Attachment J.7 DRAFT RPMP Pricing Template.xlsx
XLSX spreadsheet 106 KB Posted
- Attached to
- REQUEST FOR PROPOSAL (RFP) for Radiation Portal Monitor Program (RPMP) Deployment, Construction and Design
- Solicitation number
- 70RWMD20R00000012
About this file
This draft Request for Proposal solicits proposals for Radiation Portal Monitor Program deployment, construction, and design services. Offerors are invited to propose fully burdened time and materials rates by labor category for program management, site survey, site management, commissioning, and decommissioning activities. Fixed prices are also requested for design engineering and construction costs. The pricing template provided as an attachment outlines the required level of detail for direct and indirect labor rates, materials, and other direct costs. Questions regarding this draft RFP are due by August 5, 2020, with a pre-proposal conference scheduled for August 13, 2020 to review submission requirements and answer questions. Final proposals will be evaluated based on the total price for a sample task.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions DRAFT RFP 70RWMD20R00000012 Attachment J.7- Pricing Structure
Please see RFP Section L, Price Quotation, for complete instructions.
The following instructions shall be used in completing all tabs, except the "Pricing Summary" and "T&M Rates" tabs which will self populate. Each Offeror must complete as needed only the shaded "yellow" cells. Propose all costs in accordance with your accounting and estimating practices, the indirect bases and rates on this template are for illustration only.
All proposed and subsequently negotiated T&M fully burdened rates through profit will become the IDIQ rates used on future orders.
Program Management: This tab will capture the time and material rates and hours by proposed labor category required for Program Management (Section 4.1 of the IDIQ Statement of Work) Offerors will provide the direct labor, burden and profit for proposed fully burdened T&M rates. Offerors will provide the estimated hours required for the period of performance covered by the sample task. Note that the Government has identified Key positions which must be proposed for this CLIN. The offeror will list additional labor categories, level, required degree, minimum number of years of experience, and rate information required for their proposed technical solution. For your information, at the bottom of the worksheet, the Government has included historical labor categories used for this requirement. The proposed labor escalation factor is capped by the Government at 2.5%. Your proposed escalation factor, 2.5% or lower, will be consistently applied to compute T&M rates for all option years covered by this IDIQ. Proposed and negotiated rates will become the IDIQ rates for use on future orders. The offeror must enter the number of labor hours by category required to complete the sample task, consistent with the proposed technical solution. The offeror must propose the unit price of materials, applicable adders, and the quantity required for the sample task, consistent with the proposed technical solution.
Site Survey, Site Management, Commissioning, and Decommissioning tabs: The offeror will list labor categories, level, required degree, minimum number of years experience, and rate information required for the proposed technical solution. The Offeror will detail the direct labor rate, fringe benefit rate, other burden rates (offsite overhead, G&A) and profit rate, consistent with the offeror's current accounting structure. The proposed labor escalation factor is capped by the Government at 2.5%. Your proposed escalation factor will be consistently applied to compute T&M rates for all option years covered by this IDIQ. Proposed and negotiated rates will become the IDIQ rates for use on future orders. The offeror must enter the number of labor hours, by category, required to complete the sample task, consistent with the proposed technical solution. The offeror must propose the unit price of materials, applicable adders, and the quantity required for the sample task consistent with the proposed technical solution.
Design Engineering, Construction tab: Offerors are to provide and complete a detailed cost proposal for Design Engineering and Construction, consistent with their proposed techical solution to the sample task. Proposed costs must be detailed simmilar to the structure on this tab, and supported by other than certified cost or pricing data as listed in Section L of the solicitation. Proposed costs should be in accordance with the offeror's established accounting and estimating practices.
