B08_Attach_1_MORA_313019_331809_312439_Final_Specifications.pdf
PDF 17 MB Posted
- Solicitation number
- 140P2024R0077
About this file
This document appears to be the Final Specifications for the Rehabilitation of the Ohanapecosh Campground, which is part of a larger federal contract opportunity solicitation.
The key details are: The solicitation number is 140P2024R0077, the project is titled "MORA/ 313019A, 312439 & 313809, Rehabilitate Ohanapecosh Campground", and it is being issued by the Department of the Interior National Park Service. The document provides the detailed technical specifications for the rehabilitation work required, including site work, utilities, buildings, and campsite improvements. No specific pricing, response dates, or award information is included in this particular attachment. This appears to be a technical specifications document rather than the full solicitation package.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rehabilitate Ohanapecosh Campground PMIS 313019
Upgrade Utilities at Ohanapecosh Campground PMIS 312439
Electrical Utility Rehabilitation PMIS 331809
Mount Rainier National Park - MORA
Title II – Design Development and Construction Document Services
Project Location: Packwood, Washington
Project Specifications Divisions 01-33
FINAL CD – 06/28/2024
MORA 313019 / 331809 / 312439 00 01 07 - 1
SEALS PAGE
SECTION 00 01 07 - SEALS PAGE
PART 1 - GENERAL
1.1 SUMMARY
A. Professional seals by Design Professionals and others responsible for preparing Construction
Documents:
1. Architect (for Sections 02 42 96, 04 03 42, 06 03 12, 06 40 13, 06 40 23, 06 64 00, Divisions
7, 8, 9, and Sections 10 14 23, 10 21 13.43, 10 28 00, 12 36 61.19):
2. Civil Engineer
MORA 313019 / 331809 / 312439 00 01 07 - 2
3. Landscape Architect
4. Structural Engineer:
MORA 313019 / 331809 / 312439 00 01 07 - 3
5. Mechanical Engineer:
6. Electrical Engineer:
06/21/2024 07/31/2024
MORA 313019 / 331809 / 312439 00 01 07 - 4
End of Section 00 01 07
MORA 313019 / 331809 / 312439 00 01 10-1
TABLE OF CONTENTS
SECTION 00 01 10 - TABLE OF CONTENTS
00 01 07 Seals Page
00 01 10 Table of Contents
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work
01 26 01 Contract Modification Procedures
01 27 00 Definition of Contract Line Items
01 31 00 Project Management & Coordination
01 32 16 Construction Schedule
01 32 33 Photographic Documentation
01 33 23 Submittal Procedures
01 35 13.22 Archeological and Historical Resource Protection
01 35 23 Safety Requirements
01 35 91 Historic Preservation Treatment Procedures
01 40 00 Quality Requirements
01 42 00 Reference Standards
01 50 00 Temporary Facilities and Controls
01 57 19.11 Indoor Air Quality (IAQ) Management
01 57 19.12 Noise & Acoustics Management
01 57 23 Temporary Storm Water Pollution Prevention (SWPP)
01 67 00 Product Requirements
01 73 29 Cutting and Patching
01 73 40 Execution
01 74 19 Construction Waste Management and Disposal
01 77 00 Closeout Procedures
01 78 23 Operation and Maintenance (O&M) Data
01 81 13 Sustainable Design Requirements
DIVISION 02 - EXISTING CONDITIONS
02 41 13 Selective Site Demolition
02 42 96 Historic Removal and Dismantling
02 81 01 Off Site Transportation and Disposal
02 82 13 Asbestos Abatement
02 83 33 Removal and Disposal of Material Containing Lead
02 84 16 Handling of Light Ballast Containing PCBS and Devices/Lamps Containing Mercury
DIVISION 03 - CONCRETE
03 20 00 Concrete Reinforcing
03 30 00 Cast in Place Concrete
DIVISION 04 – MASONRY
04 01 40.91 Site Stone Restoration
04 03 42 Historic Stone Masonry Repair
04 34 00 Site Stone Masonry
MORA 313019 / 331809 / 312439 00 01 10-2
DIVISION 05 – METALS
05 52 13 Pipe and Tube Railings
DIVISION 06 - WOOD, PLASTICS, & COMPOSITES
06 03 12 Historic Wood Repair
06 10 00 Rough Carpentry
06 10 63 Exterior Wood Carpentry
06 16 00 Sheathing
06 40 13 Exterior Architectural Woodwork
06 40 23 Interior Architectural Woodwork
06 64 00 Plastic Paneling
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 31 29 Wood Shingle Roofing
07 41 13.16 Standing Seam Metal Roof Panels
07 62 00 Sheet Metal Flashing and Trim
07 92 00 Joint Sealants
DIVISION 08 - OPENINGS
08 03 14 Historic Treatment of Wood Doors
08 03 51.33 Historic Treatment of Aluminum Windows
08 03 52 Historic Treatment of Wood Windows
08 71 00 Door Hardware
DIVISION 09 - FINISHES
09 29 00 Gypsum Board
09 67 23 Resinous Flooring
09 91 00 Exterior Painting Pipe and Tube Railings
09 91 13 Exterior Painting and Staining
09 91 23 Interior Painting and Sealers
DIVISION 10 - SPECIALTIES
10 14 23 Panel Signage
