A07_04_20200821_Structural DrawingsRev3_0007.pdf

PDF 2 MB Posted

Attached to
CHOH-151201, Reconstruct/Stabilize Historic Stone Federal contract opportunity
Solicitation number
140P2020R0079
Issued by
Department of the Interior National Park Service National Office

About this file

This document package includes structural drawings and specifications for the reconstruction and stabilization of historic stone walls and a towpath along the Chesapeake and Ohio Canal National Historical Park between McMahons Mill and Lock 42. The work involves reconstructing sections of existing stone walls, extending walls, and stabilizing loose or failing sections. Materials required include salvaged and new stone for the walls, geotextile fabric, soil fill, and #57 stone for backfill. The drawings provide construction details, notes, a wall treatment schedule, and specifications for materials, construction methods, surveying, shop drawings, and testing.

The related federal contract opportunity is solicitation number 140P2020R0079 issued by the National Park Service for the work outlined in the drawings and specifications under project number CHOH-151201. The contractor will be responsible for verifying dimensions of existing walls, submitting surveys and shop drawings, and complying with all notes and specifications for reconstructing and stabilizing the historic stone walls and towpath.

View the file

Other files for this federal contract opportunity

Other files attached to CHOH-151201, Reconstruct/Stabilize Historic Stone, newest first.
File Type Posted
A07_05_20200821_Section B_Contract Price Schedule_0007.pdf PDF
A07_01 Questions and Answers Round 4 Final_0007.pdf PDF
A07_03_20200821_SECTION 044300 - STONE MASONRY_0007.pdf PDF
Sol_140P2020R0079_Amd_0007.pdf PDF
A07_02_20200821_SECTION 01 27 00 DEFINITION OF CONTRACT LINE ITEMS_0007.pdf PDF
Sol_140P2020R0079_Amd_0006.pdf PDF
Sol_140P2020R0079_Amd_0005.pdf PDF
2020_0811 151201 - C2.01a DEMO & ES Ext_A04_03_0004.pdf PDF
20200812 MDE_USACE Authorization_A04_02_0004.pdf PDF
QA Round 3 QA_FINAL_A04_01_0004.pdf PDF
Sol_140P2020R0079_Amd_0004.pdf PDF
140P2020R0079 Amend 04_0004.pdf PDF
Sol_140P2020R0079_Amd_0003.pdf PDF
A03_03 - B08 BidBond_SF24-16d_0003.pdf PDF
A03_04 - B08 - Solit_Equals_0003.doc DOC document
A03_01 - 011100 - SUMMARY OF WORK_REV_0003.pdf PDF
A03_02 - 151201 CHOH ALL FINAL CD-Drawings - REV2_0003.pdf PDF
A03_05 - CHOH 151201 Questions and Answers_0003.pdf PDF
A02_02 CHOH 151201 CD-ContractPriceSchedule FINAL_0002.xlsx XLSX spreadsheet
A02_03 Contract Line Items FINAL_0002.pdf PDF
A02_05_52.211-18 Variation Est Qty Clause_0002.pdf PDF
Sol_140P2020R0079_Amd_0002.pdf PDF
A02_07 151201 CHOH ALL FINAL CD-Drawings - REV1_0002.pdf PDF
A02_06_CHOH 151201 Q and A Round 1 7-30-20_0002.pdf PDF
A02_04_Section H Special Clause COVID_0002.pdf PDF
A02_01 CHOH 151201 CD-ContractPriceSchedule FINAL_0002.pdf PDF
Atch 03 PreProposal Presentation 071420_0001.pdf PDF
Atch 04 PriceSchedVol2 Amend01_0001.xlsx XLSX spreadsheet
Atch 02 CHOH 151241_PreBid_Agenda 7-14-20_0001.pdf PDF
Sol_140P2020R0079_Amd_0001.pdf PDF
Atch 01 CHOH 151201 Site Visit Attendees July 14 2020 1130 AM_0001.pdf PDF
B08_3 - 151201 CHOH ALL FINAL CD-Drawings Part II.pdf PDF
B08_5 - CHOH_151201-Reduced - 081632 Final Report-Enviroscan.pdf PDF
B08_2 - 151201 CHOH ALL FINAL CD-Specs.pdf PDF
B08_SF1442 140P2020R0079.pdf PDF
B08_4 -1048516_Big_Slackwater_T_EF.pdf PDF
B08_1 - 151201 CHOH ALL FINAL CD-Drawings Part I sig.pdf PDF
B08_7.1 - Wage Determination MD20200022 Heavy 6-5-20.pdf PDF
B08_13 - Atch13HazMatVol2.doc DOC document
B08_7.2 - Wage Determination MD20200005 Dredging 1-3-20.pdf PDF
B08_9 - Atch09ExpVol1.docx DOCX document
B08_12 - Atch12GenRefsVol2.doc DOC document
B08_10 - Atch10PastPerfVol1.docx DOCX document
B08_6 - PriceSchedVol2.xlsx XLSX spreadsheet
B08_11 - Atch11SubKPlanFormVol2.doc DOC document
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AutoCAD SHX Text 1.

