This document is an amendment to Solicitation No. 140P2024R0077 for the Rehabilitate Ohanapecosh Campground project. The key updates include:

  1. Attaching a pre-proposal site visit roster and informational trifold.
  2. Providing official government responses to questions received, which clarify that Cured-in-Place Pipe (CIPP) sewer rehabilitation, pipe bursting, and horizontal directional drilling are not required for this project.
  3. Updating Section L to revise the technical approach submittal requirements, including a 15-page limit and allowance for including pictures.
  4. Extending the proposal due date to August 19, 2024 at 12:00 Mountain Time.

The solicitation is issued by the Department of the Interior, National Park Service for the Rehabilitate Ohanapecosh Campground project. No other significant details about the scope of work, pricing, or set-asides are provided in this amendment.

View the file

Other files

File Type Posted
B09_Amd_9_2024_Quarry_Survey_Summary__0009.docx DOCX document
Sol_140P2024R0077_Amd_0009.pdf PDF
Sol_140P2024R0077_Amd_0008.pdf PDF
B09_AMD_7_Attach_(4)_20240813-Enclosure4_CertComp_0007.pdf PDF
B09_AMD_7_Attach_(6)_20240813-NWPVerifLtr-NWS-2024-570_0007.pdf PDF
B09_AMD_7_Attach_(1)_019-GC10_Amendment_07_0007.pdf PDF
B09_AMD_7_Attach_(2)_20240813-Enclosure1-PmtDrawings_NWS-2024-570_0007.pdf PDF
B09_AMD_7_Attach_(5)_20240813-Enclosure302021-NWP18_0007.pdf PDF
B09_AMD_7_Attach_(3)_20240813-Enclosure2_2021-NWP03_0007.pdf PDF
Sol_140P2024R0077_Amd_0007.pdf PDF
B09_AMD_6_Attach_(2)_MORA_HazMat_051523_REV1_FTC_0006.pdf PDF
Sol_140P2024R0077_Amd_0006.pdf PDF
B09_AMD_6_Attach_(1)_MORA_Amphitheater_Drain_Exhibit_0006.pdf PDF
B09_AMD_6_Attach_(3)_MORA_20-GC10_0006.pdf PDF
Sol_140P2024R0077_Amd_0005.pdf PDF
B09_Amd_4_Attach_1_33_40_00_-_Storm_Drainage_0004.pdf PDF
B09_Amd_4_Attach_3c_IMG_0890_0004.jpg JPG image
B09_Amd_4_Attach_2_33_31_13_-_Site_Sanitary_Sewerage_Gravity_Piping_0004.pdf PDF
B09_Amd_4_Attach_3a_IMG_0888_0004.jpg JPG image
B09_Amd_4_Attach_3d_IMG_0891_0004.jpg JPG image
B09_Amd_4_Attach_3b_IMG_0889_0004.jpg JPG image
Sol_140P2024R0077_Amd_0004.pdf PDF
Sol_140P2024R0077_Amd_0003.pdf PDF
B09_AMEND_02_Attach_(5)_31_20_00_-_Earth_Moving_MORA_Ohana_AMEND02_0002.pdf PDF
Sol_140P2024R0077_Amd_0002.pdf PDF
B09_AMEND_02_Attach_(3)_01_32_16-ConstructionSchedule_MORA_Ohana_AMEND02_0002.pdf PDF
B09_AMEND_02_Attach_(2)_01_11_00-SummaryOfWork_MORA_Ohana_AMEND02_0002.pdf PDF
B09_AMEND_02_Attach_(6)_Revised_drawing_sheets_MORA_Ohana_AMEND02_0002.pdf PDF
B09_AMEND_02_Attach_(4)_01_50_00_TemporaryFacilitiesAndControls_MORA_Ohana_AMEND02_0002.pdf PDF
B09_AMEND_02_Attach_(1)_00_01_10-1_MORA_Ohana_AMEND02_0002.pdf PDF
B11_Preproposal_SignIn_(3)_0001.pdf PDF
B11_Preproposal_SignIn_(1)_0001.pdf PDF
B11_Preproposal_SignIn_(2)_0001.pdf PDF
B11__Site_Visit_Tri_Fold_MORA_Ohanapecosh_0001.docx DOCX document
B08_Attach_2_MORA_313019_331809_312439_Final_Drawings_Part1.pdf PDF
B08_Attach_2_MORA_313019_331809_312439_Final_Drawings_Part3.pdf PDF
B08_Attach_6_Solit_PSP_Vol_I_PastPerf_REQD(1).docx DOCX document
B08_Attach_1_MORA_313019_331809_312439_Final_Specifications_App_B.pdf PDF
B08_Attach_2_MORA_313019_331809_312439_Final_Drawings_Part4.pdf PDF
B08_Attach_2_MORA_313019_331809_312439_Final_Drawings_Part2.pdf PDF
Sol_140P2024R0077.pdf PDF
B08_Attach_1_MORA_313019_331809_312439_Final_Specifications.pdf PDF
B08_Attach_1_MORA_313019_331809_312439_Final_Specifications_App_A.pdf PDF
B08_Attach_5_Solit_PSP_Vol_I_Exp_REQD.docx DOCX document
B08_Attach_7_Construction_Contract_Administration.docx DOCX document
B08_Attach_3_WD_WA20240051_20240524.pdf PDF
B08_Attach_4_Deliverables_LmtOnSubconRpt_REQD.xlsx XLSX spreadsheet
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2024R0077 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

