This document contains questions and answers regarding the federal solicitation for reconstructing and stabilizing historic stone walls and towpaths at McMahons Mill to Lock 42. The work includes reconstructing dry-laid and mortared stone walls, with options to extend the work. The National Park Service is the contracting agency. The bid due date was extended by two weeks to August 24, 2020. Additional details were provided for pricing optional line items, including quantities. The document clarifies that stone will be measured in place, weather limitations apply to stonework, and one mortar analysis is required per day of work. It also confirms that drawings need to show elevations and cross-sections, stones will be reset to match historic patterns but not exact locations, and past performance questionnaires can be resubmitted from other projects. Cofferdams are not required by the government.

View the file

Other files

File Type Posted
A07_02_20200821_SECTION 01 27 00 DEFINITION OF CONTRACT LINE ITEMS_0007.pdf PDF
A07_04_20200821_Structural DrawingsRev3_0007.pdf PDF
A07_05_20200821_Section B_Contract Price Schedule_0007.pdf PDF
A07_01 Questions and Answers Round 4 Final_0007.pdf PDF
Sol_140P2020R0079_Amd_0007.pdf PDF
A07_03_20200821_SECTION 044300 - STONE MASONRY_0007.pdf PDF
Sol_140P2020R0079_Amd_0006.pdf PDF
Sol_140P2020R0079_Amd_0005.pdf PDF
2020_0811 151201 - C2.01a DEMO & ES Ext_A04_03_0004.pdf PDF
20200812 MDE_USACE Authorization_A04_02_0004.pdf PDF
QA Round 3 QA_FINAL_A04_01_0004.pdf PDF
Sol_140P2020R0079_Amd_0004.pdf PDF
140P2020R0079 Amend 04_0004.pdf PDF
Sol_140P2020R0079_Amd_0003.pdf PDF
A03_01 - 011100 - SUMMARY OF WORK_REV_0003.pdf PDF
A03_04 - B08 - Solit_Equals_0003.doc DOC document
A03_03 - B08 BidBond_SF24-16d_0003.pdf PDF
A03_05 - CHOH 151201 Questions and Answers_0003.pdf PDF
A03_02 - 151201 CHOH ALL FINAL CD-Drawings - REV2_0003.pdf PDF
A02_01 CHOH 151201 CD-ContractPriceSchedule FINAL_0002.pdf PDF
A02_04_Section H Special Clause COVID_0002.pdf PDF
A02_02 CHOH 151201 CD-ContractPriceSchedule FINAL_0002.xlsx XLSX spreadsheet
A02_03 Contract Line Items FINAL_0002.pdf PDF
A02_05_52.211-18 Variation Est Qty Clause_0002.pdf PDF
A02_07 151201 CHOH ALL FINAL CD-Drawings - REV1_0002.pdf PDF
Sol_140P2020R0079_Amd_0002.pdf PDF
Atch 01 CHOH 151201 Site Visit Attendees July 14 2020 1130 AM_0001.pdf PDF
Atch 03 PreProposal Presentation 071420_0001.pdf PDF
Atch 04 PriceSchedVol2 Amend01_0001.xlsx XLSX spreadsheet
Sol_140P2020R0079_Amd_0001.pdf PDF
Atch 02 CHOH 151241_PreBid_Agenda 7-14-20_0001.pdf PDF
B08_4 -1048516_Big_Slackwater_T_EF.pdf PDF
B08_SF1442 140P2020R0079.pdf PDF
B08_3 - 151201 CHOH ALL FINAL CD-Drawings Part II.pdf PDF
B08_1 - 151201 CHOH ALL FINAL CD-Drawings Part I sig.pdf PDF
B08_2 - 151201 CHOH ALL FINAL CD-Specs.pdf PDF
B08_5 - CHOH_151201-Reduced - 081632 Final Report-Enviroscan.pdf PDF
B08_12 - Atch12GenRefsVol2.doc DOC document
B08_7.1 - Wage Determination MD20200022 Heavy 6-5-20.pdf PDF
B08_6 - PriceSchedVol2.xlsx XLSX spreadsheet
B08_11 - Atch11SubKPlanFormVol2.doc DOC document
B08_10 - Atch10PastPerfVol1.docx DOCX document
B08_13 - Atch13HazMatVol2.doc DOC document
B08_7.2 - Wage Determination MD20200005 Dredging 1-3-20.pdf PDF
B08_9 - Atch09ExpVol1.docx DOCX document
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHOH 151201 QUESTION ANSWER

1 Can the due date be extended 1 ‐ 2 weeks? Extended to 2:00 PM MDT August 24, 2020.

Addendum #1 provided a breakdown with unit price items for the base bid lump sum item. This is critical information for pricing the base bid because it will be very difficult to quantify the scope of work until the work commences. The same issues with quantifying the work will be true for Options “A – D” please provide unit price items for these options so contractors can all be bidding on the same scope of work.

