ATTACHMENT_F-_CONSTRUCTION_DRAWINGS.pdf

PDF 135 MB Posted

Attached to
Cell 3 Landfill Base Construction-South Landfill Central Disposal Facility (CDF)
Solicitation number
B-7-26-11
Issued by
Brevard County, Florida

About this file

Construction Drawings for Cell 3 Landfill Base Construction

This attachment comprises construction drawings submitted by Brevard County Solid Waste Management Department for the Cell 3 Class I Landfill Base Liner project at the South Landfill Central Disposal Facility in Cocoa, Florida. The project encompasses construction of a new Class I landfill base liner system covering approximately 52 acres adjacent to an existing and actively operating solid waste disposal area. Deliverables include environmental cutoff wall installation, a 12-inch compacted subgrade, a dual geomembrane lining system with composite drainage layers and geosynthetic clay liner, a 24-inch protective sand layer, perimeter and interior berms, leachate collection laterals and headers with dual pump stations, landfill gas piping and condensate systems, groundwater monitoring wells, access ramps and driveways, and site restoration with sodding. The pre-bid conference is scheduled for February 12, 2026 at 10:00 a.m., with a question deadline of February 26, 2026 at 5:00 p.m. and a bid submission deadline of March 31, 2026 at 11:00 a.m. Substantial completion is required 730 days from Notice to Proceed with final completion within 790 days.

Bidders must submit lump sum pricing with a bid bond equal to 5% of the proposed amount and detailed qualification documentation within five business days of Notice of Apparent Lowest Bidder. Qualified contractors must demonstrate successful completion of at least three Class I landfill expansion projects of minimum 30 acres each within the past ten years and maintain comprehensive insurance coverage including workers' compensation, general liability with $1,000,000 combined single limit, auto liability with $1,000,000 combined single limit, builders' risk insurance at 100% of contract price, and pollution liability with $1,000,000 per occurrence/$2,000,000 aggregate. The County maintains an owner-controlled contingency fund of $750,000 for approved changes. For contracts exceeding $200,000, contractors must furnish a Public Construction Bond equal to 100% of contract price recorded with the Clerk of Court plus a 25% Maintenance Bond. Liquidated damages are assessed at $2,500 per calendar day for failure to meet milestone dates or substantial completion deadlines. Contractors must perform at least 25% of the work with direct employees, comply with the Build America, Buy America Act requirements, utilize E-Verify for employee eligibility verification, and comply with the Florida Trench Safety Act with separate cost breakdown required for trench safety compliance.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .