Attachment A-2 Pricing Form~2.xlsx
XLSX spreadsheet 19 KB Posted
- Solicitation number
- S-63400-00016792
- Issued by
- Tillamook County, Oregon
About this file
This is a Pricing Submittal Form (Attachment A-2) for ITB 13440, a Cape Lookout State Park Parkwide Improvements Project administered by the Oregon Parks and Recreation Department (OPRD). The project encompasses three distinct packages: Package 1 covers Day Use Parking Improvements, Package 3 addresses Loop D Paving, and Package 4 includes Loop C & D Utilities. Package 1 represents the most extensive scope, comprising 55 line items that include mobilization, planning and permits, survey and stakeout, demolition and clearing, asphalt and concrete paving work, curbing and sidewalks, stormwater management features, utilities installation, landscaping improvements, and site amenities such as bollards, picnic tables, signs, pay stations, and electric vehicle charging stations. Package 3 contains 12 line items focused on pavement removal, base preparation, asphalt paving, and markings for Loop D. Package 4 consists of 13 line items dedicated to waterline installation of varying sizes and site electrical work for Loops C and D. Significant quantities include 132,500 square feet of asphalt excavation, 3,350 cubic yards of general excavation, 1,950 tons of asphalt paving, 15,560 square feet of concrete sidewalk, 5,700 square feet of stormwater planter area, and 4,700 linear feet of 3-inch waterline.
The pricing form requires bidders to enter unit costs and total costs for all itemized bid items, with payment to be made based on actual, measured quantities rather than estimated quantities listed in the form. Bid prices must include all contractor overhead and profit, as well as all necessary plant, labor, equipment, accessories, materials, permits, temporary facilities, and incidental work. OPRD explicitly reserves the right to increase or decrease quantities at the same unit prices, remove items as necessary to meet budgetary constraints, or adjust and delete items as needed. The form must be completed in its entirety, and failure to provide all required information may result in bid rejection as non-responsive. Bidders acknowledge having carefully examined the contract documents and the project site prior to submission.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ATTACHMENT A |
| FORM A-2 - PRICING FORM |
| ITB 13440 |
| CAPE LOOKOUT PARKWIDE IMPROVEMENTS |
| PRICING SUBMITTAL FORM |
| PRICING SUBMITTAL INSTRUCTIONS: Bidders shall enter pricing and other required information for all Bid Items listed in this Pricing Submittal Form. If this Pricing Submittal Form is replaced by Addendum, Bidders shall use the Addendum form to provide pricing and other required information. If the Pricing Submittal Form is only modified by Addendum, then Bidders shall follow the instructions in the Addendum for making modifications to the Pricing Submittal Form. Failure to supply the required information in the Pricing Submittal Form as modified by subsequent Addenda may result in Bid rejection as non-responsive. |
Note: Bid price is total contract price including contractor's profit and overhead. All work described in the Contract Documents but not specifically itemized in the Pricing below is considered incidental to the Work.
The undersigned understands that the State reserves the right to increase or decrease the above quantities at the same unit prices as show or to remove items as necessary to meet budgetary constraints. The undersigned has carefully examined the Contract Documents and the site of the work, ang agrees to furnish all necessary plant, labor, equipment, accessories, materials, permits, temporary facilities and perform all operations shown and specified in accordance with the Contract Documents for the price(s) set herein.
| The quantities listed in Pricing Submittal Form are intended to serve only as a guide to Bidders and are not to be construed as a guarantee. All quantities are estimated and are for Bid purposes only. All quantities are "in place" or "installed". OPRD reserves the right to adjust quantities or delete items as needed. Payment will be made based on actual, measured quantities. | |||||
| Item # | Description | Quantity | Unit | Unit Cost | Total Cost |
| Package 1 - Day Use Parking Improvements | |||||
| BASE BID | |||||
| 1.1 | Mobilization | 1 | LS | $ - 0 | |
| 1.2 | Planning, Design & Permits | 1 | LS | $ - 0 | |
| 1.3 | Survey - Project Stakeout | 1 | LS | $ - 0 | |
