing weir structure. Based on the information you provided to us, Nationwide Permits (NWP) 3, Maintenance and 18, Minor Discharges (Federal Register December 27, 2021 Vol. 86, No. 245), authorizes your proposal as depicted on the enclosed drawings dated June 17, 2024.
In order for this authorization to be valid, you must ensure the work is performed in accordance with the enclosed NWP’s 3 and 18, Terms and Conditions.
We have reviewed your project pursuant to the requirements of the Endangered Species Act, the Magnuson-Stevens Fishery Conservation and Management Act and the National Historic Preservation Act. We have determined this project complies with the requirements of these laws provided you comply with all of the permit general and special conditions.
The National Park Service completed National Historic Preservation Act (NHPA) and Section 7 Endangered Species Act (ESA) consultations for the proposed activities (U.S. Fish and Wildlife Service reference number 2023-0057170). For the purpose of this Department of the Army authorization, we have determined this project will comply with the requirements of these laws provided you comply with all of the permit conditions. We have determined the permit action is sufficiently addressed in their ESA
-2-and NHPA consultation documents. By this letter we are advising you and the U.S. Fish and Wildlife Service, in accordance with 50 CFR 402.07 and 50 CFR 600.920(b), that this agency has served as the lead Federal agency for the ESA consultation responsibility for the activities described above.
Please note that National General Condition 21, Discovery of Previously Unknown Remains and Artifacts, found in the Nationwide Permit Terms and Conditions enclosure, details procedures that must be followed should an inadvertent discovery occur. You must ensure that you comply with this condition during the construction of your project.
The authorized work complies with the U.S. Environmental Protection Agency’s (EPA) Water Quality Certification (WQC) requirements for these NWPs. No further coordination with EPA for WQC is required.
You have not requested a jurisdictional determination for this proposed project. If you believe the U.S. Army Corps of Engineers does not have jurisdiction over all or portions of your project you may request a preliminary or approved jurisdictional determination (JD). If one is requested, please be aware that we may require the submittal of additional information to complete the JD and work authorized in this letter may not occur until the JD has been completed.
Our verification of this NWP authorization is valid until March 14, 2026, unless the
NWP is modified, reissued, or revoked prior to that date. If the authorized work for the NWP authorization has not been completed by that date and you have commenced or are under contract to commence this activity before March 14, 2026, you will have until March 14, 2027, to complete the activity under the enclosed terms and conditions of this NWP. Failure to comply with all terms and conditions of this NWP verification invalidates this authorization and could result in a violation of Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act. You must also obtain all local, State, and other Federal permits that apply to this project.
Upon completing the authorized work, you must fill out and return the enclosed
Certificate of Compliance with Department of the Army Permit. All compliance reports should be submitted to the U.S. Army Corps of Engineers, Seattle District, Regulatory Branch electronically at nws.compliance@usace.army.mil. Thank you for your cooperation during the permitting process. We are interested in your experience with our Regulatory Program and encourage you to complete a customer service survey.
Referenced documents and information about our program are available on our website at www.nws.usace.army.mil, select “Regulatory Permit Information”. A copy of this letter with enclosures will be furnished to your agent, Jeff Gray at jeff.gray@otak.com. If you
-3-have any questions, please contact me at brad.a.johnson2@usace.army.mil or (503) 278-1845.
Sincerely, Brad A. Johnson, Project Manager Regulatory Branch