10 15 50 Phenolic-Core Pedestal-Mounted Privacy Toilet Compartments
10 28 00 Toilet Accessories
10 81 19 Rodent and Bird Control
DIVISION 11 – EQUIPMENT – Not Used
DIVISION 12 - FURNISHINGS
12 36 61.19 Quartz Agglomerate Countertops
DIVISION 13 – SPECIAL CONSTRUCTION – not used
MORA 313019 / 331809 / 312439 00 01 10-3
DIVISION 14 – CONVEYING EQUIPMENT – not used
DIVISION 21 – FIRE SUPPRESSION – not used
DIVISION 22 – PLUMBING
22 05 00 Common Work Results for Plumbing
22 05 17 Sleeves and Sleeve Seals for Plumbing Piping
22 05 18 Escutcheons for Plumbing Piping
22 05 19 Meters and Gages for Plumbing Piping
22 05 23 .12 Ball Valves for Plumbing Piping
22 05 29 Hangers and Supports for Plumbing Piping and Equipment
22 05 48 Vibration and Seismic Controls for Plumbing Piping and Equipment
22 05 53 Identification for Plumbing Piping and Equipment
22 07 19 Plumbing Piping Insulation
22 11 16 Domestic Water Piping
22 11 19 Domestic Water Piping Specialties
22 13 16 Sanitary Waste and Vent Piping
22 13 19 Sanitary Waste Piping Specialties
22 33 00 Electric, Domestic-Water Heaters
22 42 13.13 Commercial Water Closets
22 42 13.16 Commercial Urinals
22 42 16.13 Commercial Lavatories
22 42 16.16 Commercial Sinks
DIVISION 23 - HEATING, VENTILATION AND AIR CONDITIONING
23 05 00 Common Work Results for HVAC………………………………………………………
23 05 48 Vibration and Seismic Controls for HVAC
23 31 13 Metal Ducts
23 37 13.23 Registers and Grilles
DIVISION 26 – ELECTRICAL
26 05 00 Common Work Results for Electrical………………………………………………………
26 05 13 Medium-Voltage Cables …………………………………….……….……….…………….
26 05 19 Low-Voltage Electrical Power Conductors and Cables…………………………………….
26 05 26 Grounding and Bonding for Electrical Systems…………………………………………….
26 05 29 Hangers and Supports for Electrical Systems……………………………………………….
26 05 33 Raceway and Boxes for Electrical Systems…………………………………………………
26 05 48 Vibration and Seismic Controls for Electrical Systems………………………………………
26 05 53 Identification for Electrical Systems…………………………………………………………
26 08 00 Commissioning for Electrical Systems………………………………………………………
26 09 23 Lighting Control Device…………………...…………………………………………………
26 12 19 Pad Mounted, Liquid-Filled, Medium-Voltage Transformers.……….………………………
MORA 313019 / 331809 / 312439 00 01 10-4
26 24 16 Panelboards………………………………………………………………………………….
26 27 13 Electricity Metering
26 27 26 Wiring Devices
26 28 16 Enclosed Switches and Circuit Breakers
26 43 13 Transient-Voltage Suppression (Surge Protection) for Low-Voltage Electrical Power Circuits
26 51 00 Lighting Fixtures
DIVISION 27 – COMMUNICATIONS – Not Used
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY – Not Used
DIVISION 31 – EARTHWORK
31 10 00 Site Clearing
31 20 00 Earth Moving
31 25 00 Erosion and Sediment Control
31 32 19 Geotextile Soil Stabilization
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 12 16 Asphalt Paving
32 13 20 Site Concrete
32 15 40 Stabilized Aggregate
32 17 00 Paving Specialties
32 17 26 Tactile Warning Surfacing
32 33 00 Site Furnishings
32 40 00 Tree and Vegetation Retention and Protection
DIVISION 33 - UTILITIES
33 14 16 Site Water Utility Distribution
33 31 13 Site Sanitary Sewerage Gravity Piping
33 40 00 Storm Drainage
APPENDICES
APPENDIX A: Revised Hazardous Materials Assessment Report for 11 Buildings at the Ohanapecosh
Campground at Mount Rainier National Park in Washington 98377 (Landmark Environmental, May 2023)
APPENDIX B: Mortar Analysis - Mount Rainier National Park: Rustic Comfort Stations (Barlow Cultural
Resource Consulting, LLC, December 2021)
END OF SECTION 00 01 10
MORA 313019 / 331809 / 312439 01 11 00 - 1
112723 SUMMARY OF WORK
SECTION 01 11 00 - SUMMARY OF WORK
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes the following:
Section 1.2: Work Covered by Contract Documents
Section 1.3: Work Phases
Section 1.4: Government-Furnished Materials
Section 1.5: Government Performed Scope
Section 1.6: Construction Contractor Use of Site
Section 1.7: Public Use of Site
Section 1.8: Occupancy Requirements for Buildings
Section 1.9: Conduct of Operations
Section 1.10: Work Restrictions
Section 1.11: Protection of Existing Vegetation, Structures, Equipment, Utilities, Improvements
Section 1.12: Protection Of Special Status Species
Section 1.13: Special Construction Requirements
Section 1.14: Hazardous Materials Report
Section 1.15: Mortar Analysis
1.2 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Location: Mount Rainier National Park, Ohanapecosh Campground, southeast side of the park, 11 miles northeast of Packwood, Washington. Accessed off State Road (SR) 123.
