This document contains an authorization from the Maryland Department of the Environment to the U.S. National Park Service to conduct repairs along the Chesapeake and Ohio Canal near McMahons Mill. The authorization allows the National Park Service to repair a stone wall along the shoreline, replace two culverts, and raise a segment of towpath. The project will temporarily impact 2,432 linear feet of stream and 3,565 square feet of the 100-year floodplain, as well as 7,460 square feet temporarily. Instream construction is waived for the duration of the project. The authorization is valid from August 4, 2020 through August 4, 2025. The related federal contract opportunity is for reconstructing and stabilizing a historic stone wall and towpath between McMahons Mill and Lock 42 for the National Park Service.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF MARYLAND
DEPARTMENT OF THE ENVIRONMENT
WATER AND SCIENCE ADMINISTRATION
AUTHORIZATION TO PROCEED
AUTHORIZATION NUMBER: 202060823/20-NT-3113
EFFECTIVE DATE: August 4, 2020
EXPIRATION DATE: August 4, 2025
AUTHORIZED PERSON: U.S. National Park Service, C & O Canal NHP
1850 Dual Hwy, Ste 100
Hagerstown, Maryland 21740
Attn: Mr. Joe Roeed, P.E
IN ACCORDANCE WITH ENVIRONMENT ARTICLE §5-503(a) AND §5-906(b), ANNOTATED CODE OF
MARYLAND (2007 REPLACEMENT VOLUME), COMAR 26.17.04 AND 26.23.01, AND 26.08.02 AND THE
ATTACHED CONDITIONS OF AUTHORIZATIONS, U.S. National Park Service, C & O Canal NHP ("AUTHORIZED
PERSON"), IS HEREBY AUTHORIZED BY THE WATER AND SCIENCE ADMINISTRATION ("ADMINISTRATION")
TO CONDUCT A REGULATED ACTIVITY IN A NONTIDAL WETLAND, BUFFER, OR EXPANDED BUFFER, AND/OR TO CHANGE THE COURSE, CURRENT OR CROSS-SECTION OF WATERS OF THE STATE, IN
ACCORDANCE WITH THE ATTACHED PLANS APPROVED BY THE ADMINISTRATION ON August 3, 2020
("APPROVED PLAN") AND PREPARED BY VHB, Inc. AND INCORPORATED HEREIN, AS DESCRIBED BELOW:
Repair stone wall along shoreline, replace two culverts and raise segment of towpath. The project impacts 2,432 linear feet
(9728 square feet) of stream temporarily, 3,565 square feet of the 100-year floodplain permanently, and 7,460 square feet temporarily. Instream construction prohibition (Condition #15) is waived for this project for the entire duration of the project.
The project is located along the C&O Canal, 670 feet southwest from the intersection of Avis Mill Road and Briar Patch Lane in Washington County.
MD Grid Coordinates 207559 x 328514
Heather L. Nelso
Acting Program Manager
Wetlands and Waterways Program
Attachments: Conditions of Authorization
MDSPGP5- Cat A-b(1) cc: WSA Compliance Division w/ file (Washington County)
THE FOLLOWING CONDITIONS OF AUTHORIZATION APPLY TO ALL ACTIVITIES AUTHORIZED BY
AUTHORIZATION NUMBER 20-NT-3113/202060823
1. Validity: Authorization is valid only for use by Authorized Person. Authorization may be transferred only with prior written approval of the Administration. In the event of transfer, transferee agrees to comply with all terms and conditions of Authorization.
2. Initiation of Work, Modifications and Extension of Term: Authorized Person shall initiate authorized activities with two (2) years of the Effective Date of this Authorization or the Authorization shall expire. Authorized Person may submit written requests to the Administration for (a) extension of the period for initiation of work, (b) modification of
Authorization, including the Approved Plan, or, (c) not later than 45 days prior to Expiration Date, an extension of the term.
Requests for modification shall be in accordance with applicable regulations and shall state reasons for changes, and shall indicate the impacts on nontidal wetlands, streams, and the floodplain, as applicable. The Administration may grant a request at its sole discretion.
3. Responsibility and Compliance: Authorized Person is fully responsible for all work performed and activities authorized by this Authorization shall be performed in compliance with this Authorization and Approved Plan. Authorized Person agrees that a copy of the Authorization and Approved Plan shall be kept at the construction site and provided to its employees, agents and contractors. A person (including Authorized Person, its employees, agents or contractors) who violates or fails to comply with the terms and conditions of this Authorization, Approved Plan or an administrative order may be subject to penalties in accordance with §5-514 and §5-911, Department of the Environment Article, Annotated
Code of Maryland (2007 Replacement Volume).
4. Failure to Comply: If Authorized Person, its employees, agents or contractors fail to comply with this Authorization or
Approved Plan, the Administration may, in its discretion, issue an administrative order requiring Authorized Person, its employees, agents and contractors to cease and desist any activities which violate this Authorization, or the Administration may take any other enforcement action available to it by law, including filing civil or criminal charges.
