ADDENDUM 3 Attachment A-2 Pricing Form.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
ITB 13440 Cape Lookout State Park Parkwide Improvements Project
Solicitation number
S-63400-00016792
Issued by
Tillamook County, Oregon

About this file

This is Addendum 3 Attachment A-2, a pricing form for Invitation to Bid (ITB) 13440 issued by the Oregon Parks and Recreation Department (OPRD) for the Cape Lookout State Park Parkwide Improvements Project. The project comprises three construction packages: Package 1 includes day use parking lot improvements with 55 line items covering mobilization, demolition, asphalt and concrete paving, curbing, sidewalks, stormwater management infrastructure, utilities, electrical work, landscaping, and site amenities; Package 3 addresses Loop D paving with 12 line items for pavement removal and asphalt paving across approximately 72,600 square feet; and Package 4 consists of 13 line items for waterline installation and site electrical work for Loops C and D. Key project deliverables include 132,500 square feet of asphalt excavation, 3,350 cubic yards of general excavation, 1,950 tons of asphalt paving, 15,560 square feet of concrete sidewalk, and 4,700 linear feet of 3-inch waterline. The voluntary pre-bid conference is scheduled for May 18, 2026, at 11:00 AM at Cape Lookout State Park in Tillamook, Oregon. Requests for clarifications must be submitted by May 27, 2026, at 2:00 PM, with electronic bid submissions required through the OregonBuys system by June 3, 2026, at 2:00 PM. Project start is upon Notice to Proceed, with substantial completion required by December 1, 2026, and final completion by December 31, 2026.

Bidders must enter pricing for all line items in the form, with bid prices representing total contract cost including contractor profit and overhead. The OPRD reserves the right to adjust quantities or delete items as needed, with payment based on actual measured quantities rather than estimated quantities listed in the form. Bid security equal to 10% of the total bid amount is required, and the successful bidder must provide performance and payment bonds each equal to 100% of the contract amount within seven days of award notification. All bidders and subcontractors must be registered with the Oregon Construction Contractors Board (CCB) prior to bid submission or work commencement. The OPRD is exempt from Oregon's Public Contracting Code, including prevailing wage requirements. While no formal set-asides are mandated, bidders are encouraged to utilize certified disadvantaged businesses, minority-owned businesses, women-owned businesses, emerging small businesses, and veteran-owned businesses as subcontractors. No incumbent vendors or current contractors are identified. Liquidated damages are assessed at $1,000 per calendar day for each day beyond substantial completion. Project funding is anticipated from state sources, contingent upon the agency's receipt of sufficient project funding, with no specific budget amount or award value range disclosed in the solicitation documents.