B. The Base Scope of Work consists of (see also 00-G006):
1. MORA 313019 – Campsite and Comfort Station Rehabilitation and ABAAS Upgrades at
Loops A (O-304, O-305), C (O-303), and D (O-306) and ABAAS Upgrades at the Visitor
Center
a. Includes rehabilitation of campsites at Loops A, C, and D – regrading, improvements to parking spurs and campsites, removal and replacement of campsite signs, bollards, pedestrian paths, tent pads, repair/replacement of site furnishings, select removal of vegetation, erosion control of impacted areas, and placement of logs and boulders and tree and vegetation protection.
b. Includes rehabilitation of comfort stations O-303, O-304, O-305 and O-306 – replacement of select finishes, repair/replacement of concrete slab, installation of a new concrete slab-on-grade and floor drain in the utility chase, replacement of the water lines, replacement of plumbing, light fixtures and toilet partitions, rehabilitation/replacement of lavatories, rehabilitation of log structure and stone masonry, improvements to wood structure, rehabilitation of wood and aluminum windows, and replacement of wood shingle and standing seam metal roofing and flashing.
MORA 313019 / 331809 / 312439 01 11 00 - 2
c. Includes rehabilitation of wood privacy screens and existing water stations is included. Due to changes to water line entry in MORA 312439 scope, revisions to water supply in Comfort Station O-307 are included. Also includes addition of accessible concrete parking and pedestrian paths, and water stations, at select comfort stations (O-303, O-304, and O-306), ABAAS campsites, day use areas for
Loops A and C, the visitor center, and the associated erosion control of these sites.
Parking for park maintenance vehicles and various site work elements only occur as described in the drawings at Loops A, C. and D.
d. Also includes rehabilitation of the paving and parking at the Visitor Center – regrading, addition of ABAAS parking spaces and concrete ramps, and new concrete ramp and stairs with painted steel handrails, new concrete paving, removal and salvage of existing vegetation and reinstallation of salvage soil and vegetation.
2. MORA 313019 Campsite and Comfort Station Rehabilitation and ABAAS Upgrades at
Loop B (O-302)
a. Includes rehabilitation of campsites at Loop B – regrading, improvements to parking spurs and campsites, removal and replacement of campsite signs, bollards, pedestrian paths, tent pads, repair /replacement of site furnishings, select removal of vegetation and select removal, salvage and reinstallation of select vegetation , erosion control of impacted areas, and placement of logs and boulders and tree and vegetation protection.
b. Includes rehabilitation and ABAAS upgrades of Comfort Station O-302 – replacement of select finishes, repair/replacement of concrete slab, installation of a new concrete slab-on-grade and floor drain in the utility chase, replacement of the water lines, replacement of plumbing, light fixtures and toilet partitions, rehabilitation/replacement of lavatories, rehabilitation of log structure and stone masonry, improvements to wood structure, rehabilitation of wood windows, and replacement of wood shingle roofing and flashing.
c. Includes repair/rehabilitation of wood privacy screens and existing water stations and addition of accessible concrete parking and pedestrian path, water station, and stone walls, ABAAS campsites, day use areas for Loop B, and the associated erosion control of these sites. Parking for park maintenance vehicles and various site work elements only occur as described in the drawings at Loop B.
3. MORA 312439 – Sanitary Utility Rehabilitation and Select Sanitary Sewer Demolition
a. Includes replacement of sanitary sewer lines with primarily new locations, select removal of old sanitary sewer lines, abandonment of sanitary sewer manholes, select abandonment of old sanitary sewer, removal of existing concrete weir and associated stream restoration, and erosion control of impacted areas and tree and vegetation protection.
4. MORA 331809 – Electric Utility Rehabilitation
a. Includes new primary electrical conductors and conduits are to be provided underground from the existing to remain pull box to transformers located throughout loops E, G, and H. Trenching for new water lines is to be used where possible. Three transformers located at Comfort Stations O-307, O-308 and O-310 are to be replaced with new transformers. Also includes provision of electrical service to a new host site, and erosion control of impacted areas and tree and vegetation protection.
MORA 313019 / 331809 / 312439 01 11 00 - 3
5. Tree Removal
a. Includes the felling of select trees. Number and location of trees per the Drawings
(01-GL1.7 provides a summary). Includes contractor marking and flagging of trees to be removed to be reviewed by CO and park staff prior to any staging or removal.
All work within identified laminated root rot zones shall follow practices indicated in the Drawings and Specifications, and in consultation with park staff to avoid the spread of disease. Tree removal shall be limited to only what is needed to meet project objectives, and to meet accessibility and safety requirements.
C. The Bid Option Work includes (see also 00-G006):
1. Option A, MORA 313019 – Rehabilitation of Comfort Stations at Loops E (O-310), F (O-
309), G (O-307), and H (O-308).
a. Includes rehabilitation of comfort stations at Loops E (O-310), F (O-309), G (O-
307), and H (O-308), including: replacement of select finishes, repair/replacement of concrete slab, installation of a new concrete slab-on-grade and floor drain in the utility chase, replacement of the water lines, replacement of plumbing, light fixtures, and toilet partitions, rehabilitation/replacement of lavatories, rehabilitation of board and batten wood finish, rehabilitation/repair of wood structure, rehabilitation of aluminum windows, and replacement of standing seam metal roofing and flashing.
This also includes the rehabilitation of the site through regrading, pedestrian access routes, maintenance vehicle parking, new stone walls, new stairs with painted steel handrails, rehabilitation of water stations, select removal, salvage and reinstallation of select vegetation, and associated erosion control, and tree and vegetation protection.
