Attachment D - Contractors Daily Report Form WI-452.pdf

PDF 108 KB Posted

Attached to
Wallops Flight Facility - Restoration of Main Base Electrical Infrastructure Federal contract opportunity
Solicitation number
80GSFC21B0002
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This daily construction report form and related federal contract opportunity involve electrical infrastructure restoration services at NASA's Wallops Flight Facility in Wallops Island, Virginia. The construction report form is Attachment D to solicitation 80GSFC21B0002, and will be used to document daily work, weather conditions, labor counts, equipment use, surveillance results, test results, instructions received, remarks, and safety inspections. The solicitation seeks bids to replace medium voltage direct burial cable and switches, create redundant feeders and looped circuits, replace transformers, and upgrade wiring at the main base. The contractor will be responsible for construction services in compliance with contract plans and specifications. The deadline to submit a bid response was not provided.

View the file

Other files for this federal contract opportunity

Other files attached to Wallops Flight Facility - Restoration of Main Base Electrical Infrastructure, newest first.
File Type Posted
Restoration of Main Base Electrical Infrastructure Industry RFIs 11 - 05272021.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 10 - 05242021.pdf PDF
A-131 - Skeet Range PAH Remediation.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 9 - 05202021.pdf PDF
SF30 amendment 3 5-19-21 -Signed.pdf PDF
IFB Solicitation Cover Letter-Rev A - Updated 5-20-2021 - Signed.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 8 - 05192021.pdf PDF
A-131 - Skeet Range PAH Area.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 7 - 05182021.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 6 - 05182021.pdf PDF
SF30 amendment 2 5-13-21 - Signed.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 5 - 05132021.pdf PDF
SF30 amendment 1 5-10-21 - Signed.pdf PDF
80GSFC21B0002 Rev. A.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 4 - 05102021.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 3 - 05072021 rev. 2.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 3 - 05072021.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 2 - 05042021.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 1 - 05032021.pdf PDF
Attachment H - 80GSFC21B0002 - Final.pdf PDF
Attachment E - Safety and Health Plan.pdf PDF
Attachment G - 80GSFC21B0002.pdf PDF
IFB Solicitation Cover Letter-Final 4-20-21.pdf PDF
Attachment C - Main Base Electrical Stamped Construction Drawings 2020_07_31.pdf PDF
COVID Health Screening and Badge Information for Site Visits.pdf PDF
Attachment H - 80GSFC21B0002.pdf PDF
Attachment F - PIV Card Issuance Procedures.pdf PDF
Attachment A - Wage Determination.pdf PDF
80GSFC21B0002.pdf PDF
Attachment B - 20_0730 NASA Wallops Restoration of Main Base Electrical Infrastructure Submission Specs.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT D

80GSFC21B0002

NATIONAL AERONAUTICS AND SPACE ADMINISTRATION

GODDARD SPACE FLIGHT CENTER

WALLOPS FLIGHT FACILITY

WALLOPS ISLAND, VA 23337

CONTRACTORS DAILY REPORT

FORM WI 452

FOR

Wallops Restoration of Main Base Electrical Infrastructure

LOCATED

AT

NASA GSFC/WALLOPS FLIGHT FACILITY

WALLOPS ISLAND, VIRGINIA

NASA WI-452

DAILY CONSTRUCTION REPORT

Contract No. ___________ Date: ______________ Report No. ____________

Description and Location of Work: ________________________________________________

Weather: (Clear) (P. Cloudy) (Cloudy) Temperature ______ Min: ______ Max: _______ Rainfall: __________ inches.

Contractor/Subcontractors and Area of Responsibility with Labor Count for Each:

a. __________________________________ d. __________________________________

b. __________________________________ e. __________________________________

c. __________________________________ f. __________________________________

Equipment Data: (Indicate items of construction equipment, other than hand tools, at the job site, and whether or not used.)

1. Work Performed Today: (Indicate location and description or work performed. Refer to work performed by prime and/or subcontractors by letter in Table above.)

NASA WI-452

2. Result of Surveillance: (Include satisfactory work completed, or deficiencies with action to be taken.)

3. Test Required by Plans and/or Specifications Performed and Results of Tests:

4. Verbal Instruction Received: (List any instructions given by Government personnel on construction deficiencies, retesting required, etc., with action to be taken.)

5. Remarks: (Cover any conflicts in plans, specifications, or instructions on any delay to the job attributable to weather conditions.)

6. Results of Safety Inspections: (Include safety violations and corrective actions taken.)

CONTRACTOR’S VERIFICATION: The above report is complete and correct and all material and equipment used and work performed during this reporting period are in compliance with the contract plans and specifications except as noted above.

(Contractor’s Approved Authorized Representative)

(NASA Inspector)