This is Addendum 3 to Invitation to Bid (ITB) 13440 issued by the Oregon Parks and Recreation Department (OPRD) for the Cape Lookout State Park Parkwide Improvements Project. The addendum modifies the original ITB by revising the pricing form, amending technical specifications for electrical work, and replacing multiple plan sheets across the three construction packages. Specifically, the addendum revises Section 16050 regarding basic electrical materials and methods to permit Schedule 80 PVC or rigid metal conduit in exposed areas, updates electrical plan sheet keynotes to reference Section 16050 instead of Section 262726 for pedestal information, and replaces 18 revised drawing sheets across Package 1 (day use parking lot improvements), Package 3 (Loop D paving), and Package 4 (Loop C and D utilities). The addendum extends the bid closing date from the original June 3, 2026, at 2:00 PM to June 4, 2026, at 2:00 PM (PT), providing bidders additional time to prepare accurate cost proposals accounting for the project's complexity and supplier coordination requirements.

The addendum also provides clarifications to 18 bidder questions addressing subsurface conditions, equipment ownership and installation responsibilities, utility coordination procedures, electrical panel specifications, pavement depths, stormwater infrastructure details, and material specifications. Key responses confirm that campsite pedestals will be owner-furnished and contractor-installed, that contractors must coordinate with Tillamook Public Utility District for transformer installation while TPUD handles primary line pulling, that Schedule 80 PVC is acceptable for exposed electrical connections at kiosks, and that electrical plan review by Tillamook County has not been completed as of the addendum date. The clarifications address technical questions regarding culvert quantities, stormwater basin locations, concrete pad fabrication methods for RV pedestals, yurt panel connections, and stormwater planter details, ensuring bidders have comprehensive project information necessary for accurate proposal submission.

View the file

Other files

File Type Posted
Attachment A-2 Pricing Form~2.xlsx XLSX spreadsheet
Addendum 4 to ITB 13440 Cape Lookout State Park Parkwide Improvements Project.docx DOCX document
ADDENDUM 5 Attachment C - Revised Drawings Package 4 Loop C and D Utilities.pdf PDF
ADDENDUM 5 Attachment A-2 Pricing Form.xlsx XLSX spreadsheet
ADDENDUM 5 Attachment C - Revised Drawings Package 1 Day Use Parking Lot Improvements.pdf PDF
Attachment C Plans and Drawings_Package 1 Day Use Parking Lot Improvements.pdf PDF
Attachment B Technical Specifications - Cape Lookout State Park Parkwide Improvements.pdf PDF
ADDENDUM 3 Attachment A-2 Pricing Form.xlsx XLSX spreadsheet
Attachment C Plans and Drawings_Package 4 Loop C and D Utilities.pdf PDF
Addendum 1 to ITB 13440 Cape Lookout State Park Parkwide Improvements Project.docx DOCX document
ADDENDUM 2 Attachment E-3 Geotechnical Report.pdf PDF
ITB 13440 Cape Lookout Parkwide Improvements~1.docx DOCX document
Addendum 2 to ITB 13440 Cape Lookout State Park Parkwide Improvements Project.docx DOCX document
ADDENDUM 3 Attachment C - Revised Drawings Package 3 Loop D Paving.pdf PDF
Addendum 5 to ITB 13440 Cape Lookout State Park Parkwide Improvements Project_.docx DOCX document
ADDENDUM 3 Attachment C - Revised Drawings Package 1 Day Use Parking Lot Improvements.pdf PDF
Attachment E-1 Inadvertent Discovery Plan .pdf PDF
ADDENDUM 2 Attachment E-2 Project Permits.pdf PDF
13440 Pre-bid sign in.pdf PDF
ADDENDUM 3 Attachment C - Revised Drawings Package 4 Loop C and D Utilities.pdf PDF
Attachment C Plans and Drawings_Package 3 Loop D Paving.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM #3

OregonBuys # S-63400-00016792

ITB # 13440

Cape Lookout State Park Parkwide Improvements Project

This Addendum 3 modifies the Invitation to Bid (“ITB”) only to the extent indicated herein. All other areas not specifically mentioned or affected by this Addendum 3 shall remain in full force and effect. This Addendum shall be added as a part of the original ITB document(s) and shall become part of the work required.

