Copy of RPMP CWMD _post bidders conference_QA_rev01.pdf

PDF 87 KB Posted

Attached to
REQUEST FOR PROPOSAL (RFP) for Radiation Portal Monitor Program (RPMP) Deployment, Construction and Design
Solicitation number
70RWMD20R00000012
Issued by

About this file

This document contains a draft Request for Proposal for Radiation Portal Monitor Program Deployment, Construction and Design Services. The solicitation is being issued by the Department of Homeland Security Office of Procurement Operations. Offerors are invited to attend a pre-solicitation conference on August 13, 2020 via Microsoft Teams to ask questions about submission criteria and requirements. Any requests for additional information on the draft RFP must be received by August 5, 2020. The RFP includes seven attachments labeled J.1 through J.7 outlining requirement details. Offerors are asked to provide pricing templates and key personnel commitment letters with a minimum expected term of six months. The selected contractor will be responsible for deployment, construction, and design services to support the Radiation Portal Monitor Program.

View the file

Other files

File Type Posted
FINAL_AMEND_02_RFP_70RWMD20R00000012_RPMP Deployment.pdf PDF
FINAL_AMEND_02_RPMP_RFP_QAs.pdf PDF
FINAL_AMEND_01_Attachment J.2 - RPMP Deployment.doc DOC document
FINAL_AMEND_01_SF33 70RWMD20R00000012_RPMP_Deployment.pdf PDF
FINAL_AMEND_01_RFP_70RWMD20R00000012_RPMP Deployment.pdf PDF
FINAL Attachment J.9 - CWMD Sensitive Systems_Requirements Traceability Matrix_2020928.pdf PDF
FINAL Attachment J.8 - Firm Fixed Price Construction CLINs- RS Means plus Co-Efficient_CWMD_9-1-2020.pdf PDF
FINAL RFP_70RWMD20R00000012_RPMP Deployment Construction and Design_101620.pdf PDF
FINAL Attachment J.6 - Sample Task Order SOW.pdf PDF
FINAL Attachment J.3 - Company to Company NDA Template RPMP Deployment Construction and Design.pdf PDF
FINAL Attachment J.5 - SF1408-14b.pdf PDF
FINAL Attachment J.4 - NDA_DHS_Form_11000-6.pdf PDF
FINAL Attachment J.1 - RPMP Deployment Construction and Design Questions Template.xlsx XLSX spreadsheet
FINAL Attachment J.2 - RPMP Deployment Construction and Design Past Performance Questionnaire.doc DOC document
FINAL Attachment J.7 - Pricing Template 09 25.xlsx XLSX spreadsheet
FINAL SF33 70RWMD20R00000012_RPMP Deployment_101620.pdf PDF
RPMP Deployment Construction and Design QAs Batch 3.pdf PDF
SF30_AMD00004_RFP 70RWMD20R00000012.pdf PDF
Revised Draft RFP_70RWMD20R00000012_RPMP Deployment Construction and Design_942020.pdf PDF
Attachment J.9 RPM Deployment_RTM_20200611.xlsx XLSX spreadsheet
Revised Attachment J.7 Draft RPMP Pricing Model 09 02.xlsx XLSX spreadsheet
Attachment J.8 - Firm Fixed Price Construction CLINs- RS Means plus Co-Efficient_CWMD_9-1-2020.pdf PDF
Revised Attachment J.2 RPMP Deployment Construction and Design Past Performance Questionnaire.doc DOC document
RPMP Pre Solicitaton Conference Registrant List4.xlsx XLSX spreadsheet
70RWMD20R00000012_SF30_P00003_18AUG20_.pdf PDF
RPM Deployment pre-solicitation conference_13Aug20_V1.0_Final_081220 (002).pptx PPTX presentation
70RWMD20R00000012_SF30_P0000212AUG20_.pdf PDF
70RWMD20R00000012_RevisedDraftRPMDeployment_QAs_08122020v2_Final1.pdf PDF
70RWMD20R00000012_DraftRPMDeployment_QAs_08122020v2_Final.pdf PDF
Draft RFP_70RWMD20R00000012_RPMP Deployment Construction and Design_7_23_20.pdf PDF
Attachment J.7 DRAFT RPMP Pricing Template.xlsx XLSX spreadsheet
Attachment J.6 - Scenario Task Order.docx DOCX document
Attachment J.5 - SF1408-14b.pdf PDF
Attachment J.4 - NDA_DHS_Form_11000-6.pdf PDF
Attachment J.2 RPMP Deployment Construction and Design Past Performance Questionnaire.doc DOC document
Attachment J.3 - Company to Company NDA Template RPMP Deployment Construction and Design.pdf PDF
Attachment J.1 - RPMP Deployment Construction and Design Questions Template.xlsx XLSX spreadsheet
SF33_Draft RFP_70RWMD20R00000012_RPMP Deployment Construction Design.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HSHQDN-17-Q-0007 - Attachment 5 Question/Comment Template

