Restoration of Main Base Electrical Infrastructure Industry RFIs 7 - 05182021.pdf

PDF 151 KB Posted

Attached to
Wallops Flight Facility - Restoration of Main Base Electrical Infrastructure
Solicitation number
80GSFC21B0002
Issued by

About this file

This document contains responses to industry questions regarding a solicitation from the National Aeronautics and Space Administration Goddard Space Flight Center for the restoration of main base electrical infrastructure at Wallops Flight Facility. The responses clarify that certain buildings may be able to have restoration work performed during normal business hours though this cannot be guaranteed. Additionally, it is acceptable to arc tape medium voltage cables as a group rather than individually wrapping each conductor. The solicitation seeks construction services including replacement of medium voltage direct burial cable and switches, creation of redundant feeders and looped circuits, transformer replacement, and wiring upgrades at the main base location.

View the file

Other files

File Type Posted
Restoration of Main Base Electrical Infrastructure Industry RFIs 11 - 05272021.pdf PDF
A-131 - Skeet Range PAH Remediation.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 10 - 05242021.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 9 - 05202021.pdf PDF
IFB Solicitation Cover Letter-Rev A - Updated 5-20-2021 - Signed.pdf PDF
SF30 amendment 3 5-19-21 -Signed.pdf PDF
A-131 - Skeet Range PAH Area.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 8 - 05192021.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 6 - 05182021.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 5 - 05132021.pdf PDF
SF30 amendment 2 5-13-21 - Signed.pdf PDF
SF30 amendment 1 5-10-21 - Signed.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 4 - 05102021.pdf PDF
80GSFC21B0002 Rev. A.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 3 - 05072021 rev. 2.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 3 - 05072021.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 2 - 05042021.pdf PDF
Restoration of Main Base Electrical Infrastructure Industry RFIs 1 - 05032021.pdf PDF
Attachment H - 80GSFC21B0002 - Final.pdf PDF
Attachment A - Wage Determination.pdf PDF
Attachment C - Main Base Electrical Stamped Construction Drawings 2020_07_31.pdf PDF
80GSFC21B0002.pdf PDF
Attachment B - 20_0730 NASA Wallops Restoration of Main Base Electrical Infrastructure Submission Specs.pdf PDF
Attachment D - Contractors Daily Report Form WI-452.pdf PDF
Attachment H - 80GSFC21B0002.pdf PDF
COVID Health Screening and Badge Information for Site Visits.pdf PDF
Attachment E - Safety and Health Plan.pdf PDF
Attachment F - PIV Card Issuance Procedures.pdf PDF
IFB Solicitation Cover Letter-Final 4-20-21.pdf PDF
Attachment G - 80GSFC21B0002.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Restoration of Main Base Electrical Infrastructure Response to Industry Questions #7

5/18/21

1. Will all buildings be required to be done after hours or weekends? If not please clarify which buildings can be during normal business hours.

The following buildings may be able to be done during normal business hours, but can’t be guaranteed.

A-1 A-2-1 A-41 A-131 B-30

CG-6

C-094 D-4 D-8 D-137 E-6 E-7 E-10 E-110 E-134 F-8 F-9 F-10-3 F-10-4 F-11 F-16-1 F-16-2 F-19 F-20 F-14 F-19 F-21 F-23 F-24 F-25 F-26 F-27 F-44 F-168 H-30 M-1 N-116

Restoration of Main Base Electrical Infrastructure Response to Industry Questions #7

5/18/21

N-117 N-133 N-157 N-159B N-159C N-159-Ramp N-161C N-163A-W N-165—1 N-169-W N-159D-W Cap Bank #1-W N-174-A&B N-175-W N-179-W N-181-2 N-185 N-181-3-W N-181-4-W N-181-1-W N-222 H-30

MLS PAD-3

TR-HOT-PAD

TR-A-2-1

M-1

2. General note 23 drawing E-002 “Single phase fault indicators shall be provided on all incoming and outgoing conductors located within the medium voltage equipment enclosures. This includes all pad mounted enclosures for medium voltage equipment, such as transformers, sectionalizing cabinets, medium voltage switches, etc.

Fault indicators are not required.

3. Second part of note 23. Please confirm if it is acceptable to arc tape the medium voltage cables as a group instead of individually wrapping each conductor.

Yes, its acceptable to arc tape the medium voltage cables as a group instead of individually wrapping each conductor.

File details come from the government source that posted it. Updated .