5. Suspension or Revocation: Authorization may be suspended or revoked by the Administration, after notice of opportunity for a hearing, if Authorized Person: (a) submits false or inaccurate information in Permit application or subsequently required submittals; (b) deviates from the Approved Plan, specifications, terms and conditions; (c) violates, or is about to violate terms and conditions of this Authorization; (d) violates, or is about to violate, any regulation promulgated pursuant to Title 5, Department of the Environment Article, Annotated Code of Maryland as amended; (e) fails to allow authorized representatives of the Administration to enter the site of authorized activities at any reasonable time to conduct inspections and evaluations; (f) fails to comply with the requirements of an administrative action or order issued by the Administration;
or (g) does not have vested rights under this Authorization and new information, changes in site conditions, or amended regulatory requirements necessitate revocation or suspension.
6. Other Approvals: Authorization does not authorize any injury to private property, any invasion of rights, or any infringement of federal, State or local laws or regulations, nor does it obviate the need to obtain required authorizations or approvals from other State, federal or local agencies as required by law.
7. Site Access: Authorized Person shall allow authorized representatives of the Administration access to the site of authorized activities during normal business hours to conduct inspections and evaluations necessary to assure compliance with this Authorization. Authorized Person shall provide necessary assistance to effectively and safely conduct such inspections and evaluations.
8. Inspection Notification: Authorized Person shall notify the Administration's Compliance Program at least five (5) days before starting authorized activities and five (5) days after completion. For Allegany, Garrett, and Washington counties, Authorized Person shall call 301-689-1480. For Carroll, Frederick, Howard, Montgomery, and Prince George’s counties, Authorized Person shall call 301-665-2850. For Baltimore City, Anne Arundel, Baltimore, Calvert, Charles, and St.
Mary’s, Authorized Person shall call 410-537-3510. For Caroline, Cecil, Dorchester, Harford, Kent, Queen Anne’s, Somerset, Talbot, Wicomico and Worcester, Authorized Person shall call 410-901-4020. If Authorization is for a project that is part of a mining site, please contact the Land and Materials Administration’s Mining Program at 410-537-3557 at least five (5) days before starting authorized activities and five (5) days after completion.
9. Sediment Control: Authorized Person shall obtain approval from the Washington Soil Conservation District for a grading and sediment control plan specifying soil erosion control measures. The approved grading and sediment control plan shall be included in the Approved Plan, and shall be available at the construction site.
THE FOLLOWING CONDITIONS OF AUTHORIZATION APPLY TO ALL ACTIVITIES AUTHORIZED BY
AUTHORIZATION NUMBER 20-NT-3113/202060823
10. Best Management Practices During Construction: Authorized Person, its employees, agents and contractors shall conduct authorized activities in a manner consistent with the Best Management Practices specified by the Administration.
11. Disposal of Excess: Unless otherwise shown on the Approved Plan, all excess fill, spoil material, debris, and construction material shall be disposed of outside of nontidal wetlands, nontidal wetlands buffers, and the 100-year floodplain, and in a location and manner which does not adversely impact surface or subsurface water flow into or out of nontidal wetlands.
12. Temporary Staging Areas: Temporary construction trailers or structures, staging areas and stockpiles shall not be located within nontidal wetlands, nontidal wetlands buffers, or the 100-year floodplain unless specifically included on the
Approved Plan.
13. Temporary Stream Access Crossings: Temporary stream access crossings shall not be constructed or utilized unless shown on the Approved Plan. If temporary stream access crossings are determined necessary prior to initiation of work or at any time during construction, Authorized Person, its employees, agents or contractors shall submit a written request to the Administration and secure the necessary permits or approvals for such crossings before installation of the crossings.
Temporary stream access crossings shall be removed and the disturbance stabilized prior to completion of authorized activity or within one (1) year of installation.
14. Discharge: Runoff or accumulated water containing sediment or other suspended materials shall not be discharged into waters of the State unless treated by an approved sediment control device or structure.
15. Instream Construction Prohibition:
No instream construction is to occur under this Authorization;
To protect important aquatic species, motor driven construction equipment shall not be allowed within stream channels unless on authorized ford crossings. Activities within stream channels are prohibited as determined by the classification of the stream (COMAR 26.08.02.08): Potomac River is a Use I waterway; in-stream work may not be conducted from March
1 through June 15 inclusive, of any year.
16. Instream Blasting: Authorized Person shall obtain prior written approval from the Administration before blasting or using explosives in the stream channel.
17. Minimum Disturbance: Any disturbance of stream banks, channel bottom, wetlands, and wetlands buffer authorized by this Authorization or Approved Plan shall be the minimum necessary to conduct permitted activities. All disturbed areas shall be stabilized vegetatively no later than seven (7) days after construction is completed or in accordance with the approved grading or sediment and erosion control plan.
18. Restoration of Construction Site: Authorized Person shall restore the construction site upon completion of authorized activities. Undercutting, meandering or degradation of the stream banks or channel bottom, any deposition of sediment or other materials, and any alteration of wetland vegetation, soils, or hydrology, resulting directly or indirectly from construction or authorized activities, shall be corrected by Authorized Person as directed by the Administration.
