B09_AMEND_02_Attach_(1)_00_01_10-1_MORA_Ohana_AMEND02_0002.pdf

PDF 84 KB Posted

Attached to
MORA/ 313019A, 312439 & 313809, Rehabilitate Ohana
Solicitation number
140P2024R0077
Issued by

About this file

This document appears to be the Table of Contents for a solicitation related to the rehabilitation of the Ohanapecosh Campground. The solicitation number is 140P2024R0077 and the federal agency involved is the Department of the Interior National Park Service National Office.

The Table of Contents lists the various sections and divisions of work required, including General Requirements, Existing Conditions, Concrete, Masonry, Metals, Wood/Plastics/Composites, Thermal and Moisture Protection, Openings, Finishes, Specialties, and Furnishings. Key requirements appear to include site demolition, stone masonry restoration, historic wood repair, roofing, windows and doors, painting, and specialty items like pedestal-mounted toilet compartments and quartz countertops. The document suggests this is a detailed solicitation covering a wide scope of work for the campground rehabilitation project.

View the file

Other files

File Type Posted
B09_Amd_9_2024_Quarry_Survey_Summary__0009.docx DOCX document
Sol_140P2024R0077_Amd_0009.pdf PDF
Sol_140P2024R0077_Amd_0008.pdf PDF
B09_AMD_7_Attach_(4)_20240813-Enclosure4_CertComp_0007.pdf PDF
B09_AMD_7_Attach_(6)_20240813-NWPVerifLtr-NWS-2024-570_0007.pdf PDF
B09_AMD_7_Attach_(1)_019-GC10_Amendment_07_0007.pdf PDF
B09_AMD_7_Attach_(2)_20240813-Enclosure1-PmtDrawings_NWS-2024-570_0007.pdf PDF
B09_AMD_7_Attach_(5)_20240813-Enclosure302021-NWP18_0007.pdf PDF
B09_AMD_7_Attach_(3)_20240813-Enclosure2_2021-NWP03_0007.pdf PDF
Sol_140P2024R0077_Amd_0007.pdf PDF
B09_AMD_6_Attach_(2)_MORA_HazMat_051523_REV1_FTC_0006.pdf PDF
Sol_140P2024R0077_Amd_0006.pdf PDF
B09_AMD_6_Attach_(1)_MORA_Amphitheater_Drain_Exhibit_0006.pdf PDF
B09_AMD_6_Attach_(3)_MORA_20-GC10_0006.pdf PDF
Sol_140P2024R0077_Amd_0005.pdf PDF
B09_Amd_4_Attach_1_33_40_00_-_Storm_Drainage_0004.pdf PDF
B09_Amd_4_Attach_3c_IMG_0890_0004.jpg JPG image
B09_Amd_4_Attach_2_33_31_13_-_Site_Sanitary_Sewerage_Gravity_Piping_0004.pdf PDF
B09_Amd_4_Attach_3a_IMG_0888_0004.jpg JPG image
B09_Amd_4_Attach_3d_IMG_0891_0004.jpg JPG image
B09_Amd_4_Attach_3b_IMG_0889_0004.jpg JPG image
Sol_140P2024R0077_Amd_0004.pdf PDF
Sol_140P2024R0077_Amd_0003.pdf PDF
B09_AMEND_02_Attach_(5)_31_20_00_-_Earth_Moving_MORA_Ohana_AMEND02_0002.pdf PDF
Sol_140P2024R0077_Amd_0002.pdf PDF
B09_AMEND_02_Attach_(3)_01_32_16-ConstructionSchedule_MORA_Ohana_AMEND02_0002.pdf PDF
B09_AMEND_02_Attach_(2)_01_11_00-SummaryOfWork_MORA_Ohana_AMEND02_0002.pdf PDF
B09_AMEND_02_Attach_(6)_Revised_drawing_sheets_MORA_Ohana_AMEND02_0002.pdf PDF
B09_AMEND_02_Attach_(4)_01_50_00_TemporaryFacilitiesAndControls_MORA_Ohana_AMEND02_0002.pdf PDF
B11_Preproposal_SignIn_(3)_0001.pdf PDF
B11_Preproposal_SignIn_(1)_0001.pdf PDF
B11_Preproposal_SignIn_(2)_0001.pdf PDF
B11__Site_Visit_Tri_Fold_MORA_Ohanapecosh_0001.docx DOCX document
Sol_140P2024R0077_Amd_0001.pdf PDF
B08_Attach_2_MORA_313019_331809_312439_Final_Drawings_Part1.pdf PDF
B08_Attach_2_MORA_313019_331809_312439_Final_Drawings_Part3.pdf PDF
B08_Attach_6_Solit_PSP_Vol_I_PastPerf_REQD(1).docx DOCX document
B08_Attach_1_MORA_313019_331809_312439_Final_Specifications_App_B.pdf PDF
B08_Attach_2_MORA_313019_331809_312439_Final_Drawings_Part4.pdf PDF
B08_Attach_2_MORA_313019_331809_312439_Final_Drawings_Part2.pdf PDF
Sol_140P2024R0077.pdf PDF
B08_Attach_1_MORA_313019_331809_312439_Final_Specifications.pdf PDF
B08_Attach_1_MORA_313019_331809_312439_Final_Specifications_App_A.pdf PDF
B08_Attach_5_Solit_PSP_Vol_I_Exp_REQD.docx DOCX document
B08_Attach_7_Construction_Contract_Administration.docx DOCX document
B08_Attach_3_WD_WA20240051_20240524.pdf PDF
B08_Attach_4_Deliverables_LmtOnSubconRpt_REQD.xlsx XLSX spreadsheet
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MORA 313019 / 331809 / 312439 00 01 10-1