See revised bid schedule. Additional detail has been provided for Options A & B.

Please confirm that the proposal evaluation is based on pricing for the base bid and all bid options. Accordingly, if optional bid items are assessed in the overall evaluation, then please provide quantities for the bid options so all proposals can be evaluated on an equal basis. Errant quantities in optional bid items could make a contractor an artificially low bidder, that would only become apparent through the course of construction.

See Section "M" of the Solicitation.

Even with unit pricing items that were provided with addendum #1 for the base bid, coordinating potentially multiple site visits to quantify work for Optional Bid Items and analyzing the variable field conditions for the entire project will be a time consuming process. We respectfully request a three week extension to the current bid date.

Extended to 2:00 PM MDT August 24, 2020.

Will NPS provide quantities for CLIN’s 18,19,19, 20 and 21. We cannot price these items without quantities.

See revised bid schedule. Additional detail has been provided for Options A & B.

2.Contract Line Item No. 13‐Repair exis ng Dry‐Laid Stone Walls states to be paid by CF. Not clear how this item is going to be measured. Will it be the volume of each small piece of stone installed? We believe that a better description of this item would be SF of face of wall repaired. Based on reviewing entire face of wall, quantity seems low.

Stone will be measured in place, within the limits of the structure shown on the plans.

Contract Line Item No. 17‐Repair existing Mortared Stone Walls states to be paid by SF. However, pricing sheet states to be paid by CF. Please confirm that this line item is to be paid by SF.

Payment will be by CF.

Please provide source of stone(quarry) for the last project that was done adjacent to this one.

The previous rubble stone used was sourced from Williamson Stone (limestone) from the Williamson Quarry, Greencastle, Pennsylvania. Other possible sources for projects that used similar stone was sourced from Greystone Quarry, Inc. in New York.

These sources are provided for informational purposes only; the Government is not directing the contractor to any particular source and there is no brand name or sole source justification for this material.

9 Will there be water source at McMahon’s Mill?

No potable water is available at McMahon's Mill.

Previously, potable water was trucked in by the contractor and other water (for tasks such as cleaning, dust control, etc.) has been sourced from Downey Branch or the Potomac River so long as it meets the technical requirements for its intended use and is within parameters established by MDE (see Water Appropriation and Use Permit thresholds available online).

Please confirm that there will be no weather limitations for setting dry lay stone walls.

Weather limitations for setting dry laid stone walls are found in paragraph 1.7 of Section 04 43 00. Sub‐ paragraph "A" indicates that : "Do not use frozen materials or materials mixed or coated with ice or frost. Do not build on frozen substrates. Remove and replace stone masonry damaged by frost or freezing conditions. Comply with cold‐weather construction requirements contained in ACI 530.1/ASCE6/TMS 602".

Please verify if there will be a requirement for a mortar analysis on existing mortar. If so, how many?

Mortar Analysis is addressed in paragraph 3.7.D of Section 04 43 00, therein it indicates that: "Prepare one set of mortar cubes for compression testing in accordance with ASTM C270 for each day's work.

Complete compression test and provide reports with test results to Contracting Officer."

8.Please confirm that extent of shop drawings required per 044300.3.2.C will be limited to plan view of wall showing construction type at each location. No elevation and/cross section required. Cross sections cannot be developed until after wall is removed.

The intent of the shop drawings is to capture the existing condition and establish the proposed repair schemes. To do this thoroughly elevation profiles and some cross‐sections will be necessary to convey this information. Detail 1/S1.1 requires existing height and width of wall to remain to be submitted as dimensions to the CO for approval prior to the start of wall reconstruction work, paragraph 1.4.A of Section 044300 in the specifications further details the contents of the shop drawings for the proposed wall treatment ‐ which includes the top of existing wall elevation, bottom of existing wall elevation, condition of existing wall and type of damage present, extents of mortared and dry laid masonry walls, and location of trees.

Please confirm that the intent is to reset stones to match historical/existing pattern, NOT stone by stone on its original location.

The intent is to match the historic character of the existing intact sections of wall. Per paragraph 1.5.C of Section 04 43 00 of the Specifications ‐ mockups will be used to establish the acceptable range of color, range, textures, blending of stone, quality of workmanship, and overall consistency of matching pre‐demolition appearance (or approved sample panel).

This question was answered in the affirmative at the pre‐bid conference, but please confirm that contractors ARE permitted to submit Past Performance Questionnaires that have been previously completed and submitted for other projects. For example, the attached was submitted for another solicitation back in March. Is this sufficient to submit with our proposal?

Yes.

15 Are cofferdams required to perform the work?

As seen in the drawings, the government is not requiring the use of cofferdams. The contractor's means & methods are his own responsibility to execute.