FEDERALLY MANDATED STATE AUTHORIZATIONS
The State of Maryland issued a Water Quality Certification to the U.S. Army Corps of Engineers for projects receiving federal authorization under the Maryland State Programmatic General Permit, Regional General Permit for Chesapeake
Bay Total Maximum Daily Load (TMDL) Activities and non-suspended Nationwide Permits. In addition, as applicable, this Authorization constitutes the State’s concurrence with the Applicant’s certification that the activities authorized herein are consistent with the Maryland Coastal Zone Management Program, as required by Section 307 of the Coastal
Zone Management Act of 1972, as amended. Activities in the following counties are not subject to the Maryland Coastal
Zone Management requirement: Allegany, Carroll, Frederick, Garrett, Howard, Montgomery, and Washington.
U.S. ARMY CORPS OF ENGINEERS AUTHORIZATION
The U.S. Army Corps of Engineers has reviewed this activity and has granted authorization under the Maryland State
Programmatic General Permit (MDSPGP-5), as a Category A. The terms and conditions of the MDSPGP-5, as outlined in the enclosed attachment, should be followed when performing the authorized work.
DEPARTMENT OF THE ARMY
BALTIMORE DISTRICT, CORPS OF ENGINEERS
ATTN: REGULATORY BRANCH
10 S. HOWARD STREET
BALTIMORE, MD 21201
IMPORTANT INFORMATION ABOUT YOUR PROJECT
Corps Permit Tracking No.: _________________________ Date: ________________ Permittee/Project Name: ________________________________________________ MDSPGP-5 Activity No.: ________________________________________________
Dear Applicant:
The U. S. Army Corps of Engineers, Baltimore District, has determined that the proposed work meets the enclosed terms and conditions of the Maryland State Programmatic General Permit-5 (MDSPGP-5). A requisite of permit issuance requires that the applicant comply with any specific terms and conditions associated with the authorized project (conditions enclosed). This MDSPGP-5 verification is provided pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act. If any of the information contained in your application and/or plans is later found to be in error, the MDSPGP-5 authorization for your project may be modified, suspended, or revoked.
As a condition of the MDSPGP-5 authorization, you, the permittee, are required to complete and sign the enclosed Compliance Self-Certification Form regarding the completed work and any required mitigation. The signed form should be returned to the Regulatory Branch at the above address within 60 days following completion of the authorized work and any required mitigation.
Please be aware that the terms and conditions of this permit will continue to be binding on the new property owner(s) if structures or work authorized by this permit exist at the time of ownership transfer of the associated property. Although the construction period for work authorized by this MDSPGP-5 is finite, the permit itself, with its limitations, does not expire. To validate the transfer of this permit and the legal responsibility to comply with its terms and conditions, the transferee (new owner) must provide the Corps a mailing address and telephone number along with their signature and date in the space provided below and mail a copy to the above address.
Your MDSPGP-5 authorization is valid until September 30, 2021 unless the permit is modified, reissued, or revoked. You must remain informed of the changes to the MDSPGP-5. When changes to the MDSPGP-5 occur, a public notice announcing the changes will be issued. Be advised that you have 12 months from the effective date of the MDSPGP-5’s expiration, modification or revocation to complete the work under the present terms and conditions provided you have commenced construction or are under contract to commence construction of the authorized work.
In order for this authorization to be valid, you must obtain all required Federal, State, and local permits.
Beth E. Bachur Acting Chief, Regulatory Branch
TRANSFEREE SIGNATURE DATE AREA CODE / TELEPHONE NO.
PRINTED NAME ADDRESS
20-NT-3113/202060823 Aug 4, 2020 NPS, C&O Canal National Historic Park/Towpath Repair Cat A-b(1)
ATTN: REGULATORY BRANCH
10 S. HOWARD STREET
BALTIMORE, MD 21201
Effective October 1, 2016 ________________ Corps Permit No.
CENAB-OPR-MDSPGP-5 (MARYLAND STATE PROGRAMMATIC GENERAL PERMIT-5)
TO WHOM IT MAY CONCERN:
Upon recommendation of the Chief of Engineers, and under the provisions of Section 404 of the Clean Water Act, as amended, and Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.
403), the Secretary of the Army hereby authorizes the discharge of dredged or fill material or the placement of structures into Waters of the United States, including wetlands and navigable waters. These discharges and structures must comply with all the terms and conditions identified in this MDSPGP-5. It has been determined that the project qualifies for the MDSPGP-
5. Accordingly, you are authorized to undertake the activity pursuant to:
1. Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403); and/or
2. Section 404 of the Clean Water Act (33 U.S.C. 1344).
You are authorized to perform work in accordance with the terms and conditions specified in Section VII of the MDSPGP-5 effective on October 1, 2016.
VII. General Conditions: To qualify for MDSPGP-5 authorization, the prospective permittee must comply with the following general conditions, as appropriate, in addition to any activity-specific impact limits and requirements identified in the Description of MDSPGP-5 Authorized Activities, and any case-specific special conditions imposed by the Corps.
A. General Requirements:
1. Other Permits: Authorization under the MDSPGP-5 does not obviate the need to obtain other Federal, State, or local authorizations required by law or to comply with all Federal, state or local laws.
2. Geographic Jurisdiction: This MDSPGP-5 will authorize work undertaken within the geographic limits of the State of Maryland under the regulatory jurisdiction of the Baltimore District.