2. Option B, MORA 313019 – Rehabilitation of Campsites at Loops E, F, G, and H and Day
Use Area at Loop D
a. Includes rehabilitation of campsites at Loops E, F, G, and H, including regrading, improvements to parking spurs, and campsites, removal and replacement of campsite signs, bollards, pedestrian paths, tent pads, repair/replacement of site furnishings, select removal of vegetation, select removal, salvage and reinstallation of select vegetation, erosion control of impacted areas, and placement of logs and boulders. This item also includes the addition of accessible concrete parking at the day use area at Loop D.
3. Option C, MORA 313019 – Rehabilitation and ABAAS Upgrades at Amphitheater and
ABA ORAR Paths to Amphitheater.
a. Includes work at and around the amphitheater: a new concrete accessible ramp with painted steel metal guard/handrails, repair of metal bench supports and pier repair/replacement or removal, installation of new wood bench planks, regrading for accessibility, erosion control of impacted areas, replacement and new asphalt paving, replacement of wood handrail and guards inside building, rehabilitation/repair of wood structure, replacement of overhead screen cover, rehabilitation of board and batten wood finish, and replacement of standing seam metal roofing and flashing. Also includes new stone walls and stone steps and repair of existing stone edge, and tree and vegetation protection. This item also includes the addition of accessible concrete parking at the amphitheater.
4. OPTION D, MORA 313019 – ABAAS Upgrades at Comfort Stations at Loops E (O-310), F (O-309), G (O-307, building only), and H (O-308, building only).
a. Includes accessibility upgrades to comfort stations at Loops E (O-310), F (O-309), G (O-307), and H (O-308), including reconfiguration of the doors and door frames, a different fixture and toilet partition layout from Contract Line Item 0006, and
MORA 313019 / 331809 / 312439 01 11 00 - 4
b. Sitework includes accessibility improvements at Comfort Stations O-310 and O-309 only, as O-307 and O-308 are not accessible from sitework/path perspective due to extreme elevation differences. These improvements include the addition of accessible concrete parking, regrading and accessible pedestrian paths, new stone walls, the addition of an accessible water spigot, and tree and vegetation protection.
5. Option E, MORA 312439 – Water Utility Rehabilitation on Loops E, G, and H
a. Includes replacement of water lines with primarily new locations, select removal of old water lines, and erosion control of impacted areas, and tree and vegetation protection.
6. Option F, MORA 312439 – Roadway Rehabilitation on All Loops
a. Includes shoulder repair at select areas in all loops, improvement of roadway drainage at select areas, low water crossing, replacement of five existing dumpster enclosures, and tree and vegetation protection.
D. Project will be constructed under a single prime contract.
E. Contractor shall be required to cease construction activities if a special-status species is discovered
(living, injured, or dead) in the project area and be on hold until the park staff re-evaluates the project.
This would allow modification of the contract to include protection measures to protect the discovery.
1. The contractor shall alert the Contracting Officer immediately should this occur.
2. Additionally, the contractor is required in the Construction Contractor’s Environmental
Training Program (re: 01 31 00 “Project Management and Coordination”) to train workers regarding special-status species.
F. Concurrent Work:
1. Work on SR 123 East of Ohanapecosh Campground Entrance – For construction transportation approaching from the north and east, Contractor should be aware that one lane closures are anticipated during 2024, construction all of 2025, and total closure during September and October 2025. This roadwork may affect campground access for workers and deliveries as well as potentially affect resource availability.
1.3 WORK PHASES
A. The Work shall be conducted in two phases in the following recommended order, with each phase to be substantially completed before beginning next phase:
1. Phase One: Phase One work takes place during the first construction season. This is anticipated to take place April 2025 to December 2025; varying due to snow levels and campground access via SR 123. All Phase One work to be completed by the end of the first construction season before work is to start on Phase Two.
2. Phase Two: All remaining Work to take place during the second construction season. This is anticipated to take place March 2026 to October 2026; varying due to snow levels and campground access via SR 123.
3. The Anticipated division of scope is:
a. Phase One recommendation is the following: Loops D, E, F, G, & H (north of the
Ohanapecosh River)
b. Phase Two recommendation is the following: Loops A, B, & C (south of the
Ohanapecosh River)
MORA 313019 / 331809 / 312439 01 11 00 - 5
4. Contractor shall propose their own phasing plan (re: Section 01 50 00 “Temporary
Facilities and Controls.)
5. Comfort Stations associated with each loop shall remain open for visitors when that same loop is open to visitors. All repair work on comfort stations shall only occur when it is that loop is closed for visitors and loop is under repairs.
6. Contractor to document substantial completion procedures that accompany the two-phased construction schedule.
B. The campground will be partially open during construction, requiring phasing of the work.
1. Three campground loops minimum must be open to the public from the Friday before
Memorial Day through the Tuesday after Columbus Day.
2. The two phases are likely to need to shift outside of this period of service to ensure continuity of service to the public. This is a recommendation only.
C. The campground is typically accessed seasonally, and winter shut down occurs from December through late March/early April due to closure of SR 123 due to snow levels.
