This amendment to a solicitation extends the proposal submission and question deadlines for a federal contract to reconstruct and stabilize a historic stone wall and towpath located within a national park. The National Park Service seeks offers by August 24, 2020 at 2:00 PM Mountain Time to complete work on the CHOH-151201 project restoring approximately 1,200 linear feet of stone wall and towpath between McMahons Mill and Lock 42 under a fixed-price contract running from September 2020 through March 2022. The amendment replaces sections of the solicitation related to pricing schedules, adds special clauses on infectious disease response and contract quantity variations, and provides contractor questions and drawing revisions that may impact construction.

View the file

Other files for this federal contract opportunity

Other files attached to CHOH-151201, Reconstruct/Stabilize Historic Stone, newest first.
File Type Posted
A07_05_20200821_Section B_Contract Price Schedule_0007.pdf PDF
A07_01 Questions and Answers Round 4 Final_0007.pdf PDF
A07_03_20200821_SECTION 044300 - STONE MASONRY_0007.pdf PDF
Sol_140P2020R0079_Amd_0007.pdf PDF
A07_02_20200821_SECTION 01 27 00 DEFINITION OF CONTRACT LINE ITEMS_0007.pdf PDF
A07_04_20200821_Structural DrawingsRev3_0007.pdf PDF
Sol_140P2020R0079_Amd_0006.pdf PDF
Sol_140P2020R0079_Amd_0005.pdf PDF
140P2020R0079 Amend 04_0004.pdf PDF
2020_0811 151201 - C2.01a DEMO & ES Ext_A04_03_0004.pdf PDF
20200812 MDE_USACE Authorization_A04_02_0004.pdf PDF
QA Round 3 QA_FINAL_A04_01_0004.pdf PDF
Sol_140P2020R0079_Amd_0004.pdf PDF
Sol_140P2020R0079_Amd_0003.pdf PDF
A03_03 - B08 BidBond_SF24-16d_0003.pdf PDF
A03_04 - B08 - Solit_Equals_0003.doc DOC document
A03_02 - 151201 CHOH ALL FINAL CD-Drawings - REV2_0003.pdf PDF
A03_05 - CHOH 151201 Questions and Answers_0003.pdf PDF
A03_01 - 011100 - SUMMARY OF WORK_REV_0003.pdf PDF
A02_07 151201 CHOH ALL FINAL CD-Drawings - REV1_0002.pdf PDF
A02_06_CHOH 151201 Q and A Round 1 7-30-20_0002.pdf PDF
A02_04_Section H Special Clause COVID_0002.pdf PDF
A02_01 CHOH 151201 CD-ContractPriceSchedule FINAL_0002.pdf PDF
A02_02 CHOH 151201 CD-ContractPriceSchedule FINAL_0002.xlsx XLSX spreadsheet
A02_03 Contract Line Items FINAL_0002.pdf PDF
A02_05_52.211-18 Variation Est Qty Clause_0002.pdf PDF
Atch 03 PreProposal Presentation 071420_0001.pdf PDF
Atch 04 PriceSchedVol2 Amend01_0001.xlsx XLSX spreadsheet
Atch 02 CHOH 151241_PreBid_Agenda 7-14-20_0001.pdf PDF
Sol_140P2020R0079_Amd_0001.pdf PDF
Atch 01 CHOH 151201 Site Visit Attendees July 14 2020 1130 AM_0001.pdf PDF
B08_5 - CHOH_151201-Reduced - 081632 Final Report-Enviroscan.pdf PDF
B08_2 - 151201 CHOH ALL FINAL CD-Specs.pdf PDF
B08_SF1442 140P2020R0079.pdf PDF
B08_4 -1048516_Big_Slackwater_T_EF.pdf PDF
B08_1 - 151201 CHOH ALL FINAL CD-Drawings Part I sig.pdf PDF
B08_3 - 151201 CHOH ALL FINAL CD-Drawings Part II.pdf PDF
B08_7.2 - Wage Determination MD20200005 Dredging 1-3-20.pdf PDF
B08_9 - Atch09ExpVol1.docx DOCX document
B08_12 - Atch12GenRefsVol2.doc DOC document
B08_10 - Atch10PastPerfVol1.docx DOCX document
B08_6 - PriceSchedVol2.xlsx XLSX spreadsheet
B08_11 - Atch11SubKPlanFormVol2.doc DOC document
B08_7.1 - Wage Determination MD20200022 Heavy 6-5-20.pdf PDF
B08_13 - Atch13HazMatVol2.doc DOC document
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2020R0079 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

CHOH 15120107/16/20200002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/02/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of Amendment 0002 is to:

A) Extend the proposal submission date from 08/04/2020 to 08/24/2020 at 1400 hours MDT

(1600 hours ET)

B) Extend date to submit questions from 07/29/2020 to 08/6/2020 at 1000 hours MDT (1200 hours ET)

C) Replace SECTION B SUPPLIES OR SERVICES AND PRICES Contract Price Schedule (A02_01)

D) Replace Section J, Attachment 6 entitled, B08_6 PriceSchedVol2 (A02_02) (same as A02_02 but in Excel format)

E) Add Sheets with new Contract Line Item (CLIN) descriptions consistent with revised

Contract Price Schedule (A02_03)

F) Add Section H clause Special Clause "Infectious Disease Preparedness and Response and

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Anne Laporta

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 19

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P2020R0079/0002

Coronavirus Pandemic (COVID-19)" (A02_04)

G) Add Section F clause FAR 52.211-18 VARIATION

IN ESTIMATED QUANTITY (APR 1984) (A02_05)

H) Provide Contractor Questions and Answers, Round 1 through 7-30-20. (A02_06)

I) Provide Rev 1 to two sheets of CD Drawings, Re: Two construction access revisions that would potentially have an impact on the constructability. (A02_07)

Legacy Doc #: NPS

Period of Performance: 09/15/2020 to 03/19/2022