AutoCAD SHX Text 2.

AutoCAD SHX Text 3.

AutoCAD SHX Text 4.

AutoCAD SHX Text 5.

AutoCAD SHX Text

NOTES

AutoCAD SHX Text

AutoCAD SHX Text

EXTENT OF WALL TREATMENTS ARE APPROXIMATE AND SHOULD BE USED FOR PRICING ONLY.

AutoCAD SHX Text

COORDINATE WALL AND TOWPATH ELEVATIONS WITH CIVIL DRAWINGS.

AutoCAD SHX Text COORDINATE DIMENSIONS WITH CIVIL DRAWINGS AND EXISTING CONDITIONS PRIOR TO STARTING CONSTRUCTION.

AutoCAD SHX Text SUBMIT SURVEY OF EXISTING CONDITIONS AND PROPOSED WALL TREATMENT SHOP DRAWINGS FOR REVIEW AND APPROVAL AT START OF CONSTRUCTION. IDENTIFY LOCATIONS OF DIFFERENT WALL TREATMENTS WITHIN SHOP DRAWINGS. SEE PROJECT SPECIFICATIONS FOR DETAILED REQUIREMENTS.

AutoCAD SHX Text GEOTECHNICAL ENGINEER TESTING IS REQUIRED TO CONFIRM BEARING CONDITIONS OF RETAINING WALLS. NOTIFY CONTRACTING OFFICER IF

AutoCAD SHX Text

CONDITIONS VARY FROM THOSE LISTED IN TABLE ABOVE AND IN GENERAL NOTES ON S0.0.

AutoCAD SHX Text

A/E FIRM - P15PC00037

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

PMIS/PKG NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

PRIME/ARCH:

AutoCAD SHX Text

GWWO, INC.

AutoCAD SHX Text

BALTIMORE, MD

AutoCAD SHX Text

LANDSCAPE:

AutoCAD SHX Text

VHB

AutoCAD SHX Text

WILLIAMSBURG, VA

AutoCAD SHX Text

CIVIL:

AutoCAD SHX Text

VHB

AutoCAD SHX Text

WILLIAMSBURG, VA

AutoCAD SHX Text

STRUCTURAL:

AutoCAD SHX Text

SGH

AutoCAD SHX Text

WASHINGTON D.C.

AutoCAD SHX Text

MECHANICAL:

AutoCAD SHX Text N/A

AutoCAD SHX Text

ELECTRICAL:

AutoCAD SHX Text N/A

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

CADD:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

6/25/2020 3:38:15 PM

AutoCAD SHX Text

WALL TREATMENT

AutoCAD SHX Text

SCHEDULE

AutoCAD SHX Text

RECONSTRUCT/STABILIZE HISTORIC

AutoCAD SHX Text STONE WALL & TOWPATH McMAHON'S

AutoCAD SHX Text

MILL TO LOCK 42 CHESAPEAKE & OHIO

AutoCAD SHX Text

CANAL NHP

AutoCAD SHX Text

AutoCAD SHX Text 133,700

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S1.0

AutoCAD SHX Text

SGH

AutoCAD SHX Text

SGH

AutoCAD SHX Text

SGH

AutoCAD SHX Text 07/01/2020

AutoCAD SHX Text

CHOH-151201

AutoCAD SHX Text I:\DC\Projects\2019\190806.00-CHOH\Drawings\Working_Set

ARush Text Box 6.

ARush Text Box EXISTING MORTARED WALLS DO NOT EXTEND BELOW THE BASE FLOW ELEVATION. ASSUME LOWEST EXTENT OF MORTARED WALLS ARE APPROXIMATELY 6" ABOVE THE BASE FLOW ELEVATION AND THE REMAINDER OF THE EXISTING WALLS BELOW THIS ELEVATION ARE DRY-LAID WALLS.

ARush Text Box

ARush Polygon

ARush Text Box

- Revision #3 - (NPS & SGH 8/21/20)

ARush Text Box

ARush Polygon

AutoCAD SHX Text

AutoCAD SHX Text X

AutoCAD SHX Text

#57 STONE

AutoCAD SHX Text

(N) STONES. AVOID USE OF (N)

AutoCAD SHX Text

STONES AT WALL FACE UNLESS

AutoCAD SHX Text

OTHERWISE DIRECTED BY C.O.

AutoCAD SHX Text

AutoCAD SHX Text

1, MIN.

AutoCAD SHX Text

(E) BEDROCK SHELF VARIES, VIF

AutoCAD SHX Text

EXTENT OF EXCAVATION TO

AutoCAD SHX Text

RECONSTRUCT WALL

AutoCAD SHX Text

GEOTEXTILE FABRIC TO SEPARATE

AutoCAD SHX Text

SATISFACTORY SOIL FILL AND (E)

AutoCAD SHX Text

FILL FROM #57 STONE

AutoCAD SHX Text

(E) SUITABLE SOILS TO REMAIN

AutoCAD SHX Text

SATISFACTORY SOIL FILL,

AutoCAD SHX Text

SEE CIVIL DWGS &

AutoCAD SHX Text

PROJECT SPECS

AutoCAD SHX Text

(E) STONE WALL TO

AutoCAD SHX Text

REMAIN WHERE TIGHTLY

AutoCAD SHX Text

PACKED AND NOT EASILY

AutoCAD SHX Text

REMOVABLE BY HAND

AutoCAD SHX Text

MATCH (E) WALL

AutoCAD SHX Text

BATTER, MIN = 1H:6V

AutoCAD SHX Text

AutoCAD SHX Text X

AutoCAD SHX Text

SEE CIVIL FOR SOIL SLOPE

AutoCAD SHX Text

ABOVE WALL, MAX = 2H:1V

AutoCAD SHX Text

AutoCAD SHX Text X

AutoCAD SHX Text

WALL BATTER, MIN = SEE KEY ON THIS SHEET

AutoCAD SHX Text

SEE SCHEDULE

AutoCAD SHX Text

SEE SCHEDULE

AutoCAD SHX Text

SEE SCHEDULE

AutoCAD SHX Text

ABOVE T/WALL

AutoCAD SHX Text

ABOVE T/WALL

AutoCAD SHX Text

T/TOW PATH EL

AutoCAD SHX Text

SEE CIVIL

AutoCAD SHX Text

SEE SCHEDULE

AutoCAD SHX Text

SEE SCHEDULE

AutoCAD SHX Text

SEE SCHEDULE

AutoCAD SHX Text 1.

AutoCAD SHX Text 2.

AutoCAD SHX Text

NOTES:

AutoCAD SHX Text CONTRACTOR MUST VERIFY HEIGHT AND WIDTH OF (E) WALL TO REMAIN AND SUBMIT THESE DIMENSIONS TO THE CONTRACTING OFFICER FOR

AutoCAD SHX Text

APPROVAL PRIOR TO START OF WALL RECONSTRUCTION WORK.

AutoCAD SHX Text OVERLAP GEOTEXTILE AT TOP OF RECONSTRUCTED WALL A MINIMUM OF 2'-0" AND AT BOTTOM OF RECONSTRUCTED WALL A MINIMUM OF 2'-0" ABOVE THE WATER LINE. OVERLAP ADJACENT GEOTEXTILE SHEETS A MINIMUM OF 1'-0". USE STAPLES OR PINS AS NEEDED TO HOLD OVERLAPS IN PLACE DURING PLACEMENT OF STONE. ROLL GEOTEXTILE SHEETS IN DIRECTION PARALLEL TO RIVER FLOW. UPSTREAM GEOTEXTILE SHEETS SHALL ALWAYS OVERLAP DOWNSTREAM SHEETS. UP-SLOPE GEOTEXTILE SHEETS SHALL ALWAYS OVERLAP DOWN-SLOPE SHEETS. OVERLAPS ALONG THE LENGTH OF THE RIVER SHALL BE STAGGERED A MINIMUM OF 6'-0". CONTRACTOR MUST SUBMIT PROPOSED OVERLAP LOCATIONS TO THE CONTRACTING OFFICER FOR APPROVAL.