3. Applicability: Applicability of the MDSPGP-5 must be reviewed with reference to the Corps definition of waters of the United States, including wetlands, and navigable waters of the United States. Applicants are responsible for delineating boundaries of all waters of the United States, including wetland boundaries. The identification and delineation of wetland boundaries must be accomplished in accordance with the current Federal manual for identifying jurisdictional wetlands and applicable supplemental guidance issued by the Corps of Engineers.
4. Minimal Effects: Projects authorized by the MDSPGP-5 must have no more than minimal individual and cumulative adverse environmental effects, as determined by the Baltimore District.
20-NT-3113/202060823
5. Discretionary Authority: Notwithstanding compliance with the terms and conditions of the MDSPGP-5, the Corps retains discretionary authority to require an alternate Corps permit review for any project under any categories of the MDSPGP-5 based on concerns for the aquatic environment or for any other public interest factor. This authority may be invoked on a case-by-case basis during the review process for Category B activities whenever the Corps determines that, based on the concerns stated above, the potential consequences of the proposed project warrant individual review. In some rare instances, the Corps may have concerns for the aquatic environment or for any other public interest factor pertaining to a specific proposed project, which has already received a case-specific verification as a Category A activity. In order to evaluate this project under an alternate Corps permit review, the verification must be suspended in accordance with Section VIII.E of the MDSPGP-5.
Whenever the Corps notifies an applicant that an alternate Corps permit may be required, authorization under the MDSPGP-5 is voided. No work may be conducted until the individual Corps permit is obtained, or until the Corps notifies the applicant that further review has demonstrated that the work may proceed under the MDSPGP-5.
6. Single and Complete Projects: The MDSPGP-5 must not be used for piecemeal work and must be applied to single and complete projects, including maintenance activities. For purposes of this MDSPGP-5, a single and complete project means the total project proposed or accomplished by one owner/developer or partnership or other association of owners/developers and which has independent utility. All components of a project, including all attendant features both temporary and permanent, must be reviewed together as constituting one single and complete project. The MDSPGP-5 must not be used for any activity or portion of a project (e.g., a pier or boat ramp), that is part of, or dependent on, an overall project (e.g., the dredging of a main navigation channel or a spur channel), for which an individual permit or some other alternate Corps permit is required. The same activity under the MDSPGP-5 cannot be used more than once for the same single and complete project.
7. Use of Multiple MDSPGP-5 Activities: More than one MDSPGP-5 activity may be used to authorize a single and complete project. However, the specific requirements, including all activity-specific requirements and impact thresholds, must be met for each MDSPGP-5 activity and the total extent of project impacts must not exceed the acreage and/or linear foot limit of the MDSPGP-5 activity with the highest specified acreage and/or linear foot limit. For example, if a road crossing is authorized under Category A of Section IV.B.1.(d)(1) with an associated nontidal bank stabilization authorized under Section IV.B.1.f.(4)(a), the maximum total impact limits to nontidal waters of the United States for the single and complete project may not exceed 10,000 square feet in total area and/or 500 linear feet in total length. The road crossing and nontidal bank stabilization activities must still meet all Category A activity-specific requirements and impact thresholds.
A single and complete project with multiple impacts, that may be eligible for authorization under a Category A and a Category B activity, requires an application submittal to the Corps and review under the MDSPGP-5 Category B verification procedures. All specific requirements, including the activity-specific requirements and impact thresholds of the Category A activity and the Category B activity must be met and the total extent of project impacts must not exceed to total acreage and/or linear foot limit of the MDSPGP-5 activity with the highest specified acreage and/or linear foot limit. For example, if a road crossing is authorized under Category A of Section IV.B.1.(d)(1) with an associated nontidal bank stabilization authorized under Section IV.B.f.(4)(b), the maximum total impact limits to waters of the United States for the single and complete project may not exceed 1/2 acre (21,780 square feet) in total area and/or 2,000 linear feet in total length. The road crossing activity must meet the Category A activity-specific requirements and impact thresholds, and the nontidal bank stabilization activity must meet the Category B activity-specific requirements and impact thresholds.
8. Permit On-Site: The permittee must ensure that a copy of the MDSPGP-5 and the accompanying authorization letter are at the work site at all times. These copies must be made available to any regulatory representative upon request. Although the permittee may assign various aspects of the work to different contractors or sub-contractors, all contractors and sub-contractors must be expected to comply with all conditions of any general permit authorization.
9. Authorized Activities in Navigable Waters Subject to Section 10 of the Rivers and Harbors Act of 1899:
a. If future operations by the United States require removal, relocation, or other alteration of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work must cause unreasonable obstruction to the free navigation of the navigable water, the permittee will be required, upon due notice from the Corps, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim must be made against the United States on account of any such removal or alteration.
b. The permittee acknowledges the possibility that the structure permitted herein may be subject to damage by wave wash from passing vessels and/or ice flows within the waterway. The issuance of this permit does not relieve the permittee from taking all proper steps to ensure the integrity of the structure permitted herein and the safety of vessels moored thereto from damage by wave wash and/or ice flows, and the permittee must not hold the United States liable for such damage.
c. The permittee must install and maintain, at his/her expense any safety lights, markers, and/or signals prescribed by the USCG, through regulations or otherwise, on the authorized facilities and/or structures. The permittee must contact the Commander (AOWW), Fifth Coast Guard District, Federal Building, 431 Crawford Street, Portsmouth, Virginia, 23704, to ascertain the need for obstruction lights. Prior to commencing the construction or installation of an authorized structure in navigable waters of the United States, the permittee must submit a “Private Aids to Navigation Application” to the Commander of the USCG.
d. The permittee must provide location coordinates of the authorized structures, including minimum depth and other pertinent information to the USCG and request that a Local Notice to Mariners is issued regarding the authorized work.
