ADDENDUM 5 Attachment C - Revised Drawings Package 4 Loop C and D Utilities.pdf
PDF 3 MB Posted
- Solicitation number
- S-63400-00016792
- Issued by
- Tillamook County, Oregon
About this file
This is Addendum 5 attachment providing revised construction drawings for the Cape Lookout State Park Parkwide Improvements Project in Tillamook, Oregon, prepared by KPFF Consulting Engineers with a permit set expiration date of December 31, 2025. The addendum includes detailed civil construction notes, material specifications, and technical drawings for Loops C and D utilities work, specifically addressing demolition, earthworks, utility installation, water system requirements, and general construction standards. Key specifications include water and fire protection piping with minimum 36-inch cover to finish grade, trench backfill compaction to at least 95% maximum dry density per ASTM D-698, water main clearance requirements per Oregon State Health Department Chapter 333 regulations, and sanitary sewer crossing specifications requiring 18-inch minimum clearance between outside diameters with 10-foot horizontal separation for parallel installations. The drawings establish construction layout requirements based on a survey dated September 12, 2024, utilizing NAVD 88 vertical datum with control point elevations of 31.76 feet, and reference a soils report by GRI dated May 12, 2025. Contractor responsibilities include demolition of existing pavement and site elements, sediment and erosion control measures compliant with Tillamook County requirements, coordination with private utility companies, temporary and permanent traffic control, and maintenance of utilities to buildings throughout construction. All work must conform to 2021 Oregon Standard Specifications for Construction, the 2021 Oregon Plumbing Specialty Code, and applicable federal, state, and local codes and ordinances, with contractors required to notify the Oregon Utility Notification Center at least 48 business hours but not more than 10 business days prior to excavation.
The document specifies detailed material standards including resilient seated gate valves, HDPE vaults with polymer concrete covers meeting H-20 loading minimums, low-lead brass ball valves and fittings, PVC and PEX piping configurations, and composite lumber components with specifications for mounting and orientation. Yard hydrant installations must be certified to ASSE 1057 standards with backflow preventers, ADA-compliant turn handles, and replaceable moving parts accessible from the surface without excavation. The contractor bears responsibility for survey verification of existing site conditions, coordination of all work scheduling with the project owner, maintenance of roadways free of construction debris, and dust control throughout construction. All materials must be new with manufacturer substitutions requiring written approval from the engineer prior to installation. Special inspection is required for all compaction testing, and contractors must survey and record exact location and depth measurements of all subgrade utility improvements before backfilling, submitting documentation to both engineer and owner. The contract emphasizes strict adherence to OSHA regulations, protection of existing monumentation during construction, and immediate notification of the civil engineer upon discovery of any discrepancies between plan dimensions and field conditions.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
111 SW Fifth Ave., Suite 2400 Portland, OR 97204 O: 503.227.3251 F: 503.274.4681 www.kpff.com
PERMIT SET
EXPIRATION DATE:
OREGON
12/31/2025
79775
DEMOLITION
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION AND DISPOSAL OF EXISTING AC, CURBS, SIDEWALKS AND OTHER SITE ELEMENTS WITHIN THE SITE AREA IDENTIFIED IN THE PLANS.
2. EXCEPT FOR MATERIALS INDICATED TO BE STOCKPILED OR TO REMAIN ON OWNER'S PROPERTY, CLEARED MATERIALS SHALL BECOME CONTRACTOR'S PROPERTY, REMOVED FROM THE SITE, AND DISPOSED OF
PROPERLY.
3. ITEMS INDICATED TO BE SALVAGED SHALL BE CAREFULLY REMOVED AND DELIVERED STORED AT THE
PROJECT SITE AS DIRECTED BY THE OWNER.
4. ALL LANDSCAPING, PAVEMENT, CURBS AND SIDEWALKS, BEYOND THE IDENTIFIED SITE AREA, DAMAGED
DURING THE CONSTRUCTION SHALL BE REPLACED TO THEIR ORIGINAL CONDITION OR BETTER.
5. CONCRETE SIDEWALKS SHOWN FOR DEMOLITION SHALL BE REMOVED TO THE NEAREST EXISTING
CONSTRUCTION JOINT.
6. SAWCUT STRAIGHT MATCHLINES TO CREATE A BUTT JOINT BETWEEN THE EXISTING AND NEW PAVEMENT.
EARTHWORKS
1. CONTRACTOR SHALL PREVENT SEDIMENTS AND SEDIMENT LADEN WATER FROM ENTERING THE STORM
DRAINAGE SYSTEM AND WETLANDS.