1. Subject to change depending on weather conditions and snow levels.
2. Typical park calendar outlook:
a. December through late March/early April: closed due to SR123 access.
b. Late March/early April through the Friday before Memorial Day: shoulder season road closed to public and NPS provides contractor access to site. Contractor will clear snow on construction site as needed.
c. Friday of Memorial Day weekend - Tuesday after Columbus Day: road open to public and contractor has access to construction site.
d. Tuesday after Columbus Day – end of November: shoulder season road closed to public and NPS provides contractor access to site. Contractor will clear snow on construction site as needed.
D. In water work (i.e. removal of the concrete weir) shall occur during the summer low flow season:
late July – September, to minimize potential effects to aquatic resources and habitat.
E. Tree removal shall be permitted only outside the nesting seasons of the northern spotted owl (March
15 to September 30) and the Migratory Bird Treaty Act (early April to mid August) unless the appropriate surveys are conducted and no listed species are present and no active nesting is occurring in trees proposed for removal.
1. Trees may be felled in the fall after the nesting season ends (September 30th) as site preparation for work occurring in the spring of the following year.
2. For more requirements, refer to 1.12 and 1.13 of this specification section.
1.4 GOVERNMENT-FURNISHED MATERIALS
A. In case of Government -furnished materials:
1. Government will arrange and pay for delivery of Government-furnished items according to Construction Contractor's Construction Schedule.
2. Construction Contractor is responsible for initial inspection, receiving, unloading, and handling Government-furnished items at Project site.
3. Government will inspect delivered items for damage after delivery. Construction
Contractor shall be present for and assist in Government's inspection.
MORA 313019 / 331809 / 312439 01 11 00 - 6
4. Government will arrange for replacement if Government-furnished items are damaged, defective, or missing.
5. Construction Contractor is responsible for protecting Government-furnished items from damage during storage and handling, including damage from exposure to the elements.
6. If Government-furnished items are damaged as a result of Construction Contractor's operations, Construction Contractor shall repair or replace them.
7. Construction Contractor shall install and otherwise incorporate Government-furnished items into Work.
B. Government-Furnished Materials:
1. Fallen logs for delineation of sites.
C. Site Items Salvaged Onsite:
1. Boulders for delineation of sites. Only to be salvaged from within the Limits of
Construction and with approval of Contracting Officer.
2. Fallen Logs for delineation of sites and spurs. Only to be salvaged from within the Limits of Construction and with approval of Contracting Officer. Douglas fir logs not to be reused to mitigate spread of disease.
3. Wood Screens, including posts, frames, and lattices. Only select screens to be salvaged.
Refer to landscape drawings showing comfort stations for locations.
4. See also Section 02 41 13 “Selective Site Demolition” for items to be salvaged and reused.
1.5 GOVERNMENT-PERFORMED SCOPE
A. Park shall provide, install, and maintain plantings for revegetation and seeds for reseeding.
B. Contractor shall coordinate with park on timing and provision of prepared soils for planting and seeding activities.
1.6 CONSTRUCTION CONTRACTOR USE OF SITE
A. General: Construction Contractor shall have limited use of site for construction operations. Limit use of premises to areas within the Limits of Construction as indicated on drawings. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Confine constructions operations to Limits of Construction as indicated on drawings.
2. Limits of Construction shall be staked at the start of construction as described in 01 73 40
“Execution.”
3. Limits of Construction stakes shall be inspected on a weekly basis and missing stakes shall be reinstalled within 3 working days.
4. Intrusion on areas outside of the Limits of Construction shall be brought to the attention of the Contracting Officer and remedies, including methods of enforcement shall be discussed at the weekly progress meeting.
5. The contractor shall provide access for campers/visitors to open campground areas. See also “Public Use of Site,” Section 1.7, below.
6. To minimize impact to the park’s natural and cultural environment, use lowest impact methodologies for trench excavation.
MORA 313019 / 331809 / 312439 01 11 00 - 7
7. Parking and driving shall be on hardened surfaces only. No parking and no driving on vegetated areas shall be permitted.
B. Storage of Materials:
1. Staging and stockpiling areas to be located in previously disturbed sites and in hardened areas, including the roadway and existing gravel pullouts. Staging and stockpiling areas shall be restored to pre-construction conditions following construction.
2. Confine storage of materials to within Limits of Construction and designated staging area, unless directed otherwise by Contracting Officer.
3. When possible, place soils on asphalt, paved areas, planks or tarps to reduce ground and vegetation disturbance.
4. Equipment will be kept on hardened surfaces, except where needed to perform grading and utility work.
5. Washout Area(s): Shall be offsite or in repairable areas as approved by the Contracting
Officer prior to start of work. Washout sites shall be returned to their original, pre-construction condition, at the close of work. If on Government Property, repaired/cleaned washout site(s) shall be reviewed and approved by Contracting Officer.
6. Contractor shall maintain emergency egress routes through construction zone on paved surfaces.
C. Parking: Confine parking to staging, hardened areas, and parking areas. See drawing sheet 00-G005.
D. Stockpiling: Confine stockpiling to staging areas. See drawing sheet 00-G005.
E. Preservation of Natural Features:
1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
2. Provide high visibility temporary barriers that do not penetrate the ground to protect existing trees and plants and root zones. See detail on drawing sheet 00-GL1.1 and tree protection zones on all landscape drawings. See also specification section 32 40 00
“Vegetation Retention and Protection” for more information.
3. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with
Contracting Officer (CO) and remove agreed-on roots and branches that interfere with construction.
4. Do not fasten ropes, cables, or guys to existing trees.
5. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
6. Rubble or other materials cleared from the work site must not be deposited on roadside vegetation, into streams, wetlands or low-lying areas.