10. For Aerial Transmission Lines Across Navigable Waters: The following minimum clearances are required for aerial electric power transmission lines crossing navigable waters of the United States. These clearances are related to the clearances over the navigable channel provided by existing fixed bridges, or the clearances which would be required by the USCG for new fixed bridges, in the vicinity of the proposed aerial transmission line. These clearances are based on the low point of the line under conditions producing the greatest sag, taking into consideration temperature, load, wind, length of span, and type of supports as outlined in the National Electrical Safety Code:
NOMINAL SYSTEM VOLTAGE (kV) Minimum additional clearance (ft.) above clearance required for bridges.
115 and below 20
138 22
161 24
230 26
350 30
500 35
700 42
750-765 45
a. Clearances for communication lines, stream gauging cables, ferry cables, and other aerial crossings must be a minimum of ten feet above clearances required for bridges, unless specifically authorized otherwise by the District Engineer.
b. Corps Regulation ER 1110-2-4401 prescribes minimum vertical clearances for power communication lines over Corps lake projects. In instances where both the National Electrical Safety Code requirements and ER 1110-2-4401 apply, the greater minimum clearance is required.
B. National Concern:
1. Historic Properties: Any activity authorized by the MDSPGP-5 must comply with Section 106 of the National Historic Preservation Act. Maryland Department of the Environment, in cooperation with the Maryland Historic Trust, must conduct an initial review and notify the Corps if any archaeological or other cultural resources are in the vicinity of the project.
The Corps may require applicants to perform a survey of archaeological and historical resources in the project area. The Corps must determine whether National Historic Preservation Act Section 106 consultation is required. The applicant must notify the Corps if they have knowledge that the activity may affect any historic properties listed or eligible for listing, or that the applicant has reason to believe may be eligible for listing on the National Register of Historic Places. Upon discovery of any previously unknown historic, cultural, or archeological resources or remains while accomplishing the activity authorized by this permit, the permittee must immediately notify the Corps of what has been found, and avoid construction activities that may affect the resources or remains until the required coordination has been completed. The Corps will initiate the Federal, Tribal, and state coordination required to determine if the items or remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places. The permittee must not begin or continue work until notified by the District Engineer that the requirements of the National Historic Preservation Act have been satisfied and that the activity may proceed. Information on the location and existence of historical resources can be obtained from the MHT, Office of Preservation Services, and the National Register of Historic Places. The Corps will conclude all tribal coordination in accordance with the District’s tribal coordination procedures prior to verifying an activity authorized by MDSPGP-5.
2. Tribal Rights: No activity or its operation may impair reserved tribal rights, including but not limited to, reserved water rights and treaty fishing and hunting rights.
3. National Lands: Activities authorized by the MDSPGP-5 must not impinge upon the value of any Federal land, including but not limited to, National Wildlife Refuges, National Forests, National Parks, National Marine Sanctuaries, or any area administered by the FWS, U.S. Forest Service, or National Park Service (e.g., Assateague Island National Seashore).
4. Endangered Species: The MDSPGP-5 does not authorize any activity that may directly or indirectly affect a threatened or endangered species or a species proposed for such designation, as identified under the Federal ESA; or which may directly or indirectly destroy or adversely modify the critical habitat of such species unless and until appropriate coordination with the applicable resource agency(s) is complete and all such issues are resolved in accordance with the applicable regulations and procedures. Prior to application submittal, applicants must conduct an initial review for ESA resources, including FWS and/or NMFS species or critical habitat, utilizing the appropriate website(s) provided below. A complete permit application must contain evidence that the applicant has already contacted and received a response from the FWS and/or NMFS concerning any Federally listed or proposed threatened and endangered species and designated or proposed critical habitat that may be affected by the proposed activity. For FWS ESA species, an applicant must use the FWS Chesapeake Bay Field Office Project Review website (FWS website tool) provided below to determine if any Federally listed species are present in the proposed project area. A complete application must contain one of the following: If species or designated critical habitat are determined to be present in the proposed project area using the FWS website tool: A FWS Official Species List tailored for the proposed project area must be obtained and submitted with the application. An Official Species List is considered valid for 90 days. If no listed species or designated critical habitat are determined to be present in the proposed project area using the FWS website tool:
A report that includes an online self-certification letter, map of action area, and Official Species List must be obtained and submitted with the application. For NMFS species and/or critical habitat, an applicant must use the NOAA Fisheries Species Information and Maps website (NMFS website tool) provided below to determine if any Federally listed species or critical habitat are present in the proposed project area. A complete application must include mapping depicting the project location in relation to any Federally listed species and/or critical habitat.