2. TRENCH BEDDING AND BACKFILL SHALL BE AS SHOWN ON THE PIPE BEDDING AND BACKFILL DETAIL, THE
PROJECT SPECIFICATIONS AND AS REQUIRED IN THE SOILS REPORT.
UTILITIES
1. ADJUST ALL INCIDENTAL STRUCTURES, MANHOLES, VALVE BOXES, CATCH BASINS, FRAMES AND COVERS, ETC.
TO FINISHED GRADE.
2. CONTRACTOR SHALL ADJUST ALL EXISTING AND/OR NEW FLEXIBLE UTILITIES (WATER, TV, TELEPHONE, ELEC., ETC.) TO CLEAR ANY EXISTING OR NEW GRAVITY DRAIN UTILITIES (STORM DRAIN, SANITARY SEWER, ETC.) IF
CONFLICT OCCURS.
3. CONTRACTOR SHALL COORDINATE WITH PRIVATE UTILITY COMPANIES FOR THE INSTALLATION OF OR
ADJUSTMENT TO GAS, ELECTRICAL, POWER AND TELEPHONE SERVICE.
4. BEFORE BACKFILLING ANY SUBGRADE UTILITY IMPROVEMENTS CONTRACTOR SHALL SURVEY AND RECORD
MEASUREMENTS OF EXACT LOCATION AND DEPTH AND SUBMIT TO ENGINEER AND OWNER.
5. ALL WORK TO CONFORM TO THE 2021 OREGON PLUMBING SPECIALTY CODE.
WATER
1. ALL WATER AND FIRE PROTECTION PIPE SHALL HAVE A MINIMUM 36-INCH COVER TO THE FINISH GRADE.
2. ALL WATER AND FIRE PRESSURE FITTINGS SHALL BE PROPERLY RESTRAINED WITH THRUST BLOCKS PER
DETAIL.
3. ALL WATER MAIN / SANITARY SEWER CROSSINGS SHALL CONFORM TO THE OREGON STATE HEALTH
DEPARTMENT REGULATIONS, CHAPTER 333.
GENERAL
1. SUBGRADE AND TRENCH BACKFILL SHALL BE COMPACTED TO AT LEAST 95% OF THE MAXIMUM DRY DENSITY AS DETERMINED BY ASTM D-698. FLOODING OR JETTING THE BACKFILLED TRENCHES WITH WATER IS NOT
PERMITTED.
2. SPECIAL INSPECTION REQUIRED FOR ALL COMPACTION TESTING.
1. GENERAL: MATERIALS SHALL BE NEW. THE USE OF MANUFACTURER'S NAMES, MODELS, AND NUMBERS IS INTENDED TO ESTABLISH STYLE, QUALITY, APPEARANCE, AND USEFULNESS. PROPOSED SUBSTITUTIONS WILL
REQUIRE WRITTEN APPROVAL FROM ENGINEER PRIOR TO INSTALLATION.
2. PRIVATE WATER MAINS 4-INCH DIAMETER AND LARGER SHALL CONFORM TO THE PROJECT SPECIFICATIONS.
3. PRIVATE WATER LINES 3-INCH DIAMETER AND SMALLER SHALL CONFORM TO THE PROJECT SPECIFICATIONS.
ALL WATER MAIN CROSSINGS SHALL CONFORM TO THE OREGON STATE HEALTH DEPARTMENT, CHAPTER 333.
WATER MAINS SHALL CROSS OVER SANITARY SEWERS WITH A 18" MINIMUM CLEARANCE BETWEEN OUTSIDE DIAMETERS OF PIPE WITH ALL PIPE JOINTS EQUIDISTANT FROM CROSSING. HORIZONTAL SEPARATION BETWEEN WATER MAINS AND SANITARY SEWERS IN PARALLEL INSTALLATIONS SHALL BE 10'. MAINTAIN 12" MINIMUM VERTICAL DISTANCE FOR ALL OTHER UTILITY CROSSINGS AND 12" HORIZONTAL PARALLEL DISTANCE. IN CASES WHERE IT IS NOT POSSIBLE TO MAINTAIN THE MINIMUM 10' HORIZONTAL SEPARATION, THE WATER MAIN SHALL BE LAID ON A
SEPARATE SHELF IN THE TRENCH 18" INCHES ABOVE THE SEWER.