AutoCAD SHX Text

SALVAGE AND REUSE (E)

AutoCAD SHX Text

STONES AT WALL FACE

AutoCAD SHX Text

APPROX. BASE FLOW

AutoCAD SHX Text

SEE CIVIL FOR EL.

AutoCAD SHX Text

SALVAGE AND REUSE (E) STONES

AutoCAD SHX Text

AS COPING STONES UNLESS

AutoCAD SHX Text

OTHERWISE DIRECTED BY C.O.

AutoCAD SHX Text BACKFILL W/REJECTED WALL STONE BELOW THE WATER LINE. PACK VOIDS TIGHT WITH HEART STONES IN SIMILAR MANNER TO WALL CONSTRUCTION

AutoCAD SHX Text

SEE KEY ON THIS SHEET

AutoCAD SHX Text

SEE KEY ON THIS SHEET

AutoCAD SHX Text

SEE CIVIL FOR SEEDING AND STABILIZATION

AutoCAD SHX Text

MIN.

AutoCAD SHX Text

HEIGHT OF (E) WALL ASSUMED TO REMAIN, SEE KEY ON THIS SHEET

AutoCAD SHX Text

MIN.

AutoCAD SHX Text

MIN.

AutoCAD SHX Text

1'-0" MIN. OVERLAP BETWEEN (E) STONES

AutoCAD SHX Text

THAT ARE TO REMAIN IN PLACE AND (E)

AutoCAD SHX Text

STONES THAT ARE TO BE RESET, TYP.

AutoCAD SHX Text

AutoCAD SHX Text

1, MIN.

AutoCAD SHX Text

T/TOW PATH EL.

AutoCAD SHX Text

SEE CIVIL

AutoCAD SHX Text

STATION AT END OF WALL

AutoCAD SHX Text

RECONSTRUCTION SEGMENT

AutoCAD SHX Text

SALVAGE AND REUSE

AutoCAD SHX Text

(E) STONES AT WALL

AutoCAD SHX Text

FACE AND AT TOP

AutoCAD SHX Text

OF WALL

AutoCAD SHX Text

SATISFACTORY SOIL FILL

AutoCAD SHX Text

EXTENT OF EXCAVATION BEHIND EXISTING WALL TO COMPLETE RECONSTRUCTION WORK

AutoCAD SHX Text

(E) STONE WALL TO REMAIN

AutoCAD SHX Text

(E) BEDROCK SHELF VARIES, VIF

AutoCAD SHX Text 1.

AutoCAD SHX Text 2.

AutoCAD SHX Text

NOTES

AutoCAD SHX Text

AutoCAD SHX Text

ELEVATION SHOWN AT END OF WALL RECONSTRUCTION SEGMENT. SAME

AutoCAD SHX Text

DETAILING APPLIES AT START OF WALL RECONSRTUCTION SEGMENT.

AutoCAD SHX Text

RESET (E) STONES AND (N) STONES FOR WALL RECONSTRUCTION ARE TO BE

AutoCAD SHX Text

TOOTHED IN TO MATCH ADJACENT (E) WALL.

AutoCAD SHX Text

COPING STONE, TYP. AT T/WALL

AutoCAD SHX Text

WALL TREATMENT LEGEND:

AutoCAD SHX Text

(E) STONE: REMAIN IN PLACE

AutoCAD SHX Text

(E) STONE: SALVAGE & REUSE

AutoCAD SHX Text

STONE SHOWN GRAPHICALLY,

AutoCAD SHX Text COORD w/ WALL TREATMENT SCHED

AutoCAD SHX Text

(N) STONE

AutoCAD SHX Text

(N) RECHINKING STONE

AutoCAD SHX Text

(E) SILT & DEBRIS

AutoCAD SHX Text

(E) SOIL TO REMAIN

AutoCAD SHX Text

(E) BEDROCK

AutoCAD SHX Text

(OR SUITABLE BEARING SUBSTRATE)

AutoCAD SHX Text

(N) SATISFACTORY SOIL FILL, SEE CIVIL

AutoCAD SHX Text

(N) PRE-WASHED, #57 STONE BACKFILL

AutoCAD SHX Text

REJECTED WALL STONE BACKFILL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE OF FEET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

A/E FIRM - P15PC00037

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

PMIS/PKG NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

PRIME/ARCH:

AutoCAD SHX Text

GWWO, INC.

