70RWMD20R00000012_DraftRPMDeployment_QAs_08122020v2_Final.pdf

PDF 93 KB Posted

Attached to
REQUEST FOR PROPOSAL (RFP) for Radiation Portal Monitor Program (RPMP) Deployment, Construction and Design
Solicitation number
70RWMD20R00000012
Issued by

About this file

This document contains a draft Request for Proposal (RFP) for Radiation Portal Monitor Program (RPMP) Deployment, Construction and Design Services. The RFP is seeking proposals to provide deployment, construction, and design services for the Radiation Portal Monitor Program. Services will include deployment and installation of radiation portal monitors, construction support, and design work. The solicitation number is 70RWMD20R00000012. Questions regarding the draft RFP are due by August 5, 2020 and should reference all attachments J.1 through J.7. A pre-proposal conference will be held on August 13, 2020 via Microsoft TEAMS to review submission requirements and answer questions. Interested offerors must register for the conference by August 10, 2020. The Department of Homeland Security Office of Procurement Operations will administer the RFP.

View the file

Other files

File Type Posted
FINAL_AMEND_02_RFP_70RWMD20R00000012_RPMP Deployment.pdf PDF
FINAL_AMEND_02_RPMP_RFP_QAs.pdf PDF
FINAL_AMEND_01_Attachment J.2 - RPMP Deployment.doc DOC document
FINAL_AMEND_01_SF33 70RWMD20R00000012_RPMP_Deployment.pdf PDF
FINAL_AMEND_01_RFP_70RWMD20R00000012_RPMP Deployment.pdf PDF
FINAL Attachment J.9 - CWMD Sensitive Systems_Requirements Traceability Matrix_2020928.pdf PDF
FINAL Attachment J.8 - Firm Fixed Price Construction CLINs- RS Means plus Co-Efficient_CWMD_9-1-2020.pdf PDF
FINAL RFP_70RWMD20R00000012_RPMP Deployment Construction and Design_101620.pdf PDF
FINAL Attachment J.6 - Sample Task Order SOW.pdf PDF
FINAL Attachment J.3 - Company to Company NDA Template RPMP Deployment Construction and Design.pdf PDF
FINAL Attachment J.5 - SF1408-14b.pdf PDF
FINAL Attachment J.4 - NDA_DHS_Form_11000-6.pdf PDF
FINAL Attachment J.1 - RPMP Deployment Construction and Design Questions Template.xlsx XLSX spreadsheet
FINAL Attachment J.2 - RPMP Deployment Construction and Design Past Performance Questionnaire.doc DOC document
FINAL Attachment J.7 - Pricing Template 09 25.xlsx XLSX spreadsheet
FINAL SF33 70RWMD20R00000012_RPMP Deployment_101620.pdf PDF
RPMP Deployment Construction and Design QAs Batch 3.pdf PDF
SF30_AMD00004_RFP 70RWMD20R00000012.pdf PDF
Revised Draft RFP_70RWMD20R00000012_RPMP Deployment Construction and Design_942020.pdf PDF
Attachment J.9 RPM Deployment_RTM_20200611.xlsx XLSX spreadsheet
Revised Attachment J.7 Draft RPMP Pricing Model 09 02.xlsx XLSX spreadsheet
Attachment J.8 - Firm Fixed Price Construction CLINs- RS Means plus Co-Efficient_CWMD_9-1-2020.pdf PDF
Revised Attachment J.2 RPMP Deployment Construction and Design Past Performance Questionnaire.doc DOC document
Copy of RPMP CWMD _post bidders conference_QA_rev01.pdf PDF
RPMP Pre Solicitaton Conference Registrant List4.xlsx XLSX spreadsheet
70RWMD20R00000012_SF30_P00003_18AUG20_.pdf PDF
RPM Deployment pre-solicitation conference_13Aug20_V1.0_Final_081220 (002).pptx PPTX presentation
70RWMD20R00000012_SF30_P0000212AUG20_.pdf PDF
70RWMD20R00000012_RevisedDraftRPMDeployment_QAs_08122020v2_Final1.pdf PDF
Draft RFP_70RWMD20R00000012_RPMP Deployment Construction and Design_7_23_20.pdf PDF
Attachment J.7 DRAFT RPMP Pricing Template.xlsx XLSX spreadsheet
Attachment J.6 - Scenario Task Order.docx DOCX document
Attachment J.5 - SF1408-14b.pdf PDF
Attachment J.4 - NDA_DHS_Form_11000-6.pdf PDF
Attachment J.2 RPMP Deployment Construction and Design Past Performance Questionnaire.doc DOC document
Attachment J.3 - Company to Company NDA Template RPMP Deployment Construction and Design.pdf PDF
Attachment J.1 - RPMP Deployment Construction and Design Questions Template.xlsx XLSX spreadsheet
SF33_Draft RFP_70RWMD20R00000012_RPMP Deployment Construction Design.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question/Comment Template

