This document contains responses to industry questions regarding the National Aeronautics and Space Administration Goddard Space Flight Center's solicitation for the restoration of the main base electrical infrastructure at Wallops Flight Facility. The solicitation requests construction services including replacement of medium voltage direct burial cable and switches, creation of redundant feeders and looped circuits, transformer replacement, and wiring upgrades. One question asked about alternate bids referenced in the drawings but not the solicitation; the response clarified that all work noted as included in phase two or add alternates is excluded from this project and for reference only. Pricing is to be provided as a firm fixed price for the total base bid.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Restoration of Main Base Electrical Infrastructure Response to Industry Questions #2
5/4/21
1. On drawing E-307 there is the following note:
“ALL WORK ON THIS SHEET SHALL BE INCLUDED IN ADD ALTERNATE #E-2”
In the Solicitation it only refers to a Lump Sum total base bid:
B.1 1852.216-78 FIRM FIXED PRICE (DEC 1988)
The total firm fixed price of this contract is: $____ (To Be Completed by Bidder)
(End of clause)
We are unable to locate in the Solicitation any instructions/requests for Alternate Bids, please clarify.
Government Response: All work in the drawings noted as being included in Phase II Bid Package, Add Alternate #E-1, or Add Alternate #E-2 is excluded from this project and are for references purposes only