AutoCAD SHX Text

BALTIMORE, MD

AutoCAD SHX Text

LANDSCAPE:

AutoCAD SHX Text

VHB

AutoCAD SHX Text

WILLIAMSBURG, VA

AutoCAD SHX Text

CIVIL:

AutoCAD SHX Text

VHB

AutoCAD SHX Text

WILLIAMSBURG, VA

AutoCAD SHX Text

STRUCTURAL:

AutoCAD SHX Text

SGH

AutoCAD SHX Text

WASHINGTON D.C.

AutoCAD SHX Text

MECHANICAL:

AutoCAD SHX Text N/A

AutoCAD SHX Text

ELECTRICAL:

AutoCAD SHX Text N/A

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

CADD:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SCALE A

AutoCAD SHX Text

6/25/2020 3:39:57 PM

AutoCAD SHX Text

WALL RECONSTRUCTION

AutoCAD SHX Text

DETAILS

AutoCAD SHX Text

RECONSTRUCT/STABILIZE HISTORIC

AutoCAD SHX Text STONE WALL & TOWPATH McMAHON'S

AutoCAD SHX Text

MILL TO LOCK 42 CHESAPEAKE & OHIO

AutoCAD SHX Text

CANAL NHP

AutoCAD SHX Text

AutoCAD SHX Text 133,700

AutoCAD SHX Text

CHOH-151201

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S1.1

AutoCAD SHX Text

SGH

AutoCAD SHX Text

SGH

AutoCAD SHX Text

SGH

AutoCAD SHX Text 07/01/2020

AutoCAD SHX Text

SCALE A

AutoCAD SHX Text S1.1

AutoCAD SHX Text

AutoCAD SHX Text

TYPICAL WALL RECONSTRUCTION SECTION

AutoCAD SHX Text

SCALE A

AutoCAD SHX Text S1.1

AutoCAD SHX Text

AutoCAD SHX Text

TYPICAL INTERFACE BETWEEN

AutoCAD SHX Text

RECONSTRUCTED STONE WALL AND EXISTING

AutoCAD SHX Text

STONE WALL TO REMAIN

AutoCAD SHX Text G

AutoCAD SHX Text 12'-0"

AutoCAD SHX Text 1'-0"

AutoCAD SHX Text 3'-0"

AutoCAD SHX Text 1H:6V

AutoCAD SHX Text 1'-6"

AutoCAD SHX Text 4'-6"

AutoCAD SHX Text F

AutoCAD SHX Text 11'-0"

AutoCAD SHX Text 3'-0"

AutoCAD SHX Text 3'-0"

AutoCAD SHX Text 1H:6V

AutoCAD SHX Text 1'-6"

AutoCAD SHX Text 4'-4"

AutoCAD SHX Text E

AutoCAD SHX Text 10'-0"

AutoCAD SHX Text 2'-6"

AutoCAD SHX Text 3'-0"

AutoCAD SHX Text 1H:6V

AutoCAD SHX Text 1'-6"

AutoCAD SHX Text 4'-2"

AutoCAD SHX Text D

AutoCAD SHX Text 9'-6"

AutoCAD SHX Text 8'-0"

AutoCAD SHX Text 2'-6"

AutoCAD SHX Text 1H:6V

AutoCAD SHX Text 1'-6"

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text C-1

AutoCAD SHX Text 9'-0"

AutoCAD SHX Text 8'-0"

AutoCAD SHX Text 2'-6"

AutoCAD SHX Text 1H:6V

AutoCAD SHX Text 5'-0"

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text C

AutoCAD SHX Text 9'-0"

AutoCAD SHX Text 8'-0"

AutoCAD SHX Text 2'-6"

AutoCAD SHX Text 1H:6V

AutoCAD SHX Text 1'-6"

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text B-1

AutoCAD SHX Text 9'-0"

AutoCAD SHX Text 1'-0"

AutoCAD SHX Text 2'-3"

AutoCAD SHX Text 1H:6V

AutoCAD SHX Text 3'-0"

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text B

AutoCAD SHX Text 9'-0"

AutoCAD SHX Text 1'-0"

AutoCAD SHX Text 2'-3"