For assistance please contact Mr. Brian Hopper of NMFS Fisheries at 410.573.4592. MDE must conduct an initial review and notify the Corps and FWS or NMFS if any Federally listed species or critical habitat is likely to be in the vicinity of the project. MDE, in cooperation with MD DNR, must conduct an initial review and notify the Corps and FWS if any Federally listed species or critical habitat is likely to be in the vicinity of the project. The Corps must determine if consultation with FWS or NMFS is required under Section 7 of the ESA. If consultation is required, the applicant, after notification, must not begin or continue work until notified by the Corps that the requirements of the ESA have been satisfied and that the activity is eligible for authorization. Information on the location of threatened and endangered species and their critical habitat can be obtained from the offices of the FWS and NMFS or their web pages at:
https://www.greateratlantic.fisheries.noaa.gov/protected/section7/guidance/maps/index.html and, http://www.fws.gov/chesapeakebay/EndSppWeb/ProjectReview/Index.html respectively.
National Marine Fisheries Service – Endangered Species Act Requirements:
a. Interactions with National Marine Fisheries Service Federally Threatened or Endangered Species: Any interaction between a sea turtle or any species listed now or in the future under Federal law as a threatened or endangered species (“listed species”) (e.g., North
Atlantic right whale, humpback whale, shortnose sturgeon) and the vessels associated with the project must be reported to the NMFS as follows: If the animal appears alive and uninjured (i.e., breathing normally, no visible wounds, movement uninhibited), the permittee or its representative must report the incident to the NMFS Northeast Region Marine Mammal and Sea Turtle Stranding and Entanglement Hotline at (866) 755-6622 within 24 hours of returning from the trip on which they made the discovery. If the animal requires assistance, the call to the hotline must be made immediately. If the animal appears to be injured (i.e. bleeding, gasping for air, etc.) or dead, the permittee or its representative must also immediately call the hotline so the appropriate rehabilitation or stranding network representative can be contacted. The applicant must also notify the Corps of all correspondence and interaction with the NMFS within two calendar days. Additional information about any Federally threatened or endangered species may be obtained from the attached fact sheet or online at:
http://www.nero.noaa.gov/prot_res/stranding/SpeciesOverview.html and at:
http://www.nero.noaa.gov/prot_res/esp/. An interaction is defined as an entanglement or capture of a listed species or a strike/direct contact between vessels or equipment used for the project and a listed species.
b. Vessel Buffer: When listed species are sighted, vessels must attempt to maintain a distance of 50 yards (150 feet) or greater between the animal and the vessel whenever possible. State and Federal regulations prohibit approaching a right whale within a 500 yard (1,500 foot) buffer zone. Any vessel finding itself within the 500 yard (1,500 foot) buffer zone created by a surfacing right whale must depart immediately at a safe, slow speed. If other listed species are detected, vessels will reduce their speeds to 10 knots or to the maximum extent practicable to ensure human safety. If listed species are sighted off of a moving dredge, intentional approaches within 100 yards (300 feet) of the animal must be avoided. Vessels must reduce speeds to 4 knots or the lowest speed practicable to ensure human safety. Any interactions must be reported to the NMFS.
c. Best Management Practices Applicable to Category A and Category B Activities within Tidal Waters and Wetlands:
i. Pile Driving for Category A Activities: For the protection of listed species, pile one of the following conditions:
(1) Plastic or concrete piles must be less than 12 inches when a cushioned impact hammer or vibratory hammer is utilized for installation.
(2) Timber piles must be 10 inches or less when a vibratory hammer is utilized for installation.
(3) Vinyl or timber sheet piles must be 24 inches or less in width, as measured from the outer edge of corrugation to the inner edge of corrugation, when a cushioned impact hammer or vibratory hammer is used.
(4) Pile driving activities must be located within freshwater tributaries or within tidal or nontidal wetlands.
(5) Piles of any size/type with any hammer method must be installed behind diversion structures or in the dry when the tide is out in the intertidal zone.
(6) Piles of any size/type with any hammer method must be installed between November 30 and March 15.
(Note: Any pile driving activity that does not meet one of the conditions above must be reviewed by the Corps as a Category B activity or an alternate Corps permit review process, as appropriate.
ii. Pile Driving for Category A and Category B Activities: For Category A and Category B activities, pile driving must be initiated with a soft start each day of pile driving, building up power slowly from a low energy start-up over a 20 minute period to allow for fish and other wildlife to leave the area.
iii. Sediment Disturbing Activities Time-of-Year Restriction: Sediment disturbing activities, which includes pile driving activities, are prohibited during the period April 1 through June 30 within all tidal waters of the Chesapeake Bay in Maryland and its tidal tributaries with salinity levels <6 ppt for the protection of shortnose sturgeon during early life stages in these waters.