1. SURVEY PROVIDED BY KPFF, DATED 9/12/2024. ELEVATIONS ARE BASED ON NAVD 88 VERTICAL DATUM ESTABLISHED PER CONTROL POINT NO. 1 WITH AN ELEVATION OF 31.76' USING THE OREGON REAL-TIME GPS
NETWORK (ORGN)
2. CONSTRUCTION LAYOUT (ALL ACTUAL LINES AND GRADES) SHALL BE STAKED BY A PROFESSIONAL SURVEYOR, REGISTERED IN THE STATE OF OREGON, BASED ON COORDINATES, DIMENSIONS, BEARINGS, AND
ELEVATIONS, AS SHOWN, ON THE PLANS.
3. PROJECT CONTROL SHALL BE FIELD VERIFIED AND CHECKED FOR RELATIVE HORIZONTAL POSITION PRIOR TO
BEGINNING CONSTRUCTION LAYOUT. SEE SHEET C1.2 FOR PROJECT CONTROL INFORMATION.
4. PROJECT CONTROL SHALL BE FIELD VERIFIED AND CHECKED FOR RELATIVE VERTICAL POSITION BASED ON
THE BENCHMARK STATED HEREON, PRIOR TO BEGINNING CONSTRUCTION LAYOUT.
5. WHEN DIMENSIONS AND COORDINATE LOCATIONS ARE REPRESENTED - DIMENSIONS SHALL HOLD OVER COORDINATE LOCATION. NOTIFY THE CIVIL ENGINEER OF RECORD IMMEDIATELY UPON DISCOVERY.
6. CONTRACTOR SHALL PRESERVE AND PROTECT FROM DAMAGE ALL EXISTING MONUMENTATION DURING
CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING AND PAYING FOR THE
REPLACEMENT OF ANY MONUMENTS DAMAGED OR REMOVED DURING CONSTRUCTION. NEW MONUMENTS
SHALL BE REESTABLISHED BY A LICENSED SURVEYOR.
7. SURVEY MAY NOT BE COMPLETE OR ACCURATE. CONTRACTOR TO VERIFY EXISTING SITE CONDITIONS PRIOR TO CONSTRUCTION. CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE ATTENTION OF THE ENGINEER
PRIOR TO BEGINNING CONSTRUCTION.
8. CONTRACTOR TO REFERENCE SOILS REPORT BY GRI DATED 5/12/2025 FOR THE SITE SOILS CONDITIONS.
9. ALL CONSTRUCTION AND MATERIALS SHALL CONFORM TO THESE PLANS, THE PROJECT SPECIFICATIONS AND THE APPLICABLE REQUIREMENTS OF THE 2021 OREGON STANDARD SPECIFICATIONS FOR CONSTRUCTION, THE 2021 OREGON PLUMBING SPECIALTY CODE AND REQUIREMENTS OF TILLAMOOK COUNTY.
10. THE COMPLETED INSTALLATION SHALL CONFORM TO ALL APPLICABLE FEDERAL, STATE, AND LOCAL CODES, ORDINANCES AND REGULATIONS. ALL PERMITS, LICENSES AND INSPECTIONS REQUIRED BY THE GOVERNING AUTHORITIES FOR THE EXECUTION AND COMPLETION OF WORK SHALL BE SECURED BY THE CONTRACTOR
PRIOR TO COMMENCING CONSTRUCTION.
11. ATTENTION: OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH OAR 952-001-0090. YOU MAY OBTAIN COPIES OF THE RULES BY CALLING THE CENTER. (NOTE: THE TELEPHONE NUMBER FOR THE OREGON UTILITY NOTIFICATION CENTER IS (503) 232-1987). EXCAVATORS MUST NOTIFY ALL PERTINENT COMPANIES OR AGENCIES WITH UNDERGROUND UTILITIES IN THE PROJECT AREA AT LEAST 48 BUSINESS-DAY HOURS, BUT NOT MORE THAN 10 BUSINESS DAYS PRIOR TO COMMENCING AN EXCAVATION, SO UTILITIES MAY
BE ACCURATELY LOCATED.
