This document contains three contract price schedule templates for federal construction projects. The templates provide guidance on submitting pricing for base requirements and optional line items for design-bid-build, design-build, and sample projects. Offerors are required to submit pricing for all base and option line items using lump-sum or unit pricing as specified. Pricing must conform to solicitation requirements, and errors will be resolved based on unit prices or corrected totals. The templates include examples for reconstructing and stabilizing stone walls and a towpath along the Chesapeake and Ohio Canal for the National Park Service, constructing a visitor center at Old Faithful in Yellowstone National Park, and designing and building a new structure in Yosemite Valley. Measurement and payment details are provided in the project specifications.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| Contract Price Schedule | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | 140P2020R0079 | ||||
| PARK - PMIS: | CHOH 151201 | ||||
| (Project Management Information System) | |||||
| Developed Area: | McMahon's Mill to Lock 42 | ||||
| Project Title: | Reconstruct/Stabilize Historic Stone Wall and Towpath | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Mobilization & Demobilization | 1 | LS | ||
| 2 | Contractor Staging & Access/ General Conditions | 1 | LS | ||
| 3 | Erosion & Sediment Control/Oil Seepage Control | 1 | LS | ||
| 4 | Tree Removal (12" Or Smaller) | 78 | EA | ||
| 5 | Tree Removal (13" Or Larger) | 38 | EA | ||
| 6 | Site Clearing and Grubbing | 1 | LS | ||
| 7 | Towpath Excavation and Backfill | 364 | CY | ||
| 8 | Wall Excavation and Backfill | 1775 | CY | ||
| 9 | Towpath | 364 | CY | ||
| 10 | Topsoil & Seeding | 2973 | SY | ||
| 11 | Culvert Replacement | 40 | LF | ||
| 12 | Stone Backfill Behind Walls | 3395 | CY | ||
| 13 | Repair Existing Dry-laid Stone Walls | 234 | CF | ||
| 14 | Reconstruct Existing Stone Walls | 37530 | CF | ||
| 15 | Extend Existing Dry-laid Stone Walls | 3244 | CF | ||
| 16 | Extend Existing Mortared Stone Walls | 1515 | CF | ||
| 17 | Repair Existing Mortared Stone Walls | 239 | CF | ||
| TOTAL BASE PRICE from Station 4+00 to 28+00 (Contract Line Item Number 1 through 17) --------------------------------------------------------------------------------- | |||||
| 18 | Bid Option A: Station 0+00 to 4+00 - Reconstruct/Stabilize Historic Stone Wall & Towpath | 1 | LS | ||
| 19 | Bid Option B: Station 28+00 to 38+50 - Reconstruct/Stabilize Historic Stone Wall & Towpath | 1 | LS | ||
| 20 | Bid Option C: Station 38+50 to 51+75 - Reconstruct/Stabilize Historic Towpath | 1 | LS | ||
| 21 | Bid Option D: Widen Towpath Trail to 8' | 1 | LS | ||
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 18 through 21) ----------------------------------------------------------- | |||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 21) -------------------------- | |||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
Design-Bid-Build (DBB) Sample
| Contract Price Schedule - Design-Bid-Build (DBB) SAMPLE | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | N2011080811 | ||||
| PARK - PMIS: | YELL 012345 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Old Faithful | ||||
| Project Title: | Johnstonian Visitors Center | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Visitors Center | 1 | Lump Sum | $0.00 | |
| 2 | Water Line | 400 | Lineal Feet | - 0 | |
| 3 | Sanitary Sewer Line | 200 | Lineal Feet | - 0 | |
| 4 | Rock Excavation | 150 | Cubic Yards | - 0 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 through 4) --------------------------------------------------------------------------------- | $0.00 | ||||
| 5 | OPTION A, Geothermal Wells | 1 | Lump Sum | - 0 | |
| 6 | OPTION B, Photovoltaic System | 1 | Lump Sum | - 0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 5 and 6) ------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 6) ---------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
Design-Build (DB) Sample
| Contract Price Schedule - Design-Build (DB) SAMPLE | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | N2011080811 | ||||
| PARK - PMIS: | YELL 012345 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Yosemite Valley | ||||
| Project Title: | Design and Build a New Structure | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Design | 1 | Lump Sum | $0.00 | |
| 2 | Construction | 1 | Lump Sum | - 0 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 and 2) --------------------------------------------------------------------------------------- | $0.00 | ||||
| 3 | OPTION A, Photovoltaic System | 1 | Lump Sum | - 0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3) ---------------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 3) ---------------------------- | $0.00 | ||||