Addendum 2 to ITB 13440 Cape Lookout State Park Parkwide Improvements Project.docx

DOCX document 85 KB Posted

Attached to
ITB 13440 Cape Lookout State Park Parkwide Improvements Project
Solicitation number
S-63400-00016792
Issued by
Tillamook County, Oregon

About this file

This Addendum 2 document modifies the Invitation to Bid (ITB) 13440 issued by the Oregon Parks and Recreation Department (OPRD) for the Cape Lookout State Park Parkwide Improvements Project. The addendum introduces three new attachments to the procurement: Project Permits (Attachment E-2) and a Geotechnical Report (Attachment E-3), both available as separate documents on OregonBuys, along with corresponding exhibits to the Sample Construction Contract Form. The addendum clarifies that CXT toilet buildings and vaults will be Owner-furnished and Contractor-installed, with the Contractor responsible for site preparation, grading, and paving. Electrical kiosks panels are also Owner-furnished with the Contractor responsible for site work and installation. Campsite pedestals (Parkmates) are specified as Owner-furnished with Contractor installation responsibility. The ITB closing date and time remain unchanged, with prospective bidders required to submit written questions, requests for change, or protests by 2:00 PM on May 27, 2026. The addendum includes clarifications addressing bidder questions regarding cobble excavation expectations, electrical panel specifications, culvert locations, utility coordination responsibilities with Tillamook Public Utility District, and pavement depth specifications for milling and inlay work in Package 3, with reference to the Geotechnical Report for subsurface condition details and pavement boring information.

The addendum confirms that existing culverts are included in project plans with available coordination through OPRD for field location assistance prior to directional boring. Responsibility for electrical work is clarified, with the Contractor responsible for conduit placement, transformer pad installation, and coordination with TPUD, while TPUD will handle pulling primary lines and setting the transformer. The Contractor is responsible for furnishing and installing non-OFCI electrical panels, while electrical kiosks remain OFCI. For pavement milling operations, if shallower asphalt than anticipated is encountered, the Contractor must coordinate with the Project Manager to determine the affected area and appropriate response. No changes to project funding sources, bid security requirements, performance and payment bond obligations, or competitive award criteria are introduced by this addendum, which serves solely to clarify technical specifications and add required supporting documentation to the original ITB.

View the file

Other files

File Type Posted
Attachment A-2 Pricing Form~2.xlsx XLSX spreadsheet
Addendum 4 to ITB 13440 Cape Lookout State Park Parkwide Improvements Project.docx DOCX document
ADDENDUM 5 Attachment C - Revised Drawings Package 4 Loop C and D Utilities.pdf PDF
ADDENDUM 5 Attachment A-2 Pricing Form.xlsx XLSX spreadsheet
ADDENDUM 5 Attachment C - Revised Drawings Package 1 Day Use Parking Lot Improvements.pdf PDF
Attachment C Plans and Drawings_Package 1 Day Use Parking Lot Improvements.pdf PDF
Attachment B Technical Specifications - Cape Lookout State Park Parkwide Improvements.pdf PDF
ADDENDUM 3 Attachment A-2 Pricing Form.xlsx XLSX spreadsheet
Attachment C Plans and Drawings_Package 4 Loop C and D Utilities.pdf PDF
Addendum 1 to ITB 13440 Cape Lookout State Park Parkwide Improvements Project.docx DOCX document
ADDENDUM 2 Attachment E-3 Geotechnical Report.pdf PDF
ITB 13440 Cape Lookout Parkwide Improvements~1.docx DOCX document
ADDENDUM 3 Attachment C - Revised Drawings Package 3 Loop D Paving.pdf PDF
Addendum 5 to ITB 13440 Cape Lookout State Park Parkwide Improvements Project_.docx DOCX document
Addendum 3 to ITB 13440 Cape Lookout State Park Parkwide Improvements Project-2.docx DOCX document
ADDENDUM 3 Attachment C - Revised Drawings Package 1 Day Use Parking Lot Improvements.pdf PDF
Attachment E-1 Inadvertent Discovery Plan .pdf PDF
ADDENDUM 2 Attachment E-2 Project Permits.pdf PDF
13440 Pre-bid sign in.pdf PDF
ADDENDUM 3 Attachment C - Revised Drawings Package 4 Loop C and D Utilities.pdf PDF
Attachment C Plans and Drawings_Package 3 Loop D Paving.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM #2

OregonBuys # S-63400-00016792

ITB # 13440

Cape Lookout State Park Parkwide Improvements Project

This Addendum 2 modifies the Invitation to Bid (“ITB”) only to the extent indicated herein. All other areas not specifically mentioned or affected by this Addendum 2 shall remain in full force and effect. This Addendum shall be added as a part of the original ITB document(s) and shall become part of the work required.