12. THE LOCATION OF EXISTING UNDERGROUND UTILITIES SHOWN ON THE PLANS ARE FOR INFORMATION ONLY AND ARE NOT GUARANTEED TO BE COMPLETE OR ACCURATE. CONTRACTOR SHALL VERIFY ELEVATIONS, PIPE SIZE, AND MATERIAL TYPES OF ALL UNDERGROUND UTILITIES PRIOR TO COMMENCING WITH CONSTRUCTION AND SHALL BRING ANY DISCREPANCIES TO THE ATTENTION OF KPFF CONSULTING ENGINEERS, 72 HOURS
PRIOR TO START OF CONSTRUCTION TO PREVENT GRADE AND ALIGNMENT CONFLICTS.
13. THE ENGINEER OR OWNER IS NOT RESPONSIBLE FOR THE SAFETY OF THE CONTRACTOR OR THEIR CREW. ALL O.S.H.A. REGULATIONS SHALL BE STRICTLY ADHERED TO IN THE PERFORMANCE OF THE WORK.
14. TEMPORARY AND PERMANENT EROSION CONTROL MEASURES SHALL BE IMPLEMENTED. THE CONTRACTOR SHALL ADHERE TO TILLAMOOK COUNTY REQUIREMENTS FOR MINIMUM EROSION CONTROL MEASURES. THE ESC FACILITIES SHOWN IN THESE PLANS ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT LEAVE
THE SITE.
15. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ALL ROADWAYS, KEEPING THEM CLEAN AND FREE OF
CONSTRUCTION MATERIALS AND DEBRIS, AND PROVIDING DUST CONTROL AS REQUIRED.
16. TRAFFIC CONTROL SHALL BE PROVIDED BY THE CONTRACTOR THROUGHOUT CONSTRUCTION. CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN TO OPRD FOR REVIEW AND APPROVAL PRIOR TO COMMENCING
CONSTRUCTION.
17. CONTRACTOR SHALL MAINTAIN ALL UTILITIES TO BUILDING AT ALL TIMES DURING CONSTRUCTION. UNLESS
OTHERWISE COORDINATED WITH OWNER.
18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING AND SCHEDULING ALL WORK WITH THE
OWNER.
GENERAL NOTES CONSTRUCTION NOTES MATERIAL NOTES
SEPARATION STATEMENT
AC ASPHALT CONCRETE
AD AREA DRAIN
APPROX. APPROXIMATE
B BOLLARD
BLDG BUILDING
BOW BACK OF WALK
BS BOTTOM OF SWALE
BOTTOM OF STAIR
BW BOTTOM OF WALL
CB CATCH BASIN
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
CONC. CONCRETE
COTG CLEANOUT TO GRADE
CP CONTROL POINT
Δ DELTA
D/W DRIVEWAY
DIA.,Ø DIAMETER
DIP DUCTILE IRON PIPE
E EASTING
EXIST./EX EXISTING
FDC FIRE DEPARTMENT CONNECTION
FF FINISH FLOOR ELEVATION
FG FINISH GRADE
FH FIRE HYDRANT
FL FLOWLINE
FND FOUNDATION
G GUTTER
GB GRADE BREAK
GL GAS LINE
GV GATE VALVE
H HEIGHT
HCP HANDICAP PARKING SPACE
HP HIGH POINT
ID INSIDE DIAMETER
IE INVERT ELEVATION
INV INVERT
IRR. IRRIGATION
LP LIGHT POLE
MH MANHOLE
MIN MINIMUM
N NORTHING
OD OUTSIDE DIAMETER
OF OUTFALL
OVH/OH OVERHEAD
P/L PROPERTY LINE
PC POINT OF CURVATURE
PCC POINT OF COMPOUND CURVATURE
PCR POINT OF CURB RETURN
PED PEDESTRIAN
PIV POST INDICATOR VALVE
PM PARKING METER
POC POINT ON CURVE
PP POWER POLE
PRC POINT OF REVERSE CURVATURE
PT POINT OF TANGENT
PUE PUBLIC UTILITY EASEMENT
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
PVT PRIVATE
R RIM
RD ROOF DRAIN
ROW RIGHT-OF-WAY
S SLOPE (FT/FT)
SD STORM DRAIN
SDMH STORM DRAIN MANHOLE
SHT SHEET
SS SANITARY SEWER
SSMH SANITARY SEWER MANHOLE
ST STREET
STA STATION
STD STANDARD
S/W SIDEWALK
TC TOP OF CURB
TD TRENCH DRAIN
TG TOP OF GROUND
TP TOP OF PAVEMENT
TRANS. TRANSFORMER
TS TOP OF STAIR
TW TOP OF WALL
TOP OF WALK
TYP TYPICAL
UG UNDERGROUND
UGE UNDERGROUND ELECTRIC
UNO UNLESS NOTED OTHERWISE
W WATER
W/ WITH
WCR WHEEL CHAIR RAMP
WM WATER METER
WV WATER VALVE
ABBREVIATIONS
5/
/2
A D
D
P S
6/
/2
A D
D
P
SADDENDUM 5
: 12/31/202
4" M
IN
(6 " I
N
RO
CK
D/2
12"
UNPAVED
AREAS
PAVED
AREAS
6"
6"
MIN.