ADDENDUM

1. ATTACHMENT A, FORM A-2 PRICING FORM is DELETED in its entirety and REPLACED with ATTACHMENT A, FORM A-2 PRICING FORM (Revised Addendum 3), which is found as a separate document on OregonBuys.

2. ATTACHMENT B – TECHNICAL SPECIFICATIONS are amended as follows:

A. Section 16050 - BASIC ELECTRICAL MATERIALS & METHODS, PART 2 - PRODUCTS, Section 2.01 RACEWAYS AND FITTINGS, B. is revised as follows, with added language shown in bold and underline:

B. Aboveground Conduit:

1. Exposed raceways shall be rigid metal conduit (“RMC”) or Schedule 80 PVC, unless otherwise approved by the Project Manager, or required by the local electric utility company or the permitting authority having jurisdiction.

2. Raceway between vibrating equipment and outlet boxes shall be liquid tight flexible metallic conduit.

3. ATTACHMENT C – PLANS AND DRAWINGS is revised as follows, with added language shown in bold and underline:

A. Electrical plans in Package 4, plan sheets E0.01 through E7.03:

i. Where Sheet Keynote states “REFER TO SPECIFICATION SECTION 262726 FOR PEDESTAL INFORMATION” the Keynote shall be replaced with the following: “REFER TO SPECIFICATION SECTION 16050 FOR PEDESTAL INFORMATION”

B. ATTACHMENT C – PLANS AND DRAWINGS is amended to delete and replace the following sheets. Replacement sheets are provided in Addendum 3, Attachment B - Revised Drawings, which is found as a separate file in OregonBuys:

i. Package 1 - Day Use Parking Lot Improvements

· C3.1

· C3.2

· C3.3

· C4.2

· C6.3

· E0.01

ii. Package 3 – Loop D Paving

· C2.0

· C2.1

· C2.2

· C2.3

· C2.4

· C3.0

iii. Package 4 - Loop C & D Utilities

· C0.1

· C2.0

· C2.1

· C2.2

· C2.3

· C2.4

· C2.5

· C2.6

· C7.1

· C8.2

· C8.3

All references to the ITB CLOSING DATE are changed to:

June 4, 2026 at 2:00PM (PT)

Addendum prepared by:

Bryant Hayes Sr. Contracts Specialist Bryant.hayes@oprd.regon.gov

1.

2.

3.

4.

5.

6.

1.

2.

3.

4.

5.

6.

End of Addendum 3

CLARIFICATIONS AND RESPONSE(S) TO QUESTIONS

The following provides OPRD’s answers to questions received from potential Bidders. The information provided below is for clarification purposes only and does NOT constitute a change to the solicitation documents or requirements.

QUESTION: Is cobble expected to be encountered during excavation or boring?

OPRD RESPONSE: The cobble stockpile noted in the corner of the day use parking lot is material imported from offsite for park operations. Please see Addendum 3, Attachment E-3 Geotechnical Report for more information about anticipated subsurface conditions.

QUESTION: Are the campsite pedestals furnished by Contractor or Owner?

OPRD RESPONSE: Campsite pedestals (Parkmates) will be Owner Furnished Contractor installed.

QUESTION: Are the existing culverts included on the plans?

OPRD RESPONSE: Existing culverts are included in the plans. Contractor may coordinate with OPRD to assist in field locating known culverts prior to commencement of directional boring.

QUESTION: Is the Contractor or Tillamook Public Utility District responsible for pulling primary from the pole to the transformer in C Loop?

OPRD RESPONSE: The Contractor is responsible for placing conduit, installing transformer pad, and coordinating with TPUD to perform their work. TPUD will pull primary and set transformer. See Addendum 2, Attachment E-2 for more information.

QUESTION: Are the electrical panels OFCI?

OPRD RESPONSE: No, the electrical panels will be furnished and installed by the Contractor. Electrical kiosks are OFCI.