5. Essential Fish Habitat (EFH) and Fish and Wildlife Coordination Act: Section 305(b)(2) of the Magnuson-Stevens Fishery Conservation and Management Act requires an EFH consultation with the NMFS for any action or proposed action authorized, funded, or undertaken by a Federal agency that may adversely affect EFH. Essential Fish Habitat has been defined by Congress as “those waters and substrate necessary to fish for spawning, breeding, feeding, or growth to maturity.” The designation and conservation of EFH seeks to minimize adverse effects on habitat caused by fishing and non-fishing activities. NMFS has determined that many of the MDSPGP-5 Category A activities are eligible for EFH general or programmatic concurrence and require no further EFH consultation. National Marine Fisheries Service, in consultation with the District, has determined that individual EFH consultation is needed for some projects potentially eligible for authorization under Category A of the MDSPGP-5 that may adversely affect EFH. The Corps will coordinate with NMFS as part of the Category B review procedures. EFH conservation recommendations made by NMFS will normally be included as a permit requirement by the Corps. If the EFH coordination and consultation requirements cannot be resolved under the MDSPGP-5 process, an alternate Corps permit review process is required for the project.
6. Wild and Scenic Rivers: No activity is authorized under the MDSPGP-5 that occurs in a component of the National Wild and Scenic River System, including rivers officially designated by Congress as study rivers for possible inclusion in the system, while such rivers are in an official study status, unless the appropriate Federal agency, with direct management responsibility for the river, has determined in writing that the proposed activity will not adversely affect any National Wild and Scenic River, including study rivers. Information on Wild and Scenic Rivers may be obtained from the appropriate Federal land management agency in the area (e.g., National Park Service, U. S. Forest Service, Bureau of Land Management, or FWS).
7. Federally Authorized Civil Works Projects:
a. Federal Navigation Projects: The MDSPGP-5 does not authorize interference with any existing or proposed Federal navigation projects. The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work must cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim must be made against the United States on account of any such removal or alteration. (See VII.A.9.a.)
b. Federal Navigation Channel Setbacks: All activities must comply with the Baltimore District Minimum Setback Guidance for Structures Along Federally Authorized Channels. Please see the Baltimore District’s Regulatory webpage to view this guidance:
http://www.nab.usace.army.mil/Missions/CivilWorks/NavMaps.aspx
c. Other Federally Authorized Civil Works Properties and/or Projects (e.g., flood control, dams, and reservoirs): The MDSPGP-5 does not authorize interference to any proposed or existing Federally authorized civil works project.
d. Activities Affecting Structures or Works Built by the United States: Engineer Circular (EC 1165-2-216) provides policy and procedural guidance for processing requests by private, public, tribal, or other federal entities, to make alterations to, or temporarily or permanently occupy or use, any US Army Corps of Engineers (USACE) federally authorized civil works project, pursuant to 33 USC 408 (Section 408). Proposed alterations must not be injurious to the public interest or affect the USACE project’s ability to meet its authorized purpose. The decision on a Department of the Army permit application pursuant to Section 10/404/103 cannot and will not be rendered prior to the decision on the Section 408 request. An activity that requires Section 408 permission is not authorized by the MDSPGP-5 until the Corps issues the Section 408 permission to alter, occupy, or use the USACE project, and the Corps issues a written MDSPGP-5 verification.
8. Federal Liability: In issuing this permit, the Federal Government does not assume any liability for the following:
a. Damages to the permitted project, or uses thereof, as a result of other permitted or unpermitted activities or from natural causes;
b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest;
c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit;
d. Design or construction deficiencies associated with the permitted work;
e. Damage claims associated with any future modification, suspension or revocation of the MDSPGP-5 or any specific MDSPGP-5 verification.
9. Navigation: Projects authorized under the MDSPGP-5 must not cause interference with navigation, and no attempt must be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to projects authorized under the MDSPGP-5. Nothing in the MDSPGP-5 must in any way restrict the District Engineer, U.S. Army Engineer District, Baltimore, from exercising his legal authority to protect the public interest in navigation or from exercising his authority under the Navigation Servitude of the United States. (See VII.A.9.)
10. Fills Within 100-Year Floodplain: The activity must comply with applicable Federal Emergency Management Agency approved State or local floodplain management requirements.
11. Safety of Impoundment Structures: To ensure that all impoundment structures are safely designed, the Corps may require non-Federal applicants to demonstrate that the structures comply with established State dam safety criteria or have been designed by qualified persons. The Corps may also require documentation that the design has been independently reviewed by similarly qualified persons, and appropriate modifications made to ensure safety.
12. Migratory Birds and Bald and Golden Eagles: The permittee is responsible for obtaining any “take” permits required under the FWS’s regulations governing compliance with the Migratory Bird Treaty Act or the Bald and Golden Eagle Protection Act. The permittee should contact the appropriate local office of the FWS to determine if such “take” permits are required for a particular activity.
13. Environmental Justice: Activities authorized under this MDPSGP-5 must comply with Executive Order 12898, “Federal Actions to Address Environmental Justice in Minority Populations and Low- Income Populations.”