| Pricing Summary tab: The total sample task shown on this worksheet will be the total evaluated price for best value trade off. Ensure all totals from supporting tabs agree to figures on this summary sheet. |
| T&M Rates tab: This tab self populates with the fully burdened T&M rates from the proposed base year with proposed escalation applied to each option year. This tab provides T&M rates which will subsequently be negotiated and included in the IDIQ for use on future orders. |
Pricing Summary
| CLINs | Description | Base Year | OY1 CLINs | OY 1 | ||
| 0001 | Program Management | T&M | - 0 | 1001 | - 0 | |
| 0002 | Site Survey | T&M | - 0 | 1002 | - 0 | |
| 0003 | Site Management | T&M | - 0 | 1003 | - 0 | |
| 0004 | Design Engineering | CPFF | - 0 | 1004 | - 0 | |
| 0005 | Construction | CPFF | - 0 | 1005 | - 0 | |
| 0006 | Commissioning | T&M | - 0 | 1006 | - 0 | |
| 0007 | DeCommissioning | T&M | - 0 | 1007 | - 0 | |
| Total Sample Price/Total Evaluated Price | - 0 | - 0 | - 0 |
Program Management
| NOTE: TYPES OF COSTS, BASES AND RATES ARE FOR ILLUSTRATION PURPOSES ONLY. |
| PROPOSE ALL COSTS IN ACCORDANCE WITH YOUR ESTABLISHED ACCOUNTING AND ESTIMATING PRACTICES. |
| Proposed Escalation** | 0.00% | ||||||||||||||
| Proposed T&M Rate | |||||||||||||||
| 0% | 0% | 0% | 0% | ||||||||||||
| Labor Category | Level | Required Degree | Minimum Years Experience | Direct Labor | Fringe Benefits | Off Site OH | G&A | Profit | Base Year Rate | Option Year 1 | Base Year Hours | Option Year 1 Hours | Total Base Year | Total OY 1 | |
| Program Management | |||||||||||||||
| Key* | Program Manager | Sr. | BS | 15 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Key* | Deputy Program Manager | BS | 10 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| Key* | Technical Manager | Sr. | BS | 15 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Key* | Business Finance Manager | Sr. | BS | 15 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| TOTAL LABOR | $ - 0 | $ - 0 |
| * The Government requires that one FTE is provided for each Key category |
| ** Proposed Escalation cannot exceed 2.5%. The proposed escalation factor will apply to all fiscal years. Proposed and negotiated T&M rates will become the IDIQ rates. |
| Proposed Escalation | 0.00% | |||||||||
| 0 | ||||||||||
| 0% | ||||||||||
| Program Management | Base Year Unit Price | Applied Burden | Base Year Burdened Unit Cost | OY 1 Burdened Unit Cost | Base Year Quantity | OY 1 Quantity | Total Base Year | Total OY 1 | ||
| xyz travel | $ - 0 | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | ||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | ||
| TOTAL MATERIAL | $ - 0 | $ - 0 |
| For Reference, Historical Categories for this requirement: | |||
| Program Management | Level | Degree | Years |
| Program Manager IV | Sr. | BS | 15 |
| Deputy Program Manager | Sr. | BS | 10 |
| Project Planner | Mid | BS | 5 |
| Senior Cost Analyst | Sr. | BS | 10 |
| Senior Management Analyst | Sr. | BS | 10 |
| Procurement Specialist III | Sr. | BS | 10 |
| Training Specialist II | Mid | BS | 5 |
| Administrative Assistant II | Mid | N/A | 2 |
Site Survey
| NOTE: TYPES OF COSTS, BASES AND RATES ARE FOR ILLUSTRATION PURPOSES ONLY. |
| PROPOSE ALL COSTS IN ACCORDANCE WITH YOUR ESTABLISHED ACCOUNTING AND ESTIMATING PRACTICES. |
| Proposed Escalation** | 0.00% | ||||||||||||||
| Proposed T&M Rate | |||||||||||||||
| 0% | 0% | 0% | 0% | ||||||||||||
| Labor Category | Level | Required Degree | Minimum Years Experience | Direct Labor | Fringe Benefits | Off Site OH | G&A | Profit | Base Year Rate | Option Year 1 | Base Year Hours | Option Year 1 Hours | Total Base Year | Total OY 1 | |
| Site Survey | |||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| TOTAL LABOR | $ - 0 | $ - 0 | |||||||||||||
| ** Proposed Escalation cannot exceed 2.5%. The proposed escalation factor will apply to all fiscal years. Proposed and negotiated T&M rates will become the IDIQ rates. |
| Proposed Escalation | 0.00% | |||||||||
| Proposed Material/Travel/ODC | ||||||||||
| 0% | ||||||||||
| Site Survey | Base Year Unit Price | Applied Burden | Base Year Burdened Unit Cost | OY 1 Burdened Unit Cost | Base Year Quantity | OY 1 Quantity | Total Base Year | Total OY 1 | ||
| xx | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | ||||
| Material Item Description | $ - 0 | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | ||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | ||||