AutoCAD SHX Text 1H:6V

AutoCAD SHX Text 1'-6"

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text A-1

AutoCAD SHX Text 8'-0"

AutoCAD SHX Text 8'-0"

AutoCAD SHX Text 2'-9"

AutoCAD SHX Text

NO BATTER

AutoCAD SHX Text 3'-0"

AutoCAD SHX Text 3'-4"

AutoCAD SHX Text A

AutoCAD SHX Text 8'-0"

AutoCAD SHX Text 8'-0"

AutoCAD SHX Text 2'-9"

AutoCAD SHX Text

NO BATTER

AutoCAD SHX Text 1'-6"

AutoCAD SHX Text 3'-4"

AutoCAD SHX Text

TYPE

AutoCAD SHX Text

MAX. WALL HEIGHT

AutoCAD SHX Text

MAX. HEIGHT OF SOIL ABOVE T/WALL

AutoCAD SHX Text W

AutoCAD SHX Text

BACK BATTER

AutoCAD SHX Text

HEIGHT OF (E) WALL ASSUMED TO REMAIN

AutoCAD SHX Text

WIDTH OF (E) WALL ASSUMED TO REMAIN

AutoCAD SHX Text

WALL RECONSTRUCTION KEY

AutoCAD SHX Text I:\DC\Projects\2019\190806.00-CHOH\Drawings\Working_Set

ARush Text Box

ARush Polygon

ARush Text Box

- Revision #3 - (NPS & SGH 8/21/20)

ARush Text Box CONTRACTOR MUST VERIFY HEIGHT AND WIDTH OF (E) WALL TO REMAIN AND SUBMIT THESE DIMENSIONS AS PART OF THE DAILY CORRESPONDENCE TO THE CONTRACTING OFFICER FOR RECORD PRIOR TO START OF WALL RECONSTRUCTION WORK.

ARush Text Box

ARush Polygon jreed Text Box jreed Polygon jreed Text Box

- Revision #2 - (NPS 8/3/20) jreed Polygon jreed Text Box

OR OTHER FREE DRAINING MATERIAL BENEATH WATER (AS DETAILED BELOW)

jreed Callout

OR OTHER FREE DRAINING MATERIAL BENEATH WATER (AS DETAILED ABOVE)

jreed Callout

OR OTHER FREE DRAINING MATERIAL BENEATH WATER (AS DETAILED ABOVE)

jreed Callout IN REACHES REQUIRED TO HAVE FREE DRAINING BACKFILL PLACED BENEATH WATER, BACKFILL WITH WALL STONE MATERIAL (SALVAGED OR NEW) BELOW THE WATER LINE. PACK VOIDS TIGHT WITH HEART STONES IN SIMILAR MANNER TO WALL CONSTRUCTION.

jreed Callout

OR OTHER FREE DRAINING MATERIAL BENEATH WATER (AS DETAILED ABOVE)

jreed Callout

OR OTHER FREE DRAINING MATERIAL BENEATH WATER (AS DETAILED ABOVE)

jreed Callout

OR OTHER FREE DRAINING MATERIAL BENEATH WATER (AS DETAILED ABOVE)

ARush Polygon

ARush Polygon

ARush Callout RESET ANY LOOSE (E) STONES AT TOP OF WALL PER DETAILS ON S1.3 PRIOR TO CONSTRUCTING WALL EXTENSIONS.

ARush Polygon

ARush Polygon

ARush Polygon

ARush Polygon

ARush Callout STABILIZE LOOSE FACE STONES WITH RE-CHINKING STONES PER DETAILS ON S1.3 PRIOR TO CONSTRUCTING WALL EXTENSION.

ARush Text Box

ARush Polygon

ARush Polygon

ARush Polygon

ARush Polygon

ARush Polygon

ARush Polygon

ARush Polygon

ARush Polygon

ARush Callout REPLACE MISSING FACE STONES OR INFILL (E) VOIDS PER DETAILS ON S1.3 PRIOR TO CONSTRUCTING WALL EXTENSION.

ARush Cloud

ARush Text Box

ARush Polygon

ARush Text Box

- Revision #3 - (NPS & SGH 8/21/20)

S1.0_WALL TREATMENT SCHED_REV 3_20200821
S1.1_WALL RECONSTRUCTION_REV 3_20200821
S1.2_WALL EXTENSION_REV 3_20200821