This document is an amendment to Solicitation 140P2024R0077 for the MORA/ 313019A, 312439 & 313809, Rehabilitate Ohanapecosh Campground project issued by the Department of the Interior National Park Service National Office. The amendment provides an USACE permit, official government responses to questions received, and clarification on requirements such as a meter-main loadcenter for electrical work and the acceptable sanitary sewer manhole ring and cover. The solicitation seeks to rehabilitate the Ohanapecosh Campground, with a proposal due date of August 14, 2024 and a contract award planned for no later than September 30, 2024. The government will not grant a time extension for proposal submissions to meet the fiscal year end obligation deadline.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2024R0077 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
08/14/20240007
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/11/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of amendment 6 is to:
1) Provide USACE Permit; and
2) Provide official government responses to questions received. Refer to the continuation sheet of the SF 30.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Dayna Omiya
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Questions and Answers:
Q1. Electrical Bid Option A Meter/Main
On Bid Option A, it calls for Meter/Main for Comfort Stations O-307, O-308, O-309, O-310. Is the intent for a Meter/Panel Combo or does the Meter and Panel to be separated?
A1. Construction drawings indicate to provide a meter main loadcenter (meter/panel combo). Engineer takes no objection, however, to providing them separately if the contractor prefers. Note that cost may differ if provided separately.
Q2. Phenolic Core Pedestal Mounted Privacy Toilet, is this a viable substitute?
A2. The submitted substitution product is approximately 4 inches taller than the basis of design product, which results in a conflict at the Mission 66 Comfort Station plumbing walls. If installed, the submitted product would be in conflict with existing historic light fixtures, which are intended to be replaced in kind without relocation. For this reason, architect does not approve the submitted product.
Q3. With the level of detail needed/magnitude of this project would the National Park Service consider a 1-week time extension for project proposals to 8/27/2024?
A3. We plan to award this contract no later than September 30, 2024. An extension is not possible to meet this end of fiscal year obligation with the appropriated funding.
Q4. Will you please clarify what sanitary sewer manhole ring and cover you are requiring? Plan sheet 19- GC10 has two models listed - Neenah R1642 & R1755G.
A4. Neenah R1642. See B09_AMD 7 Attach (1) 019-GC10_Amendment 07.