QUESTION: Concerning the Mill & Inlay on Package #3, Is the existing asphalt more than 3 Inches where there will not be any re grading of rock if the mill grinds all the way through the asphalt? And if it does mill through the whole depth of asphalt will those areas need to be paved back in at 4 Inches as the other areas on rock are being paved?

OPRD RESPONSE: Please see pavement boring information included in Addendum 2, Attachment E-3 Geotechnical Report for information on pavement depths. If shallower asphalt is encountered during milling operations, Contractor shall coordinate with Project Manager to determine the extent of the area affected.

QUESTION: The bid list provided shows (11) cleanouts. I am only finding 6. Am I missing something or are there only 6? I see the cleanouts on the end of the planter runs (5), and (1) cleanout shown on the mainline pipe.

OPRD RESPONSE: Cleanouts: There are cleanouts at beginning of each planter run on the perforated pipe (detail on Sheet C6.4). There are also cleanouts at the beginning of each carrier pipe (detail on Sheet C6.5).

QUESTION: Bid list calls for 3LF of Stormwater Culvert (bid item 1.34) – not seeing it on the plans. Can you confirm what page this is referencing?

OPRD RESPONSE: Culverts: Culverts are located under the walkway for three of the storm treatment swales. Bid table should be corrected to 3 Each instead of 3 LF. See Addendum 3, ATTACHMENT A, FORM A-2 PRICING FORM (Revised Addendum 3).

QUESTION: On the plan view I see profiles for the Overflow Basins (OV-1 through OV-4) and OV-07. Not seeing information on OV5 and OV6. Can you confirm?

OPRD RESPONSE: OV-05 and OV-06 are located on Sheet C4.1

QUESTION: Can you provide a detail for the concrete pad required for attachment of RV pedestals?

OPRD RESPONSE: See Addendum 3, Attachment C - Revised Plans and Drawings for RV pedestal detail.

QUESTION: Can these be pre-cast?

OPRD RESPONSE: Yes, they can be prefabricated. The contractor can select their preferred method to provide concrete pads that conform with the drawings, specifications and manufacturer’s installation requirements.

QUESTION: Is schedule 80 PVC acceptable in exposed areas where connecting to service equipment at kiosks? Similar to other State Park locations along the coast?

OPRD RESPONSE: Yes. See revision to Attachment B Technical Specifications in Addendum 3.

QUESTION: Has electrical plan review been completed by Tillamook county? This can slow the permitting process down if done after contract award.

OPRD RESPONSE: No, Tillamook County has not reviewed the plans. TPUD has reviewed the plans. Trade permits are the responsibility of the Contractor.

QUESTION: Are there details/size requirements for polymer/concrete in-ground j-boxes where shown on the plans?

OPRD RESPONSE: See Addendum 3 Attachment C-Revised Plans and Drawings for more information.

QUESTION: Does Tillamook PUD have a design plan available for this project? Available Inrush Currents for each of the 3 new service locations?

OPRD RESPONSE: See Addendum 2, Attachment E-2 Tillamook PUD Work Order and Service Agreement. The Contractor is responsible for coordinating with TPUD, calling for inspections, procuring and installing any equipment or other work required to be installed by “Customer” in the Electric Service checklist within Attachment E-2, unless otherwise noted in the Plans and Specifications.

QUESTION: Do all of the Yurts have existing sub-panels to connect the 60amp sub-feed circuits to?

OPRD RESPONSE: Yurt sub panels are existing to remain.

QUESTION: I see 4/0 feeder conductors called out for on the plans to connect from the 60 amp breakers out to the Yurt panels. This size conductor would likely be too large to connect to the lugs on both ends. Is the expectation to splice these conductors to smaller conductors to connect to the circuit breakers and lugs at yurt panel?

OPRD RESPONSE: Provide splicing as needed for the Yurt connections.

QUESTION: Due to the complexity of the project and getting supplier and subcontractor quotes, please consider extending the bid by one week so we can provide a more accurate quote.

OPRD RESPONSE: See Addendum 3 for updated bid close date.

QUESTION: Is there landscape irrigation required for this project?

OPRD RESPONSE: No, watering requirements during construction are outlined in ATTACHMENT B Technical Specifications, Section 02910 -GENERAL LANDSCPAPE AND MAINTENANCE.