TABLE OF CONTENTS

SECTION 00 01 10 - TABLE OF CONTENTS

00 01 07 Seals Page

00 01 10 Table of Contents

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work

01 26 01 Contract Modification Procedures

01 27 00 Definition of Contract Line Items

01 31 00 Project Management & Coordination

01 32 16 Construction Schedule

01 32 33 Photographic Documentation

01 33 23 Submittal Procedures

01 35 13.22 Archeological and Historical Resource Protection

01 35 23 Safety Requirements

01 35 91 Historic Preservation Treatment Procedures

01 40 00 Quality Requirements

01 42 00 Reference Standards

01 50 00 Temporary Facilities and Controls

01 57 19.11 Indoor Air Quality (IAQ) Management

01 57 19.12 Noise & Acoustics Management

01 57 23 Temporary Storm Water Pollution Prevention (SWPP)

01 67 00 Product Requirements

01 73 29 Cutting and Patching

01 73 40 Execution

01 74 19 Construction Waste Management and Disposal

01 77 00 Closeout Procedures

01 78 23 Operation and Maintenance (O&M) Data

01 81 13 Sustainable Design Requirements

DIVISION 02 - EXISTING CONDITIONS

02 41 13 Selective Site Demolition

02 42 96 Historic Removal and Dismantling

02 81 01 Off Site Transportation and Disposal

02 82 13 Asbestos Abatement

02 83 33 Removal and Disposal of Material Containing Lead

02 84 16 Handling of Light Ballast Containing PCBS and Devices/Lamps Containing Mercury

DIVISION 03 - CONCRETE

03 20 00 Concrete Reinforcing

03 30 00 Cast in Place Concrete

DIVISION 04 – MASONRY

04 01 41 Site Stone Restoration

04 03 42 Historic Stone Masonry Repair

04 34 00 Site Stone Masonry

InitialDateREVISIONSheetMark

1 00-G002

00-G003

ADDENDUM 2 BIDDER

QUESTIONS

07/30/2024 ACN

MORA 313019 / 331809 / 312439 00 01 10-2

TABLE OF CONTENTS

DIVISION 05 – METALS

05 52 13 Pipe and Tube Railings

DIVISION 06 - WOOD, PLASTICS, & COMPOSITES

06 03 12 Historic Wood Repair

06 10 00 Rough Carpentry

06 10 63 Exterior Wood Carpentry

06 16 00 Sheathing

06 40 13 Exterior Architectural Woodwork

06 40 23 Interior Architectural Woodwork

06 64 00 Plastic Paneling

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 31 29 Wood Shingle Roofing

07 41 13.16 Standing Seam Metal Roof Panels

07 62 00 Sheet Metal Flashing and Trim

07 92 00 Joint Sealants

DIVISION 08 - OPENINGS

08 03 14 Historic Treatment of Wood Doors

08 03 51.33 Historic Treatment of Aluminum Windows

08 03 52 Historic Treatment of Wood Windows

08 71 00 Door Hardware

DIVISION 09 - FINISHES

09 29 00 Gypsum Board

09 67 23 Resinous Flooring

09 91 00 Exterior Painting Pipe and Tube Railings

09 91 13 Exterior Painting and Staining

09 91 23 Interior Painting and Sealers

DIVISION 10 - SPECIALTIES

10 14 23 Panel Signage

10 21 13.43 Phenolic-Core Pedestal-Mounted Privacy Toilet Compartments

10 28 00 Toilet Accessories

10 81 19 Rodent and Bird Control

DIVISION 11 – EQUIPMENT – Not Used

DIVISION 12 - FURNISHINGS

12 36 61.19 Quartz Agglomerate Countertops

DIVISION 13 – SPECIAL CONSTRUCTION – not used

File details come from the government source that posted it. Updated .