| TOTAL MATERIAL | $ - 0 | $ - 0 |
| For Reference, Historical Categories for this requirement: | |||
| Site Survey | Level | Degree | Years |
| Civil Engineer II | Mid | BS | 5 |
| Electrical Engineer II | Mid | BS | 5 |
| Administrative Assistant II | Mid | N/A | 2 |
| CAD technician | Mid | BS | 5 |
Site Management
| NOTE: TYPES OF COSTS, BASES AND RATES ARE FOR ILLUSTRATION PURPOSES ONLY. |
| PROPOSE ALL COSTS IN ACCORDANCE WITH YOUR ESTABLISHED ACCOUNTING AND ESTIMATING PRACTICES. |
| Proposed Escalation** | 0.00% | ||||||||||||||
| Proposed T&M Rate | |||||||||||||||
| 0% | 0% | 0% | 0% | ||||||||||||
| Labor Category | Level | Required Degree | Minimum Years Experience | Direct Labor | Fringe Benefits | Off Site OH | G&A | Profit | Base Year Rate | Option Year 1 | Base Year Hours | Option Year 1 Hours | Total Base Year | Total OY 1 | |
| Site Management | |||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| TOTAL LABOR | $ - 0 | $ - 0 | |||||||||||||
| ** Proposed Escalation cannot exceed 2.5%. The proposed escalation factor will apply to all fiscal years. Proposed and negotiated T&M rates will become the IDIQ rates. |
| Proposed Escalation | 0.00% | |||||||||
| Proposed Material/Travel/ODC | ||||||||||
| 0% | ||||||||||
| Site Management | Base Year Unit Price | Applied Burden | Base Year Burdened Unit Cost | OY 1 Burdened Unit Cost | Base Year Quantity | OY 1 Quantity | Total Base Year | Total OY 1 | ||
| Material Item Description | $ - 0 | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | ||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | ||
| TOTAL MATERIAL | $ - 0 | $ - 0 |
| For Reference, Historical Categories for this requirement: | |||
| Site Management | Level | Degree | Years |
| Senior Project Manager (Technical Lead) | Sr | BS | 10 |
| Project Execution Support IV | Sr | BS | 10 |
Design Engineering
| NOTE: TYPES OF COSTS, BASES AND RATES ARE FOR ILLUSTRATION PURPOSES ONLY. | ||||||
| PROPOSE ALL COSTS IN ACCORDANCE WITH YOUR ESTABLISHED ACCOUNTING AND ESTIMATING PRACTICES. | ||||||
| Design Engineering | ||||||
| PROPOSED | PROPOSED | |||||
| COST ELEMENT | BASE | RATE | AMOUNT | OY 1 | RATE | AMOUNT |
| Direct Labor | Labor Hours | Labor Hours | ||||
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| TOTAL DIRECT LABOR | $ - 0 | $ - 0 |
| FRINGE BENEFITS | $ - 0 | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 |
| LABOR OVERHEAD | $ - 0 | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 |
| SUBTOTAL INDIRECT LABOR EXPENSE | $ - 0 | $ - 0 |
| Material, Equipment, Subcontractor, Other Direct Costs (list) | ||
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Subtotal: | $ - 0 | $ - 0 |
Material Handling 0% $ - 0 0% $ - 0
Travel Costs, location, number of people, number of trips, days
Subtotal: $ - 0 $ - 0
G&A $ - 0 0.00% $ - 0 $ - 0 0.00% $ - 0
Total Costs: $ - 0 $ - 0
Fixed Fee $ - 0 0.00% $ - 0 $ - 0 0.00% $ - 0
TOTAL PRICE $ - 0 $ - 0
Construction
| NOTE: TYPES OF COSTS, BASES AND RATES ARE FOR ILLUSTRATION PURPOSES ONLY. | ||||||
| PROPOSE ALL COSTS IN ACCORDANCE WITH YOUR ESTABLISHED ACCOUNTING AND ESTIMATING PRACTICES. | ||||||
| Construction | ||||||
| PROPOSED | PROPOSED | |||||
| COST ELEMENT | BASE | RATE | AMOUNT | OY 1 | RATE | AMOUNT |
| Direct Labor | Labor Hours | Labor Hours | ||||
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| Labor Category | 0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 |
| TOTAL DIRECT LABOR | $ - 0 | $ - 0 |
| FRINGE BENEFITS | $ - 0 | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 |
| LABOR OVERHEAD | $ - 0 | 0.0% | $ - 0 | $ - 0 | 0.0% | $ - 0 |
| SUBTOTAL INDIRECT LABOR EXPENSE | $ - 0 | $ - 0 |
| Material, Equipment, Subcontractor, Other Direct Costs (list) | ||
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Item Description | $ - 0 | $ - 0 |
| Subtotal: | $ - 0 | $ - 0 |
Material Handling 0% $ - 0 0% $ - 0
Travel Costs, location, number of people, number of trips, days
Subtotal: $ - 0 $ - 0
G&A $ - 0 0.00% $ - 0 $ - 0 0.00% $ - 0
Total Costs: $ - 0 $ - 0
Fixed Fee $ - 0 0.00% $ - 0 $ - 0 0.00% $ - 0
TOTAL PRICE $ - 0 $ - 0
Commissioning
| NOTE: TYPES OF COSTS, BASES AND RATES ARE FOR ILLUSTRATION PURPOSES ONLY. |
| PROPOSE ALL COSTS IN ACCORDANCE WITH YOUR ESTABLISHED ACCOUNTING AND ESTIMATING PRACTICES. |
| Proposed Escalation** | 0.00% | ||||||||||||||
| Proposed T&M Rate | |||||||||||||||
| 0% | 0% | 0% | 0% | ||||||||||||