Number Section /

Attachment Paragraph

Page Number Question

1 L 2 102

Q. There is a discrepancy between the total page count on Volume 1 Phase 1 and Volume 1 Phase 2. In Volume 1 Phase 1, the subsections total to a maximum of 42 pages, and the total page count is 46 pages. In Volume 1 Phase 2, the subsections total to 36 and the total page count is 28. Please clarify.

A. Total pages should be 42 and 36 respectively

2 L and J.7 Tab 4 110 Q. The pricing instructions indicate that the program office should be priced on a task order basis. In our opinion, and similar to the DICCE program, a separate task order for the PMO as a baseline of cost associated with the project independent of the number of task orders would be more efficient with lower costs for the overall program. Would CWMD consider a single task order for the Program office on an annual basis priced independently of the task order work?

A. Yes, the government will consider to fund the program management CLIN for the entire year as a separate task order.

3 C 4.12 27 Q. What is the definition of the RFI Register?

A. The RFI Register is the Request For Information Register that contractors submit questions to the government during construction typically for the design omissions, errors and conflicts

4 C 4.1.1 12 Q. Should the contractor include Calibrations in the Project Management Plan?

A. No. However Contractor must coordinate with PNNL team for calibration.

5 C 4.13 30 Q. Is the contractor responsible for calibrations of the RPM following installation, or responsible for collecting calibration data from another organization to complete the commissioning package?

A. See answer for Section 4.1.1. page 12.

6 C 4.22 35 Q. Is the contractor responsible for functionality checks and certification of RPM operability prior to shipping from the warehouse or storage location?

A. No. The government will perform this function.

7 C 4.22 35 Q. Is the contractor responsible for the actual shipment of the RPMs to the site during an installation task? If yes, please advise that location for costing purposes.

A. No. However, the contractor is responsible for coordinating the shipment.

8 C 4.22 35

Q. Is the contractor responsible for the actual shipment of the decommissioned RPMs back to a storage location in addition to the He3 tubes as described? Please advise that location for costing purposes.

A. No. The government will fund the return shipment of RPMs and/or He3 tubes. The contractor will coordinate and prepare the RPMs and/or He3 tubes for shipment and ensure loading.

9 C B.4 5 Q. Please clarify CLIN x001 (CPFF) and x002 (FFP), what portion of the work will be cost plus fixed fee or firm fixed price?

A. The government will determine the apportionment of cost plus fixed fee and firm fixed price per Task Order.

10 Sample Task J.7 No Reference NA

Q. SOW 4.7 requires a cost estimate 30 days after the site survey before the design is started. In Sample Task J.6, there is no estimate required after the site survey. Is an estimate required after site survey? If so, is this section applicable to CLIN x001 or x002? Note that there may be changes derived at each design review percent complete.

A. A Rough Order of Magnitude estimate is required for the Site Survey Report CLIN. Understandingly, this estimate will mature as the design is developed. For the solicitation, only those who are selected for phase2 will be provided with that information

11 C 6.1 37

Q. We downloaded the files under “(3) DHS 4300A Sensitive Systems Handbook and Attachments”. However, attachments were not in sequential order. Please confirm the attached list is the complete list of reference documents required for compliance with this program.