07/30/20240001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/11/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of amendment 1 is to:

1) Attach pre-proposal site visit roster, and site visit informational trifold.

2) Provide official government responses to questions received. Refer to the continuation sheet of the SF 30.

3) Update section L - Instructions for the submission of offers and other information to reflect an accurate submittal requirement for: Factor 1: Technical Approach. Refer to the continuation sheet.

4) Extend the due date for proposals to August 19, 2024, at 12:00 Mountain Time.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Dayna Omiya

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

The following in section L – Instructions for the submission of offers and other information, is updated to reflect an accurate submittal requirement for:

Factor 1: Technical Approach

Technical approach is your means and methods to complete a technical aspect of required work in this solicitation. Provide a written technical approach for performing this construction project which demonstrates a clear understanding of the project to include remoteness and harsh mountain environments, how the work will be accomplished, and safety practices. No specific form or format is prescribed for this technical approach document. Describe what work will be self-performed or the proposed subcontractors to demonstrate technical competence to perform the horizontal utility improvement scope of this project to include but not limited to:

a. Sewer bypass pumping

b. Open cut sewer replacement work

c. Cured in place pipe sewer rehabilitation work.

d. Pipe bursting sewer rehabilitation work.

e. Horizontal directional drilling pipe replacement work

f. Lift Station mechanical work

g. Electrical and controls work

h. Traffic control & residences/businesses access control

i. Scheduling and coordination with the public and customers

Assume all options will be exercised.

Submit a written narrative limited to 15 pages describing your technical approach. Additional pages will not be evaluated. Pictures can be included and will count towards the page limitation.

There is no preprinted form for this submittal.

(End of provision)

Question and answer:

Q1. The solicitation references Cured in Place Pipe (CIPP) Sewer Rehabilitation, but the work is not shown on the plans. Please confirm if CIPP is required on this project, and if so, please provide locations.

A1. CIPP is not required on this project.

Q2: The solicitation references Pipe Bursting Sewer Rehabilitation, but the work is not shown on the plans.

Please confirm if pipe bursting is required on this project, and if so, please provide locations.

A2. Pipe Bursting Sewer Rehabilitation is not required on this project.

Q3. The solicitation references Horizontal Directional Drilling, but the work is not shown on the plans. Please confirm if Horizontal Directional Drilling is required on this project, and if so, please provide locations.

A3. Horizontal Directional Drilling is not required on this project.

Q4. Spec Section 33 31 13 includes section 3.7 STRUCTURAL EPOXY SYSTEM, but the work is not shown on the plans. Does this only apply to the existing manholes to be rehabilitated, or does it apply to all manholes or other scopes? Please confirm application/location of the work.

A4. This only applies to existing manholes to be rehabilitated.

Q5. Spec Section 31 20 00 part 2.2 states that native material excavated from trenches should not be anticipated for use as trench backfill. Part 2.3 states that soils from excavations of fill and residuum can generally be used as engineered fill. These contradict and there is no Geotech report. Please provide direction on what material should be used as trench backfill for bidding purposes.