| 1.4 | Erosion Control | 1 | LS | $ - 0 | |
| 1.5 | Traffic Control | 1 | LS | $ - 0 | |
| 1.6 | Demolition, Clearing and Grubbing | 1 | LS | $ - 0 | |
| 1.7 | Tree Removal & Protection | 1 | LS | $ - 0 | |
| 1.8 | Asphalt Excavation | 132,500 | SF | $ - 0 | |
| 1.9 | General Excavation and Earthwork | 3,350 | CY | $ - 0 | |
| 1.10 | Rock Excavation | 170 | CY | $ - 0 | |
| 1.11 | Over Excavation | 170 | CY | $ - 0 | |
| 1.12 | Base Rock or Shoulder Rock | 3500 | TON | $ - 0 | |
| 1.13 | Gravel Driveway | 35 | TON | $ - 0 | |
| 1.14 | Asphalt Paving - Leveling and Wearing Courses | 1950 | TON | $ - 0 | |
| 1.15 | Concrete Paving | 115 | CY | $ - 0 | |
| 1.16 | Pavement Markings - Painted Striping | 1 | LS | $ - 0 | |
| 1.17 | Pavement Markings - Thermoplastic Markings - Symbols | 21 | EA | $ - 0 | |
| 1.18 | Standard Curb | 4,150 | LF | $ - 0 | |
| 1.19 | Flush Curb | 1,100 | LF | $ - 0 | |
| 1.20 | Curb Cut | 34 | EA | $ - 0 | |
| 1.21 | Concrete Sidewalk | 15,560 | SF | $ - 0 | |
| 1.22 | Asphalt Sidewalk | 10 | TON | $ - 0 | |
| 1.23 | Precast Concrete Wheel Stops | 78 | EA | $ - 0 | |
| 1.24 | Gravity Storm Sewer - 6 Inch | 260 | LF | $ - 0 | |
| 1.25 | Gravity Storm Sewer - 8 Inch | 505 | LF | $ - 0 | |
| 1.26 | 48" Manhole - Flat Top Manhole | 1 | EA | $ - 0 | |
| 1.27 | Catch Basin | 5 | EA | $ - 0 | |
| 1.28 | Cleanout to Grade | 11 | EA | $ - 0 | |
| 1.29 | Outfall | 2 | EA | $ - 0 | |
| 1.30 | Overflow Inlet | 7 | EA | $ - 0 | |
| 1.31 | Stormwater - Planter | 5,700 | SF | $ - 0 | |
| 1.32 | Stormwater - Facility | 1,800 | SF | $ - 0 | |
| 1.33 | Stormwater - Swale | 2,310 | SF | $ - 0 | |
| 1.34 | Stormwater - Culvert | 3 | LF | $ - 0 | |
| 1.35 | Stormwater - Check Dam | 19 | EA | $ - 0 | |
| 1.36 | Stormwater - Planter Wall | 900 | LF | $ - 0 | |
| 1.37 | Waterline - 3/4 Inch | 20 | LF | $ - 0 | |
| 1.38 | Waterline - 1 Inch | 165 | LF | $ - 0 | |
| 1.39 | Waterline - Yard Hydrant | 2 | EA | $ - 0 | |
| 1.40 | Site Electrical | 1 | LS | $ - 0 | |
| 1.41 | Landscape - Top Soil | 860 | CY | $ - 0 | |
| 1.42 | Landscape - Seeding | 8,500 | SF | $ - 0 | |
| 1.43 | Landscape - General - Plantings | 1 | LS | $ - 0 | |
| 1.44 | Landscape - Stone Veneer Faced Seat Wall | 1 | LS | $ - 0 | |
| 1.45 | Landscape - Stone Paving Band | 1 | LS | $ - 0 | |
| 1.46 | Landscape - Split Rail Fence | 1 | LS | $ - 0 | |
| 1.47 | Landscape - Rock Steps | 1 | LS | $ - 0 | |
| 1.48 | Bollards | 5 | EA | $ - 0 | |
| 1.49 | Picnic Tables - Relocate | 2 | EA | $ - 0 | |
| 1.50 | Signs - Relocate | 1 | LS | $ - 0 | |
| 1.51 | Signs - New | 1 | LS | $ - 0 | |
| 1.52 | Pay Station - Relocate | 1 | LS | $ - 0 | |
| 1.53 | Pay Station - Install | 1 | LS | $ - 0 | |
| 1.54 | Electric Car Charging - Relocate | 1 | LS | $ - 0 | |
| 1.55 | Excavate, Base Preparation and Backfill for CXT Vault Toilet | 2 | EA | $ - 0 | |
| PACKAGE 1 TOTAL | $ - 0 | ||||
| Package 3 - Loop D Paving | |||||
| BASE BID | |||||
| 3.1 | Mobilization | 1 | LS | $ - 0 | |
| 3.2 | Planning, Design & Permits | 1 | LS | $ - 0 | |
| 3.3 | Survey - Project Stakeout | 1 | LS | $ - 0 | |
| 3.4 | Erosion Control | 1 | LS | $ - 0 | |
| 3.5 | Traffic Control | 1 | LS | $ - 0 | |
| 3.6 | Demolition, Clearing and Grubbing | 1 | LS | $ - 0 | |
| 3.7 | Asphalt Excavation | 6,675 | SF | $ - 0 | |
| 3.8 | 3" Cold Plane Pavement Removal | 62,300 | SF | $ - 0 | |
| 3.9 | Base Rock or Shoulder Rock | 950 | TON | $ - 0 | |
| 3.10 | Asphalt Paving - Leveling and Wearing Courses | 1,390 | TON | $ - 0 | |
| 3.11 | Pavement Markings - Thermoplastic Markings - Symbols | 17 | EA | $ - 0 | |
| 3.12 | Precast Concrete Wheel Stops | 71 | EA | $ - 0 | |
| PACKAGE 3 TOTAL | $ - 0 | ||||
| Package 4 - Loop C & D Utilities | |||||
| BASE BID | $ - 0 | ||||
| 4.1 | Mobilization | 1 | LS | $ - 0 | |
| 4.2 | Planning, Design & Permits | 1 | LS | $ - 0 | |
| 4.3 | Survey - Project Stakeout | 1 | LS | $ - 0 | |
| 4.4 | Erosion Control | 1 | LS | $ - 0 | |
| 4.5 | Traffic Control | 1 | LS | $ - 0 | |
| 4.6 | Demolition, Clearing and Grubbing | 1 | LS | $ - 0 | |
| 4.7 | Tree Removal & Protection | 1 | LS | $ - 0 | |
| 4.8 | Asphalt Excavation | 400 | SF | $ - 0 | |
| 4.9 | Waterline - 3/4 Inch | 2,450 | LF | $ - 0 | |
| 4.10 | Waterline - 1 1/2 Inch | 105 | LF | $ - 0 | |
| 4.11 | Waterline - 3 Inch | 4,700 | LF | $ - 0 | |
| 4.12 | Waterline - Yard Hydrant | 75 | EA | $ - 0 | |
| 4.13 | Site Electrical | 1 | LS | $ - 0 | |
| PACKAGE 4 TOTAL | $ - 0 |
TOTAL BID (Sum of Package 1, Package 3 and Package 4 Totals) $ - 0
By (Bidder Company Name and Authorized Signer Name) Date