View the file

Other files

File Type Posted
Attachment A-2 Pricing Form~2.xlsx XLSX spreadsheet
Addendum 4 to ITB 13440 Cape Lookout State Park Parkwide Improvements Project.docx DOCX document
ADDENDUM 5 Attachment C - Revised Drawings Package 4 Loop C and D Utilities.pdf PDF
ADDENDUM 5 Attachment A-2 Pricing Form.xlsx XLSX spreadsheet
ADDENDUM 5 Attachment C - Revised Drawings Package 1 Day Use Parking Lot Improvements.pdf PDF
Attachment C Plans and Drawings_Package 1 Day Use Parking Lot Improvements.pdf PDF
Attachment B Technical Specifications - Cape Lookout State Park Parkwide Improvements.pdf PDF
Attachment C Plans and Drawings_Package 4 Loop C and D Utilities.pdf PDF
Addendum 1 to ITB 13440 Cape Lookout State Park Parkwide Improvements Project.docx DOCX document
ADDENDUM 2 Attachment E-3 Geotechnical Report.pdf PDF
ITB 13440 Cape Lookout Parkwide Improvements~1.docx DOCX document
Addendum 2 to ITB 13440 Cape Lookout State Park Parkwide Improvements Project.docx DOCX document
ADDENDUM 3 Attachment C - Revised Drawings Package 3 Loop D Paving.pdf PDF
Addendum 5 to ITB 13440 Cape Lookout State Park Parkwide Improvements Project_.docx DOCX document
Addendum 3 to ITB 13440 Cape Lookout State Park Parkwide Improvements Project-2.docx DOCX document
ADDENDUM 3 Attachment C - Revised Drawings Package 1 Day Use Parking Lot Improvements.pdf PDF
Attachment E-1 Inadvertent Discovery Plan .pdf PDF
ADDENDUM 2 Attachment E-2 Project Permits.pdf PDF
13440 Pre-bid sign in.pdf PDF
ADDENDUM 3 Attachment C - Revised Drawings Package 4 Loop C and D Utilities.pdf PDF
Attachment C Plans and Drawings_Package 3 Loop D Paving.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ATTACHMENT A
FORM A-2 - PRICING FORM
ITB 13440
CAPE LOOKOUT PARKWIDE IMPROVEMENTS
PRICING SUBMITTAL FORM
PRICING SUBMITTAL INSTRUCTIONS: Bidders shall enter pricing and other required information for all Bid Items listed in this Pricing Submittal Form. If this Pricing Submittal Form is replaced by Addendum, Bidders shall use the Addendum form to provide pricing and other required information. If the Pricing Submittal Form is only modified by Addendum, then Bidders shall follow the instructions in the Addendum for making modifications to the Pricing Submittal Form. Failure to supply the required information in the Pricing Submittal Form as modified by subsequent Addenda may result in Bid rejection as non-responsive.

Note: Bid price is total contract price including contractor's profit and overhead. All work described in the Contract Documents but not specifically itemized in the Pricing below is considered incidental to the Work.

The undersigned understands that the State reserves the right to increase or decrease the above quantities at the same unit prices as show or to remove items as necessary to meet budgetary constraints. The undersigned has carefully examined the Contract Documents and the site of the work, ang agrees to furnish all necessary plant, labor, equipment, accessories, materials, permits, temporary facilities and perform all operations shown and specified in accordance with the Contract Documents for the price(s) set herein.