A5. Updated Spec Section to be released in forthcoming Amendment. Spec Section 31 2 00 part 2.3.C. should be revised to read "Site soils generated from on-site excavation activities of fill and residuum shall not be anticipated to be used as engineered fill. Additional evaluation and laboratory testing should be performed by the contractor during earthwork activities to better evaluate the suitability of the on-site soils for re-use as engineered fill at this site." Material imported or generated from on-site excavation that meets the requirements of Spec Section 31 2 00 part 2.3.B. can be used for trench backfill.

Q6. The proposed sewer between MH230 and MH231 appears to go over a utility bridge, please provide further information. Is there an existing casing pipe the proposed carrier pipe will go inside, if so, are skids and seals required? Is a new Casing or Utility Hangars required? Etc.?

A6. The proposed sewer between MH230 and MH231 goes under a wood pedestrian bridge and should be hung off the bridge with Utility Hangars like the existing line.

Q7. The Site Plans (Sheets 21-C20 through 21-C29) show trench restoration at 36 inches wide, it is not possible to install sewer at the proposed depths in a 36-inch-wide trench. Please confirm it is acceptable to have trench widths up to 7’ wide or wider without the need for full width roadway repair.

A7. Use of trench boxes should be expected to keep trench widths to a minimum. Trench widths 7' or wider in roadways will require full width roadway repair.

Q8. Is a Geotechnical Report available?

A8. A Geotechnical Report is not available.

Q9. I wanted to mention some discrepancies found in the documents for this project.

Attachment 1 Specifications:

- Section 040141.91 & 102113.43 number mismatch vs. table of contents

Attachment 1 Specifications Appendix A:

- missing content for Appendix A-N, unsure if intentional

Attachment 2 Drawings Part 1:

- 00-GL2.11 slight title mismatch vs. index

Attachment 2 Drawings Part 2:

- 13-L201 slight title mismatch vs. index

Attachment 2 Drawings Part 3:

- Sheets LG4.1-LG4.7 & 19-G10 sheet number mismatch vs. index

- 18-LH4.6 & 18-AD01 slight title mismatch vs. index

A9. Updated Spec Sections and Drawings to be released in forthcoming Amendment.

Attachment 1 Specifications: - Section 040141.91 & 102113.43 Page 6 of table of contents should list Site Stone Restoration as 04 01 41 (not 04 14 40.91). Similarly, page 7 should list Phenolic-Core Pedestal-Mounted Privacy Toilet Compartments as 10 21 13.43 (not 10 15 50). Table of Contents will be corrected.

Attachment 1 Specifications Appendix A: - missing content for Appendix A-N, unsure if intentional Per the Specification table of contents, appendix only consists of items A and B.

Attachment 2 Drawings Part 1: - 00-GL2.11 slight title mismatch vs. index 00-GL2.11 should be titled "CS 310 CONCRETE STAIR DETAILS". No impacts to sheet index. Sheet will be corrected.

Attachment 2 Drawings Part 2: - 13-L201 slight title mismatch vs. index Index should read "CAMPSITE 4, 7, 10, 12 TO 14 GRADING PLAN." No impacts to sheet 13-L201. Index will be corrected.

Attachment 2 Drawings Part 3:

- Sheets LG4.1-LG4.7 & 19-G10 sheet number mismatch vs. index

- 18-LH4.6 & 18-AD01 slight title mismatch vs. index

16-LG4.1-LG4.7: Sub-sheet number in Index should read 16-LG4.1 through 16-LG4.7. No impact to drawing sheets.

19-G10: Sub-sheet number in Index should read 19-GC10. No impact to 19-GC10.

18-LH4.6: Index should read "LOOP H COMFORT STATION O-308 WATER STATION". No impact to sheet

18-LH4.6.

18-AD01: Index should read "COMFORT STATION 0-304 DEMO PLANS". No impact to 18-AD01.

Index will be corrected.

Q10. If we have a project we’d like to highlight within “Factor 3. Project Experience” that is outside of the (5) year relevancy criteria, would this project be viewed as unfavorable, or would it be completely disregarded as a whole?

A10. Follow Factor language to meet the criteria.

Q11. May we kindly request that the project experience criteria “within (5) years of the solicitation closing date” be extended to a minimum of (6) years?

A11. Follow Factor language to meet the criteria.

Q12. Due to the complexity of the specifications and plans, we are requesting a minimum of a one (1) week bid date extension. This additional time will allow for a proper proposal for this project.

A12. The new proposal due date is August 19, 2024. Proposals are due to NPS/DSC by 12/Noon Mountain Time.