6"
MIN.
" M
IN
(IF
IE
IS
N
O T
PR
O
VI
DE
D)
D
12"
SA
TI
SF
AC
TO
RY
SO
IL
M
AT
ER
IA
L
IE
D
EP
TH
P
ER
P
LA
N
FI
NA
L
TR
EN
CH
BA
CK
FI
LL
(V
AR
Y)
IN
IT
IA
L
TR
EN
CH
BA
CK
FI
LL
BE
DD
IN
G
DETECTABLE
WARNING TAPE
RESURFACING MATCH
EXISTING PAVEMENT
SECTION
SAWCUT
LINE
EXISTING AC
PAVEMENT
SCALE: NTS1 TYPICAL PIPE BEDDING AND BACKFILL
6"
TRACER WIRE
CL
SCALE: NTS3 UTILITY CONNECTION LAYOUT RV HOOKUP
SCALE: NTS4 YARD HYDRANT
NOTES:
1. SANITARY TYPE YARD HYDRANT SHALL BE APPROVED BY OPRD PRIOR TO ORDERING.
2. YARD HYDRANTS SHALL BE CERTIFIED TO ASSE 1057 SANITARY YARD HYDRANT STANDARD.
3. YARD HYDRANTS SHALL BE SUPPLIED WITH A BACKFLOW PREVENTER AND ADA TURN HANDLE HOSE BIB. THE
INLET OF THE HYDRANT SHALL BE 3/4 FIP AND THE OUTLET SHALL BE 3/4 HOSE THREAD.
4. ALL MOVING PARTS ARE TO BE REPLACEABLE FROM THE SURFACE WITHOUT THE NEED TO EXCAVATE HYDRANT.
5. YARD HYDRANT SHALL OPERATE AT A MINIMUM OPERATING PRESSURE OF 20 PSI AND A MAX. OF 100 PSI.
6. YARD HYDRANT SHALL HAVE LOCKABLE HANDLE. PROVIDE SUBMITTAL TO OPRD FOR REVIEW AND APPROVAL.
7. COMPOSITE LUMBER COLOR TO BE COORDINATED WITH OWNER PRIOR TO CONSTRUCTION STARTING.
STANDARD RV ELECTRICAL
PANEL HOOK UP. SEE ELECTRICAL
PLANS FOR MORE DETAILS. ORIENT
TOWARD STALL.
CONFORM TO MANUFACTURERS
RECOMMENDATIONS FOR MOUNTING,
BOLT PATTERN AND BLOCKOUT.
STANDARD 6"X6" FREEZE PROOF
RV WATER HOOKUP. SEE DETAIL 4.
SEE NOTE 1. ORIENT PARALLEL TO STALL
2'x2'x6" THICK CONCRETE PAD
DETAIL A
NOTES:
1. CONFIRM LOCATION AND FINAL LAYOUT WITH OWNER.
E
24"
24" MIN
RESILIENT SEATED GATE
VALVE. SIZE AS SHOWN
ON PLANS.
PIPE SIZE AS SHOWN
ON PLANS
4" PVC
SCALE: NTS2 GATE VALVE
6" MIN.
2" MIN.
RISER O.D.
+ 12" MIN.
#4 HOOP CENTERED IN
3000 PSI CONCRETE
PAD.
CAST IRON FRAME
SET IN CONCRETE
CAST IRON FRAME AND
COVER TO FINISHED GRADE IN
PAVED AREAS
HARD SURFACE LANDSCAPE AREA
AC PVM'T OR CONC. PAVING OR
OTHER SURFACING
1" MAX.
PROVIDE 14" MIN.
CLEARANCE FOR
CONCRETE PAD AND
RISER PIPE
4" MIN.