ADDENDUM

1. ITB 13440 Cape Lookout State Park is amended as follows:

A. Table of Contents is modified as follows:

i. Under Attachment E – Additional Project Requirements, ADD:

· ATTACHMENT E-2: Project Permits

Attachment E-2 is found as 1 separate document on OregonBuys.

ii. Under Attachment E – Additional Project Requirements, ADD:

· ATTACHMENT E-3: Geotechnical Report

Attachment E-3 is found as 1 separate document on OregonBuys.

B. Attachment D-1, Sample Construction Contract Form, Section 5, Exhibits, is modified as follows:

i. ADD Exhibit 9-Project Permits

ii. ADD Exhibit 10-Geotechnical Report

2. Attachment B, Technical Specifications are amended as follows:

A. Section 01010, paragraph 1.01, D is revised as follows, with added text shown in bold and underline and deleted text struck-through:

D. Specific items furnished by Owner and installed by Contractor:

0. CXT toilet buildings and vaults installed by Owner, Contractor responsible for site work including site preparation, grading, and paving.

Electrical kiosks panels, Contractor responsible for site work and installation.

Campsite pedestals (Parkmates), Contractor is responsible for site work, utilities, and installation.

All references to the ITB CLOSING DATE AND TIME REMAIN UNCHANGED.

Addendum prepared by:

Bryant Hayes Sr. Contracts Specialist Bryant.hayes@oprd.regon.gov

Prospective Bidders have until 2:00 PM on May 27, 2026 to submit written questions, requests for change, or protests regarding this Addendum.

1.

2.

3.

4.

5.

6.

1.

2.

3.

4.

5.

6.

End of Addendum 2

CLARIFICATIONS AND RESPONSE(S) TO QUESTIONS

The following provides OPRD’s answers to questions received from potential Bidders. The information provided below is for clarification purposes only and does NOT constitute a change to the solicitation documents or requirements.

QUESTION: Is cobble expected to be encountered during excavation or boring?

OPRD RESPONSE: The cobble stockpile noted in the corner of the day use parking lot is material imported from offsite for park operations. Please see Addendum 3, Attachment E-3 Geotechnical Report for more information about anticipated subsurface conditions.

QUESTION: Are the campsite pedestals furnished by Contractor or Owner?

OPRD RESPONSE: Campsite pedestals (Parkmates) will be Owner Furnished Contractor installed.

QUESTION: Are the existing culverts included on the plans?

OPRD RESPONSE: Existing culverts are included in the plans. Contractor may coordinate with OPRD to assist in field locating known culverts prior to commencement of directional boring.

QUESTION: Is the Contractor or Tillamook Public Utility District responsible for pulling primary from the pole to the transformer in C Loop?

OPRD RESPONSE: The Contractor is responsible for placing conduit, installing transformer pad, and coordinating with TPUD to perform their work. TPUD will pull primary and set transformer. See Addendum 2, Attachment E-2 for more information.

QUESTION: Are the electrical panels OFCI?

OPRD RESPONSE: No, the electrical panels will be furnished and installed by the Contractor. Electrical kiosks are OFCI.

QUESTION: Concerning the Mill & Inlay on Package #3, Is the existing asphalt more than 3 Inches where there will not be any re grading of rock if the mill grinds all the way through the asphalt? And if it does mill through the whole depth of asphalt will those areas need to be paved back in at 4 Inches as the other areas on rock are being paved?

OPRD RESPONSE: Please see pavement boring information included in Addendum 2, Attachment E-3 Geotechnical Report for information on pavement depths. If shallower asphalt is encountered during milling operations, Contractor shall coordinate with Project Manager to determine the extent of the area affected.

Addendum #2ITB #13440
OregonBuys #S-63400-00016792Cape Lookout State Park Parkwide Improvements