14. Hazardous Wildlife Attractants On or Near Airports: Permittees must consider the activity’s effects on aviation safety and design a project so it does not create a wildlife hazard. All authorized activities that may attract hazardous wildlife must be consistent with the siting criteria and land use practice recommendations stated in Section 1-3 of the Federal Aviation Administration Advisory Circular 150/5200-33. This document can be found at:
http://www.faa.gov/documentLibrary/media/advisory_circular/150-5200- 33B/150_5200_33b.pdf
15. Water Quality Certification: Permittees must satisfy any conditions imposed by the State of Maryland and EPA, where applicable, in their Water Quality Certification for the MDSPGP-5 pursuant to Section 401 of the Clean Water Act. On September 13, 2016, the Maryland Department of the Environment issued WQC for the MDSPGP-5 subject to the condition that the applicant obtains all necessary State permits and approvals. The Corps or State may require additional water quality management measures to ensure that the authorized activity does not result in more than minimal degradation of water quality.
16. Coastal Zone Management Consistency (CZM): The Corps determined that all activities authorized under the MDSPGP-5 will be carried out in a manner consistent with the Coastal Zone Management Program pursuant to Section 307 of the Federal Coastal Zone Management Program of 1972, as amended. On September 13, 2016, the Maryland Department of the Environment concurred with the Corps’ determination provided that the applicant obtains all necessary State permits and approvals. Permittees must satisfy any additional conditions imposed by the State of Maryland in their CZM concurrences for the
MDSPGP-5.
17. Coastal Barrier Resources Act (CBRA): Federal funding for certain activities requiring Corps authorization may be prohibited within the established Coastal Barrier Resources System, which is a defined set of coastal barrier units located along the Atlantic, Gulf of Mexico, Great Lakes, U.S. Virgin Islands, and Puerto Rico coasts. Activities authorized under the MDSPGP-5 must comply with the CBRA. More detailed information can be found at:
http://www.fws.gov/cbra.
C. Minimization of Environmental Impacts:
1. Avoidance and Minimization: Discharges of dredged or fill material into waters of the United States and adverse impacts of such discharges on the aquatic ecosystem, both temporary and permanent, must be avoided and minimized to the maximum extent practicable at the project site (i.e., on-site). Mitigation in all its forms (avoiding, minimizing, rectifying, reducing or compensating for resource losses) will be required to the extent necessary to ensure that the adverse effects to the aquatic environment are minimal.
2. Mitigation Standards: The Corps will consider the following factors when determining appropriate and practicable mitigation necessary to ensure that the adverse effects on the aquatic environment are minimal and that the project is eligible for authorization under the MDSPGP-5:
a. Wetlands: Compensatory wetland mitigation at a minimum one-for-one ratio will be required for all permanent tidal or nontidal wetland losses that exceed 5,000 square feet and that require an application submittal for Corps authorization, unless the Corps determines in writing that either some type of mitigation or ratio of mitigation other than a one-to-one ratio would be more appropriate or the adverse effects of the proposed activity are minimal, and provides a project-specific waiver of this requirement. For wetland losses of 5,000 square feet or less that require an application submittal for Corps authorization, the Corps may determine on a case-by-case basis that compensatory mitigation is required to ensure that the activity results in minimal adverse effects on the aquatic environment. Generally, the minimum required wetland mitigation ratios will be as follows: 2:1 for forested and scrub-shrub wetlands; 1:1 for herbaceous emergent wetlands, and 1:1 for permanent conversion of forested wetlands to herbaceous emergent wetlands. Maintenance of previously authorized activities typically does not require mitigation. Since the likelihood of success is greater and the impacts to potentially valuable uplands are reduced, wetland restoration should be the first compensatory mitigation option considered.
b. Streams and Other Open Waters: Compensatory mitigation at a minimum one-for-one ratio will be required for permanent losses of streams or other open waters that exceed 200 linear feet and that require an application submittal for Corps authorization, unless the Corps determines in writing that either some other type of mitigation would be more appropriate or the adverse effects of the proposed activity are minimal, and provides a project-specific waiver of this requirement. Compensatory mitigation, such as stream rehabilitation, enhancement (including enhancement of riparian buffers), or preservation, focusing on functional replacement, may be required to ensure that the activity results in minimal adverse effects on the aquatic environment. In addition, compensatory mitigation plans for losses of streams and other open waters will normally include a requirement for the restoration or establishment, maintenance, and site protection of riparian areas next to open waters. Riparian buffer areas should consist of native species. The width of the required riparian area will address documented water quality or aquatic habitat impact concerns. Typically, the riparian area will not be less than 25 feet wide on each side of the stream, but the Corps may require wider riparian areas to address documented water quality or habitat loss concerns.
Furthermore, the Corps may determine that restoration or establishment of a riparian area along a single bank or shoreline is sufficient when it is not possible to establish a riparian area on both sides of a stream, or if the waterbody is a lake or coastal waters.
c. All compensatory mitigation projects provided to offset losses of aquatic resources must comply with the applicable provisions of 33 CFR Part 332.
d. The applicant is responsible for proposing an appropriate compensatory mitigation option if compensatory mitigation is necessary to ensure that the activity results in minimal adverse effects on the aquatic environment. Applicants may propose the use of mitigation banks, in-lieu-fee programs, or separate permittee-responsible mitigation.
e. When permittee-responsible mitigation is the proposed compensatory mitigation option, the applicant is responsible for submitting a compensatory mitigation plan. A conceptual or detailed mitigation plan may be used by the Corps to make the decision on the MDSPGP-5 verification request, but a final mitigation plan that addresses the applicable requirements of 33 CFR 332.4(c)(2) –…