| Labor Category | Level | Required Degree | Minimum Years Experience | Direct Labor | Fringe Benefits | Off Site OH | G&A | Profit | Base Year Rate | Option Year 1 | Base Year Hours | Option Year 1 Hours | Total Base Year | Total OY 1 | |
| Commissioning | |||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| TOTAL LABOR | $ - 0 | $ - 0 | |||||||||||||
| ** Proposed Escalation cannot exceed 2.5%. The proposed escalation factor will apply to all fiscal years. Proposed and negotiated T&M rates will become the IDIQ rates. |
| Proposed Escalation | 0.00% | |||||||||
| Proposed Material/Travel/ODC | ||||||||||
| 0% | ||||||||||
| Commissioning | Base Year Unit Price | Applied Burden | Base Year Burdened Unit Cost | OY 1 Burdened Unit Cost | Base Year Quantity | OY 1 Quantity | Total Base Year | Total OY 1 | ||
| Material Item Description | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | ||||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | ||
| TOTAL MATERIAL | $ - 0 | $ - 0 |
| For Reference, Historical Categories for this requirement: | |||
| Commissioning | Level | Degree | Years |
| Electrical Engineer Sr. | Sr. | BS | 10 |
| Training Specialist II | Mid | BS | 5 |
Decommissioning
| NOTE: TYPES OF COSTS, BASES AND RATES ARE FOR ILLUSTRATION PURPOSES ONLY. |
| PROPOSE ALL COSTS IN ACCORDANCE WITH YOUR ESTABLISHED ACCOUNTING AND ESTIMATING PRACTICES. |
| Proposed Escalation** | 0.00% | ||||||||||||||
| Proposed T&M Rate | |||||||||||||||
| 0% | 0% | 0% | 0% | ||||||||||||
| Labor Category | Level | Required Degree | Minimum Years Experience | Direct Labor | Fringe Benefits | Off Site OH | G&A | Profit | Base Year Rate | Option Year 1 | Base Year Hours | Option Year 1 Hours | Total Base Year | Total OY 1 | |
| DeCommissioning | |||||||||||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||
| TOTAL LABOR | $ - 0 | $ - 0 | |||||||||||||
| ** Proposed Escalation cannot exceed 2.5%. The proposed escalation factor will apply to all fiscal years. Proposed and negotiated T&M rates will become the IDIQ rates. |
| Proposed Escalation | 0.00% | |||||||||
| Proposed Material/Travel/ODC | ||||||||||
| 0% | ||||||||||
| DeCommissioning | Base Year Unit Price | Applied Burden | Base Year Burdened Unit Cost | OY 1 Burdened Unit Cost | Base Year Quantity | OY 1 Quantity | Total Base Year | Total OY 1 | ||
| Material Item Description | $ - 0 | $ - 0 | $ - 0 | - 0 | $ - 0 | $ - 0 | ||||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | |||
| Material Item Description | $ - 0 | $ - 0 | $ - 0 | - 0 | - 0 | - 0 | $ - 0 | $ - 0 | ||
| TOTAL MATERIAL | $ - 0 | $ - 0 |
| For Reference, Historical Categories for this requirement: | |||
| Commissioning | Level | Degree | Years |
| Electrical Engineer Sr. | Sr. | BS | 10 |
| Training Specialist II | Mid | BS | 5 |
T&M Rates
| This worksheet is for Government use, and pre-populates with offeror proposed T&M rates plus with applied escalation | |||||||||
| Labor Category | Level | Required Degree | Minimum Years Experience | ||||||
| Program Management | Base | OY 1 | OY 2 | OY 3 | OY 4 | Escalation Factor | |||
| Program Manager | Sr. | BS | 15 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% |
| Deputy Program Manager | 0 | BS | 10 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Technical Manager | Sr. | BS | 15 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Business Finance Manager | Sr. | BS | 15 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0 | 0 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Site Survey | Escalation Factor | ||||||||
| 0 | 0 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% |
| 0 | 0 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0 | 0 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0 | 0 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Site Management | Escalation Factor | |||||
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% |
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Commissioning | Escalation Factor | ||||||||
| 0 | 0 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% |
| 0 | 0 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0 | 0 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0 | 0 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| DeCommissioning | Escalation Factor | ||||||||
| 0 | 0 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 0.00% |
| 0 | 0 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0 | 0 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 0 | 0 | 0 | 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |