Exhibit_3_-_Elect_Panel_Mounting_Detail.pdf
PDF 111 KB Posted
- Solicitation number
- B-7-26-11
- Issued by
- Brevard County, Florida
About this file
Exhibit 3 is a technical detail document for the Brevard County Solid Waste Management Department's Cell 3 Landfill Base Construction project at the South Landfill Central Disposal Facility in Cocoa, Florida. The exhibit provides electrical panel mounting specifications derived from the Cell 2 construction drawings, with the intent to replicate the assembly design for installation at Pump Station 3 and Pump Station 4. The broader project encompasses construction of a new Class I landfill base liner system covering approximately 52 acres and includes multiple integrated components such as an environmental cutoff wall, geomembrane lining systems, leachate collection infrastructure with dual pump stations, landfill gas piping, groundwater monitoring wells, access improvements, and site restoration. The pre-bid conference is scheduled for February 12, 2026 at 10:00 a.m., with a question deadline of February 26, 2026 at 5:00 p.m. and a revised bid submission deadline of March 31, 2026 at 11:00 a.m. Substantial completion is required 730 days from Notice to Proceed, with final completion within 790 days.
The project is awarded to the lowest responsive and qualified bidder on a lump sum basis with an owner-controlled contingency fund of $750,000 for county-approved changes. Bidders must submit a bid bond equal to 5% of the proposed amount and demonstrate minimum qualifications including successful completion of at least three Class I landfill expansion projects of 30 acres or more within the past ten years. Upon award, contractors must furnish a Public Construction Bond equal to 100% of contract price and a 25% Maintenance Bond. Required insurance includes general liability and auto liability with $1,000,000 combined single limits, builders' risk at 100% of contract price, and pollution liability with $1,000,000 per occurrence/$2,000,000 aggregate. Liquidated damages are assessed at $2,500 per calendar day for failure to meet milestone or completion deadlines. The contractor must perform at least 25% of work with direct employees, comply with Build America, Buy America Act requirements, utilize E-Verify for employee verification, and comply with the Florida Trench Safety Act with separate cost breakdown required.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit 3-Addendum 4
Note: This detail is taken from Cell 2 construction drawings. The intent is to construct a similar assembly for Pump Station 3 and Pump Station 4.
File details come from the government source that posted it. Updated .