The quantities listed in Pricing Submittal Form are intended to serve only as a guide to Bidders and are not to be construed as a guarantee. All quantities are estimated and are for Bid purposes only. All quantities are "in place" or "installed". OPRD reserves the right to adjust quantities or delete items as needed. Payment will be made based on actual, measured quantities.
Item #DescriptionQuantityUnitUnit CostTotal Cost
Package 1 - Day Use Parking Improvements
BASE BID
1.1Mobilization1LS$ - 0
1.2Planning, Design & Permits1LS$ - 0
1.3Survey - Project Stakeout1LS$ - 0
1.4Erosion Control1LS$ - 0
1.5Traffic Control1LS$ - 0
1.6Demolition, Clearing and Grubbing1LS$ - 0
1.7Tree Removal & Protection1LS$ - 0
1.8Asphalt Excavation132,500SF$ - 0
1.9General Excavation and Earthwork3,350CY$ - 0
1.10Rock Excavation170CY$ - 0
1.11Over Excavation170CY$ - 0
1.12Base Rock or Shoulder Rock3500TON$ - 0
1.13Gravel Driveway35TON$ - 0
1.14Asphalt Paving - Leveling and Wearing Courses1950TON$ - 0
1.15Concrete Paving115CY$ - 0
1.16Pavement Markings - Painted Striping1LS$ - 0
1.17Pavement Markings - Thermoplastic Markings - Symbols21EA$ - 0
1.18Standard Curb4,150LF$ - 0
1.19Flush Curb1,100LF$ - 0
1.20Curb Cut34EA$ - 0
1.21Concrete Sidewalk15,560SF$ - 0
1.22Asphalt Sidewalk10TON$ - 0
1.23Precast Concrete Wheel Stops78EA$ - 0
1.24Gravity Storm Sewer - 6 Inch260LF$ - 0
1.25Gravity Storm Sewer - 8 Inch505LF$ - 0
1.2648" Manhole - Flat Top Manhole1EA$ - 0
1.27Catch Basin5EA$ - 0
1.28Cleanout to Grade11EA$ - 0
1.29Outfall2EA$ - 0
1.30Overflow Inlet7EA$ - 0
1.31Stormwater - Planter5,700SF$ - 0
1.32Stormwater - Facility1,800SF$ - 0
1.33Stormwater - Swale2,310SF$ - 0
1.34Stormwater - Culvert (Revised Addendum 3)3EA$ - 0
1.35Stormwater - Check Dam19EA$ - 0
1.36Stormwater - Planter Wall900LF$ - 0
1.37Waterline - 3/4 Inch20LF$ - 0
1.38Waterline - 1 Inch165LF$ - 0
1.39Waterline - Yard Hydrant2EA$ - 0
1.40Site Electrical1LS$ - 0
1.41Landscape - Top Soil860CY$ - 0
1.42Landscape - Seeding8,500SF$ - 0
1.43Landscape - General - Plantings1LS$ - 0
1.44Landscape - Stone Veneer Faced Seat Wall1LS$ - 0
1.45Landscape - Stone Paving Band1LS$ - 0
1.46Landscape - Split Rail Fence1LS$ - 0
1.47Landscape - Rock Steps1LS$ - 0
1.48Bollards5EA$ - 0
1.49Picnic Tables - Relocate2EA$ - 0
1.50Signs - Relocate1LS$ - 0
1.51Signs - New1LS$ - 0
1.52Pay Station - Relocate1LS$ - 0
1.53Pay Station - Install1LS$ - 0
1.54Electric Car Charging - Relocate1LS$ - 0
1.55Excavate, Base Preparation and Backfill for CXT Vault Toilet2EA$ - 0
PACKAGE 1 TOTAL$ - 0
Package 3 - Loop D Paving
BASE BID
3.1Mobilization1LS$ - 0
3.2Planning, Design & Permits1LS$ - 0
3.3Survey - Project Stakeout1LS$ - 0
3.4Erosion Control1LS$ - 0
3.5Traffic Control1LS$ - 0
3.6Demolition, Clearing and Grubbing1LS$ - 0
3.7Asphalt Excavation6,675SF$ - 0
3.83" Cold Plane Pavement Removal62,300SF$ - 0
3.9Base Rock or Shoulder Rock950TON$ - 0
3.10Asphalt Paving - Leveling and Wearing Courses1,390TON$ - 0
3.11Pavement Markings - Thermoplastic Markings - Symbols17EA$ - 0
3.12Precast Concrete Wheel Stops71EA$ - 0
PACKAGE 3 TOTAL$ - 0
Package 4 - Loop C & D Utilities
BASE BID$ - 0
4.1Mobilization1LS$ - 0
4.2Planning, Design & Permits1LS$ - 0
4.3Survey - Project Stakeout1LS$ - 0
4.4Erosion Control1LS$ - 0
4.5Traffic Control1LS$ - 0
4.6Demolition, Clearing and Grubbing1LS$ - 0
4.7Tree Removal & Protection1LS$ - 0
4.8Asphalt Excavation400SF$ - 0
4.9Waterline - 3/4 Inch2,450LF$ - 0
4.10Waterline - 1 1/2 Inch105LF$ - 0
4.11Waterline - 3 Inch4,700LF$ - 0
4.12Waterline - Yard Hydrant75EA$ - 0
4.13Site Electrical1LS$ - 0
PACKAGE 4 TOTAL$ - 0

TOTAL BID (Sum of Package 1, Package 3 and Package 4 Totals) $ - 0

By (Bidder Company Name and Authorized Signer Name) Date

File details come from the government source that posted it. Updated .