BOX CENTERED
ON VALVE
FINISH GRADE
SECTION
4"
MIN.
12" MIN.
DRAIN
ROCK
30"
MIN.
NOTES:
1. TYPICAL PIPE CONFIGURATION SHOWN, SEE PLAN FOR ACTUAL CONFIGURATION. CONFIRM VAULT
LOCATION WITH OWNER.
2. VAULT SHALL BE HDPE WITH POLYMER CONCRETE (H-20 LOADING MIN) COVER BY OLDCASTLE.
CARSON OLDCASTLE MODEL MSBCF-1118-18XL OR APPROVED EQUAL.
3. INSTALL VALVES 3" MIN. CLR FROM VAULT WALL AND TEES.
NOTE 2
PLAN (INSIDE VAULT)
VALVE, TYP.
(BALL OR GATE VALVE
DEPENDING ON SIZE)
FLOW
SCALE: NTS6 WATER JUNCTION VALVE BOX
36"
3/4" SHARKBITE BRASS PUSH MALE
ADAPTER ELBOW (SHARKBITE X MALE MIP)
3/4" MALE THREADED BRASS BALL VALVE (LOW LEAD)
WITH FEMALE UNIONS (LOW LEAD) ON EACH SIDE,
WITH STAINLESS STEEL T-HANDLE.
3/4" QUARTER BEND BRASS
FITTING (COMPRESSION
CTS X MIP) MULLER
H15531N OR EQUAL.
NEW 3/4" WATER
SUPPLY LINE.
FURNISH & INSTALL
(2) 3/8" INSERT ON
COMPRESSION
FITTINGS (MCDONALD
6133T) OR EQUAL.
CONCRETE PAD. FLUSH WITH
ADJACENT PAVEMENT OR
FINISH GRADE.
SEE DETAIL 3
LOW LEAD HOSE BIB WITH ADA COMPLIANT AND LOCKABLE
HANDLE. ARROWHEAD BRASS MODEL 353BVLF WITH ARROWHEAD
BRASS MODEL 58ABP BRASS VACUUM BREAKER, OR EQUAL.
PROVIDE ALL HARDWARE TO MOUNT TO PEDESTAL. ORIENT
TOWARD CAMPING STALL
" M
IN
2'X2'X6" HDPE DRYWELL / DRAIN
WITH DRAIN ROCK. BUILD DIRECTLY
IN LINE WITH SPOUT
2"X6" COMPOSITE LUMBER
6"X6" HDPE SQUARE CAP
3/4" GALVANIZED 90° BEND
15/16" X 1/4" X 1/8" THICK
TEFLON WASHER
BRACE PIPE TO POST
EVERY 24"
VALVE BOX AND COVER
SEE DETAIL 6/C7.1
WATER VALVE BOX. SEE DETAIL 4.
SEE NOTE 1.
WATER DRYWELL / DRAIN. SEE DETAIL 4.
SEE NOTE 1.
48" MIN
EDGE OF RV CAMPING STALL
ELECTRICAL HOOK UP. SEE
ELECTRICAL PLANS FOR
DETAILS AND DETAIL 3.
3/4" GALVANIZED PIPE
4"X6" COMPOSITE LUMBER
DETAIL A
4"X6"
COMPOSITE
LUMBER
2"X6"
COMPOSITE
LUMBER
LAG SCREW
EVERY 14" (TYP)
1.5" DEEP, 2" WIDE CUT
OUT FOR 3/4" PIPE
BRACING
3/4" PIPE
3/4" GALVANIZED NIPPLE
PRE DRILL & COUNTERSINK
1/4" GALVANIZED HEX HEAD
LAG SCREW (TYP)
3/4" COMPRESSION BY
MALE PIPE THREAD W/ A
FEMALE PIPE THREAD
COUPLER
3/4" PEX WATER LINE
SEE DETAIL A FOR
SECTION CUT OF
COMPOSITE LUMBER
AND PIPE ATTACHMENT
111 SW Fifth Ave., Suite 2400 Portland, OR 97204 O: 503.227.3251 F: 503.274.4681 www.kpff.com
PERMIT SET
EXPIRATION DATE:
OREGON
12/31/2025
79775
6"
5/
/2
A D
D
P S
6/
/2
A D
D
P S
ADDENDUM 5
| C0.1 CIVIL NOTES |
| C7.1 DETAILS |
File details come from the government source that posted it. Updated .