Attachment H - 80GSFC21B0002.pdf

PDF 74 KB Posted

Attached to
Wallops Flight Facility - Restoration of Main Base Electrical Infrastructure Federal contract opportunity
Solicitation number
80GSFC21B0002
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This document consists of a specification/drawing supplemental clarification and related federal contract opportunity for the Wallops Flight Facility Restoration of Main Base Electrical Infrastructure project. The clarification provides additional requirements for the infrastructure replacement project, including prohibiting wire brush sweepers, ensuring stability of closure markings, performing smoothness testing within 24 hours of paving, requiring separate full-time QC Manager and SSHO/Superintendent positions with minimum experience requirements, and numerous specifications for hot mix asphalt airfield paving. The related federal contract opportunity is solicitation number 80GSFC21B0002 from the National Aeronautics and Space Administration Goddard Space Flight Center/Wallops Flight Facility seeking construction services for replacement of medium voltage direct burial cable, air switches, transformers, and wiring upgrades throughout the main base to create redundant feeders and looped circuits.

View the file

Other files for this federal contract opportunity

Other files attached to Wallops Flight Facility - Restoration of Main Base Electrical Infrastructure, newest first.
File Type Posted
Restoration of Main Base Electrical Infrastructure Industry RFIs 11 - 05272021.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 10 - 05242021.pdf PDF
A-131 - Skeet Range PAH Remediation.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 9 - 05202021.pdf PDF
SF30 amendment 3 5-19-21 -Signed.pdf PDF
IFB Solicitation Cover Letter-Rev A - Updated 5-20-2021 - Signed.pdf PDF
A-131 - Skeet Range PAH Area.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 8 - 05192021.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 7 - 05182021.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 6 - 05182021.pdf PDF
SF30 amendment 2 5-13-21 - Signed.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 5 - 05132021.pdf PDF
SF30 amendment 1 5-10-21 - Signed.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 4 - 05102021.pdf PDF
80GSFC21B0002 Rev. A.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 3 - 05072021 rev. 2.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 3 - 05072021.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 2 - 05042021.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 1 - 05032021.pdf PDF
Attachment H - 80GSFC21B0002 - Final.pdf PDF
Attachment G - 80GSFC21B0002.pdf PDF
IFB Solicitation Cover Letter-Final 4-20-21.pdf PDF
Attachment D - Contractors Daily Report Form WI-452.pdf PDF
Attachment E - Safety and Health Plan.pdf PDF
Attachment B - 20_0730 NASA Wallops Restoration of Main Base Electrical Infrastructure Submission Specs.pdf PDF
Attachment C - Main Base Electrical Stamped Construction Drawings 2020_07_31.pdf PDF
COVID Health Screening and Badge Information for Site Visits.pdf PDF
Attachment F - PIV Card Issuance Procedures.pdf PDF
Attachment A - Wage Determination.pdf PDF
80GSFC21B0002.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT H

80GSFC21B0002

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

GODDARD SPACE FLIGHT CENTER

WALLOPS FLIGHT FACILITY

WALLOPS ISLAND, VA 23337

WALLOPS RESTORATION OF MAIN BASE ELECTRICAL

INFRASTRUCTURE SPECIFICATION/DRAWING

SUPPLEMENTAL CLARIFICATION

Wallops Restoration of Main Base Electrical Infrastructure

LOCATED

AT

NASA GSFC/WALLOPS FLIGHT FACILITY

WALLOPS ISLAND, VIRGINIA

Date: March 1, 2021

Wallops Restoration of Main Base Electrical Infrastructure Specification/Drawing Supplemental Clarification

No wire brush sweepers can be operated for the project.

Contractor shall ensure stability of closure markings and ensure sandbags/etc. used to weight them down are replaced as necessary to avoid FOD hazards on the runway.

Transverse straight edge testing (smoothness requirements) shall be performed within 24 hours of the placement of a lane and shall apply to the lane, across the joints, and longitudinal transition from existing pavement to new pavement.

The QC Manager and SSHO/Superintendent cannot be the same person. The QC Manager and SSHO/Superintendent are both full time required positions for this project, if either is not present then all work shall stop until the project is properly manned. The QC Manager and SSHO shall both have at least 5 years of experience working on similar size and scope and Airfield Pavement Projects to be acceptable.

Sheet CS501 Detail A Overcutting of PCC shall not exceed 1” per spall repair notes on CS501.

Sheet CS501 Detail F, G, H, J The final elevation of the joint sealant shall be 1/8” from surface to minimize FOD.

Hot Mix Asphalt Airfield Paving -JMF shall state the minimum placement temperature of HMA.

-Production pavement cannot begin until all tests are back and approved for the test strip. The equipment and workers that place the test strip MUST be the same workers and equipment that applies production pavement.

-All test, reports, certifications, invoices, control charts, etc must be reviewed and approved by the QC prior to submittal to the Government for acceptance.

-Lab must be located at the batch plant.

-HMA specimen must be compacted and tested within 2 hours of mixing and prior to HMA bulk production (no reheat allowed on HMA production specimen).

-HMA must be in place 3 hours or less from the plant (for uninsulated trucks) and must meet minimum temperature requirements or cannot be placed and cannot be recycled, must be discarded offsite.

-JMF should be designed for a TMD of 4% air void and the in place cores should have actual air voids less than 6% to be acceptable.

-Testing lab must be certified per ASTM D3666

-JMF test must be less than 6 months old

-PG 70-22 binder should exceed 5% and may be as high as 7% to provide a properly consolidated matt

-Crushed aggregate should have more than 75% that have 2 or more fractured faces

-No RAP allowed in surface

-No more than 3 passes are allowed on the matt with a vibratory roller (additional passes can be made with vibration turned off), this should be established with the approved roller pattern established during the test strip

-Must use an oscillatory vibratory roller on joints

-Must use a rubber tire roller on PCC to HMA joints

-Must mark each lot and core location in the field for Government verification

-Required Material Transfer Vehicle must reheat and remix HMA and be self-propelled with an articulated arm

-If batch plant is located onsite, Contractor must ensure that plant meets all safety requirements, labeled panels, containment berms, spill protection kits, fire extinguishers, first aid kits, handrails on elevated platforms, confined space signage, etc.

-Must cut back longitudinal joints by 3” minimum if temperature is below 175F before next matt placement. Or can trim and reheat edge if approved

-No tack balls or tracking of tack is allowed on subgrade or on new HMA matt or on existing station infrastructure, can use trackless tack.

-Overly segregated surface will be rejected and must be removed and repaved, overly segregated surface promotes premature failure due to freeze and thaw and creates a FOD hazard on an Airfield, Airfield segregation does not ‘heal’.