A. The Contractor shall follow all current versions of Government policies and guidance accessible at http://www.dhs.gov/dhs-security-and-training-requirements-contractors, or available upon request from the Contracting Officer DHS 4300A Sensitive Systems Handbook (DHS 4300A, v 12.0, November 15, 2015) DHS 4300A Sensitive Systems Handbook Attachment B Waiver Request Form (DHS 4300A, Attach B, v 11.0, July 30, 2014) DHS 4300A Sensitive Systems Handbook Attachment C Information Systems Security Officer (ISSO) Designation Letter (DHS 4300A Attach C, v 11.0, August 5, 2014)

DHS 4300A Sensitive Systems Handbook Attachment D Type Accreditation (DHS 4300A Attach D, v 11.0, August 5, 2014)

DHS 4300A Sensitive Systems Handbook Attachment E FISMA Reporting (DHS 4300A Attach E, v 11.0, August 5, 2014)

DHS 4300A Sensitive Systems Handbook Attachment F, Incident Response (DHS 4300A Attachment F, v. 11.0, April 24, 2015)

DHS 4300A Sensitive Systems Handbook Attachment G, Rules of Behavior(DHS 4300A Attach G, v 11.0 August 5, 2014)

DHS 4300A Sensitive Systems Handbook Attachment H, Process Guide for Plan of Action and Milestones (POA&M) (DHS 4300A Attach H, v 11.0, December 3, 2014)

DHS 4300A Sensitive Systems Handbook IT Contingency Plan Template (DHS 4300A Attach K v 11.0, August 5, 2014)

DHS 4300A Sensitive Systems Handbook Attachment M Tailoring NIST 800-53 Security Controls Version 11.0 August 5, 2014 (DHS 4300A Attach M v 11.0, August 5, 2014) DHS 4300A Sensitive Systems Handbook Attachment N, Preparation of Interconnection Security Agreements (DHS 4300A Attach N, v 11.0, August 5, 2014) DHS 4300A Sensitive Systems Handbook Attachment P, Document Change Requests(DHS 4300A Attach P, v 11.0, August 5, 2014) DHS 4300A Sensitive Systems Handbook Attachment Q1, Sensitive Wireless Systems (DHS 4300A Attach Q1, v 11.0, August 5, 2014)

DHS 4300A Sensitive Systems Handbook Attachment Q2, Mobile Devices (DHS 4300A Attach Q2 v 11.0, August 5, 2014)

DHS 4300A Sensitive Systems Handbook Attachment Q4, Sensitive RFID Systems (DHS 4300A Attach Q4, v 11.0 August 5, 2014 ) DHS 4300A Sensitive Systems Handbook Attachment Q5, Voice over Internet Protocol (VoIP) (DHS 4300A Attach Q5, v.

11.0 December 22, 2014)

DHS 4300A Sensitive Systems Handbook Attachment Q6, Bluetooth Security (DHS 4300A Attach Q6, v11.0 December 22, 2014) DHS 4300A Sensitive Systems Handbook Attachment R Compliance Framework for CFO-Designated Systems (DHS 4300A Attach R, v 9.1, July 24, 2012) DHS 4300A Sensitive Systems Handbook Attachment S1 Managing CREs Containing SPII (DHS 4300A Attach S1, v 9.1, July 24, 2012) DHS 4300A Sensitive Systems Handbook Attachment S Compliance Framework for Remote Access to and Extracts from Privacy Sensitive Systems (DHS 4300A Attach S, v 11.0)

12 C 6.1 (5) and (6) 37

Q. SOW 6.1 (5) and (6) has two different descriptions. However, when you open the links under Privacy Safeguards, they point to the same file titled “Handbook for Safeguarding Sensitive PII, Privacy Policy Directive 047-01-007, Revision 3, Published by the DHS Privacy Office, December 4, 2017”. Is Policy Directive 047-01-007, Revision 3 applicable to both SOW

6.1 (5) and (6)? If not, then please provide correct documentation.

A. The Contractor shall follow all current versions of Government policies and guidance accessible at http://www.dhs.gov/dhs-security-and-training-requirements-contractors, or available upon request from the Contracting Officer

13 C 6.1(7) 37

Q. SOW 6.1 (7) indicates current fiscal year in the title. However, when we downloaded this file, the reference “FY17 Information Security DHS Information Security Performance Plan Version 1.0 December 31, 2016”. Is FY17 correct? If not, then please provide current year documentation.

A. The Contractor shall follow all current versions of Government policies and guidance accessible at http://www.dhs.gov/dhs-security-and-training-requirements-contractors, or available upon request from the Contracting Officer

14 C 6.1 37

Q. SOW 6.1 references NIST SP 800-53. There are two versions available for download. Should we use the Final Revision 4 or Draft Revision 5 document?

A. The Contractor shall follow all current versions of Government policies and guidance accessible at http://www.dhs.gov/dhs-security-and-training-requirements-contractors, or available upon request from the Contracting Officer