7. Construction will avoid the root zones of trees to the greatest extent practicable.
F. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to
Government employees, and emergency vehicles at all times. Do not use for parking or storage of materials.
1. Schedule deliveries to minimize use of driveways and entrances.
2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
MORA 313019 / 331809 / 312439 01 11 00 - 8
G. Construction Camp: Establishment of a camp within park will not be permitted.
H. Construction Trailer: Establishment of a construction trailer will be permitted, provided it is within the Limits of Construction. Provide utilities as specified in Division 1 Section 01 50 00 “Temporary
Facilities and Controls.” Keep trailer area neat and clean and return site to previous condition at completion of work.
1. No utility or communication connections are available at Ohanapecosh Campground.
I. Construction Equipment:
1. Construction Equipment shall not be stored along open roadways overnight, without prior approval of the Contracting Officer.
2. Construction equipment and vehicles shall not be permitted to idle for longer than five (5) minutes.
3. Mufflers and sound attenuation devices (such as rubber strips or sheeting) will be installed and maintained on all equipment. This will include truck tail and other gate dampeners
(both opening and closing) for all dump trucks on the project.
4. Equipment and vehicles shall be checked for leaking oil and fluids daily.
5. Heavy equipment hydraulic fluid lines would be filled with biodegradable hydraulic oil alternatives.
6. See also Section 01 50 00 “Temporary Facilities and Controls.”
J. Hauling Restrictions: Comply with legal load restrictions in hauling of materials. Load restrictions on park roads are identical to state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Construction Contractor of liability for damage which may result from moving of equipment.
K. The use of unmuffled compression breaks will be prohibited within park boundaries.
L. The use of air horns will only be used within the park for emergencies and safety.
M. Tunnel and Bridge Restrictions: Identify jurisdictions, load restrictions, permit requirements, time and calendar restrictions as outlined.
1. On SR 123, there is a tunnel height limit of 13’-1”.
2. The Ohanapecosh River Bridge (within the campground) has a 15 ton design load.
3. All other bridges in the area are on state highways.
1.7 PUBLIC USE OF SITE
A. Parts of Ohanapecosh Campground will be open to the public during construction. (See also section
1.3 “Work Phases” above.)
B. Construction Contractor shall conduct their operations to ensure the least inconvenience to public.
Road closures of the entry road may be permitted per the following criteria:
1. Temporary closures of longer than 10 minutes shall be coordinated in advance with park staff.
2. Temporary closures of 10-30 minutes shall be discussed during Construction Progress
Meetings.
MORA 313019 / 331809 / 312439 01 11 00 - 9
3. Temporary closures of greater than 30 minutes shall be applied for 72 hours in advance of closure date/time. One (1) hour maximum, 2 hours total for any incidence of approval.
4. Contractor shall follow terms for closures detailed in Section 01 50 00 “Temporary
Facilities and Controls.”
C. Contractor shall provide protected crosswalks for pedestrians if area of work separates two publicly accessible areas. If physical barriers are not provided, crosswalks shall be staffed with a flagger for visitor protection.
1. See also Section 01 50 00 “Temporary Facilities and Controls” for requirements for a
Construction Staging and Phasing Plan that protects visitors and staff through all phases of work, including traffic controls.
2. See also Section 01 35 23 “Safety Requirements” for requirements for an effective accident prevention program and providing a safe working environment for personnel and visitors.
1.8 OCCUPANCY REQUIRMENTS FOR BUILDINGS (Applicable for Visitor Center Only)
A. Existing Buildings
1. Partial Government Occupancy: Government will occupy premises during entire construction period, with exception of areas of adjacent site improvements under construction. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform Work so as not to interfere with
Government’s operations. Maintain existing exits, unless otherwise indicated.
a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Contracting Officer.
1.9 CONDUCT OF OPERATIONS
A. Construction Contractor shall conduct his operations in conformance with rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by Park Superintendent.
B. Work on Saturdays, Sundays, Federal holidays or at night may not be performed unless stated in the
Work Restrictions below or without prior consent from the Contracting Officer. Submit requests 7 calendar days in advance of the work to the Contracting Officer for approval.
C. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.
1.10 WORK RESTRICTIONS
A. On-Site Work Hours: Work shall be generally performed during normal business working hours of
8 a.m. to 6 p.m., Monday through Friday, except when otherwise indicated.
1. No work shall be performed beyond normal working hours, on weekends or federal holidays without prior approval of the Contracting Officer.
MORA 313019 / 331809 / 312439 01 11 00 - 10
2. No nightwork is permitted per the Endangered Species Act.
B. Work Near or Affecting Existing Utilities
1. Existing Utilities: Notify Contracting Officer and park of proposed locations and times for excavation not less than one week in advance.
2. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.
3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.
C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or
Visitors unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:
1. Notify Contracting Officer not less than two business days in advance of proposed utility interruptions.
2. Do not proceed with utility interruptions without Contracting Officer’s written permission.
3. Interruptions over 30 minutes in length will not be permitted to facilities occupied by the
Government or Visitors.
D. Nonsmoking Building/Tobacco Use/Vaping: Smoking is not permitted within building or within 25 feet of entrances, operable windows, or outdoor air intakes.
1.11 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES
AND IMPROVEMENTS
A. As required by FAR Clause 52.236-9:
1. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The
Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall treat as directed by the Contracting Officer.
2. The Contractor shall protect from damage all existing improvements and utilities (1) at or near the work site, and (2) on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
B. Provide temporary barriers to protect existing trees and plants and root zones.
1. See detail on drawing sheet 00-GL1.1 and tree protection zones on all landscape drawings.
See also specification section 32 40 00 “Vegetation Retention and Protection” for more information.
MORA 313019 / 331809 / 312439 01 11 00 - 11
C. Provide temporary barriers to protect existing cultural features, as identified by the Contracting
Officer.
D. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with
Contracting Officer and remove agreed-on roots and branches that interfere with construction.
E. Do not fasten ropes, cables, temporary fence, or guy wires to existing trees.
F. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
G. Construction and excavation work within the dripline of trees not marked for removal would include the use of hand tools instead of large machinery to reduce impacts to the root systems.
H. No storage, parking, or excavation shall be allowed within the drip line of protected trees without approval from the Contracting Officer.
I. Ground protection mats, or similar, would be placed in the construction areas to reduce trampling impacts on vegetation from heavy machinery, when possible.
1. See Specification Section 31 25 00 “Erosion and Sediment Control” regarding use of ground protection mats or similar during construction.
J. See Specification Section 01 31 00 regarding Progress Meeting requirements before all and any landscape removal and/or protection requirements are established and maintained during construction.
K. All protection of existing vegetation, trees and natural resources falls under the responsibility of the Contractor’s Environmental Manager. See Specification Section 01 31 00 1.6
ENVIRONMENTAL COORDINATION.
1.12 PROTECTION OF SPECIAL STATUS SPECIES
A. Northern Spotted Owl
1. Annual northern spotted owl monitoring will be completed by the Government using autonomous recording units (ARU). If northern spotted owl activity is detected within the
Project area, MORA will prohibit the use of heavy equipment within a 0.7 mile radius of any identified northern spotted owl activity centers from March 15 through July 31 unless surveys demonstrate that northern spotted owls are not nesting.
2. In suitable habitat areas, construction activities would occur after July 31 if northern spotted owl activity is detected within a 0.7 mile radius during the previous nesting season to minimize potential impacts on nesting spotted owls.
B. Wolves
1. If wolf dens or rendezvous areas are documented (e.g., through WDFW tracking, NPS surveys, or confirmed wildlife sighting reports) within one mile of the action area during the years prior to or during project implementation, the NPS will reinitiate consultation with the USFWS to determine whether additional conservation measures are needed and if formal consultation is required.
MORA 313019 / 331809 / 312439 01 11 00 - 12
2. If an active wolf den or rendezvous site becomes established, no ground-disturbing work would occur within one mile until wolves are no longer using the area for denning or as a rendezvous site.
1.13 SPECIAL CONSTRUCTION REQUIREMENTS
A. Roads
1. Highway SR123/Cayuse Pass is closed during the winter. Locations of closures will vary based on weather and road conditions. It is generally closed at the first significant snowfall (sometime in December) and reopened through plowing by sometime in March.
Check https://wsdot.com/travel/real-time/mountainpasses/Cayuse for up-to-date information.
a. Note that this is the road that accesses Ohanapecosh Campground.
B. Project Management and Communication Software: Software administered by NPS shall be used to manage communication and document sharing during construction.
1. See Section 01 31 00 "Project Management and Coordination" for requirements on using
NPS project management and communication software.
C. Weed Mitigation
1. All material sources and materials, such as topsoil or gravel, incorporated into the work area would be certified to be free from noxious weeds, invasive plants, and other deleterious materials by a federal, state, or local public agency and approved by the NPS.
Commercial certifications may be acceptable if materials have been certified through the
North American Weed Free Forage Program standard or a similarly recognized certification process. Certifications must include comprehensive lists of introduced plant species located at the material source site. All certifications will be evaluated by park vegetation specialists for approval.
2. Equipment Cleaning:
a. Clean vehicles and construction equipment prior to entry and re-entry into the Park to minimize the potential for introduction and/or proliferation of invasive non-native weeds through project actions. The contractor is required to wash equipment, with emphasis on undercarriages, with a high pressure spray prior to transporting such equipment to Mount Rainier National Park.
b. All vehicles and construction equipment entering and re-entering Mount Rainier
National Park shall be inspected and approved by the Contracting Officer prior to entering the park.
c. Equipment not deemed clean by the Contracting Officer will not be allowed to enter the park. The contractor remains liable for additional transportation fees incurred when equipment fails inspection.
d. Cleaning will not be permitted within the park. Contractor shall be responsible for identifying and using a cleaning location outside the park. Note that this may be some distance from the park and project site.
MORA 313019 / 331809 / 312439 01 11 00 - 13
3. All fill and excavated materials would be tarped when stockpiled to reduce potential for invasive species establishment.
D. Avoid Soil Compaction
1. Avoid compaction from heavy equipment to surrounding area by keeping equipment inside the Limits of Construction, within areas allowed for equipment, and outside tree protection zones.
2. Compacted soils shall be ripped or decompacted post construction to enable vegetation, according to the specifications.
3. All disturbances shall be returned to grade and any tracks from equipment shall be raked out.
E. Reducing Wildlife Interactions
1. Do not feed or disturb wildlife within the Park boundaries. Do not approach or remain within 25 yards of any wildlife.
