About this file

This document contains general references for a surety contractor bidding on solicitation number 140P2020R0079 from the Department of the Interior National Park Service National Office. The solicitation is for the reconstruction and stabilization of a historic stone wall and towpath located between McMahons Mill and Lock 42.

The contractor is required to provide references from its surety, corporate banks, insurance companies, and material suppliers on the form. Contact information including names, addresses, telephone numbers, and areas of specialized work must be included for each reference. The purpose of collecting this information is to allow the government to evaluate the contractor's past performance. Explanations for any less than fully satisfactory relationships with references must also be disclosed.

View the file

Other files for this federal contract opportunity

Other files attached to CHOH-151201, Reconstruct/Stabilize Historic Stone, newest first.
File Type Posted
A07_05_20200821_Section B_Contract Price Schedule_0007.pdf PDF
A07_01 Questions and Answers Round 4 Final_0007.pdf PDF
Sol_140P2020R0079_Amd_0007.pdf PDF
A07_02_20200821_SECTION 01 27 00 DEFINITION OF CONTRACT LINE ITEMS_0007.pdf PDF
A07_03_20200821_SECTION 044300 - STONE MASONRY_0007.pdf PDF
A07_04_20200821_Structural DrawingsRev3_0007.pdf PDF
Sol_140P2020R0079_Amd_0006.pdf PDF
Sol_140P2020R0079_Amd_0005.pdf PDF
140P2020R0079 Amend 04_0004.pdf PDF
2020_0811 151201 - C2.01a DEMO & ES Ext_A04_03_0004.pdf PDF
20200812 MDE_USACE Authorization_A04_02_0004.pdf PDF
QA Round 3 QA_FINAL_A04_01_0004.pdf PDF
Sol_140P2020R0079_Amd_0004.pdf PDF
Sol_140P2020R0079_Amd_0003.pdf PDF
A03_03 - B08 BidBond_SF24-16d_0003.pdf PDF
A03_04 - B08 - Solit_Equals_0003.doc DOC document
A03_05 - CHOH 151201 Questions and Answers_0003.pdf PDF
A03_02 - 151201 CHOH ALL FINAL CD-Drawings - REV2_0003.pdf PDF
A03_01 - 011100 - SUMMARY OF WORK_REV_0003.pdf PDF
A02_04_Section H Special Clause COVID_0002.pdf PDF
A02_01 CHOH 151201 CD-ContractPriceSchedule FINAL_0002.pdf PDF
Sol_140P2020R0079_Amd_0002.pdf PDF
A02_07 151201 CHOH ALL FINAL CD-Drawings - REV1_0002.pdf PDF
A02_06_CHOH 151201 Q and A Round 1 7-30-20_0002.pdf PDF
A02_02 CHOH 151201 CD-ContractPriceSchedule FINAL_0002.xlsx XLSX spreadsheet
A02_03 Contract Line Items FINAL_0002.pdf PDF
A02_05_52.211-18 Variation Est Qty Clause_0002.pdf PDF
Atch 03 PreProposal Presentation 071420_0001.pdf PDF
Atch 04 PriceSchedVol2 Amend01_0001.xlsx XLSX spreadsheet
Sol_140P2020R0079_Amd_0001.pdf PDF
Atch 01 CHOH 151201 Site Visit Attendees July 14 2020 1130 AM_0001.pdf PDF
Atch 02 CHOH 151241_PreBid_Agenda 7-14-20_0001.pdf PDF
B08_SF1442 140P2020R0079.pdf PDF
B08_4 -1048516_Big_Slackwater_T_EF.pdf PDF
B08_1 - 151201 CHOH ALL FINAL CD-Drawings Part I sig.pdf PDF
B08_5 - CHOH_151201-Reduced - 081632 Final Report-Enviroscan.pdf PDF
B08_2 - 151201 CHOH ALL FINAL CD-Specs.pdf PDF
B08_3 - 151201 CHOH ALL FINAL CD-Drawings Part II.pdf PDF
B08_10 - Atch10PastPerfVol1.docx DOCX document
B08_6 - PriceSchedVol2.xlsx XLSX spreadsheet
B08_11 - Atch11SubKPlanFormVol2.doc DOC document
B08_7.2 - Wage Determination MD20200005 Dredging 1-3-20.pdf PDF
B08_9 - Atch09ExpVol1.docx DOCX document
B08_7.1 - Wage Determination MD20200022 Heavy 6-5-20.pdf PDF
B08_13 - Atch13HazMatVol2.doc DOC document
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General References

READ CAREFULLY: The purpose of this form is for the offeror to provide the Government with general references in the spaces provided as described in the Instructions, Conditions, and Notices to Offerors (Section L). Include Area Codes with all telephone numbers. Fill in the information by typing or printing legibly.

It is especially important that the offeror disclose instances in which their relationships with the references may be considered less than fully satisfactory. The offeror should tell their side of the story and describe remedial corrective action that has been taken or will be taken to correct the deficiency. Failure to do so may result in a determination that an offeror has been less than candid with the Government, which could result in an unfavorable assessment of the offeror’s past performance record. Provide explanations on separate sheets as necessary.

Name of Contractor/Offeror:

Surety

Name of Surety:

Address of Surety:

Name of Agent:

Telephone Number:

Corporate Bank

Name of Bank:

Address of Bank:

Name of Agent:

Telephone Number:

Types and Numbers of Accounts:

Corporate Bank

Name of Bank:

Address of Bank:

Name of Agent:

Telephone Number:

Types and Numbers of Accounts:

Insurance Company

Name:

Address:

Name of Agent:

Telephone Number:

Types of Policies:

Subcontractor

Name:

Address:

Name of Contact:

Telephone Number:

Area of Specialized Work:

Subcontractor

Name:

Address:

Name of Contact:

Telephone Number:

Area of Specialized Work:

Subcontractor

Name:

Address:

Name of Contact:

Telephone Number:

Area of Specialized Work:

Material Supplier

Name:

Address:

Name of Contact:

Telephone Number:

Types of Material:

Material Supplier

Name:

Address:

Name of Contact:

Telephone Number:

Types of Material:

MATERIAL Supplier

Name:

Address:

Name of Contact:

Telephone Number:

Types of Material: