A02_01 CHOH 151201 CD-ContractPriceSchedule FINAL_0002.pdf
PDF 71 KB Posted
- Attached to
- CHOH-151201, Reconstruct/Stabilize Historic Stone Federal contract opportunity
- Solicitation number
- 140P2020R0079
About this file
This document contains a contract price schedule for the CHOH-151201 project to reconstruct and stabilize a historic stone wall and towpath from McMahon's Mill to Lock 42. The National Park Service is soliciting offers to complete base work from station 4+00 to 28+00 including tree removal, excavation, backfilling, stone wall reconstruction using salvaged and new stone, and towpath and topsoil work. Bid options include additional work from station 0+00 to 4+00 (Option A), station 28+00 to 38+50 (Option B), station 38+50 to 51+75 (Option C), and widening the towpath to 8 feet (Option D). Pricing is required for individual contract line items as well as total proposed prices for the base work, each option, and all work. Offerors must submit pricing for all base and option line items.
View the file
Other files for this federal contract opportunity
Show all 45
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Price Schedule National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18
Solicitation Number: 140P2019F0121
PARK - PMIS: CHOH 151201
(Project Management Information System)
Developed Area: McMahon's Mill to Lock 42
Project Title: Reconstruct/Stabilize Historic Stone Wall and Towpath
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars.
Contract Line Item Number
(CLIN)
Contract Line Item (CLI) Title Quantity Unit of Measure Unit Price Total Price
1 Mobilization & Demobilization 1 LS
2 Contractor Staging & Access/ General Conditions 1 LS
3 Erosion & Sediment Control/Oil Seepage Control 1 LS
4 Tree Removal (12" Or Smaller) 78 EA
5 Tree Removal (13" Or Larger) 38 EA
6 Site Clearing and Grubbing 1 LS
7 Towpath Excavation and Backfill 364 CY
8 Wall Excavation and Backfill 1775 CY
9 Towpath 364 CY
10 Topsoil & Seeding 2973 SY
11 Culvert Replacement 40 LF
12 Stone Backfill Behind Walls 3395 CY
13 Repair Existing Dry-laid Stone Walls 234 CF
14 Reconstruct Existing Stone Walls (Salvaged Stone) 27714 CF
15 Reconstruct Existing Stone Walls (New Stone) 9816 CF
16 Extend Existing Dry-laid Stone Walls 3244 CF
17 Extend Existing Mortared Stone Walls 1515 CF
18 Repair Existing Mortared Stone Walls 239 CF
19 Temporary Controls for Option A 1 LS
20 Tree Removal (12" Or Smaller) for Option A 2 EA
21 Tree Removal (13" Or Larger) for Option A 2 EA
22 Site Clearing and Grubbing for Option A 1 LS
23 Towpath Excavation and Backfill 72 CY
24 Wall Excavation and Backfill for Option A 48 CY
25 Towpath for Option A 65 CY
26 Topsoil & Seeding for Option A 280 SY
27 Stone Backfill Behind Walls for Option A 48 CY
28 Repair Existing Dry-laid Stone Walls for Option A 647 CF
Reconstruct Existing Stone Walls for Option A
(Salvaged Stone)
634 CF
Reconstruct Existing Stone Walls for Option A (New
Stone)
56 CF
31 Temporary Controls for Option B 1 LS
32 Tree Removal (12" Or Smaller) for Option B 28 EA
33 Tree Removal (13" Or Larger) for Option B 30 EA
34 Site Clearing and Grubbing for Option B 1 LS
35 Towpath Excavation and Backfill 415 CY
36 Towpath for Option B 171 CY
37 Topsoil & Seeding for Option B 1386 SY
38 Culvert Replacement 20 LF
Repair Existing Laid Back Stone Revetment for
Option B
466 CF
Bid Option C: Station 38+50 to 51+75 - Reconstruct/Stabilize Historic Towpath
1 LS
41 Bid Option D: Widen Towpath Trail to 8' 1 LS
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 41) --------------------------
TOTAL OPTION A PRICE from Station 0+00 to 4+00 (Contract Line Item Number 19 through 30) -----------------------------
TOTAL BASE PRICE from Station 4+00 to 28+00 (Contract Line Item Number 1 through 18) -----------------------------
Bid Option A: Station 0+00 to 4+00 - Reconstruct/Stabilize Historic Stone Wall & Towpath
Bid Option B: Station 28+00 to 38+50 - Reconstruct/Stabilize Historic Stone Wall & Towpath
TOTAL OPTION B PRICE from Station 28+00 to 38+50 (Contract Line Item Number 31 through 39) -----------------------------
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 19 through 41) -----------------------------------------------------------