Number Section /

Attachment Paragraph

Page Number Question

Based on Bidders

Conference

NA NA

Q. With regard to the concept of a coefficient for conversion of a T&M/CPFF bid to a Lum Sum contract, is this to be limited to the design phase for the sample task or the construction phase of the sample task, or both? Given the immaturity of the design as presented in the RFP, how would the contractor have sufficient detail to provide a lump sum bid? A. The offerors selected for Phase II will be provided a completed design.

Based on Bidders

Conference NA NA Q. Noting the comment earlier that the date for submission of Phase 2 is unknown, does the DHs have a plan for the duration of the proposal development time to be alloted to the offerors downselected? A. Approximately 30 days

Q&A 83 and

NA NA

Q. In the response to questions, questions 83 and 84 seem to allow an increase in the number of key personnel at the discretion of the offeror, would this increase in key personnel also allow for an increase in page count iaw the proposal instructions. that is, 3 pages for a resume for each added key personnel?

A. The offeror can provide the additional key personnel and resume pages but the government reserves the right to consider any additonal personnel beyond the RFP.

Based on Bidders

Conference

NA NA

Q. During the bidders conference, the concept of two task orders per year was announced. Does that mean that each task order will have multiple deployments associated with it, or does the DHS contemplate two deployments per year? A. The government will determine the number of task orders to execute the contract. Typically, there will be multiple deployments in task orders that are not specified as program management.

Based on Bidders

Conference

NA NA

Q. Innovation was discussed twice in the conference, and we believe that this is a very good thing. However, we are struggling to understand how to discuss innovation in our proposal and to then include a measurable savings for that innovation in the price proposal. For example, if we were to offer a revised process than that which is provided in the SOW, that could improve schedule dramatically and then price that improvement in the proposal, would we be considered non-responsive by not 'pricing' the total SOW as written, because our plan is to deliver the same output with a different process?

A. The cost/pricing requested in the RFP will be based on the design provided to the Phase II offerors. Discuss innovations in the context of the provided designs. Detailed cost savings or these innovations are not required.

Provide general areas where cost, efficiences, and effectiveness can be obtained from your recommended design innovations.

Based on Bidders

Conference

NA NA

Q. As a subcontractor, we are concerned that our past performance questionaire, which would need to be submitted to a potential rival in this procurement may not receive a fair review of performance. IF the ultimate customer, a government agency, is willing to complete the PPQ for this effort based on their knowledge of our performance, would that be acceptable to the DHS? A. If you were the subcontractor for the government contractor you are referencing, the Government is not allowed to provide a separate Past Performance (CPARS) outside of the Prime's past performance. You can still use this past performance it will not be a separate PP just for the subcontractor.

Based on Bidders

Conference

NA NA

Q, Can you provide an example of 'fabrication at a deployment site', so that we can be certain we fully understand the requirements as discussed during the bidders conference. A.

Brackets or stanchions for mounting RDE or similar hardware.

8 NA NA

Q. Should we price Innovations that result from a change to the detailed SOW, or propose them as ideas and then discuss the acceptability of the change with you during execution following award? A. Discuss innovations in the context of the provided designs. Detailed cost savings or these innovations are not required.

Provide general areas where cost, efficiences, and effectiveness can be obtained from your recommended design innovations.

Q. What part of the project lifecycle (engineering, procurement, construction and startup/commissioning) do we apply the coefficient too? A. The coefficients will only apply to Firm Fixed Price construction

Q. Can you define this contractor coefficient and identify which cost elements the coefficient would be applied to (labor, materials, overhead, other direct charge, mobilization/demobilization, contingency, etc.)?

A. Cost elements will be provided in the RFP

Q. Will you include the coefficient calculation in your pricing templates? A. Yes

HSHQDN-17-Q-0007 - Attachment 5 Question/Comment Template

12 Q. How will the coefficient be evaluated as part of the award process? A. The Government will review the coefficient for reasonableness and realism

13 Q. Given the immaturity of the design as presented in the RFP, how would the contractor have sufficient detail to provide a lump sum bid? A. See Question 1's answer.

M Factor 3

Key Personnel

1 117

Q. Key personnel Commitment letters. IS there a minimum limit of service required (term) expected for the Key peronnel? A. The government's expectation is six months with suffient time to properly transition the position if/when the key person has to leave the contract.

Question and Comment Template