2. All construction personnel working in the field shall follow park food storage regulations, 36 CFR 2.10. All food, garbage, toiletry, or other bear attractants shall not be left unattended for any length of time.
a. These items shall be stored inside vehicle trunks.
b. In vehicles with no trunk, place these items as low in the vehicle compartment as possible and covered from sight, with all windows and doors closed and locked.
c. A litter control program will be implemented during construction to eliminate the accumulation of trash
3. On-site construction personnel are required to report all bear, mountain lion, and/or any unusual sightings in the work area to the Contracting Officer.
F. Archeological Monitoring
1. The Government will provide archeological monitoring, and Contractor shall comply with information and procedures as specified in Section 01 35 13 “Archeological and
Historical Resource Protection.”
2. The National Park Service will ensure that contractors and subcontractors are informed of the penalties for illegally collecting artifacts or intentionally damaging archeological and/or natural sites and/or historic properties. Contractors and subcontractors will be instructed on procedures to follow, in case previously unknown archeological and/or natural resources are uncovered during construction.
G. Blasting is not permitted in this project.
H. Tree Removal
1. Prior to removal, a site walk with the Contracting Officer, Park Representatives, Contractor’s Representative, and Tree Removal Subcontractor is required.
2. An annotated or revised version of the tree removal plan documenting the results of the site walk shall be submitted by the Contractor to the Contracting Officer for review and approval prior to tree removal.
3. See also section 1.3 above regarding timing limitations on tree work.
MORA 313019 / 331809 / 312439 01 11 00 - 14
1.14 HAZARDOUS MATERIALS REPORT
A. The report “Hazardous Materials Assessment Report for 11 Buildings at the Ohanapecosh
Campground at Mount Rainier National Park in Washington, Revision 1” prepared by Landmark
Environmental Inc., May 15, 2023, is Appendix A with this package.
B. In case of conflict between report and drawings or specifications, drawings and specifications govern.
1.15 MORTAR ANALYSIS
A. The “Mortar Analysis – Mount Rainier National Park: Rustic Comfort Stations” prepared by Barlow
Cultural Resource Consulting, LLC, December 2021, is Appendix B with this package.
B. In case of conflict between report and drawings or specifications, drawings and specifications govern.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01 11 00
MORA 313019 / 331809 / 312439 01 26 01 - 1
012721 CONTRACT MODIFICATION PROCEDURES
SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section consists of administrative and procedural requirements for contract modifications.
1.2 DEFINITIONS AND ALLOWANCES
A. Home Office Overhead: Costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):
1. Rent
2. Utilities
3. Furnishings
4. Office equipment
5. Executive and management staff not exclusively assigned to the project
6. Support, accounting, and administrative staff
7. Preparation of cost proposals, estimating, and schedule analyses connected with
Modifications
8. Estimating and preconstruction services
9. Mortgage costs
10. Real estate and corporate taxes
11. Automobile maintenance and travel costs for home office personnel
12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.
13. Depreciation of equipment and other assets
14. Home office supplies (paper, staples, etc.)
15. Legal services
16. Accounting and data processing
17. Professional fees/registration
B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with preparation of modifications will not be allowed. Costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:
1. Project Manager (PM), Assistant Project Manager
2. Superintendent, Assistant Superintendent
3. Quality Control, Safety Officer, Environmental Manager, etc.
4. Engineers
5. Travel, lodging, and per diem (as established by Federal Travel Regulations)
6. Scheduling
MORA 313019 / 331809 / 312439 01 26 01 - 2
7. Field Office Trailers and associated temporary utilities
8. Field office supplies
a. Mailing and couriers
b. Reproduction costs
c. Storage
d. Phones
e. Computers
f. Copiers
9. Personal vehicles i.e. Superintendent Pickup trucks
C. General Requirements: Costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate.
The following items, if applicable, are considered allowable costs for calculating General Requirements:
1. Hoisting
2. Material handling
3. Temporary fencing
4. Port-a-lets
5. Trash removal, dumpsters
6. Barricades
7. Small tools
8. Safety supplies
9. Scaffolding
10. Daily cleaning
11. Traffic control
12. Temporary signage
13. Temporary heating and power
D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on project site. Modification costs for salaried workers are only allowed within the structure of a 40-hour week and no overtime or holiday pay will be allowed.
1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:
a. Base Rate: The hourly rate paid directly to the worker
b. Labor Burden: Employer payments of all applicable burdens; includes insurance and taxes the business must pay on behalf of the worker to government entities and educational forums, such as:
1) Social Security
2) Medicare
3) Workers Compensation – Policy and company calculation to be made available.
4) Federal Unemployment Tax Act (FUTA) - Cap Rate and percentage to be proportionally allocated over one year.
5) State Unemployment Tax Act (SUTA) - Cap Rate and percentage to be proportionally allocated over one year.
MORA 313019 / 331809 / 312439 01 26 01 - 3
6) Union agreement costs - Other costs required under an enforceable collective bargaining agreement.
c. Fringe Benefits: Various non-wage compensations provided to employees such as:
1) Health Care Insurance Premiums
2) Cell Phone
3) Clothing
4) 401K and Pensions
5) Vehicle allowances
6) Gas allowance
7) Life insurance premiums
8) Disability insurance
9) Other Fringe Benefits required under an enforceable collective bargaining agreement
E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.
F. General Liability Insurance: An insurance policy that protects Contractor from claims resulting from bodily injury or property damage to a third party. Include as a separate line item within all modification proposals and provide a current insurance quote upon request.
G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank…